Loading...
TC 11-23-20 Meeting Agenda1.Capital Improvement Program Update 1.A.Capital Improvement Program Update 2.VTRANS Update 2.A.VTRANS Update 3.County Project Updates 3.A.County Project Updates 4.Other 4.A.Other AGENDA TRANSPORTATION COMMITTEE MONDAY, NOVEMBER 23, 2020 8:30 AM BOARD OF SUPERVISORS ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA TC11-23-20CapitalImprovementProgramUpdate.pdf TC11-23-20VTRANSUpdate.pdf TC11-23-20CountyProjectUpdates.pdf TC11-23-20Other.pdf 1 Transportation Committee Agenda Item Detail Meeting Date: November 23, 2020 Agenda Section: Capital Improvement Program Update Title: Capital Improvement Program Update Attachments: TC11-23-20CapitalImprovementProgramUpdate.pdf 2 Item 1: Capital Improvement Program Update Topic Synopsis Staff will be discussing the update of the transportation portion of the County’s Capital Improvement Program update. Analysis Attached please find the transportation portion of the County’s current Capital Improvement Program. At this time, with the Comprehensive Plan update scheduled for next year and the current round of SmartScale applications still pending staff is recommending few changes. Those recommended changes are as follows: 1. Removal of item 2, Crossover Blvd. & Bridge of I-81 due to the expectation that it will be nearing completion by the time the new Capital Improvement Program is adopted. Note: While project 1, Route 277 Widening and Safety Improvements (PH 1) is also under construction, it is very early in the project which is why staff is not recommending that that project be removed at this time. 2. Update of costs to adjust for inflation. 3.Update of Redbud Road costs to reflect VDOT analysis of that project which is expected to be completed shortly. Recommended Action Approval 3 £¤522 £¤11 £¤522 £¤11 £¤50 £¤50 £¤11 £¤522 §¨¦81 §¨¦81 ¬«277 ¬«7 ¬«37 Winche ster Steph ensCity 0 1 20.5 Miles Frederick County Dept ofPlanning & Development107 N Kent StWinchester, VA 22601www.fcva.us11/27/19 V 2020 - 2025Frederick CountyCapital Imp rovement PlanTransportation Projects 6 6 6 6 1 7 17 20 4 2 3 181914 88 13 13 13 9 2020 - 2025Capital Improvement PlanTransportation Projects Unfun ded Prio rities $+5 Funded Priorities1. ROUTE 277 WID ENING & SAFETY IMPROVEMENTS (PH 1) 5. ROUTE 277; RT TUR N LANE EXTENSION AT WARRIOR DR$+5 12 2. CROSSOVER BLVD &BRIDGE OVER I-81 3. EXIT 313 BRIDGE REPLACEMENT& CAPAC ITY IMPROVEMENTS 4. RENAISSAN CE DR, PHASE 2 11 ðñò""307 16 $+15 16. I-81 EXIT 307 RELOCATIONðñò""307 15. SENSENY R D; TURN LANES AT CR ESTLEIGH DR$+15 21. EASTERN ROAD PLANIMPROVEMENTS21 20. WARRIOR DR EXTENSIONFROM ROUTE 37 19. IN VERLEE WAY; C ONNECTION FROM SENSENY RD TO ROUTE 50 18. CHANNING DR EXTENSION TO ROUTE 50 17. WARRIOR DR EXTENSION TO NEW EXIT 307 14. SENSENY R D WIDENIN G 13. ROUTE 11 N OF WINCHESTER WIDENING TO WV LINE 12. ROUTE 11 S WIDENING &INTERSECTION IMPROVEMENTSFROM CITY LIMITS TOOPEQUON C HURCH LN 11. ROUTE 7 CORRIDORIMPROVEMENTS FROM EXIT 315TO GR EENWOOD RD 9. ROUTE 11 N WIDENING FROMSNOWDEN BRIDGE BLVD TOOLD C HARLESTOWN RD 8. REDBUD RD & EXIT 317INTERCHANGE IMPROVEMENTS 7. ROUTE 277 WID ENING & SAFETY IMPROVEMENTS (PH 2) 6. CONTIN UE ROUTE 37 PLANNING & ENGINEERING WOR K 10. BR UCETOWN RD/HOPEWELL RD; ALIGNMENTAND INTERSECTION$+10 $+10 4 Contribution Per Fiscal Year Projects - Ranked by Agency 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025+ Long Range Comprehensive Plan Projects County/VDOT/P rivate Contributions Notes Total Project Costs Ensuing Fiscal Year Year 2 Year 3 Year 4 Year 5 Beyond Year 6+ Funded Priorities Route 277, Fairfax Pike, Widening and Safety Improvements (ph 1)$35,934,878 $35,934,878 E $35,934,878 Crossover Blvd and Bridge over 81 $20,000,000 $20,000,000 E $20,000,000 Exit 313 Bridge Replacement and Capacity Improvements $34,100,000 $34,100,000 E $34,100,000 Rennaisance Drive, Phase 2 $4,100,000 $4,100,000 E $4,100,000 Route 277 right turn extension Warrior Drive $476,644 $476,644 E $476,644 Unfunded Priorities Route 37 Engineering & Construction $750,000,000 $750,000,000 E $750,000,000 Route 277, Fairfax Pike, Widening and Safety Improvements (ph 2)$25,428,550 $25,428,550 E $25,428,550 Redbud Road Realignment and Exit 317 Interchange Improvements $11,239,132 $11,239,132 E $11,239,132 Widening of Route 11 North (ph 1)$28,346,120 $28,346,120 E $28,346,120 Brucetown/Hopewell Realign.