TC 01-28-19 Meeting MinutesTRANSPORTATION COMMITTEE REPORT to the BOARD OF SUPERVISORS
Monday, January 28, 2019
8:30 a.m.
107 NORTH KENT STREET, WINCHESTER, VIRGINIA
ATTENDEES:
Committee Members Present: Gary Lofton, Chairman (Voting), Judith McCann-
Slaughter (Voting), Gary Oates (Voting), James Racey (Voting), Barry Schnoor (Voting)
and Lewis Boyer (Liaison Stephens City).
Committee Members Absent: Mark Davis (Liaison Middletown).
Staff Present: Assistant Director-Transportation John Bishop, and Kathy Smith,
Secretary.
ITEMS REQUIRING ACTION BY BOARD OF SUPERVISORS:
1-Renaissance Drive, Phase II (see attached): The 30% design and update for the cost estimate
for the completion of the project has been received. It was significantly higher than the original
operating cost estimate. This was due to the fact of the increase in the cost of construction and
materials. In response to this, Staff requested estimates for the additional project alternative
options to include a two (2) lane bridge and an at grade crossing for the relocation of the
Springdale Road Crossing. Summary of alternatives and funding below:
The current cost estimates are attached and are as follows:
1. 4-lane Bridge over CSX transitioning to 2-lane road section (current scope) -
$9,738,224.00
2. 2-lane bridge over CSX and 2-lane road section - $7,673,038.00
3. 2-lane relocated at grade crossing and 2-lane road section - $3,081,692
Available funding is as follows:
1. Revenue sharing funds from VDOT - $1,638,764.00
2. Local Funds:
a. $633,644.00 (Artillery Rezoning Proffer)
b. $452,791.46 (Blackburn Rezoning Proffer)
c. $1,080,000.00 (Carbaugh Rezoning Proffer)
3. Transportation Partnership Opportunity Fund (TPOF) - $1,995,682.00
4. Total Original Available Funding: $5,800,881.46
5. Expenditures to date less reimbursement/expected reimbursement: $120,419.65
6. Total Remaining Funding: $5,680,461.81
Alternatives to address the funding shortfall.
1. Seek additional private funding
a. Staff met with the entities that have provided the private funding to date and it
was indicated that they were not interested in additional funding for the sake
of a bridge at this time and would prefer to see the County move forward with
an at grade crossing.
2. Seek additional revenue sharing funds
a. The next revenue sharing application window is in the winter of 2019 and funds
for successful applications would not be available until the summer of 2020
which creates a timeline impact on the project. In addition, potential matching
funding has not been identified.
3. Seek additional TPOF funds
a. Guidance from TPOF staff in Richmond indicates that while a successful
application for additional TPOF is possible, it would likely require additional
local investment which has not been identified at this time. In addition, the
application and approval process would likely take approximately 6 months or
more.
Based upon those additional alternative estimates and available funding, Staff has
recommended to proceed with the at grade crossing as an alternative option. Also, VDOT has
recommended that the County issue a letter to request release of the Transportation
Partnership Opportunity Funds (TPOF), for this option if recommended. The Committee
discussed the options. Judith McCann-Slaughter commented that she is still not in agreement
of the project without a backstop in place.
Upon a motion by, Mr. James Racey seconded by Mr. Barry Schnoor the Committee
recommended to forward the option of the at grade crossing to the Board for recommendation
of approval. Supervisor McCann-Slaughter voted against the motion.
ITEMS FOR INFORMATION ONLY:
2-SmartScale Scoring Update (see attached): The SmartScale rankings of Round 3 was
presented to the Commonwealth Transportation Board (CTB) on January 15, 2019 by Nick
Donohue, Deputy Secretary of Transportation. The only area project to get funding was the I-
81 Exit 317 accel/decel Lane Extension. Staff briefly discussed the Staunton District procedures
for the SmartScale applications scoring and ranking procedures. A key to scoring allocation is
that District funds are first which makes the County less of a competitor for the State funding.
Staff will discuss this more in detail to the Committee in future along with VDOT staff before the
Round 4 ranking.
3-County Projects Updates: Tevis Street Extension/Airport Road/I-81 Bridge: The project is
currently being advertised for the proposed bid to be submitted by Wednesday, February 27,
2019. A pre-bid meeting with potential contractors was held on January 22, 2019. The project
is expected to be completed in the Summer of 2021.
Renaissance Drive: Please see item 1.
Northern Y: Currently, the 30% design is underway and expected by mid-February.
Coverstone Drive: The funds have been deallocated.
Jubal Early Drive Extension and Interchange with Route 37: Staff had a meeting in December
and is waiting to hear back. Currently, no other activity at this time.
4-Upcoming Agenda Items: SmartScale and Revenue Sharing next round discussion
TBD: Oakdale Crossing Traffic Calming Study.
5-Other: Staff received an informal request for general VDOT projects in the County area to be
updated and posted on the County’s web page.
Job No: FREDC18001
Date 11/6/2018
Des By:MAG
Chk By:BTN
MOBILIZATION LS 1 $100,000.00 $100,000
DEMOLITION
REMOVAL OF SIDEWALK SY 108 $7.50 $810
FLEXIBLE PAVEMENT REMOVAL SY 1,565 $24.00 $37,560
REMOVAL OF EXISTING CURB LF 666 $10.00 $6,660
REMOVAL OF EXISTING STORM PIPE LF 317 $10.00 $3,170
REMOVAL OF EXISTING STORM STRUCTURES EA 4 $1,000.00 $4,000
EARTHWORKS
CLEARING AND GRUBBING AC 7.7 $5,000.00 $38,650
REGULAR EXCAVATION - CUT TO FILL CY 10,715 $7.00 $75,005
STRUCTURAL FILL IMPORT CY 6,740 $32.00 $215,680
REGULAR FILL IMPORT CY 55,790 $22.00 $1,227,380
GRADING SY 26,475 $0.50 $13,238
SEEDING LB 1,375 $10.50 $14,438
PAVEMENT
STD. COMB. CURB & GUTTER CG-6 LF 2,040 $18.00 $36,720
STD CG-12, (3)TYPE B & (1)TYPE A SY 36 $45.00 $1,620
CG-12 DETECTABLE WARNING SURFACE SY 7 $270.00 $1,890
HYDRAULIC CEMENT CONC. 4" SIDEWALK SY 545 $40.00 $21,800
7' GRAVEL SHOULDER - NO.21B TON 421 $18.00 $7,578
1.5" SURFACE COURSE - S-9.5A TON 798 $90.00 $71,820
2.5" INTERMEDIATE COURSE - IM-19A TON 1,283 $105.00 $134,715
6" BASE COURSE - BM-25.0 TON 3,020 $75.00 $226,500
10" AGGREGATE BASE - NO.21B TON 3,841 $18.00 $69,138
TACK COAT GAL 1,020 $3.50 $3,570
GUARDRAIL / FENCING
STD GR-2 LF 876 $25.00 $21,900
RADIAL GR-2 LF 717 $25.00 $17,925
DRAINAGE
BEST MANAGEMENT PRACTICES CY 5,915 $15.00 $88,725
DITCHES CY 466 $15.00 $6,990
VDOT STD. UD-4 LF 2,588 $15.00 $38,820
VDOT STD. CD-1 LF 74 $12.50 $925
VDOT STD. CD-2 LF 250 $12.50 $3,125
VDOT STD. EW-12 EA 6 $700.00 $4,200
VDOT STD. DI-3B, L=6"EA 4 $3,400.00 $13,600
VDOT STD. DI-3C, L=6'EA 4 $3,800.00 $15,200
STORM SEWER, CONC. PIPE, 15"LF 275 $46.00 $12,650
STORM SEWER, CONC. PIPE, 24"LF 155 $65.00 $10,075
VDOT STD ES-1 - 15"EA 1 $600.00 $600
VDOT STD ES-1 - 24"EA 1 $1,200.00 $1,200
SIGNAGE / PAVEMENT MARKING
CONCRETE FOUNDATION STP-1 EA 5 $210.00 $1,050
TRAFFIC SIGN SQUARE TUBE STEEL POST 2-1/2", 12 GA.LF 40 $50.00 $2,000
TYPE B CLASS I PAVE. LINE MARKING 4"LF 7,210 $0.85 $6,129
TYPE B CLASS I PAVE. LINE MARKING 6"LF 332 $1.20 $398
TYPE B CLASS I PAVE. LINE MARKING 8"LF 300 $1.70 $510
TYPE B CLASS I PAVE. LINE MARKING 24"LF 24 $9.00 $216
TYPE III BARRICADE, 8'EA 12 $450.00 $5,400
MAINTENANCE OF TRAFFIC
MOT LS 1 $50,000.00 $50,000
BRIDGE
BRIDGE LS 1 $3,902,000.00 $3,902,000
MISCELLANEOUS
EROSION AND SEDIMENT CONTROL LS 1 $75,000.00 $75,000
UTILITY RELOCATIONS - GAS, ELECTRIC LINES AND POLES LS 1 $1,000,000.00 $1,000,000
SUB TOTAL $7,590,579
CSX ADMINISTRATIVE FEES LS 1 $250,000.00 $250,000
CONSTRUCTION ADMINISTRATION @ 10%$759,058
CONTINGENCIES @ 15%$1,138,587
GRAND TOTAL $9,738,224
PRICE TOTAL
Pennoni Associates Inc.
Consulting Engineers
Project: Renaissance Drive Extension - 4 Lane Bridge
Subject: 30% Submittal Estimate
ITEM UNIT QUANTITY
Job No: FREDC18001
Date 11/6/2018
Des By:MAG
Chk By:BTN
MOBILIZATION LS 1 $100,000.00 $100,000
DEMOLITION
REMOVAL OF SIDEWALK SY 108 $7.50 $810
FLEXIBLE PAVEMENT REMOVAL SY 1,565 $24.00 $37,560
REMOVAL OF EXISTING CURB LF 666 $10.00 $6,660
REMOVAL OF EXISTING STORM PIPE LF 317 $10.00 $3,170
REMOVAL OF EXISTING STORM STRUCTURES EA 4 $1,000.00 $4,000
EARTHWORKS
CLEARING AND GRUBBING AC 7.3 $5,000.00 $36,500
REGULAR EXCAVATION - CUT TO FILL CY 10,715 $7.00 $75,005
STRUCTURAL FILL IMPORT CY 6,066 $32.00 $194,112
REGULAR FILL IMPORT CY 50,211 $22.00 $1,104,642
GRADING SY 23,828 $0.50 $11,914
SEEDING LB 1,375 $10.50 $14,438
PAVEMENT
STD. COMB. CURB & GUTTER CG-6 LF 2,040 $18.00 $36,720
STD CG-12, (3)TYPE B & (1)TYPE A SY 36 $45.00 $1,620
CG-12 DETECTABLE WARNING SURFACE SY 7 $270.00 $1,890
HYDRAULIC CEMENT CONC. 4" SIDEWALK SY 545 $40.00 $21,800
7' GRAVEL SHOULDER - NO.21B TON 421 $18.00 $7,578
1.5" SURFACE COURSE - S-9.5A TON 638 $90.00 $57,456
2.5" INTERMEDIATE COURSE - IM-19A TON 1,026 $105.00 $107,772
6" BASE COURSE - BM-25.0 TON 2,416 $75.00 $181,200
10" AGGREGATE BASE - NO.21B TON 3,073 $18.00 $55,310
TACK COAT GAL 816 $3.50 $2,856
GUARDRAIL / FENCING
STD GR-2 LF 876 $25.00 $21,900
RADIAL GR-2 LF 717 $25.00 $17,925
DRAINAGE
BEST MANAGEMENT PRACTICES CY 5,915 $15.00 $88,725
DITCHES CY 466 $15.00 $6,990
VDOT STD. UD-4 LF 2,588 $15.00 $38,820
VDOT STD. CD-1 LF 74 $12.50 $925
VDOT STD. CD-2 LF 250 $12.50 $3,125
VDOT STD. EW-12 EA 6 $700.00 $4,200
VDOT STD. DI-3B, L=6"EA 4 $3,400.00 $13,600
VDOT STD. DI-3C, L=6'EA 4 $3,800.00 $15,200
STORM SEWER, CONC. PIPE, 15"LF 275 $46.00 $12,650
STORM SEWER, CONC. PIPE, 24"LF 155 $65.00 $10,075
VDOT STD ES-1 - 15"EA 1 $600.00 $600
VDOT STD ES-1 - 24"EA 1 $1,200.00 $1,200
SIGNAGE / PAVEMENT MARKING
CONCRETE FOUNDATION STP-1 EA 3 $210.00 $630
TRAFFIC SIGN SQUARE TUBE STEEL POST 2-1/2", 12 GA.LF 24 $50.00 $1,200
TYPE B CLASS I PAVE. LINE MARKING 4"LF 7,210 $0.85 $6,129
TYPE B CLASS I PAVE. LINE MARKING 6"LF 332 $1.20 $398
TYPE B CLASS I PAVE. LINE MARKING 8"LF 300 $1.70 $510
TYPE B CLASS I PAVE. LINE MARKING 24"LF 24 $9.00 $216
TYPE III BARRICADE, 8'EA 12 $450.00 $5,400
MAINTENANCE OF TRAFFIC
MOT LS 1 $50,000.00 $50,000
BRIDGE
BRIDGE LS 1 $2,500,000.00 $2,500,000
MISCELLANEOUS
EROSION AND SEDIMENT CONTROL LS 1 $75,000.00 $75,000
UTILITY RELOCATIONS - GAS, ELECTRIC LINES AND POLES LS 1 $1,000,000.00 $1,000,000
SUB TOTAL $5,938,431
CSX ADMINISTRATIVE FEES LS 1 $250,000.00 $250,000
CONSTRUCTION ADMINISTRATION @ 10%$593,843
CONTINGENCIES @ 15%$890,765
GRAND TOTAL $7,673,038
PRICE TOTAL
Pennoni Associates Inc.
