TC 11-25-19 Meeting AgendaCOUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation RE: November 25, 2019 Transportation Committee Meeting DATE: November 19, 2019 The Frederick County Transportation Committee will be meeting at 8:30 a.m. on Monday, November 25, 2019 in the first-floor conference room of the Frederick County Administration Building, 107 North Kent Street, Winchester, Virginia. AGENDA 1. Capital Improvement Plan - Update 2. Cedar Hill Road Truck Restriction 3. County Project Updates 4. Upcoming Agenda Items 5. Other Please contact our Department if you are unable to attend this meeting. Attachments JAB/dw MEMORANDUM Item 1: Capital Improvement Plan - Update Topic Synopsis Each year the County must update the Capital Improvement Plan. The Capital Improvement Plan outlines key capital funding priorities from among the different County Departments and Agencies. Analysis Staff has attached the 2019-2024 CIP, transportation section, for reference and is recommending the following changes. 1. Removal of Sulphur Springs Road because the project is under construction. 2. Addition of the Exit 313 Bridge replacement and capacity improvements to the funded list. 3. Addition of the Route 11 widening and intersection improvements from Opequon Church Lane to the Winchester City limits to the unfunded list. 4. Updated the road name for Crossover Boulevard from Tevis and Airport Extension. 5. Adjust the wording for Exit 317 interchange from ramp alignment to interchange improvements to allow greater SmartScale flexibility. 6. Addition of spot improvements to the Route 7 corridor to allow for potential SmartScale projects that are being identified in the STARS study that is currently underway for that area. 7. With the exception of Route 37, adjust the rankings on the unscheduled list to place all improvements to existing facilities above construction of new facilities. Recommended Action Staff would recommend a recommendation of approval to the Board of Supervisors. £¤522 £¤11 £¤522 £¤11 £¤50 £¤50 £¤11 £¤522 §¨¦81 §¨¦81 ¬«277 ¬«7 ¬«37 Winchester StephensCity 0 1 20.5 Miles Frederick County Dept of Planning & Development 107 N Kent St Winchester, VA 22601 www.fcva.us 11/19/19 V 2020 - 2025Frederick CountyCapital Improvement PlanTransportation Projects 7 7 7 7 1 8 18 21 4 2 3 192015 99 14 14 14 10 2020 - 2025Capital Improvement PlanTransportation Projects Unfunded Priorities 22. EASTERN ROAD PLAN IMPROVEMENTS22 7. CONTINUE ROUTE 37 PLANNING & ENGINEERING WORK $+6 $+5 Funded Priorities 8. ROUTE 277 WIDENING & SAFETY IMPROVEMENTS (PH 2) 9. REDBUD RD & EXIT 317 INTERCHANGE IMPROVEMENTS 10. ROUTE 11 N WIDENING FROM SNOWDEN BRIDGE BLVD TO OLD CHARLESTOWN RD 11. BRUCETOWN RD/ HOPEWELL RD; ALIGNMENT AND INTERSECTION$+11 1. ROUTE 277 WIDENING & SAFETY IMPROVEMENTS (PH 1) 6. PAPERMILL RD; RT TURN LANE EXTENSION AT ROUTE 522$+6 5. ROUTE 277; RT TURN LANE EXTENSION AT WARRIOR DR$+5 13 $+11 2. CROSSOVER BLVD & BRIDGE OVER I-81 3. EXIT 313 BRIDGE REPLACEMENT & CAPACITY IMPROVEMENTS 4. RENAISSANCE DR, PHASE 2 21. WARRIOR DR EXTENSION FROM ROUTE 37 20. INVERLEE WAY; CONNECTION FROM SENSENY RD TO ROUTE 50 19. CHANNING DR EXTENSION TO ROUTE 50 18. WARRIOR DR EXTENSION TO NEW EXIT 307 17. I-81 EXIT 307 RELOCATIONðñò""307 16. SENSENY RD; TURN LANES AT CRESTLEIGH DR$+16 15. SENSENY RD WIDENING 14. ROUTE 11 N OF WINCHESTER WIDENING TO WV LINE 13. ROUTE 11 S WIDENING & INTERSECTION IMPROVEMENTS FROM CITY LIMITS TO OPEQUON CHURCH LN 12. ROUTE 7 CORRIDOR IMPROVEMENTS FROM EXIT 315 TO GREENWOOD RD $+16 ðñò""307 17 12 Item 2: Cedar Hill Road Truck Restriction Topic Synopsis This item below was presented at the July Transportation Committee Meeting. At that meeting, Staff was directed to monitor the situation and bring the item back at a later date. To date, with the exception of receiving a report of a citizen that was unhappy the item was not recommended for approval, Staff has received no further contacts or reports of incidents on this roadway. Staff is in receipt of a citizen request through Supervisor McCann-Slaughter to consider requesting that VDOT place a designation of No Through Trucks on Cedar Hill Road (Route 671). Analysis The current issue of trucks that appear on Cedar Hill Road is anecdotally due to trucks that have lost their way seeking the Amazon Distribution Center and have been mistakenly routed to Burgess Lane. Staff would note that through truck designations apply only to trucks traveling through the entire restricted roadway. As such, a truck driver, who believes his/her destination is within this restricted area (even if that belief is mistaken) would not be deterred from the route. The most recent recorded traffic count by VDOT on this segment of Cedar Hill Road was 910 vehicles per day with 97% of those trips being 4-wheel vehicles and the remaining 3% (27 vehicles) being some other type. Fourteen of those other trips are school buses, 2 axle vehicles, and 7 being 3 axle vehicles. A field review of the roadway does indicate that it is not well suited to trucks with a number of locations where a truck and passenger vehicle would have trouble passing each other if they were moving in opposite directions. As such, the roadway is not well suited for tractor trailer traffic. Finally, there is potential for trucks to use Cedar Hill Road to bypass the truck restriction on Welltown Road, however, the volumes would not seem to indicate this is taking place. Recommended Action If the Committee would wish to seek a truck restriction on Cedar Hill Road, the action would be to direct Staff to prepare an application packet for Board of Supervisors review and to pass a recommendation to the Board of Supervisors. Item 3: County Project Updates Crossover Boulevard aka Tevis Street Extension/Airport Road/I-81 Bridge: Construction continues to go well and as long as weather doesn’t create a delay, bridge beams are expected to be set in early December. Renaissance Drive: 60% design has been reached and Staff is coordinating with CSX and VDOT to get the plan reviewed. Northern Y: No updates at this time. Item 4: Upcoming Agenda Items December SmartScale (ongoing discussion and development) MPO Study Progress TBD Oakdale Crossing Traffic Calming Study Item 5: Other