$8,000,000 $8,000,000 E $8,000,000 Route 7 Corridor Improvements Exit 315 to Greenwood $5,000,000 $5,000,000 $5,000,000 Route 11 S Widening and Intersection Improvements from Winchester City Limits to Opequon Church Lane $3,300,000 $3,300,000 E $3,300,000 Widening of Route 11 North (ph2)$192,000,000 $192,000,000 E $192,000,000 Senseny Road Widening $67,000,000 $67,000,000 E $67,000,000 Senseny Road turn lanes/improvements Crestleigh Drive $2,548,579 $2,548,579 E $2,548,579 I-81 Exit 307 Relocation with 4 ln connection to Double Church and Stephens City Bypass $234,255,469 $234,255,469 E $234,255,469 Warrior Drive Extension (south)$47,000,000 $47,000,000 E $47,000,000 Channing Drive Extension $45,000,000 $45,000,000 E $45,000,000 Inverlee Way $27,300,000 $27,300,000 E $27,300,000 Warrior Drive Extension (Crosspointe south)$33,500,000 $33,500,000 E $33,500,000 Eastern Road Plan Improvements TBD TBD E TBD Total $94,611,522 $0 $0 $0 $0 $0 $1,479,917,850 $1,574,529,372 $1,574,529,372 Other Funding Sources: E= Partial funding anticipated through development & revenue sources Table 2 - Transportation Projects - CIP Requests The inclusion of transportation projects to the CIP is in no way an indication that Frederick County will be undertaking these projects. Funding projects will continue to come from a combination of state and federal funds, developer contributions, and revenue sharing 5 Contribution Per Fiscal Year Projects - Ranked by Agency 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025+ Long Range Comprehensive Plan Projects County Contributions Notes Total Project Costs Ensuing Fiscal Year Year 2 Year 3 Year 4 Year 5 Beyond Year 6+ New Aviation Terminal $1,990,000 $4,400,000 $85,400 A,B,C $6,475,400 Taxiway "A" Relocation Design/Construction $3,930,000 $3,750,000 4,050,000 $4,190,000 A,B,C $15,920,000 Land Parcel 64B-A-51 (Moreland)$175,000 A,B,C $175,000 Land Parcel 64-A-69 (Robertson)$160,000 A,B,C $160,000 Land Parcel 64B-A-33A (Beaver)$125,000 A,B,C $125,000 Land Parcel 64B-A-40 (Rosenberger)$175,000 A,B,C $175,000 Land Parcel 64-A-60 (Cooper)$200,000 A,B,C $200,000 Land Parcel 64-A-64 (Hott)$160,000 A,B,C $160,000 North Side Access Road $700,000 A,B,C $700,000 Fuel Storage Facility $600,000 A,C $600,000 RPZ Land Services $150,000 A,B,C $150,000 Land Parcel 64B-A-52 (Lee)$175,000 A,B,C $175,000 Land Parcel 64-A-59 (Kyle)$175,000 A,B,C $175,000 Acquire Easements $100,000 A,B,C $100,000 Northside Site Prep $500,000 A,B,C $500,000 Total $1,990,000 $9,150,000 $4,010,400 $5,150,000 $5,490,000 $0 $25,790,400 A= Partial funding from VA Dept. of Aviation B= Partial funding from FAA C = Partial local funding (% split between Frederick County and Winchester based on Weldon Cooper figures) Table 3 - Winchester Reginal Airport CIP Requests *Airport projects will be funded by contributions from the federal, state, and local governments. The local portion may include contributions from Frederick, Clarke, Shenandoah, and Warren Counties, and the City of Winchester. 