Consulting Engineers
Project: Renaissance Drive Extension - 2 Lane Bridge
Subject: 30% Submittal Estimate
ITEM UNIT QUANTITY
Job No: FREDC18001
Date 11/6/2018
Des By:MAG
Chk By:BTN
MOBILIZATION LS 1 $75,000.00 $75,000
DEMOLITION
REMOVAL OF SIDEWALK SY 108 $7.50 $810
FLEXIBLE PAVEMENT REMOVAL SY 1,565 $24.00 $37,560
REMOVAL OF EXISTING CURB LF 666 $10.00 $6,660
REMOVAL OF EXISTING STORM PIPE LF 317 $10.00 $3,170
REMOVAL OF EXISTING STORM STRUCTURES EA 4 $1,000.00 $4,000
EARTHWORKS
CLEARING AND GRUBBING AC 7.1 $5,000.00 $35,500
REGULAR EXCAVATION - CUT TO FILL CY 18,000 $7.00 $126,000
STRUCTURAL FILL IMPORT CY 2,000 $32.00 $64,000
REGULAR FILL IMPORT CY - $22.00 $0
GRADING SY 23,828 $0.50 $11,914
SEEDING LB 1,375 $10.50 $14,438
PAVEMENT
STD. COMB. CURB & GUTTER CG-6 LF 2,040 $18.00 $36,720
STD CG-12, (3)TYPE B & (1)TYPE A SY 36 $45.00 $1,620
CG-12 DETECTABLE WARNING SURFACE SY 7 $270.00 $1,890
HYDRAULIC CEMENT CONC. 4" SIDEWALK SY 545 $40.00 $21,800
7' GRAVEL SHOULDER - NO.21B TON 421 $18.00 $7,578
1.5" SURFACE COURSE - S-9.5A TON 678 $90.00 $61,047
2.5" INTERMEDIATE COURSE - IM-19A TON 1,091 $105.00 $114,508
6" BASE COURSE - BM-25.0 TON 2,567 $75.00 $192,525
10" AGGREGATE BASE - NO.21B TON 3,265 $18.00 $58,767
TACK COAT GAL 867 $3.50 $3,035
GUARDRAIL / FENCING
STD GR-2 LF 600 $25.00 $15,000
RADIAL GR-2 LF 200 $25.00 $5,000
DRAINAGE
BEST MANAGEMENT PRACTICES CY 5,915 $15.00 $88,725
DITCHES CY 466 $15.00 $6,990
VDOT STD. UD-4 LF 2,588 $15.00 $38,820
VDOT STD. CD-1 LF 74 $12.50 $925
VDOT STD. CD-2 LF 250 $12.50 $3,125
VDOT STD. EW-12 EA 6 $700.00 $4,200
VDOT STD. DI-3B, L=6"EA 4 $3,400.00 $13,600
VDOT STD. DI-3C, L=6'EA 4 $3,800.00 $15,200
STORM SEWER, CONC. PIPE, 15"LF 275 $46.00 $12,650
STORM SEWER, CONC. PIPE, 24"LF 155 $65.00 $10,075
VDOT STD ES-1 - 15"EA 1 $600.00 $600
VDOT STD ES-1 - 24"EA 1 $1,200.00 $1,200
SIGNAGE / PAVEMENT MARKING
CONCRETE FOUNDATION STP-1 EA 5 $210.00 $1,050
TRAFFIC SIGN SQUARE TUBE STEEL POST 2-1/2", 12 GA.LF 40 $50.00 $2,000
TYPE B CLASS I PAVE. LINE MARKING 4"LF 7,210 $0.85 $6,129
TYPE B CLASS I PAVE. LINE MARKING 6"LF 332 $1.20 $398
TYPE B CLASS I PAVE. LINE MARKING 8"LF 300 $1.70 $510
TYPE B CLASS I PAVE. LINE MARKING 24"LF 24 $9.00 $216
TYPE III BARRICADE, 8'EA 12 $450.00 $5,400
MAINTENANCE OF TRAFFIC
MOT LS 1 $50,000.00 $50,000
RAILROAD AT-GRADE CROSSING
RAILROAD AT-GRADE CROSSING LS 1 $500,000.00 $500,000
MISCELLANEOUS
EROSION AND SEDIMENT CONTROL LS 1 $75,000.00 $75,000
REMOVAL OF SPRINGDALE RR CROSSING AND PROVIDE TURNAROUND LS 1 $150,000.00 $150,000
UTILITY RELOCATIONS - GAS, ELECTRIC LINES AND POLES LS 1 $300,000.00 $300,000
SUB TOTAL $2,185,354
CSX ADMINISTRATIVE FEES LS 1 $350,000.00 $350,000
CONSTRUCTION ADMINISTRATION @ 10%$218,535
CONTINGENCIES @ 15%$327,803
GRAND TOTAL $3,081,692
PRICE TOTAL
Pennoni Associates Inc.
Consulting Engineers
Project: Renaissance Drive Extension - No Bridge, 2 Lane Road
Subject: 30% Submittal Estimate
ITEM UNIT QUANTITY
SM
A
R
T
S
C
A
L
E
R
o
u
n
d
3
DR
A
F
T
S
t
a
f
f
R
e
c
o
m
m
e
n
d
ed
F
u
n
d
i
n
g
S
c
e
n
a
r
i
o
Di
s
p
l
a
y
I
D
D
i
s
t
r
i
c
t
O
r
g
a
n
i
z
a
t
i
o
n
D
e
s
c
r
i
p
t
i
o
n
N
e
e
d
I
m
p
r
o
v
e
m
e
n
t
T
y
p
e
D
G
P
H
P
P
T
o
t
a
l
C
o
s
t
S
M
A
R
T
S
C
A
L
E
C
o
s
t
B
e
nefit
S
c
o
r
e
(
1
)
D
G
P
(
2
)
H
P
P
(
3
)
H
P
P
40
8
6
B
r
i
s
t
o
l
T
a
z
e
w
e
l
l
C
o
u
n
t
y
R
o
u
t
e
4
6
0
C
o
r
r
i
d
o
r
I
m
p
r
o
v
e
m
e
n
t
s
C
O
S
S
H
i
gh
w
a
y
X
X
$
3
,
5
9
7
,
0
0
0
$
3
,
5
9
7
,
0
0
0
3
.
7
7
6
1
0
.
5
0
$
3
,
5
9
7
,
0
0
0
38
0
2
B
r
i
s
t
o
l
S
m
y
t
h
C
o
u
n
t
y
U
S
R
o
u
t
e
11
/
S
R
6
6
0
R
o
u
n
d
a
b
o
u
t
S
o
u
t
h
C
O
S
S
H
i
g
h
w
a
y
X
X
$
3
,
6
0
7
,
3
1
6
$
3
,
6
0
7
,
3
1
6
3
.
6
1
5
1
0
.
0
2
$
3
,
6
0
7
,
3
1
6
37
3
6
B
r
i
s
t
o
l
W
y
t
h
e
C
o
u
n
t
y
P
r
o
g
r
e
s
s
P
a
r
k
C
o
n
n
e
c
t
o
r
C
O
S
S
H
i
g
h
w
a
y
X
X
$
2
3
,
684,000
$
1
2
,
8
5
7
,
0
0
0
1
1
.
6
4
8
9
.
0
6
$
1
2
,
8
5
7
,
0
0
0
37
5
6
C
u
l
p
e
p
e
r
C
u
l
p
e
p
e
r
T
o
w
n
R
o
u
n
d
a
b
o
u
t
‐
R
o
u
t
e
3
a
n
d
M
c
D
e
v
i
t
t
D
r
.
In
t
e
r
s
e
c
t
i
o
n
S
a
f
e
t
y
H
i
g
h
w
a
y
X
$
6
,
2
0
0
,
0
0
0
$
6
,
2
0
0
,
0
0
0
9
.
8
6
6
1
5
.
9
1
$
6
,
2
0
0
,
000
35
8
4
C
u
l
p
e
p
e
r
C
h
a
r
l
o
t
t
e
s
v
i
l
l
e
C
i
t
y
W
e
s
t
M
a
i
n
S
t
r
e
e
t
s
c
a
p
e
C
O
S
S
B
i
k
e
/
P
ed
e
s
t
r
i
a
n
X
X
$
1
2
,
6
8
9
,
0
2
0
$
2
,
0
0
9
,
2
6
5
3
.
1
0
3
1
5
.
4
4
$
2
,
0
0
9
,
2
6
5
34
4
4
C
u
l
p
e
p
e
r
F
a
u
q
u
i
e
r
C
o
u
n
t
y
R
o
u
t
e
2
9
/
F
r
e
e
m
a
n
s
F
o
r
d
R
o
a
d
A
l
t
e
r
n
a
t
iv
e
I
n
t
e
r
s
e
c
t
i
o
n
U
D
A
H
i
g
h
w
a
y
X
$
7
,
1
0
0
,
0
0
0
$
7
,
1
0
0
,
0
0
0
5
.
7
9
2
8
.
1
6
$
7
,
1
0
0
,
000
41
0
4
C
u
l
p
e
p
e
r
O
r
a
n
g
e
C
o
u
n
t
y
U
S
3
3
/
Ro
u
t
e
2
0
e
a
s
t
r
o
u
n
d
a
b
o
u
t
S
a
f
e
t
y
Hi
g
h
w
a
y
X
$
5
,
5
0
0
,
0
0
0
$
5
,
5
0
0
,
0
0
0
3
.
7
6
0
6
.
8
4
$
5
,
5
0
0
,
0
0
0
34
8
8
F
r
e
d
e
r
i
c
k
s
b
u
r
g
K
i
n
g
G
e
o
r
g
e
C
o
u
n
t
y
R
o
u
t
e
3
0
1
U
n
i
v
e
r
s
i
t
y
D
r
i
v
e
/
Ma
r
k
e
t
C
t
r
D
o
u
b
l
e
R
C
U
T
U
D
A
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
3
,
5
0
0
,
0
0
0
$
3
,
5
0
0
,
0
0
0
3
.
667
1
0
.
4
8
$
3
,
5
0
0
,
0
0
0
36
8
5
F
r
e
d
e
r
i
c
k
s
b
u
r
g
F
r
e
d
e
r
i
c
k
s
b
u
r
g
R
e
g
i
o
n
a
l
T
r
a
n
s
i
t
F
R
E
D
T
r
a
n
s
i
t
‐
S
he
l
t
e
r
s
a
n
d
B
e
n
c
h
e
s
R
N
B
u
s
T
r
a
n
s
i
t
X
$
2
5
6
,
0
0
0
$
2
1
8
,
5
0
0
0
.
2
0
0
9
.
1
7
$
2
1
8
,
500
36
2
0
F
r
e
d
e
r
i
c
k
s
b
u
r
g
F
r
e
d
e
r
i
c
k
s
b
u
r
g
C
i
t
y
L
a
f
a
y
e
t
t
e
B
l
v
d
/
K
e
n
m
o
r
e
A
v
e
/C
h
a
r
l
e
s
S
t
R
o
u
n
d
a
b
o
u
t
s
U
D
A
T
D
M
X
$
5
,
8
0
0
,
0
0
0
$
1
,
9
7
8
,
8
2
6
1.167
5
.
9
0
$
1
,
9
78,826
34
8
6
F
r
e
d
e
r
i
c
k
s
b
u
r
g
K
i
n
g
G
e
o
r
g
e
C
o
u
n
t
y
R
o
u
t
e
3
0
1
a
n
d
R
o
u
t
e
3
M
e
d
i
a
n
U
‐
T
u
r
n
I
n
t
e
r
s
e
c
t
i
o
n
C
O
S
S
H
i
g
h
w
a
y
X
X
$
3
,
3
0
0
,
0
0
0
$
3
,
3
0
0
,
0
0
0
1
.
7
5
8
5
.
3
3
$3,300,000
45
5
5
F
r
e
d
e
r
i
c
k
s
b
u
r
g
F
r
e
d
e
r
i
c
k
s
b
u
r
g
R
e
g
i
o
n
a
l
T
r
a
n
s
i
t
N
e
w
C
o
m
m
u
t
e
r
P
ar
k
i
n
g
L
o
t
o
n
R
o
u
t
e
3
C
O
S
S
T
D
M
X
$
7
,
4
5
5
,
0
0
0
$
5
,
0
5
5
,
0
0
0
2
.
5
8
1
5
.
1
1
$
5
,
0
5
5,000
35
8
0
F
r
e
d
e
r
i
c
k
s
b
u
r
g
G
l
o
u
c
e
s
t
e
r
C
o
u
n
t
y
B
i
c
y
c
l
e
/
P
e
d
e
s
t
r
i
a
n
I
m
p
r
o
v
e
m
e
nt
s
o
n
R
t
e
1
7
B
‐
M
a
i
n
S
t
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
7
,
3
0
0
,
0
0
0
$
7
,
3
0
0
,
0
0
0
2
.906
3
.
9
8
$
7
,
3
0
0
,
0
0
0
36
2
2
F
r
e
d
e
r
i
c
k
s
b
u
r
g
F
r
e
d
e
r
i
c
k
s
b
u
r
g
C
i
t
y
D
i
x
o
n
S
t
r
e
e
t
/
L
a
n
s
d
o
w
n
e
R
o
a
d
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
U
D
A
H
i
g
h
w
a
y
X
$
2
,
2
0
0
,
0
0
0
$
2
,
2
0
0
,
0
0
0
0
.
8
6
6
3.94
$
2
,
2
0
0
,
0
0
0
38
7
8
F
r
e
d
e
r
i
c
k
s
b
u
r
g
G
e
o
r
g
e
W
a
s
h
i
n
g
t
o
n
R
e
g
i
o
n
a
l
C
o
m
m
R
o
u
t
e
3
S
T
A
R
S
St
u
d
y
I
m
p
r
o
v
e
m
e
n
t
s
C
O
S
S
H
i
g
h
w
a
y
X
$
7
,
4
2
0
,
0
0
0
$
6
,
3
7
4
,
1
3
9
1
.
7
2
4
2
.
7
0
$
6
,
3
74,139
36
2
1
F
r
e
d
e
r
i
c
k
s
b
u
r
g
F
r
e
d
e
r
i
c
k
s
b
u
r
g
C
i
t
y
U
.
S
.
R
o
u
t
e
1
/
F
a
l
l
H
i
l
l
A
v
e
nu
e
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
C
O
S
S
T
D
M
X
X
$
7
,
2
0
0
,
0
0
0
$
7
,
2
0
0
,
0
0
0
1
.
6
3
6
2
.
2
7
$
7
,
2
0
0
,
0
0
0
36
5
1
F
r
e
d
e
r
i
c
k
s
b
u
r
g
S
t
a
f
f
o
r
d
C
o
u
n
t
y
S
te
f
a
n
i
g
a
a
n
d
M
o
u
n
t
a
i
n
V
i
e
w
R
o
ad
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
S
a
f
e
t
y
H
i
g
h
w
a
y
X
$
3
,
7
0
0
,
0
0
0
$
2
,
7
0
0
,
0
0
0
0
.
560
2
.
0
7
$
2
,
7
0
0
,
0
0
0
36
6
8
H
a
m
p
t
o
n
R
o
a
d
s
W
i
l
l
i
a
m
s
b
u
r
g
C
i
t
y
L
a
f
a
y
e
t
t
e
S
t
r
e
e
t
S
i
g
n
a
l
&
P
e
d
es
t
r
i
a
n
I
m
p
r
o
v
e
m
e
n
t
s
R
N
H
i
g
h
w
a
y
X
X
$
9
1
,
0
0
0
$
9
1
,
0
0
0
0
.
5
9
8
6
5
.
7
4
$
9
1
,
0
0
0
35
4
8
H
a
m
p
t
o
n
R
o
a
d
s
C
h
e
s
a
p
e
a
k
e
C
i
t
y
B
a
t
t
l
e
f
i
e
l
d
B
l
v
d
/
V
o
l
v
o
P
k
w
y
I
n
t
er
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
R
N
H
i
g
h
w
a
y
X
X
$
1
,
4
7
5
,
1
2
9
$
1
,
4
4
7
,
1
2
9
9
.
0
9
2
6
2
.
8
3
$1,447,129
36
6
6
H
a
m
p
t
o
n
R
o
a
d
s
W
i
l
l
i
a
m
s
b
u
r
g
C
i
t
y
Ri
c
h
m
o
n
d
R
o
a
d
S
i
g
n
a
l
C
o
o
r
d
i
n
a
ti
o
n
&
P
e
d
e
s
t
r
i
a
n
I
m
p
r
o
v
e
m
e
n
t
s
C
O
S
S
H
i
g
h
w
a
y
X
X
$
2
0
3
,
5
0
0
$
2
0
3
,
5
0
0
1
.