6 40 Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Route 277 Widening and Safety Improvements (Ph 1) Description: Construct a 4-lane divided roadway beginning at I-81 and continuing to Double Church Road. Project would include realignment of Aylor Road to align with Stickley Drive. Capital Cost: $35,934,878 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 2 -Crossover Boulevard and Bridge over I-81 Description: Construct a 4-lane divided roadway beginning at Route 522 and going west to connect with Crossover Boulevard in the City of Winchester. Project will include a roundabout at the location of future Warrior Drive and bridge over Interstate 81. Capital Cost: $20,000,000 Justification: This is a regional transportation improvement that will address congestion in many areas of the County and address development to the surrounding area. The location is as identified by joint planning efforts between the County, VDOT, and the Developer. Construction Schedule: Completion September 2021 PRIORITY 3 – Exit 313 Bridge Replacement and Capacity Improvements Description: Replace the structurally deficient bridge at Exit 313 and add limited capacity improvements. Capital Cost: $34,100,000 Justification: The bridge on Route 17/50/522 (Millwood Pike) Bridge over Interstate 81 at Exit 313 is reaching the end of its service life and needs to be replaced. The new bridge will feature design elements that will accommodate future improvements to the Route 17/50/522 corridor and future improvements to I-81. The interchange configuration will not change with this project. Construction Schedule: TBD 7 41 PRIORITY 4 - Renaissance Drive, Phase 2 Description: Construct a connector road and Railroad Crossing between Route 11 and Shady Elm Drive. Capital Cost: $4,100,000 Justification: This is a transportation improvement that will address congestion at key points along Route 11 and Apple Valley Drive. This project is identified in Secondary Road Improvements Plan. Construction Schedule: TBD PRIORITY 5 - Route 277 right turn lane extension at Warrior Drive Description: Extend right-turn lane for eastbound 277 at the intersection of Rt. 277 and Warrior Drive. Installation of sidewalk for pedestrian safety and installation of pedestrian pedestal. Capital Cost: $476,644 Justification: This improvement would be a significant safety upgrade to this intersection. Construction Schedule: TBD Unfunded Priorities PRIORITY 6 - Planning, Engineering, Right-of-Way and Construction Work for Route 37 Description: This project would be to continue work on the Eastern Route 37 extension. More specifically, to update the Environmental Impact Statement to the point of a new Record of Decision and to update the 1992 design plans to address the current alignment, engineering guidelines, and possible interchange improvements. In addition, this allows for advanced engineering, right-of-way purchase and construction. Capital Cost: $750,000,000 Justification: This project moves the County closer to completion of a transportation improvement that would benefit the entire County and surrounding localities. Construction Schedule: TBD 8 42 PRIORITY 7 - Route 277 Widening and Safety Improvements (Ph 2) Description: Construct a 4-lane divided roadway beginning at I-81 and continuing to Sherando Park. Project would include realignment of Aylor Road to align with Stickley Drive. Capital Cost: $25,428,550 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 8- Redbud Road Realignment and Exit 317 Interchange Improvements Description: Realign Redbud Road from its current location through development land in the vicinity of Route 11 north and Snowden Bridge Boulevard and interchange upgrades to improve traffic flow and safety. Capital Cost: $11,239,132 Justification: This is a transportation improvement that will have significant impact on Eastern Frederick County. This project is identified in the adopted Eastern Road Plan. Construction Schedule: TBD PRIORITY 9 - Route 11 North Widening to 6 Lanes from Snowden Bridge Boulevard to Old Charlestown Road Description: Route 11 North of Snowden Bridge Boulevard is currently primarily a two-lane roadway. This project would