1
6
6
5
7
.
2
8
$
2
0
3
,
5
0
0
39
6
6
H
a
m
p
t
o
n
R
o
a
d
s
N
o
r
f
o
l
k
C
i
t
y
B
a
l
l
e
n
t
i
n
e
B
l
v
d
L
a
n
e
I
m
p
r
o
v
e
m
e
n
t
s
R
N
H
i
g
h
w
a
y
X
X
$
1
,
0
6
7
,
3
8
8
$
1
,
0
6
7
,
3
8
8
5
.
5
2
4
5
1
.
7
5
$
1
,
0
6
7
,
3
8
8
43
9
2
H
a
m
p
t
o
n
R
o
a
d
s
P
o
r
t
s
m
o
u
t
h
C
i
t
y
P
o
rt
s
m
o
u
t
h
R
a
i
l
r
o
a
d
C
r
o
s
s
i
n
g
M
e
ss
a
g
e
S
i
g
n
s
U
D
A
T
D
M
X
$
7
5
3
,
6
9
9
$
5
7
0
,
0
0
0
2
.
7
1
8
4
7
.
6
8
$
5
7
0
,
0
0
0
36
9
2
H
a
m
p
t
o
n
R
o
a
d
s
W
i
l
l
i
a
m
s
b
u
r
g
A
r
e
a
T
r
a
n
s
i
t
A
u
t
h
o
r
i
t
y
W
A
T
A
B
u
s
S
to
p
P
u
l
l
O
f
f
s
R
N
B
u
s
T
r
a
n
s
i
t
X
$
2
5
5
,
0
0
0
$
2
5
5
,
0
0
0
0
.
5
6
5
2
2
.
1
7
$
2
5
5
,
0
0
0
40
5
7
H
a
m
p
t
o
n
R
o
a
d
s
N
o
r
f
o
l
k
C
i
t
y
T
e
r
m
i
n
a
l
B
l
v
d
/
D
i
v
e
n
S
t
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
R
N
H
i
g
h
w
a
y
X
X
$
1
,
7
3
2
,
6
0
0
$
1
,
7
3
2
,
6
0
0
3
.
3
2
5
1
9
.
1
9
$
1
,
7
3
2
,
6
00
41
7
5
H
a
m
p
t
o
n
R
o
a
d
s
N
o
r
t
h
a
m
p
t
o
n
C
o
u
n
t
y
S
h
o
u
l
d
e
r
W
i
d
e
n
i
n
g
R
t
e
1
3
S
a
f
e
ty
H
i
g
h
w
a
y
X
$
2
,
9
2
3
,
3
5
7
$
2
,
9
2
3
,
3
5
7
3
.
0
4
2
1
0
.
4
1
$
2
,
9
2
3
,
3
5
7
38
8
4
H
a
m
p
t
o
n
R
o
a
d
s
G
r
e
e
n
s
v
i
l
l
e
C
o
u
n
t
y
H
W
Y
3
0
1
S
S
i
d
e
w
a
l
k
G
r
e
e
n
s
v
i
l
l
e
P
r
o
j
e
c
t
S
a
f
e
t
y
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
5
7
6
,
9
0
3
$
5
7
6
,
9
0
3
0
.
5
5
0
9
.
5
4
$
5
7
6
,
9
0
3
35
8
3
H
a
m
p
t
o
n
R
o
a
d
s
N
e
w
p
o
r
t
N
e
w
s
C
i
t
y
J.
C
l
y
d
e
M
o
r
r
i
s
B
l
v
d
I
n
t
e
r
s
e
c
ti
o
n
I
m
p
r
o
v
e
m
e
n
t
s
C
O
S
S
H
i
g
h
w
a
y
X
X
$
1
,
7
6
8
,
5
2
8
$
1
,
7
6
8
,
5
2
8
1
.
3
4
1
7
.
5
8
$
1
,
7
68,528
49
4
7
H
a
m
p
t
o
n
R
o
a
d
s
H
a
m
p
t
o
n
R
o
a
d
s
T
r
a
ns
i
t
N
e
w
p
o
r
t
N
e
w
s
S
h
i
p
y
a
r
d
‐
G
lo
u
c
e
s
t
e
r
M
A
X
S
e
r
v
i
c
e
C
O
S
S
B
u
s
T
r
a
n
s
i
t
X
$
1
,
2
0
0
,
0
0
0
$
1
,
2
0
0
,
0
0
0
0
.
9
0
2
7
.52
$
1
,
2
0
0
,
0
0
0
35
8
1
H
a
m
p
t
o
n
R
o
a
d
s
N
e
w
p
o
r
t
N
e
w
s
C
i
ty
J
e
f
f
e
r
s
o
n
A
v
e
&
O
y
s
t
e
r
P
o
i
n
t
Rd
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
R
N
H
i
g
h
w
a
y
X
X
$
1
0
,
8
5
6
,
5
2
1
$
1
0
,
8
5
6
,
5
2
1
7
.
255
6
.
6
8
$
1
0
,
8
5
6
,
5
2
1
36
7
2
H
a
m
p
t
o
n
R
o
a
d
s
H
a
m
p
t
o
n
C
i
t
y
H
a
m
p
t
o
n
R
o
a
d
s
C
e
n
t
e
r
P
k
w
y
B
i
k
e
&
P
ed
e
s
t
r
i
a
n
A
c
c
e
s
s
U
D
A
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
2
,
1
6
3
,
3
2
5
$
2
,
1
5
8
,
3
2
5
1
.
3
8
6
6
.
4
2
$
2
,
1
5
8
,
3
2
5
36
3
2
H
a
m
p
t
o
n
R
o
a
d
s
S
u
s
s
e
x
C
o
u
n
t
y
W
a
k
ef
i
e
l
d
4
6
0
E
a
s
t
b
o
u
n
d
T
u
r
n
l
a
n
e
S
af
e
t
y
H
i
g
h
w
a
y
X
$
9
9
4
,
8
4
6
$
9
8
1
,
2
9
0
0
.
6
1
0
6
.
2
1
$
9
8
1
,
2
9
0
36
7
0
H
a
m
p
t
o
n
R
o
a
d
s
H
a
m
p
t
o
n
C
i
t
y
N
A
r
m
i
s
t
e
a
d
A
v
e
R
e
c
o
n
s
t
r
u
c
t
i
o
n
,
P
e
d,
&
D
r
a
i
n
a
g
e
I
m
p
r
o
v
e
m
e
n
t
s
U
D
A
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
5
,
2
9
8
,
5
2
8
$
4
,
8
1
8
,
5
28
1
.
8
4
7
3
.
8
3
$
4
,
8
1
8
,
5
2
8
49
7
1
H
a
m
p
t
o
n
R
o
a
d
s
I
s
l
e
o
f
W
i
g
h
t
C
ou
n
t
y
C
a
r
r
o
l
l
t
o
n
B
o
u
l
e
v
a
r
d
(
R
o
u
t
e
1
7
)
C
r
o
s
s
w
a
l
k
s
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
2
1
2
,
0
0
0
$
2
1
2
,
0
0
0
0
.
0
8
1
3
.
8
2
$
2
1
2,000
34
7
0
H
a
m
p
t
o
n
R
o
a
d
s
H
a
m
p
t
o
n
R
o
a
d
s
T
r
a
ns
p
o
r
t
a
t
i
o
n
P
l
a
n
H
a
m
p
t
o
n
R
o
a
d
s
B
r
i
d
g
e
‐
T
u
n
n
e
l
W
i
d
e
n
i
ng
/
I
‐
6
4
E
x
p
a
n
s
i
o
n
C
O
S
S
H
i
g
h
w
a
y
X
$
3
,
6
6
2
,
3
7
2
,
0
0
4
$
2
0
0
,
0
0
0
,
0
0
0
7
4
.
1
5
9
3
.
7
1
$
2
0
0
,
0
0
0
,
0
0
0
41
0
5
H
a
m
p
t
o
n
R
o
a
d
s
Y
o
r
k
C
o
u
n
t
y
R
o
u
t
e
1
7
1
c
a
p
a
c
i
t
y
e
n
h
a
n
c
e
m
e
n
t
s
b
e
t
we
e
n
R
o
u
t
e
s
1
3
4
a
n
d
1
7
4
0
R
N
H
i
g
h
w
a
y
X
X
$
3
,
6
3
0
,
0
0
0
$
2
,
4
2
0
,
0
0
0
0
.
7
3
4
3
.
0
3
$
2
,
4
2
0
,
0
0
0
34
6
3
H
a
m
p
t
o
n
R
o
a
d
s
N
e
w
p
o
r
t
N
e
w
s
C
i
t
y
W
a
r
w
i
c
k
B
l
v
d
&
O
y
s
t
e
r
P
o
i
n
t
R
d
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
C
O
S
S
H
i
g
h
w
a
y
X
X
$
5
,
4
4
5
,
7
3
7
$
5
,
4
4
5
,
7
3
7
1
.
6
39
3
.
0
1
$
5
,
4
4
5
,
7
3
7
41
7
9
H
a
m
p
t
o
n
R
o
a
d
s
N
o
r
t
h
a
m
p
t
o
n
C
o
un
t
y
B
i
c
y
c
l
e
L
a
n
e
o
n
U
S
B
u
s
i
n
e
s
s
13
C
O
S
S
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
2
,
3
6
0
,
0
6
1
$
2
,
3
6
0
,
0
6
1
0
.
5
5
9
2
.
3
7
$
2
,
3
6
0
,
0
6
1
46
4
2
H
a
m
p
t
o
n
R
o
a
d
s
N
o
r
f
o
l
k
C
i
t
y
V
i
r
g
i
n
i
a
B
e
a
c
h
B
l
v
d
W
i
d
e
n
i
n
g
–
G
e
o
rg
e
S
t
t
o
N
e
w
t
o
w
n
R
d
C
O
S
S
H
i
g
h
w
a
y
X
X
$
1
5
,
7
0
1
,
0
2
1
$
1
5
,
7
0
1
,
0
2
1
3
.
7
1
4
2
.
3
7
$
1
5
,
7
0
1
,
0
2
1
35
8
2
H
a
m
p
t
o
n
R
o
a
d
s
V
i
r
g
i
n
i
a
B
e
a
c
h
C
i
ty
G
e
n
e
r
a
l
B
o
o
t
h
B
l
v
d
/
O
c
e
a
n
a
B
lv
d
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
S
a
f
e
t
y
H
i
g
h
w
a
y
X
$
4
,
1
0
0
,
2
7
7
$
3
,
6
0
0
,
0
0
0
0.796
2
.
2
1
$
3
,
6
0
0
,
0
0
0
34
6
8
H
a
m
p
t
o
n
R
o
a
d
s
W
i
l
l
i
a
m
s
b
u
r
g
C
i
t
y
L
a
f
a
y
e
t
t
e
S
t
r
e
e
t
W
i
d
e
n
i
n
g
U
D
A
H
ig
h
w
a
y
X
$
5
,
8
7
0
,
0
0
0
$
4
,
3
2
9
,
0
0
0
0
.
8
3
8
1
.
9
4
$
4
,
3
2
9
,
0
0
0
34
6
9
H
a
m
p
t
o
n
R
o
a
d
s
W
i
l
l
i
a
m
s
b
u
r
g
C
i
t
y
M
o
nt
i
c
e
l
l
o
A
v
e
‐
R
i
c
h
m
o
n
d
R
d
‐
L
a
fa
y
e
t
t
e
S
t
R
o
u
n
d
a
b
o
u
t
U
D
A
H
i
g
h
w
ay
X
$
6
,
3
8
1
,
0
9
0
$
6
,
3
8
1
,
0
9
0
1
.
1
9
9
1
.
8
8
$
6
,381,090
41
2
5
H
a
m
p
t
o
n
R
o
a
d
s
J
a
m
e
s
C
i
t
y
C
o
u
n
t
y
L
o
n
g
h
i
l
l
R
o
a
d
S
h
a
r
e
d
U
s
e
P
a
t
h
RN
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
4
,
4
0
0
,
0
0
0
$
4
,
4
0
0
,
0
0
0
0
.
8
0
5
1
.
8
3
$
4
,
4
0
0
,
0
0
0
49
6
7
H
a
m
p
t
o
n
R
o
a
d
s
S
u
r
r
y
C
o
u
n
t
y
R
o
u
t
e
3
1
B
i
c
y
c
l
e
A
c
c
o
m
o
d
a
t
i
o
n
s
S
a
f
e
ty
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
9
,
6
0
0
,
0
0
0
$
9
,
6
0
0
,
0
0
0
1
.
7
1
8
1
.
7
9
$
9
,
6
0
0
,
0
0
0
35
5
6
L
y
n
c
h
b
u
r
g
L
y
n
c
h
b
u
r
g
C
i
t
y
R
i
v
e
r
m
o
n
t
A
v
e
.
a
n
d
B
e
d
f
o
r
d
A
v
e
.
I
n
t
e
rs
e
c
t
i
o
n
i
m
p
r
o
v
e
m
e
n
t
U
D
A
H
i
g
h
w
a
y
X
$
4
8
5
,
0
0
0
$
4
8
5
,
0
0
0
1
.
3
5
7
2
7
.
9
7
$
4
8
5
,
0
00
41
7
7
L
y
n
c
h
b
u
r
g
P
i
t
t
s
y
l
v
a
n
i
a
C
o
u
n
t
y
S
h
u
l
a
D
r
i
v
e
R
e
l
o
c
a
t
i
o
n
R
N
H
i
g
h
w
a
y
X
X
$
4
,
7
6
8
,
4
6
6
$
4
,
7
6
8
,
4
6
6
5
.
5
8
8
1
1
.
7
2
$
4
,
7
6
8
,
4
6
6
36
7
5
L
y
n
c
h
b
u
r
g
D
a
n
v
i
l
l
e
M
e
t
r
o
p
o
l
i
t
a
n
P
l
a
n
n
i
n
g
O
r
g
a
S
o
u
t
h
e
r
n
V
i
r
g
i
n
ia
M
e
g
a
S
i
t
e
a
t
B
e
r
r
y
H
i
l
l
C
o
n
n
e
ct
o
r
R
o
a
d
R
N
H
i
g
h
w
a
y
X
$
3
3
,
4
5
6
,
7
0
4
$
30,931,704
2
4
.
0
0
0
7
.
7
6
$
3
0
,
9
3
1
,
7
0
4
38
2
1
L
y
n
c
h
b
u
r
g
H
a
l
i
f
a
x
T
o
w
n
M
a
i
n
S
t
.
(
U
S
5
0
1
)
‐
M
o
u
n
t
a
i
n
R
d
.
(
V
A
3
6
0
)
Tu
r
n
i
n
g
R
a
d
i
u
s
U
D
A
H
i
g
h
w
a
y
X
$
7
3
8
,
9
2
5
$
7
3
8
,
9
2
5
0
.
5
6
4
7
.
6
3
$
7
3
8
,
9
2
5
43
0
4
L
y
n
c
h
b
u
r
g
A
m
h
e
r
s
t
C
o
u
n
t
y
R
o
u
t
e
2
9
/
R
o
u
t
e
1
5
1
I
n
t
e
r
s
e
c
t
i
o
n
R
N
H
i
g
hw
a
y
X
X
$
3
,
3
0
0
,
0
2
7
$
3
,
3
0
0
,
0
2
7
2
.
4
8
7
7
.
5
4
$
3
,
3
0
0
,
0
2
7
38
2
7
L
y
n
c
h
b
u
r
g
N
e
l
s
o
n
C
o
u
n
t
y
U
S
R
o
u
t
e
29
a
n
d
R
o
u
t
e
6
I
n
t
e
r
s
e
c
t
i
o
n
S
af
e
t
y
H
i
g
h
w
a
y
X
$
2
,
7
2
5
,
6
7
7
$
2
,
7
2
5
,
6
7
7
1
.
9
4
8
7
.
1
5
$
2
,
7
2
5
,
6
7
7
35
5
4
L
y
n
c
h
b
u
r
g
L
y
n
c
h
b
u
r
g
C
i
t
y
U
S
5
0
1
Bu
s
‐
L
a
n
g
h
o
r
n
e
a
n
d
V
a
s
s
a
r
R
o
un
d
a
b
o
u
t
U
D
A
H
i
g
h
w
a
y
X
$
6
,
1
0
0
,
000
$
6
,
1
0
0
,
0
0
0
2
.
3
1
4
3
.
7
9
$
6
,
1
0
0
,
0
0
0
34
9
8
L
y
n
c
h
b
u
r
g
C
a
m
p
b
e
l
l
C
o
u
n
t
y
R
o
u
t
e
29
/
6
9
9
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
me
n
t
s
S
a
f
e
t
y
H
i
g
h
w
a
y
X
$
3
,
0
8
6
,
8
1
0
$
3
,
0
8
6
,
8
1
0
1
.
1
5
0
3
.
7
3
$
3
,
0
8
6
,
8
1
0
41
2
9
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
D
A
S
H
A
l
e
x
a
n
d
r
i
a
T
r
a
n
s
i
t
C
o
m
p
a
n
y
C
i
t
y
w
i
d
e
T
S
P
o
n
M
a
j
o
r
C
o
r
r
i
d
o
r
s
R
N
B
u
s
T
r
a
n
s
i
t
X
$
2
,
2
3
0
,
0
0
0
$
2
,
1
1
0
,
0
0
0
1
0
.
3
5
4
4
9
.
07
$
2
,
1
1
0
,
0
0
0
1/
1
5
/
2
0
1
9
SM
A
R
T
S
C
A
L
E
R
o
u
n
d
3
DR
A
F
T
S
t
a
f
f
R
e
c
o
m
m
e
n
d
ed
F
u
n
d
i
n
g
S
c
e
n
a
r
i
o
Di
s
p
l
a
y
I
D
D
i
s
t
r
i
c
t
O
r
g
a
n
i
z
a
t
i
o
n
D
e
s
c
r
i
p
t
i
o
n
N
e
e
d
I
m
p
r
o
v
e
m
e
n
t
T
y
p
e
D
G
P
H
P
P
T
o
t
a
l
C
o
s
t
S
M
A
R
T
S
C
A
L
E
C
o
s
t
B
e
nefit
S
c
o
r
e
(
1
)
D
G
P
(
2
)
H
P
P
(
3
)
H
P
P
39
0
3
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
A
r
l
i
n
g
t
o
n
T
r
a
n
s
i
t
C
r
y
s
t
a
l
C
i
t
y
P
o
t
o
m
a
c
Y
a
r
d
T
r
a
n
s
i
t
w
a
y
S
o
u
t
h
e
r
n
E
x
t
e
n
s
i
o
n
C
O
S
S
B
u
s
T
r
a
n
s
i
t
X
$
8
,
4
2
6
,
6
9
4
$
6
,
6
1
1
,
694
1
9
.
5
1
0
2
9
.
5
1
$
6
,
6
1
1
,
6
9
4
40
9
8
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
F
a
l
l
s
C
h
u
r
c
h
C
i
t
y
S
W
a
s
h
i
n
g
t
o
n
M
u
l
t
i
m
o
d
a
l
I
mp
r
o
v
e
m
e
n
t
s
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
9
,
0
0
9
,
3
3
7
$
2
,
8
2
7
,
0
1
0
6
.
2
9
1
2
2
.
2
5
$
2
,
827,010
35
6
8
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
A
l
e
x
a
n
d
r
i
a
C
i
t
y
S
a
f
e
t
y
&
C
a
p
a
c
i
t
y
E
n
h
a
n
c
e
m
e
nt
s
a
t
D
u
k
e
/
T
a
y
l
o
r
R
u
n
/
T
e
l
e
g
r
a
p
h
R
N
H
i
g
h
w
a
y
X
X
$
6
,
5
4
5
,
4
6
0
$
5
,
7
4
5
,
4
6
0
9.717
1
6
.
9
1
$
5
,
7
4
5
,
4
6
0
35
1
0
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
A
l
e
x
a
n
d
r
i
a
C
i
t
y
A
c
c
e
s
s
I
m
p
r
o
v
e
m
e
n
t
s
t
o
t
h
e
La
n
d
m
a
r
k
T
r
a
n
s
i
t
H
u
b
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
6
,
3
3
4
,
6
3
0
$
6
,
3
3
4
,
6
3
0
6
.
4
7
3
1
0
.
2
2
$
6
,
3
3
4
,
6
3
0
37
7
9
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
F
a
i
r
f
a
x
C
i
t
y
P
i
c
k
e
t
t
T
r
a
i
l
C
o
n
n
e
c
t
o
r
R
N
B
i
k
e
/
Pe
d
e
s
t
r
i
a
n
X
X
$
5
,
9
6
5
,
4
4
4
$
5
,
9
6
5
,
4
4
4
4
.
0
1
6
6
.
7
3
$
5
,
9
6
5
,
4
4
4
35
3
7
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
L
o
u
d
o
u
n
C
o
u
n
t
y
R
o
u
t
e
5
0
C
o
r
r
i
d
o
r
I
m
p
r
o
v
e
m
e
n
ts
U
D
A
H
i
g
h
w
a
y
X
$
5
,
0
0
0
,
0
0
0
$
1
,
2
9
2
,
5
0
0
0
.
7
9
7
6
.
1
7
$
1
,
2
9
2
,
5
0
0
37
7
8
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
F
a
i
r
f
a
x
C
i
t
y
F
a
i
r
f
a
x
B
l
v
d
/
W
a
r
w
i
c
k
A
v
e
I
n
t
e
r
se
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
C
O
S
S
H
i
g
h
w
a
y
X
X
$
8
,
8
3
9
,
3
2
7
$
8
,
8
3
9
,
3
2
7
4
.
9
3
1
5
.
5
8
$
8,839,327
39
3
0
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
A
r
l
i
n
g
t
o
n
T
r
a
n
s
i
t
C
r
y
s
t
a
l
C
i
t
y
M
e
t
r
o
E
a
s
t
E
nt
r
a
n
c
e
R
N
R
a
i
l
T
r
a
n
s
i
t
X
$
9
0
,
7
6
5
,
0
0
0
$
5
2
,
9
0
0
,
0
0
0
2
9
.
0
3
2
5
.
4
9
$
5
2
,
9
0
0
,
0
00
34
5
2
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
A
l
e
x
a
n
d
r
i
a
C
i
t
y
W
e
s
t
E
n
d
T
r
a
n
s
i
t
w
a
y
C
o
r
r
i
d
o
r
I
n
v
e
s
t
m
e
n
t
s
C
O
S
S
B
u
s
T
r
a
n
s
i
t
X
X
$
6
1
,
8
0
0
,
0
0
0
$
5
7
,
2
0
0
,
0
0
0
2
9
.
1
9
6
5
.
1
0
$
57,200,000
37
9
9
N
o
r
t
h
e
r
n
V
i
r
g
i
n
i
a
F
a
i
r
f
a
x
C
o
u
n
t
y
R
i
c
h
m
o
n
d
H
i
g
h
w
a
y
‐
B
u
s
R
a
p
i
d
T
ra
n
s
i
t
C
O
S
S
B
u
s
T
r
a
n
s
i
t
X
X
$
5
4
4
,
8
0
0
,
0
0
0
$
5
0
,
0
0
0
,
0
0
0
1
4
.
9
5
7
2
.
9
9
$
5
0
,
0
0
0
,000
39
2
5
R
i
c
h
m
o
n
d
P
r
i
n
c
e
G
e
o
r
g
e
C
o
u
n
t
y
L
o
w
e
r
A
p
p
o
m
a
t
t
o
x
R
i
v
e
r
T
r
a
i
l
R
N
B
ik
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
4
4
,
0
0
0
$
4
4
,
0
0
0
0
.
1
3
9
3
1
.
6
4
$
4
4
,
0
0
0
45
8
4
R
i
c
h
m
o
n
d
N
o
t
t
o
w
a
y
C
o
u
n
t
y
R
o
u
n
d
a
b
o
ut
f
o
r
D
a
r
v
i
l
l
s
R
d
.
(
V
A
4
0
)
at
M
i
l
i
t
a
r
y
R
d
.
S
a
f
e
t
y
H
i
g
h
w
a
y
X
$
7
,
2
6
7
,
5
0
0
$
7
,
2
6
7
,
5
0
0
1
9
.
5
6
4
2
6
.
9
2
$
7
,
267,500
40
4
4
R
i
c
h
m
o
n
d
H
e
n
r
i
c
o
C
o
u
n
t
y
P
a
r
h
a
m
R
d
T
r
a
f
f
i
c
S
i
g
n
a
l
&
S
i
d
e
w
a
l
k
P
ro
j
e
c
t
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
4
,
4
6
0
,
0
0
0
$
1
,
3
3
5
,
0
0
0
3
.
2
7
6
2
4
.
5
4
$
1
,
3
3
5
,
0
00
37
1
3
R
i
c
h
m
o
n
d
G
r
e
a
t
e
r
R
i
c
h
m
o
n
d
T
r
a
n
si
t
C
o
m
p
a
n
y
A
S
c
o
t
t
'
s
A
d
d
i
t
i
o
n
B
R
T
S
t
a
t
i
o
n
P
e
d
e
s
t
r
i
a
n
S
a
f
e
t
y
/
S
t
r
e
e
t
s
c
a
p
e
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
1
,
612,000
$
1
,
6
1
2
,
0
0
0
3
.
6
5
9
2
2
.
7
0
$
1
,
6
1
2
,
0
0
0
34
3
0
R
i
c
h
m
o
n
d
R
i
c
h
m
o
n
d
C
i
t
y
G
U
S
3
3
L
e
i
g
h
S
t
r
e
e
t
S
t
r
e
e
t
s
c
a
p
e
I
m
p
r
o
v
em
e
n
t
s
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
6
,
6
0
8
,
0
0
0
$
6
,
6
0
8
,
0
0
0
7
.
8
7
2
1
1
.
9
1
$
6
,
6
0
8
,
0
00
49
7
7
R
i
c
h
m
o
n
d
C
h
e
s
t
e
r
f
i
e
l
d
C
o
u
n
t
y
I
T
S
S
i
g
n
a
l
U
p
g
r
a
d
e
s
R
N
H
i
g
h
w
a
y
X
X
$
1
0,440,000
$
1
0
,
4
4
0
,
0
0
0
1
1
.
3
5
1
1
0
.
8
7
$
1
0
,
4
4
0
,
0
0
0
34
3
2
R
i
c
h
m
o
n
d
R
i
c
h
m
o
n
d
C
i
t
y
I
B
o
u
l
e
v
a
r
d
S
h
a
r
e
d
U
s
e
P
a
t
h
t
o
S
c
i
e
n
c
e
M
u
s
e
u
m
B
R
T
S
t
a
t
i
o
n
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
2
,
9
9
2
,
4
8
1
$
2
,
9
9
2
,
4
8
1
3
.
1
1
3
10.40
$
2
,
9
9
2
,
4
8
1
48
8
0
R
i
c
h
m
o
n
d
N
o
t
t
o
w
a
y
C
o
u
n
t
y
C
o
n
s
t
r
u
c
t
R
‐
C
U
T
a
t
t
h
e
e
n
d
L
e
w
i
s
t
o
w
n
P
l
a
n
k
R
d
a
t
4
6
0
S
a
f
e
t
y
H
i
g
h
w
a
y
X
$
3
,
3
6
4
,
4
3
7
$
3
,
3
6
4
,
4
3
7
3
.
3
9
2
1
0
.
0
8
$
3
,
364,437
38
6
8
R
i
c
h
m
o
n
d
C
h
a
r
l
e
s
C
i
t
y
C
o
u
n
t
y
R
ou
t
e
1
0
6
/
R
o
u
t
e
5
R
o
u
n
d
a
b
o
u
t
S
a
f
e
ty
H
i
g
h
w
a
y
X
$
4
,
1
1
0
,
0
0
0
$
4
,
1
1
0
,
0
0
0
4
.
0
7
3
9
.
9
1
$
4
,
1
1
0
,
0
0
0
34
2
8
R
i
c
h
m
o
n
d
R
i
c
h
m
o
n
d
C
i
t
y
E
M
a
u
r
y
S
t
r
e
e
t
S
t
r
e
e
t
s
c
a
p
e
P
h
a
s
e
I
I
R
N
B
ik
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
4
,
6
1
8
,
0
0
0
$
4
,
6
1
8
,
0
0
0
4
.
2
4
4
9
.
1
9
$
4
,
6
1
8
,
0
0
0
37
2
6
R
i
c
h
m
o
n
d
G
r
e
a
t
e
r
R
i
c
h
m
o
n
d
T
r
a
n
s
i
t
C
o
m
p
a
n
y
C
R
v
r
f
r
o
n
t
/
O
r
l
e
a
n
s
B
R
T
S
t
a
t
i
o
n
P
e
d
e
s
t
r
i
a
n
S
a
f
e
t
y
/
S
t
r
e
e
t
s
c
a
p
e
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
2
,
057,000
$
2
,
0
5
7
,
0
0
0
1
.
6
2
7
7
.
9
1
$
2
,
0
5
7
,
0
0
0
35
4
9
R
i
c
h
m
o
n
d
H
e
n
r
i
c
o
C
o
u
n
t
y
N
L
a
b
u
r
nu
m
A
v
e
n
u
e
P
e
d
e
s
t
r
i
a
n
a
n
d
T
r
a
n
si
t
I
m
p
r
o
v
e
m
e
n
t
s
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
3
,
0
5
4
,
0
0
0
$
2
,
6
8
9
,
0
0
0
2
.
0
9
3
7
.
7
8
$
2
,
6
8
9
,
0
0
0
49
7
2
R
i
c
h
m
o
n
d
C
h
e
s
t
e
r
f
i
e
l
d
C
o
u
n
t
y
S
u
p
e
r
s
t
r
e
e
t
‐
R
o
u
t
e
6
0
a
t
W
o
o
l
r
i
dg
e
R
o
a
d
/
O
l
d
B
u
c
k
i
n
g
h
a
m
R
o
a
d
U
D
A
H
i
g
h
w
a
y
X
$
1
3
,
2
3
9
,
0
0
0
$
1
3
,
2
3
9
,
0
0
0
1
0
.026
7
.