widen that facility to a 6-lane divided roadway with turn lanes where appropriate. Capital Cost: $28,346,120 Justification: This is a transportation improvement that will provide a significant capacity upgrade to address congestion on the Route 11 Corridor. This project is identified in the adopted Eastern Road Plan. Construction Schedule: TBD 9 43 PRIORITY 10 - Brucetown Road/Hopewell Road Alignment and Intersection Improvements Description: Realign Brucetown Road to meet Hopewell Road at Route 11. Improvements to this intersection will address comprehensive planned development’s traffic generation in the area. Capital Cost: $8,000,000 Justification: This is a transportation improvement that will have significant impact on the Route 11 corridor. The location is identified by joint planning efforts between the County and VDOT. Construction Schedule: TBD PRIORITY 11 – Route 7 Corridor Improvements from Exit 315 to Greenwood Road Description: Spot improvements throughout the corridor to be determined through ongoing study in coordination with VDOT. Capital Cost: $5,000,000 Justification: The County is engaged in a STARS study with VDOT through the MPO. This study will be used to identify key spot improvements to be addressed under this item. Construction Schedule: TBD PRIORITY 12 – Route 11 S Widening & Intersection Improvements from Winchester City Limits to Opequon Church Lane Description: Route 11 S, NB side widening and improvements to the intersection of Shawnee Drive at Route 11 and Opequon Church Lane at Route 11 Capital Cost: $3,300,000 Justification: Transportation study conducted in conjunction with the MPO and VDOT determined that these improvements would significantly improve congestion and safety in the area. In addition, this improvement would promote the Comprehensive Plan vision for this area. Construction Schedule: TBD PRIORITY 13- Widening of Route 11 North to the West Virginia State Line Description: Improve Route 11 to a divided 4 and 6-lane facility as detailed in the Eastern Road Plan. 10 44 Capital Cost: $192,000,000 Justification: This is a regional transportation improvement that will address congestion over a large area of the County and address development to the surrounding area. This project improves the safety for the traveling public by reducing congestion and improving the flow of traffic. Construction Schedule: TBD PRIORITY 14 - Senseny Road Widening Description: Widen Senseny Road to a 4-lane divided roadway. This project is not dependent upon, but is being coordinated with the implementation of Route 37, Channing Drive, and development in the area. Capital Cost: $67,000,000 Justification: This is a transportation improvement that will have significant impact on Eastern Frederick County. This project is identified in the adopted Eastern Road Plan. Construction Schedule: TBD PRIORITY 15 - Senseny Road Turn lanes at the intersection of Senseny Road and Crestleigh Drive Description: Improvements to the intersection of Senseny Road (657) and Crestleigh Drive to include turn lanes and potential signalization. This project would add left and right turn lanes to Senseny Road at the intersection of Crestleigh and potentially a full signalization of the intersection. Capital Cost: $2,548,579 Justification: This improvement would be a significant safety upgrade to this intersection. Construction Schedule: TBD PRIORITY 16- Interstate 81, Exit 307 Relocation Description: Construct a relocated Exit 307 interchange. Capital Cost: $234,255,469 Justification: This is a regional transportation improvement that will address congestion in many areas of the County and address coming development to the surrounding areas. Construction Schedule: TBD 11 45 PRIORITY 17- Warrior Drive Extension Description: Construct a 4-lane divided roadway beginning at Route 277 where Warrior Drive intersects