5
7
$
1
3
,
2
3
9
,
0
0
0
37
1
0
R
i
c
h
m
o
n
d
D
i
n
w
i
d
d
i
e
C
o
u
n
t
y
R
o
u
t
e
6
0
0
/
R
o
u
t
e
6
0
1
R
o
u
n
d
a
b
o
u
t
S
a
f
e
t
y
H
i
g
h
w
a
y
X
$
3
,
7
0
0
,
0
0
0
$
3
,
7
0
0
,
0
0
0
2
.
7
0
5
7
.
3
1
$
3
,
7
0
0
,
0
0
0
37
6
4
S
a
l
e
m
R
o
a
n
o
k
e
C
i
t
y
O
r
a
n
g
e
A
v
e
n
u
e
(
U
S
4
6
0
)
I
m
p
r
o
v
e
m
e
n
t
s
C
O
S
S
H
i
g
hw
a
y
X
X
$
2
,
8
1
8
,
7
0
4
$
2
,
8
1
8
,
7
0
4
3
.
4
6
0
1
2
.
2
8
$
2
,
8
1
8
,
7
0
4
35
9
7
S
a
l
e
m
F
r
a
n
k
l
i
n
C
o
u
n
t
y
R
o
a
d
w
a
y
I
m
p
r
o
v
e
m
e
n
t
s
o
n
R
t
e
s
2
2
0
/
6
1
9
(
P
l
ea
s
a
n
t
H
i
l
l
/
S
o
n
t
a
g
)
C
O
S
S
H
i
g
h
w
ay
X
X
$
5
,
9
2
8
,
0
0
0
$
5
,
9
2
8
,
0
0
0
5
.
4
2
2
9
.
1
5
$
5
,928,000
41
2
6
S
a
l
e
m
F
r
a
n
k
l
i
n
C
o
u
n
t
y
R
o
a
d
w
a
y
I
m
p
r
o
v
e
m
e
n
t
s
o
n
R
t
e
s
2
2
0
/
9
1
9
(
G
ra
s
s
y
H
i
l
l
)
C
O
S
S
H
i
g
h
w
a
y
X
X
$
6
,
958,000
$
6
,
9
5
8
,
0
0
0
4
.
466
6
.
4
2
$
6
,
9
5
8
,
0
0
0
41
4
1
S
a
l
e
m
R
o
a
n
o
k
e
C
o
u
n
t
y
W
i
l
l
i
a
m
s
o
n
R
oa
d
S
i
d
e
w
a
l
k
I
m
p
r
o
v
e
m
e
n
t
s
U
D
A
Bi
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
1
,
9
3
4
,
0
0
0
$
1
,
6
6
2
,
2
2
0
0
.
8
2
3
4
.
9
5
$
1
,
6
6
2
,
2
2
0
35
5
3
S
a
l
e
m
F
r
a
n
k
l
i
n
C
o
u
n
t
y
R
o
a
d
w
a
y
i
mp
r
o
v
e
m
e
n
t
s
o
n
R
o
u
t
e
s
1
2
2
&
6
3
6
(
L
o
s
t
M
o
u
n
t
a
i
n
R
d
)
U
D
A
H
i
g
h
w
a
y
X
$
9
,
7
5
9
,
0
0
0
$
9
,
7
5
9
,
0
0
0
4
.
7
7
5
4
.
8
9
$
9
,
759,000
39
9
5
S
a
l
e
m
B
o
t
e
t
o
u
r
t
C
o
u
n
t
y
R
o
u
t
e
2
2
0
a
t
I
n
t
e
r
n
a
t
i
o
n
a
l
P
a
r
k
w
a
y
I
n
t
er
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
R
N
H
i
g
h
w
a
y
X
X
$
4
,
5
5
1
,
0
0
0
$
4
,
2
5
1
,
0
0
0
1
.
6
2
9
3
.
8
3
$
4,251,000
36
4
7
S
t
a
u
n
t
o
n
B
a
t
h
C
o
u
n
t
y
H
o
t
S
p
r
i
n
g
s
‐
U
S
2
2
0
&
V
A
6
1
5
I
n
t
e
r
s
e
c
t
i
on
I
m
p
r
o
v
e
m
e
n
t
s
U
D
A
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
5
6
0
,
7
6
9
$
5
6
0
,
7
6
9
2
.
4
0
1
4
2
.
8
2
$
5
6
0,769
39
1
8
S
t
a
u
n
t
o
n
W
a
r
r
e
n
C
o
u
n
t
y
R
t
e
.
3
4
0
/
5
2
2
S
B
/
I
‐
6
6
W
B
O
n
‐
R
a
m
p
E
x
t
e
n
s
io
n
R
N
H
i
g
h
w
a
y
X
X
$
5
1
8
,
6
6
4
$
5
1
8
,
6
6
4
1
.
6
5
4
3
1
.
8
8
$
5
1
8
,
6
6
4
39
2
9
S
t
a
u
n
t
o
n
W
a
r
r
e
n
C
o
u
n
t
y
J
o
h
n
M
a
r
s
h
a
l
l
H
w
y
.
/
R
t
e
.
5
5
E
a
s
t
S
a
f
e
t
y
I
m
p
r
o
v
e
m
e
n
t
P
r
o
j
e
c
t
C
O
S
S
H
i
g
h
w
a
y
X
X
$
1
,
6
3
3
,
6
3
7
$
1
,
6
3
3
,
6
3
7
4
.
1
1
4
2
5
.
1
8
$1,633,637
36
6
2
S
t
a
u
n
t
o
n
S
h
e
n
a
n
d
o
a
h
C
o
u
n
t
y
I
‐
81
E
x
i
t
2
9
1
N
o
r
t
h
b
o
u
n
d
R
a
m
p
W
i
d
e
ni
n
g
C
O
S
S
H
i
g
h
w
a
y
X
X
$
7
8
1
,
7
0
1
$
7
8
1
,
7
0
1
1
.
6
7
2
2
1
.
3
8
$
7
8
1
,
7
0
1
39
2
1
S
t
a
u
n
t
o
n
W
a
r
r
e
n
C
o
u
n
t
y
R
t
e
.
3
4
0
/
5
2
2
L
i
g
h
t
i
n
g
P
r
o
j
e
c
t
S
a
f
e
t
y
H
i
g
hw
a
y
X
$
3
,
1
4
9
,
9
4
8
$
3
,
1
4
9
,
9
4
8
5
.
1
9
1
1
6
.
4
8
$
3
,
1
4
9
,
9
4
8
37
3
0
S
t
a
u
n
t
o
n
P
a
g
e
C
o
u
n
t
y
I
n
t
e
r
s
e
c
t
i
o
n
I
m
p
r
o
v
e
m
e
n
t
s
U
S
‐
2
1
1
/
3
4
0
B
i
g
O
a
k
R
d
S
a
f
e
t
y
H
i
g
h
w
a
y
X
$
3
,
3
1
0
,
9
7
7
$
3
,
3
1
0
,
9
7
7
4
.
6
4
2
1
4
.
0
2
$
3
,
3
1
0
,
9
7
7
39
6
2
S
t
a
u
n
t
o
n
R
o
c
k
i
n
g
h
a
m
C
o
u
n
t
y
U
S
1
1
N
(
N
o
r
t
h
V
a
l
l
e
y
P
i
k
e
)
S
i
d
e
w
a
lk
C
O
S
S
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
3
,
0
3
7
,
5
5
8
$
3
,
0
3
7
,
5
5
8
3
.
6
4
5
1
2
.
0
0
$
3
,
0
3
7
,
5
5
8
36
1
1
S
t
a
u
n
t
o
n
W
a
y
n
e
s
b
o
r
o
C
i
t
y
E
a
s
t
M
a
i
n
S
t
r
e
e
t
s
c
a
p
e
C
O
S
S
B
i
k
e
/
P
e
d
e
s
t
ri
a
n
X
X
$
2
,
2
4
9
,
9
8
7
$
2
,
2
4
9
,
9
8
7
2
.
6
7
9
1
1
.
9
1
$
2
,
2
4
9
,
9
8
7
36
9
8
S
t
a
u
n
t
o
n
A
u
g
u
s
t
a
C
o
u
n
t
y
R
T
2
5
4
‐
RT
6
4
0
I
n
t
e
r
s
e
c
t
i
o
n
S
a
f
e
t
y
P
ro
j
e
c
t
S
a
f
e
t
y
H
i
g
h
w
a
y
X
$
1
,
1
6
5
,
1
3
7
$
1
,
1
6
5
,
1
3
7
1
.
1
3
2
9
.
7
2
$
1
,
1
6
5
,
1
3
7
36
8
9
S
t
a
u
n
t
o
n
S
t
a
u
n
t
o
n
C
i
t
y
E
d
g
e
w
o
o
d
R
o
a
d
S
i
d
e
w
a
l
k
I
m
p
r
o
v
e
m
e
n
t
s
U
D
A
Bi
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
1
,
0
9
8
,
0
7
1
$
1
,
0
9
8
,
0
7
1
0
.
9
5
3
8
.
6
8
$
1
,
0
9
8
,
0
7
1
36
3
7
S
t
a
u
n
t
o
n
W
a
y
n
e
s
b
o
r
o
C
i
t
y
1
3
t
h
an
d
R
o
s
s
e
r
R
o
u
n
d
a
b
o
u
t
U
D
A
H
i
g
h
w
a
y
X
$
5
7
8
,
9
3
7
$
5
5
0
,
9
9
0
0
.
4
6
4
8
.
4
2
$
5
5
0
,
9
9
0
37
0
0
S
t
a
u
n
t
o
n
S
t
a
u
n
t
o
n
C
i
t
y
N
o
r
t
h
A
u
g
us
t
a
S
i
d
e
w
a
l
k
‐
‐
L
a
m
b
e
r
t
S
t
t
o
Te
r
r
y
C
o
u
r
t
U
D
A
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
1
,
4
7
7
,
3
7
1
$
1
,
4
7
7
,
3
7
1
1
.
1
8
2
8
.
0
0
$
1
,
4
77,371
42
4
7
S
t
a
u
n
t
o
n
W
i
n
c
h
e
s
t
e
r
C
i
t
y
T
r
a
f
f
i
c
S
i
g
n
a
l
I
m
p
r
o
v
e
m
e
n
t
s
o
n
V
a
l
l
e
y
a
n
d
G
e
r
r
a
r
d
C
o
r
r
i
d
o
r
s
R
N
H
i
g
h
w
a
y
X
X
$
1
,
2
2
7
,
0
0
0
$
1
,
2
2
7
,
0
0
0
0
.
9
6
8
7
.
8
9
$1,227,000
42
2
4
S
t
a
u
n
t
o
n
W
i
n
‐
F
r
e
d
M
e
t
r
o
p
o
l
i
t
a
n
P
l
a
n
n
i
n
g
O
r
g
I‐
8
1
E
x
i
t
3
1
7
A
c
c
e
l
/
D
e
c
e
l
L
a
n
e
E
x
t
e
n
s
i
o
n
s
C
O
S
S
H
i
g
h
w
a
y
X
$
3
,
2
0
9
,
0
5
6
$3,209,056
2
.
2
6
2
7
.
0
5
$
3
,
2
0
9
,
0
5
6
35
8
8
S
t
a
u
n
t
o
n
H
a
r
r
i
s
o
n
b
u
r
g
C
i
t
y
U
n
i
v
e
r
s
i
t
y
B
l
v
d
/
E
v
e
l
y
n
B
y
r
d
A
v
e
R
o
ad
D
i
e
t
&
S
i
d
e
w
a
l
k
R
N
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
X
$
3
,
5
1
5
,
2
7
8
$
3
,
5
1
5
,
2
7
8
2
.
2
9
7
6
.54
$
3
,
5
1
5
,
2
7
8
37
0
1
S
t
a
u
n
t
o
n
S
t
a
u
n
t
o
n
C
i
t
y
N
o
r
t
h
A
u
g
u
s
t
a
S
i
d
e
w
a
l
k
‐
‐
T
e
r
r
y
C
o
u
r
t
t
o
M
e
a
d
o
w
b
r
o
o
k
R
d
U
D
A
B
i
k
e
/
P
e
d
e
s
t
r
i
a
n
X
$
1
,
0
5
8
,
2
1
1
$
1
,
0
5
8
,
2
1
1
0
.
6
7
3
6
.
3
6
$1,058,211
1/
1
5
/
2
0
1
9
SM
A
R
T
S
C
A
L
E
R
o
u
n
d
3
DR
A
F
T
S
t
a
f
f
R
e
c
o
m
m
e
n
d
e
d
F
u
n
d
i
n
g
S
c
e
n
a
r
i
o
Di
s
t
r
i
c
t
Pe
r
c
e
n
t
a
g
e
DG
P
H
P
P
#
P
r
o
j
e
c
t
s
A
m
o
u
n
t
D
G
P
#
P
r
o
j
e
c
t
s
A
m
o
u
n
t
H
P
P
#
P
r
o
j
e
c
t
s
A
m
o
u
n
t
H
P
P
#
P
ro
j
e
c
t
s
F
u
n
d
i
n
g
D
G
P
H
P
P
Br
i
s
t
o
l
6
.
7
1
%
$
2
2
,
1
3
3
,
3
2
9
3
$
2
0
,
0
6
1
,
3
1
6
0
$
0
0
$
0
3
$
2
0
,
0
6
1
,
3
1
6
$
2
,
0
7
2
,
0
1
3
Cu
l
p
e
p
e
r
6
.
3
3
%
$
2
1
,
6
9
0
,
2
8
7
4
$
2
0
,
8
0
9
,
2
6
5
0
$
0
0
$
0
4
$
2
0
,
8
0
9
,
2
6
5
$
8
8
1
,
0
2
2
Fr
e
d
e
r
i
c
k
s
b
u
r
g
6.
9
4
%
$
2
8
,
8
8
1
,
0
9
4
7
$
2
8
,
1
7
8
,
8
2
6
3
$
1
1
,
6
4
7
,
6
3
9
0
$
0
1
0
$
3
9
,
8
2
6
,
4
6
5
$
7
0
2
,
2
6
8
Ha
m
p
t
o
n
R
o
a
d
s
1
9
.
9
3
%
$
8
4
,
6
9
1
,
9
0
1
2
3
$
8
3
,
6
4
3
,
9
7
8
2
$
1
,
4
5
5
,
0
0
0
1
$
2
0
0
,
0
0
0
,0
0
0
2
6
$
2
8
5
,
0
9
8
,
9
7
8
$
1
,
0
4
7
,
9
2
3
Ly
n
c
h
b
u
r
g
7
.
0
7
%
$
2
3
,
8
4
2
,
2
5
5
7
$
2
1
,
2
0
4
,
9
0
5
0
$
0
1
$
3
0
,
9
3
1
,
7
0
4
8
$
5
2
,
1
3
6
,
6
0
9
$
2
,
6
3
7
,
3
5
0
No
r
t
h
e
r
n
V
i
r
g
i
n
i
a
2
1
.
1
7
%
$
8
8
,
4
7
2
,
6
9
0
7
$
8
8
,
2
0
4
,
3
7
1
3
$
6
1
,
6
2
1
,
6
9
4
1
$
5
0
,
00
0
,
0
0
0
1
1
$
1
9
9
,
8
2
6
,
0
6
5
$
2
6
8
,
3
1
9
Ri
c
h
m
o
n
d
1
4
.
6
6
%
$
6
0
,
6
0
5
,
7
4
1
1
2
$
6
0
,
4
0
7
,
4
1
8
2
$
3
,
6
6
9
,
0
0
0
0
1
4
$
6
4
,
0
7
6
,
4
1
8
$198,323
Sa
l
e
m
9
.
4
2
%
$
3
3
,
5
0
3
,
5
9
6
6
$
3
1
,
3
7
6
,
9
2
4
0
$
0
0
6
$
3
1
,
3
7
6
,
9
2
4
$
2
,
1
2
6
,
6
7
2
St
a
u
n
t
o
n
7
.
7
8
%
$
2
6
,
1
0
0
,
5
5
9
1
5
$
2
5
,
3
3
5
,
2
9
9
1
$
3
,
2
0
9
,
0
5
6
0
1
6
$
2
8
,
5
4
4
,
3
5
5
$
765,260
To
t
a
l
1
0
0
.
0
0
%
$
3
8
9
,
9
2
1
,
4
5
3
$
3
8
9
,
9
2
1
,
4
5
3
8
4
$
3
7
9
,
2
2
2
,
3
0
2
1
1
$
8
1
,
6
0
2
,
3
8
9
3
$
2
8
0
,
9
3
1
,
7
0
4
9
8
$
7
4
1
,
7
5
6
,
3
9
5
$
1
0
,
6
9
9
,
1
5
1
$
2
7
,
3
8
7
,
3
6
0
Dr
a
f
t
F
u
n
d
i
n
g
S
c
e
n
a
r
i
o
St
e
p
1
F
u
n
d
t
o
p
s
c
o
r
i
n
g
p
r
o
j
e
c
t
s
w
i
t
h
i
n
e
a
c
h
d
i
s
t
r
i
c
t
e
l
i
g
i
b
l
e
f
or
D
G
P
f
u
n
d
s
u
s
i
n
g
D
G
P
f
u
n
d
s
u
n
t
i
l
r
e
m
a
i
n
i
n
g
f
u
n
d
s
a
r
e
i
n
s
u
f
f
i
c
ie
n
t
t
o
f
u
n
d
t
h
e
n
e
x
t
h
i
g
h
e
s
t
s
c
o
r
i
n
g
p
r
o
j
e
c
t
.
St
e
p
2
F
u
n
d
t
o
p
s
c
o
r
i
n
g
p
r
o
j
e
c
t
s
w
i
t
h
i
n
e
a
c
h
d
i
s
t
r
i
c
t
t
h
a
t
w
o
u
l
d
h
a
v
e
o
t
h
e
r
w
i
s
e
b
e
e
n
f
u
n
d
e
d
w
i
t
h
a
v
a
i
l
a
b
l
e
D
G
P
f
u
n
d
s
,
b
u
t
w
e
r
e
no
t
b
e
c
a
u
s
e
t
h
e
y
a
r
e
o
n
l
y
e
l
i
g
i
b
l
e
f
o
r
H
P
P
fu
n
d
s
,
u
s
i
n
g
H
P
P
f
u
n
d
s
,
a
s
l
o
n
g
a
s
t
h
e
i
r
S
M
A
R
T
S
C
A
L
E
c
o
s
t
d
o
e
s
no
t
e
x
c
e
e
d
t
h
e
t
o
t
a
l
a
m
o
u
n
t
o
f
D
G
P
f
u
n
d
s
a
v
a
i
l
a
b
l
e
t
o
b
e
p
r
o
g
r
a
mm
e
d
b
a
s
e
d
o
n
t
h
e
i
r
r
a
n
k
.
St
e
p
3
F
u
n
d
p
r
o
j
e
c
t
s
w
i
t
h
a
b
e
n
e
f
i
t
r
e
l
a
t
i
v
e
t
o
S
M
A
R
T
S
C
A
L
E
s
c
o
r
e
g
r
e
a
t
e
r
t
h
a
n
a
n
e
s
t
a
b
l
i
s
h
e
d
t
h
r
e
s
h
o
l
d
b
a
s
e
d
o
n
t
h
e
h
i
g
h
e
s
t
p
r
oj
e
c
t
b
e
n
e
f
i
t
u
s
i
n
g
H
P
P
f
u
n
d
s
un
t
i
l
f
u
n
d
s
a
r
e
i
n
s
u
f
f
i
c
i
e
n
t
t
o
f
u
n
d
t
h
e
n
e
x
t
u
n
f
u
n
d
e
d
p
r
o
j
e
c
t
wi
t
h
t
h
e
h
i
g
h
e
s
t
p
r
o
j
e
c
t
b
e
n
e
f
i
t
.
St
e
p
1
S
t
e
p
2
S
t
e
p
3
T
o
t
a
l
R
e
m
a
i
n
i
n
g
1/
1
5
/
2
0
1
9
App Id Area Type District Organization Name Project Title
Statewide High
Priority
District
Grant Throughput Score Delay
Score
Crash
Frequency
Score
Crash Rate
Score Access to Jobs Disadvantaged Access
to Jobs
Multimodal Access
Score
Air Quality
Score
Enviro
Impact Score
Econ Dev Support
Score
Intermodal
Access Score
Travel Time Reliability
Score
Efficient
Land Use
Score
Increase
Efficient Land
Use Score
Project
Benefit
Score
Total Project $Score Divided by Total
Cost
SMART SCALE
Request $
SMART SCALE
Score State Rank District Rank
4086 D Bristol Tazewell County Route 460 Corridor Improvements X X - - 20.03 1.62 0.014 0.014 - - 7.531 0.539 - 0.535 3.776 3,597,000$ 10.499 3,597,000$ 10.499 31 1
3802 D Bristol Smyth County
US Route 11 / SR 660 Roundabout
South X X - 0.01 3.67 17.45 - - - - 7.807 0.266 - 0.000 3.615 3,607,316$ 10.020 3,607,316$ 10.020 37 2
3736 D Bristol Wythe County Progress Park Connector X X 0.83 1.52 - - 0.014 0.025 - 1.045 28.894 47.484 0.849 - 11.648 23,684,000$ 4.918 12,857,000$ 9.060 44 3
3836 D Bristol Bristol City
Lee Highway and Euclid Avenue
Roundabout X X 0.05 0.10 4.82 7.33 - - 0.071 0.187 5.153 - - 0.008 2.100 2,825,000$ 7.434 2,825,000$ 7.434 58 4
4029 D Bristol Abingdon Town
Hillman Highway & Old Eleven Drive
Intersection Improvements X - - 0.34 1.62 - - - - 0.895
0.087 - 0.001 0.358 668,000$ 5.359 668,000$ 5.359 85 5
4031 D Bristol Abingdon Town
Russell Road & Poplar Street
Intersection Improvements X X - - 0.86 0.80 - - - - 0.808 0.225 - - 0.336 765,000$ 4.398 765,000$ 4.398 105 6
5039 D Bristol Bluefield Town
College Avenue Traffic Sginal
Syncronization X - - 1.40 0.44 - - - - 0.879
0.142 - 0.029 0.351 859,000$ 4.086 859,000$ 4.086 116 7
4345 D Bristol Washington County
U.S. Route 58 at U.S. Route 11
Roundabout X X - 0.01 9.29 7.48 0.004 0.004 - - 7.253 0.046 0.206 0.047 2.907 7,840,608$ 3.708 7,840,608$ 3.708 129 8
3704 D Bristol Grayson County SR 89 AT SR 613 Realignment X - 0.00 1.95 6.99 - - - - 2.439 - - 0.002 1.463 4,068,990$ 3.596 4,068,990$ 3.596 134 9
3617 D Bristol Bland County
US Route 52 Intersection Safety
Enhancements X X 0.01 0.00 - - - - 0.010 0.026 3.375 6.561 - 0.002 1.549 4,491,045$ 3.448 4,491,045$ 3.448 139 10
4052 D Bristol Scott County US 23 at Hilton Road X X - - 3.29 0.99 - - - - 1.407 - - 0.115 0.720 2,203,993$ 3.266 2,203,993$ 3.266 141 11
3750 D Bristol Wytheville Town 12th Street Road Diet X - - 3.36 2.94 0.002 0.002 - - 2.015 0.049 - 0.038 1.058 3,248,775$ 3.257 3,248,775$ 3.257 143 12
3997 D Bristol Norton City
US 58 Alt and US 23 NB Off-Ramp
Modification X - - 1.15 0.90 - - - - 0.900
- - 0.082 0.358 1,276,000$ 2.809 1,276,000$ 2.809 157 13
3804 D Bristol Smyth County
US Route 11 / SR 660 Roundabout
North X X 0.00 0.03 0.92 4.71 - - - - 2.098 - - 0.000 0.950 3,572,022$ 2.661 3,572,022$ 2.661 165 14
4270 D Bristol Big Stone Gap Town Wood Ave & Shawnee Ave Realignment X - - 0.69 1.85 - - - - 0.982
- - - 0.429 1,785,310$ 2.404 1,785,310$ 2.404 176 15
4204 D Bristol Dickenson County SR 83 at SR 637 Roundabout X 0.02 0.05 5.50 0.06 - - 0.086 0.085 1.897 0.094 - 0.006 0.959 4,026,000$ 2.381 4,026,000$ 2.381 177 16
4533 D Bristol Bristol City Lee Highway 3B New X X 0.05 0.03 4.07 1.28 0.124 0.085 0.162 0.427 4.303 3.077 0.088 0.317 1.737 7,732,000$ 2.246 7,732,000$ 2.246 190 17
3834 D Bristol Bristol City Lee Highway Phase 3A X X 0.06 0.02 2.29 0.98 0.092 0.037 0.179 0.471 3.115 2.599 0.110 0.222 1.258 5,827,000$ 2.159 5,827,000$ 2.159 198 18
4187 D Bristol Washington County US Route 19 Corridor Improvements X X - 0.00 15.18 3.12 - - - - 7.875
- - 0.161 3.149 15,592,000$ 2.020 15,592,000$ 2.020 203 19
3908 D Bristol Buchanan County
SR 83 Shoulder Improvements (Phase
2)X - 0.00 3.41 5.91 0.001 0.001 - - 3.058 - - - 1.551 7,969,922$ 1.946 7,969,922$ 1.946 210 20
3907 D Bristol Abingdon Town French Moore Boulevard Extension X X 0.42 0.75 - - 0.083 0.090 0.030 0.036 8.409 15.194 - - 3.683 19,951,226$ 1.846 19,951,226$ 1.846 222 21
4760 D Bristol Tazewell County
US 460 and US 19 Intersection
Improvements X X - 0.01 4.52 1.53 0.001 0.001 - - 2.411 0.534 0.881 0.206 1.216 7,810,439$ 1.557 7,810,439$ 1.557 238 22
3751 D Bristol Marion Town
U.S. Route 11 at Chatham Hill Rd Turn
Lane Improvement X X - 0.00 0.82 0.81 0.001 0.001 - - 0.611
0.099 0.001 0.029 0.298 2,196,630$ 1.357 2,196,630$ 1.357 253 23
3723 D Bristol Russell County
US 19 EB Horizontal Curve
Improvements X - - 1.89 1.95 - - - - 1.523 - - 0.014 0.653 4,987,515$ 1.310 4,987,515$ 1.310 259 24
4307 D Bristol Washington County
U.S. Route 58/U.S. Route 11 a Maringo
Rd X X - - 3.41 - - - - - 1.497
0.050 - - 0.597 5,316,342$ 1.123 5,316,342$ 1.123 278 25
3743 D Bristol Wytheville Town I-77 Exit 41 Ramp Modifications X X - - 0.34 1.77 - - - - 2.436 2.530 - 0.000 0.970 10,997,552$ 0.882 10,997,552$ 0.882 304 26
4778 D Bristol Wise County
US58 at Tacoma Mountain
Realignment X - 0.00 1.08 1.41 0.000 0.000 - - 1.057
- 0.003 0.014 0.427 5,420,000$ 0.788 5,420,000$ 0.788 312 27
4334 D Bristol Washington County U.S. Route 11 Widening X X 0.03 0.03 5.94 1.78 0.750 0.659 0.088 0.232 3.536 0.035 0.106 0.173 1.465 22,010,719$ 0.666 20,281,165$ 0.723 320 28
3837 D Bristol Bristol City
Moore Street, Oakview Avenue and
MLK Jr. Blvd Roundabout X X 0.04 0.00 0.34 0.61 0.002 0.002 0.062 0.162 0.450
0.024 0.065 0.003 0.188 2,609,000$ 0.719 2,609,000$ 0.719 321 29
3885 D Bristol
Bristol Metropolitan Planning
Organization Lee Highway Widening Phase 3 X 0.05 0.04 1.03 - 0.086 0.077 0.162 0.427 2.417 3.042 0.274 - 0.975 13,559,000$ 0.719 13,559,000$ 0.719 322 30
4191 D Bristol Lee County
US58Alt Between Mulberry St and
River Bend Dr X - 0.00 0.34 0.46 0.005 0.005 - - 0.347
- - 0.018 0.140 2,297,545$ 0.610 2,297,545$ 0.610 346 31
4048 D Bristol Scott County US 23-58 at Kane Street X X - - 0.29 0.13 - - - - 0.198 0.068 - 0.094 0.094 1,749,800$ 0.536 1,749,800$ 0.536 349 32
4276 D Bristol Big Stone Gap Town 5th St & Clinton Ave Right Turn Lane X - - 0.04 0.08 - - - - 0.049
- - 0.003 0.021 464,808$ 0.458 464,808$ 0.458 362 33
3719 D Bristol
Cumberland Plateau Planning District
Commission
Coalfields Expressway Rte 121/460
Poplar Creek Phase B X 0.34 0.54 - - 0.045 0.072 0.171 1.715 19.685 38.220 - 0.237 9.168 275,072,341$ 0.333 275,072,341$ 0.333 376 34
3729 D Bristol
Cumberland Plateau Planning District
Commission
Coalfields Expressway (Rte 121) - Doe
Branch X 0.08 0.06 - - 0.152 0.108 0.171 0.812 -
39.181 - 0.124 8.306 261,341,284$ 0.318 261,341,284$ 0.318 379 35
4344 D Bristol Big Stone Gap Town 5th St & Gilley Ave Roundabout X X - 0.01 0.34 0.31 0.012 0.013 - - 0.278 0.025 - 0.007 0.120 5,126,997$ 0.235 5,126,997$ 0.235 390 36
4197 D Bristol Lee County US421 at SR606 X - 0.00 0.17 0.36 - - - - 0.212 - - 0.002 0.090 3,981,770$ 0.227 3,981,770$ 0.227 393 37
4269 D Bristol Bluefield Town
State Route 746 Extension to College
Avenue X - - - - - - - - 0.265 0.435 0.012 0.002 0.105 4,965,117$ 0.212 4,965,117$ 0.212 395 38
3740 D Bristol Buchanan County
SR 83 Shoulder Improvements (Phase
1)X - 0.00 0.40 0.45 0.001 0.001 - - 0.281
- - 0.004 0.142 9,975,469$ 0.143 9,975,469$ 0.143 413 39
3775 D Bristol Scott County Route 58 Climbing Lane X X - - 0.10 0.15 0.000 0.000 - - 0.108 - - 0.009 0.044 6,437,541$ 0.068 6,437,541$ 0.068 422 40
3718 D Bristol Russell County Route 80 Project 1 X - - - - - - - - 0.001 - - 0.007 0.001 8,667,489$ 0.001 8,667,489$ 0.001 427 41
3910 D Bristol Buchanan County
SR 83 Shoulder Improvements (Phase
4)X - 0.00 - - 0.001 0.001 - - 0.000
- - - 0.000 7,978,158$ 0.000 7,978,158$ 0.000 428 42
4189 D Bristol Lee County
US58 and Curt Russel Road
Realignment X - 0.00 - - - - - - 0.000
- - - 0.000 4,144,478$ 0.000 4,144,478$ 0.000 429 43
3909 D Bristol Buchanan County
SR 83 Shoulder Improvements (Phase
3)X - 0.00 - - - - - - 0.000 - - - 0.000 7,785,289$ 0.000 7,785,289$ 0.000 432 44
3756 D Culpeper Culpeper Town
Roundabout - Route 3 and McDevitt
Dr. Intersection X 0.04 0.08 9.89 28.40 0.010 0.009 0.063 0.165 24.676
13.664 - 0.013 9.866 6,200,000$ 15.913 6,200,000$ 15.913 22 1
3584 B Culpeper Charlottesville City West Main Streetscape X X 0.03 - 0.43 0.11 0.217 0.238 0.157 - 6.555 20.039 - 0.075 2.769 2.156 3.103 12,689,020$ 2.445 2,009,265$ 15.443 23 2
3444 D Culpeper Fauquier County
Route 29/Freemans Ford Road
Alternative Intersection X 0.06 0.23 16.52 0.01 0.809 1.062 0.240 16.911 10.528
7.819 2.403 0.042 5.792 7,100,000$ 8.157 7,100,000$ 8.157 47 3
4104 D Culpeper Orange County US 33 / Route 20 east roundabout X 0.02 0.01 9.35 13.01 0.000 0.000 0.036 0.096 7.418 0.127 - 0.012 3.760 5,500,000$ 6.837 5,500,000$ 6.837 64 4
4107 D Culpeper Madison County
Route 29 & Route 662 (Shelby Rd.)