from the north and continuing that roadway south and west to intersect with I-81 at the location of the relocated Exit 307 interchange. Capital Cost: $47,000,000 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 18 - Channing Drive Extension Description: Construct a 4-lane divided roadway beginning at Senseny Road where Channing Drive intersects from the north and continuing that roadway south to intersect with Route 50 East at Independence Drive. Capital Cost: $45,000,000 Justification: This project has been identified in the Eastern Road Plan and will address congestion in Eastern Frederick County and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 19 - Inverlee Way Description: Construct a 4-lane divided roadway beginning at Senseny Road and going south to Route 50 East. This project is being planned in conjunction with improvements to Senseny Road and surrounding development. Capital Cost: $27,300,000 Justification: This is a regional transportation improvement that will address congestion and provide an additional needed link between Senseny Road and Route 50 East. Construction Schedule: TBD PRIORITY 20 - Warrior Drive Extension from Route 37 Crosspointe south to existing terminus Description: 4-lane roadway from the Route 37 extension in the Crosspointe Development south to the existing terminus of Warrior Drive. 12 46 Capital Cost: $33,500,000 Justification: This improvement would be concurrent with a Route 37 extension and would provide significant congestion relief at Exit 307 as well as Tasker Road at Exit 310 Construction Schedule: TBD PRIORITY 21 - Frederick County Eastern Road Plan Description: This project is intended to address all of the planned transportation improvements in the County Comprehensive Plan, Eastern Road Plan that are not noted individually above. Capital Cost: TBD Justification: This project prepares the County for future development by addressing the projects needed to support that development in a manner consistent with the Comprehensive Plan. Construction Schedule: N/A 13 Transportation Committee Agenda Item Detail Meeting Date: November 23, 2020 Agenda Section: VTRANS Update Title: VTRANS Update Attachments: TC11-23-20VTRANSUpdate.pdf 14 Item 2: VTRANS Update Topic Synopsis Staff will be updating the Committee on the current progress of the VTRANS update. VTRANS is the Statewide Transportation Plan and is critically important for localities when applying for SmartScale funds. This is due to the fact that projects for which SmartScale funds are sought but be related to an identified VTRANS need. Analysis Recommended Action NA 15 Transportation Committee Agenda Item Detail Meeting Date: November 23, 2020 Agenda Section: County Project Updates Title: County Project Updates Attachments: TC11-23-20CountyProjectUpdates.pdf 16 Item 3: County Project Updates Crossover Boulevard aka Tevis Street Extension/Airport Road/I-81 Bridge: Work on the Route 522 intersection area is progressing, and the project team recently met to address an issue with entrances near the intersection that required a minor plan modification. Renaissance Drive: Staff and the County’s private partners recently met with CSX to discuss issues with drainage design across the railroad tracks. The railroad did not accept the County’s previous proposed solution and the meeting was to discuss alternatives. The County provided several questions in the meeting which we are awaiting answers for. It is expected that whatever is determined will likely result in a higher cost estimate, but the amount cannot be determined until the design solution can be agreed upon. Staff will continue to provide updates as we work through this process. 17 Transportation Committee Agenda Item Detail Meeting Date: November 23, 2020 Agenda Section: Other Title: Other Attachments: TC11-23-20Other.pdf 18 Item 4: Other 19