Intersection Improvements X - 0.00 6.94 4.73 - - - - 5.062
0.041 - 0.034 2.014 4,750,000$ 4.240 2,980,000$ 6.759 65 5
3655 B Culpeper Charlottesville City
Preston Ave. & Grady Ave Intersection
Improvements X 0.38 - 8.39 2.01 0.062 0.089 1.902 - 8.348 17.811 - 0.132 2.662 2.040 3.984 6,220,466$ 6.405 5,929,466$ 6.719 67 6
3653 B Culpeper Charlottesville City 5th Street SW Corridor Improvements X 0.07 0.05 1.51 0.82 0.040 0.045 0.225 0.594 7.278
19.347 0.157 0.077 2.668 2.106 3.237 6,103,034$ 5.303 6,093,034$ 5.312 87 7
3600 B Culpeper Albemarle County
US 250/Route 20 Intersection
Improvement X X 3.94 17.28 4.47 1.09 3.345 2.243 0.723 2.383 11.243 6.840 0.270 0.351 2.863 2.485 4.600 8,800,000$ 5.227 8,800,000$ 5.227 90 8
4992 C Culpeper Louisa County
3 Notch Rd (Rte 250) & Courthouse Rd
(Rte 208)X 0.01 0.02 5.28 22.62 0.001 0.001 0.015 0.040 10.608
1.399 - 0.006 4.232 8,750,000$ 4.837 8,750,000$ 4.837 97 9
4115 D Culpeper Madison County
Route 230 & Route 687 Intersection
Improvements X - 0.01 5.28 12.11 - - - - 7.600
0.205 - 0.004 3.031 7,000,000$ 4.331 7,000,000$ 4.331 108 10
3959 D Culpeper Orange County US 522 / Route 20 roundabout X 0.03 - 10.15 8.34 - - 0.047 - 8.226 0.512 - 0.022 3.296 7,650,000$ 4.309 7,650,000$ 4.309 110 11
4163 B Culpeper Albemarle County
Berkmar Drive Extension to Airport
Road X X 1.05 0.70 9.24 0.15 0.046 0.004 0.107 0.685 12.877
27.912 0.058 0.060 0.152 0.156 5.130 15,700,000$ 3.267 13,648,403$ 3.758 125 12
4848 C Culpeper Fluvanna County
Troy Road (631) and Route 250
Roundabout X - 0.00 3.90 13.23 - - - - 6.148 0.115 - 0.004 2.466 6,650,000$ 3.708 6,650,000$ 3.708 128 13
3977 D Culpeper Orange County
Gordonsville Route 231 / High St
roundabout X 0.02 0.01 4.99 8.22 0.009 0.011 0.036 1.535 5.306 - - 0.018 2.328 6,350,000$ 3.666 6,350,000$ 3.666 131 14
4243 D Culpeper Orange County Route 20 / Route 611 roundabout X 0.01 - 7.23 6.35 0.000 0.000 0.008 - 4.698 0.474 - 0.024 2.373 6,850,000$ 3.465 6,850,000$ 3.465 138 15
4116 B Culpeper
Thomas Jefferson Planning District
Commission Barracks Road Turn Lane and Sidewalk X 0.09 - 3.83 1.49 0.224 0.346 0.469 - 3.507 0.165 - 0.022 6.519 5.235 1.423 4,600,000$ 3.093 4,600,000$ 3.093 148 16
3654 B Culpeper Charlottesville City
250 BP & Hydraulic Rd Intersection
improvements X X 0.36 - 3.60 0.50 0.040 0.044 1.087 - 4.624
3.881 - 0.824 6.680 5.329 1.856 6,405,603$ 2.898 6,405,603$ 2.898 153 17
4327 B Culpeper Albemarle County Rt 20/Rt 53 Intersection Improvements X X 0.14 0.03 6.02 3.27 0.142 0.196 0.409 1.077 4.209 3.257 0.243 0.032 2.247 1.914 1.874 6,600,000$ 2.839 6,600,000$ 2.839 156 18
3458 D Culpeper Fauquier County I-66, Exit 28 Reconstruction X - 0.08 19.50 6.67 - - - - 12.816 3.417 - 0.075 5.293 20,400,000$ 2.595 20,400,000$ 2.595 168 19
4707 C Culpeper Fluvanna County
Troy Road (631) and Route 15
Intersection X - 0.00 7.63 3.96 - - - - 4.085 - - 0.046 1.655 7,100,000$ 2.331 7,100,000$ 2.331 181 20
4049 B Culpeper
Charlottesville-Albemarle Metropolitan
Planning Organization
US 29 and Fontaine Avenue
Interchange Improvements X 0.10 1.12 16.12 7.52 0.024 0.009 0.307 8.236 12.046
12.292 0.011 0.121 1.407 1.074 5.099 21,900,000$ 2.328 21,900,000$ 2.328 183 21
4496 C Culpeper Fluvanna County
Turkeysag Trail (Route 1015) & Route
53 Roundabout X 0.06 0.15 5.74 5.37 0.004 - 0.196 0.517 4.136
- - - 1.647 7,300,000$ 2.256 7,300,000$ 2.256 189 22
4302 C Culpeper Greene County
Route 29 Safety Improvements, from
Buck Drive to Route 600 X - 0.00 5.52 0.67 - - - - 5.410
8.238 - 0.513 2.306 10,350,000$ 2.228 10,350,000$ 2.228 191 23
4095 C Culpeper
Thomas Jefferson Planning District
Commission Exit 107 Park and Ride Lot X 0.02 0.02 0.22 0.00 0.032 0.041 0.086 8.035 1.115 - - 0.008 0.527 2,400,000$ 2.194 2,400,000$ 2.194 195 24
4054 C Culpeper Greene County
Route 29 Safety Improvements, from
Buck Drive to Route 616 X - 0.01 14.67 0.68 - - - - 9.721 10.481 - 1.671 4.061 18,650,000$ 2.177 18,650,000$ 2.177 197 25
3572 D Culpeper
Rappahannock - Rapidan Regional
Commission
Route 29/Telephone Road Signalized
Alternative Intersection X - 0.01 6.52 0.62 - - - - 2.953 0.421 - 0.461 1.340 6,650,000$ 2.015 6,650,000$ 2.015 204 26
4312 B Culpeper
Thomas Jefferson Planning District
Commission US29 and Frays Mill RCUT X - - 8.95 0.79 - - - - 3.652 2.311 - 0.483 0.026 0.016 1.456 7,600,000$ 1.915 7,600,000$ 1.915 215 27
4136 D Culpeper Culpeper County
Rt. 29/Rt. 663 Intersection
Improvement, R-Cut Design X - 0.01 8.78 0.83 0.013 0.011 - - 3.660
0.059 5.258 0.226 2.022 11,600,000$ 1.743 11,600,000$ 1.743 230 28
4110 B Culpeper
Thomas Jefferson Planning District
Commission Route 29 Shared Use Path X 0.05 - 2.81 0.47 0.288 0.355 0.145 - 1.559
0.496 - 0.122 0.913 0.804 0.630 3,750,000$ 1.681 3,750,000$ 1.681 234 29
4280 C Culpeper Greene County
Route 29 Safety Improvements, from
Route 600 to Route 616 X - 0.01 5.62 0.41 - - - - 3.608 3.074 - 0.880 1.440 9,900,000$ 1.454 9,900,000$ 1.454 245 30
3461 D Culpeper Fauquier County
Roundabout at Route 55 and Route
709 X - 0.03 1.61 2.99 - - - - 2.017
0.188 - 0.004 0.832 6,700,000$ 1.241 6,700,000$ 1.241 265 31
4416 B Culpeper Albemarle County
Rio Road East/Pen Park Road
Roundabout X 0.04 - 1.38 1.18 0.084 0.068 0.184 - 2.420 0.514 - 0.015 5.615 4.304 0.989 8,000,000$ 1.236 8,000,000$ 1.236 266 32
4084 D Culpeper
Rappahannock - Rapidan Regional
Commission Opal Interchange X - - 23.40 2.54 0.001 0.001 - - 11.454
2.119 - 0.437 4.940 42,000,000$ 1.176 42,000,000$ 1.176 272 33
4548 C Culpeper Fluvanna County
Bybees Church Road (613) and Route
15 Intersection X - 0.00 1.91 1.47 0.001 0.001 - 1.137 1.377 - - 0.014 0.548 4,900,000$ 1.119 4,900,000$ 1.119 279 34
3423 D Culpeper Fauquier County
Rt 28 & Schoolhouse Road (Rt 661)
Intersection Improvements X X 0.01 0.00 0.80 0.55 0.003 0.004 0.016 0.043 1.285
1.202 - 0.035 0.526 5,000,000$ 1.051 5,000,000$ 1.051 288 35
3973 D Culpeper Orange County
Gordonsville US 15/33 / High St
roundabout X 0.03 0.01 0.69 1.51 0.001 0.001 0.038 1.625 1.118 - - 0.003 0.471 6,300,000$ 0.747 6,300,000$ 0.747 319 36
4375 B Culpeper
Charlottesville-Albemarle Metropolitan
Planning Organization
Package 2 - Hydraulic Road and US 29
Intersection X 0.47 0.26 32.75 2.28 0.174 0.247 2.355 4.656 17.677
15.020 0.142 0.969 4.334 3.431 7.083 109,363,456$ 0.648 100,863,456$ 0.702 328 37
4961 C Culpeper Louisa County
New Bridge Road (Rte 208) & Kentucky
Springs Road (Rte 652)X 0.02 0.02 1.38 1.50 0.000 - 0.038 0.099 1.623
1.313 - 0.004 0.648 9,500,000$ 0.682 9,500,000$ 0.682 334 38
4102 B Culpeper
Charlottesville-Albemarle Metropolitan
Planning Organization
Package 1 - US 29 and Hydraulic Road
Improvements X 1.55 0.99 43.65 1.43 0.423 0.591 2.513 6.105 21.405 15.820 0.204 - 4.315 3.481 8.606 206,093,288$ 0.418 187,593,288$ 0.459 360 39
4987 C Culpeper Louisa County
Davis Hwy (Rte 22) & Industrial Drive
(Rte 780)X - 0.00 0.09 0.11 - - - - 0.487 0.978 - 0.003 0.196 4,550,000$ 0.430 4,550,000$ 0.430 366 40
4386 B Culpeper
Charlottesville-Albemarle Metropolitan
Planning Organization
Package 3 - US 29 and Hydraulic Road
area improvements X 1.09 0.72 4.53 0.16 0.311 0.334 0.158 1.449 9.045
16.467 - 0.255 4.779 3.860 3.637 96,729,832$ 0.376 86,729,832$ 0.419 368 41
4309 C Culpeper Louisa County
Route 15-33 Intersection
Improvements X 0.02 0.02 0.46 0.46 - - 0.032 2.322 0.669
- - - 0.268 6,575,000$ 0.408 6,575,000$ 0.408 369 42
3488 D Fredericksburg King George County
Route 301 University Drive/Market Ctr
Double RCUT X 0.02 0.09 11.04 2.29 0.184 0.298 0.036 0.096 8.838 5.219 0.928 0.398 3.667 3,500,000$ 10.477 3,500,000$ 10.477 32 1
3685 A Fredericksburg Fredericksburg Regional Transit FRED Transit-Shelters and Benches X 0.19 0.03 1.18 0.00 - - 0.964 0.381 0.527 - - 0.003 0.076 0.109 0.200 256,000$ 7.823 218,500$ 9.166 42 2
3620 A Fredericksburg Fredericksburg City
Lafayette Blvd/Kenmore Ave/Charles St
Roundabouts X 0.11 0.00 2.55 1.66 0.053 0.074 0.566 1.119 2.208 2.062 0.040 - 3.501 4.511 1.167 5,800,000$ 2.012 1,978,826$ 5.896 78 3
3486 D Fredericksburg King George County
Route 301 and Route 3 Median U-Turn
Intersection X X 0.04 0.00 5.33 3.85 0.000 0.000 0.068 0.179 4.408
0.030 1.957 0.057 1.758 3,300,000$ 5.328 3,300,000$ 5.328 86 4
4555 A Fredericksburg Fredericksburg Regional Transit New Commuter Parking Lot on Route 3 X 0.23 0.78 3.68 0.00 0.781 1.222 1.143 28.457 5.067 - - - 1.674 1.956 2.581 7,455,000$ 3.462 5,055,000$ 5.105 91 5
3580 D Fredericksburg Gloucester County
Bicycle/Pedestrian Improvements on
Rte 17B -Main St X X 0.06 - 9.48 0.61 0.936 0.075 0.190 - 6.987
3.814 - 2.112 2.906 7,300,000$ 3.981 7,300,000$ 3.981 118 6
3622 A Fredericksburg Fredericksburg City
Dixon Street/Lansdowne Road
Intersection Improvements X - 0.58 1.46 1.03 0.414 0.575 - - 1.684 - 0.494 0.037 2.500 2.989 0.866 2,200,000$ 3.935 2,200,000$ 3.935 119 7
3878 A Fredericksburg
George Washington Regional
Commission Route 3 STARS Study Improvements X - 0.07 29.70 1.98 0.142 0.172 - - 3.378
1.304 1.699 0.598 3.074 3.959 1.724 7,420,000$ 2.323 6,374,139$ 2.704 163 8
3880 A Fredericksburg
George Washington Regional
Commission
Rt 3 STARS Study and I-95 off-ramp
imp.X 0.04 0.14 12.89 0.01 0.149 0.151 0.208 25.129 1.786 1.307 1.844 3.568 2.993 3.815 2.474 11,500,000$ 2.151 9,454,139$ 2.617 167 9
3881 A Fredericksburg
George Washington Regional
Commission
US 17 Bus. STARS Study Improvements
and New PNR Lot X 0.55 2.73 48.28 0.02 2.354 2.990 2.766 33.589 11.722
0.008 0.585 - 2.902 4.440 5.274 21,835,000$ 2.415 21,835,000$ 2.415 174 10
3621 A Fredericksburg Fredericksburg City
U.S. Route 1/Fall Hill Avenue
Intersection Improvements X X 0.05 1.17 7.44 2.14 0.345 0.406 0.276 0.327 3.194 - 0.359 0.693 3.348 4.684 1.636 7,200,000$ 2.273 7,200,000$ 2.273 185 11
3651 A Fredericksburg Stafford County
Stefaniga and Mountain View Road
Intersection Improvement X 0.03 0.07 5.74 10.80 0.037 0.011 0.049 0.128 1.392
- - 0.004 0.194 0.239 0.560 3,700,000$ 1.514 2,700,000$ 2.075 200 12
3489 D Fredericksburg King George County
Route 206 and Route 218 Right Turn
Lane X - - 0.82 1.24 - - - - 0.867 - - 0.006 0.352 2,000,000$ 1.759 2,000,000$ 1.759 227 13
3816 A Fredericksburg Spotsylvania County Harrison Rd & Salem Church X X 0.22 0.07 8.00 1.23 0.790 0.769 0.660 1.739 2.164 - 0.031 0.409 2.077 2.351 1.041 6,100,000$ 1.706 6,100,000$ 1.706 232 14
4630 D Fredericksburg Lancaster County Kilmarnock Right Turn Lane X - 0.00 0.39 0.53 0.000 0.000 - - 0.398 - 0.023 0.005 0.159 1,100,000$ 1.449 1,100,000$ 1.449 247 15
3824 A Fredericksburg Spotsylvania County
Rt 2 & 17 from Lansdowne Rd past
Shannon Airport X X 0.78 1.10 36.45 3.18 2.124 2.970 0.643 1.271 4.910
- 2.262 0.624 2.366 2.796 2.550 19,500,000$ 1.308 19,500,000$ 1.308 260 16
3494 D Fredericksburg Westmoreland County Expanded Turn Lane for Flat Iron Road X - - 0.20 0.49 - - - - 0.288 - - 0.003 0.117 1,000,000$ 1.170 1,000,000$ 1.170 274 17
3819 A Fredericksburg Spotsylvania County Rt 1 and Rt 208/Lafayette Blvd X X 0.32 0.05 4.76 0.88 0.145 0.123 0.486 1.282 2.388 - 0.069 1.070 2.893 4.006 1.097 10,300,000$ 1.065 10,300,000$ 1.065 284 18
3851 A Fredericksburg
Fredericksburg Area Metropolitan
Planning Organization
I-95 Exit 126 STARS Study
Improvements X 0.19 0.72 27.24 0.76 0.110 0.120 0.964 19.392 7.177 2.154 8.268 8.744 1.699 2.479 2.896 28,320,000$ 1.023 28,320,000$ 1.023 293 19
3709 D Fredericksburg King George County
Route 301 and Route 206 Median U-
Turn Intersection X 0.09 - 3.05 0.62 - - 0.135 - 1.640
- - 0.309 0.664 6,800,000$ 0.976 6,800,000$ 0.976 295 20
3648 A Fredericksburg Stafford County
1.Stafford - Route 1/Enon Road
Intersection and Roadway IMP X X 0.19 0.08 0.43 0.12 0.347 0.525 0.224 0.310 0.988 3.274 0.100 0.212 0.395 0.731 0.394 10,600,000$ 0.372 4,452,461$ 0.885 303 21
3852 A Fredericksburg
Fredericksburg Area Metropolitan
Planning Organization
I-95 NB Widening & Exit 126 STARS
Improvements X 0.58 1.27 51.94 0.49 1.130 1.226 0.964 18.552 11.051
0.981 45.087 25.165 2.446 3.313 4.648 61,000,000$ 0.762 61,000,000$ 0.762 316 22
3927 D Fredericksburg Richmond County
SMART SCALE: Route 360/619 -
Richmond County X - - 0.22 0.31 - - - - 0.229 - - 0.005 0.091 1,300,000$ 0.701 1,300,000$ 0.701 329 23
3612 A Fredericksburg
Fredericksburg Area Metropolitan
Planning Organization I-95 SB Widening: Exit 130 to Exit 126 X 0.19 0.19 11.24 0.15 0.454 0.598 0.221 17.429 5.651
2.841 17.922 8.892 1.991 2.730 2.386 34,320,000$ 0.695 34,320,000$ 0.695 331 24
5013 A Fredericksburg
Fredericksburg Area Metropolitan
Planning Organization
I-95 SB Widening with Exit 126 SB Aux.
Deceleration Lane X 0.19 0.19 7.03 0.09 0.454 0.598 0.295 17.429 5.815 1.939 21.210 9.228 2.710 3.628 2.454 35,820,000$ 0.685 35,820,000$ 0.685 333 25
4267 A Fredericksburg
George Washington Regional
Commission
I-95 Exit 136, Centreport Pkwy, US 1 &
Enon Rd Improvements X 0.04 0.02 8.20 1.49 0.357 0.480 0.224 0.310 1.610
3.984 0.411 1.052 0.471 0.886 0.660 22,015,000$ 0.300 17,417,461$ 0.379 370 26
3492 D Fredericksburg Westmoreland County Passing Lanes on Route 3 near Lerty X - - 2.29 0.54 0.000 0.000 - - 1.227 - - 0.042 0.489 15,300,000$ 0.320 15,300,000$ 0.320 378 27
3649 A Fredericksburg Stafford County Winding Creek Road Widening X 0.02 0.00 0.36 0.22 0.052 0.050 0.024 0.063 0.649 0.186 - 0.007 0.910 1.094 0.259 15,700,000$ 0.165 12,230,500$ 0.212 396 28
3813 A Fredericksburg Spotsylvania County
Germanna Point Dr & Spotsylvania
Avenue X X 0.13 0.19 1.75 0.02 1.133 0.856 0.076 0.150 1.637 - 0.085 - 1.464 2.217 0.674 33,100,000$ 0.204 33,100,000$ 0.204 397 29
4080 D Fredericksburg Caroline County I-95/207Safety Improvements X X - - 0.60 0.29 - - - - 0.390 - - 0.041 0.157 9,900,000$ 0.158 9,900,000$ 0.158 410 30
4081 D Fredericksburg Caroline County
Bowling Green Route 301 Corridor
Safety Improvements X - - 0.58 0.12 - - - - 0.329
0.080 - 0.072 0.143 9,900,000$ 0.145 9,900,000$ 0.145 411 31
3650 A Fredericksburg Stafford County Eskimo Hill Roadway Improvement X - 0.00 0.53 0.15 0.011 0.008 - 0.769 0.406 1.436 0.277 0.009 0.154 0.296 0.162 17,500,000$ 0.093 16,500,000$ 0.098 418 32
3668 A Hampton Roads Williamsburg City
Lafayette Street Signal & Pedestrian
Improvements X X 0.04 - 0.64 0.40 0.008 0.008 0.055 - 1.230
1.496 - 0.018 2.153 2.555 0.598 91,000$ 65.742 91,000$ 65.742 1 1
3548 A Hampton Roads Chesapeake City
Battlefield Blvd/Volvo Pkwy
Intersection Improvements X X 4.54 19.61 2.92 0.49 11.500 11.381 - - 22.653 3.715 0.236 0.833 4.783 4.528 9.092 1,475,129$ 61.636 1,447,129$ 62.829 2 2
3666 A Hampton Roads Williamsburg City
Richmond Road Signal Coordination &
Pedestrian Improvements X X - - 4.57 0.21 - - - - 2.665 16.221 - 0.773 1.980 2.357 1.166 203,500$ 57.284 203,500$ 57.284 3 3
3966 A Hampton Roads Norfolk City Ballentine Blvd Lane Improvements X X - - 0.73 0.34 - - - - 13.422 - - 0.232 26.650 18.208 5.524 1,067,388$ 51.750 1,067,388$ 51.750 4 4
4392 A Hampton Roads Portsmouth City
Portsmouth Railroad Crossing Message
Signs X - - - - - - - - 5.105
- - 1.367 13.585 9.116 2.718 753,699$ 36.060 570,000$ 47.681 6 5
3692 A Hampton Roads
Williamsburg Area Transit Authority
(WATA)WATA Bus Stop Pull Offs X 0.93 0.00 0.42 0.01 - - 4.687 1.853 1.151 - - 0.020 0.197 0.274 0.565 255,000$ 22.166 255,000$ 22.166 17 6
4057 A Hampton Roads Norfolk City
Terminal Blvd/Diven St Intersection
Improvements X X 0.00 0.00 3.91 1.96 0.343 0.340 0.007 0.020 6.181
- 1.255 0.150 16.132 9.210 3.325 1,732,600$ 19.190 1,732,600$ 19.190 19 7
4175 D Hampton Roads Northampton County Shoulder Widening Rte 13 X - - 17.36 0.61 - - - - 6.918 - - - 3.042 2,923,357$ 10.407 2,923,357$ 10.407 33 8
3884 D Hampton Roads Greensville County HWY 301S Sidewalk Greensville Project X 0.01 - 0.86 2.34 0.009 0.009 0.019 - 1.364
- - - 0.550 576,903$ 9.540 576,903$ 9.540 40 9
3583 A Hampton Roads Newport News City
J. Clyde Morris Blvd Intersection
Improvements X X 0.27 0.00 5.72 1.93 0.004 0.004 0.678 1.072 2.919
- 0.466 0.355 5.002 2.671 1.341 1,768,528$ 7.583 1,768,528$ 7.583 54 10
4947 A Hampton Roads Hampton Roads Transit
Newport News Shipyard - Gloucester
MAX Service X 0.20 0.08 2.99 0.00 0.417 0.420 1.004 0.397 2.373 - - 0.011 2.741 1.435 0.902 1,200,000$ 7.517 1,200,000$ 7.517 57 11
3581 A Hampton Roads Newport News City
Jefferson Ave & Oyster Point Rd
Intersection Improvements X X 6.45 15.09 3.81 0.91 0.453 0.459 2.006 5.288 16.858
- 0.377 0.524 6.244 3.084 7.255 10,856,521$ 6.682 10,856,521$ 6.682 68 12
3672 A Hampton Roads Hampton City
Hampton Roads Center Pkwy Bike &
Pedestrian Access X 0.16 - 12.27 1.95 0.107 0.105 0.471 - 2.746 0.240 - - 4.891 2.315 1.386 2,163,325$ 6.405 2,158,325$ 6.420 71 13
3632 D Hampton Roads Sussex County Wakefield 460 Eastbound Turnlane X 0.03 - 1.59 1.96 - - 0.048 - 1.466 - - 0.011 0.610 994,846$ 6.128 981,290$ 6.212 75 14
3670 A Hampton Roads Hampton City
N Armistead Ave Reconstruction, Ped,
& Drainage Improvements X 0.07 - 9.12 1.49 0.244 0.242 0.107 - 4.274 - - 0.218 7.750 3.875 1.847 5,298,528$ 3.486 4,818,528$ 3.833 121 15
4971 A Hampton Roads Isle of Wight County
Carrollton Boulevard (Route 17)
Crosswalks X X 0.08 - 0.22 0.19 0.095 0.092 0.126 - 0.191 - - 0.009 0.117 0.184 0.081 212,000$ 3.817 212,000$ 3.817 123 16
3470 A Hampton Roads
Hampton Roads Transportation
Planning Organization
Hampton Roads Bridge-Tunnel
Widening/I-64 Expansion X 100.00 100.00 74.72 0.18 100.000 100.000 100.000 59.308 100.000
2.926 100.000 100.000 13.208 6.396 74.159 3,662,372,004$ 0.202 200,000,000$ 3.708 130 17
4105 A Hampton Roads York County
Route 171 capacity enhancements
between Routes 134 and 1740 X X 0.13 0.01 6.22 0.99 0.020 0.020 0.382 1.007 1.792 - 0.281 0.312 2.089 1.168 0.734 3,630,000$ 2.022 2,420,000$ 3.034 149 18
3463 A Hampton Roads Newport News City
Warwick Blvd & Oyster Point Rd
Intersection Improvements X X 0.27 0.69 3.53 0.47 0.468 0.476 1.374 1.629 4.033
- 0.108 0.909 5.481 2.728 1.639 5,445,737$ 3.010 5,445,737$ 3.010 150 19
4179 D Hampton Roads Northampton County Bicycle Lane on US Business 13 X X 0.00 - 2.06 1.05 0.338 0.333 0.003 - 1.021 - - - 0.559 2,360,061$ 2.367 2,360,061$ 2.367 179 20
4642 A Hampton Roads Norfolk City
Virginia Beach Blvd Widening – George
St to Newtown Rd X X 0.14 0.02 4.26 0.70 0.003 0.003 0.721 0.856 9.250
3.980 - 1.056 14.827 13.669 3.714 15,701,021$ 2.365 15,701,021$ 2.365 180 21
3582 A Hampton Roads Virginia Beach City
General Booth Blvd/Oceana Blvd
Intersection Improvements X 0.08 0.01 1.77 0.81 0.007 0.007 0.422 0.250 1.903
10.751 - 0.185 1.613 0.645 0.796 4,100,277$ 1.942 3,600,000$ 2.212 194 22
3468 A Hampton Roads Williamsburg City Lafayette Street Widening X 0.04 0.01 0.57 0.22 0.173 0.173 0.132 0.349 1.831 6.334 - 0.014 2.276 2.712 0.838 5,870,000$ 1.427 4,329,000$ 1.936 212 23
3469 A Hampton Roads Williamsburg City
Monticello Ave-Richmond Rd-Lafayette
St Roundabout X - 0.01 4.82 2.81 0.000 0.000 - - 2.743
10.092 - 0.027 2.649 3.255 1.199 6,381,090$ 1.879 6,381,090$ 1.879 218 24
4125 A Hampton Roads James City County Longhill Road Shared Use Path X X 0.06 - 4.82 1.05 0.939 0.916 0.193 - 1.802 - - - 2.036 2.518 0.805 4,400,000$ 1.830 4,400,000$ 1.830 224 25
4967 D Hampton Roads Surry County Route 31 Bicycle Accomodations X 0.00 0.01 8.13 1.89 0.000 0.000 0.025 0.049 4.129 - 0.048 0.016 1.718 9,600,000$ 1.789 9,600,000$ 1.789 225 26
3630 A Hampton Roads Poquoson City
Victory Blvd Enhancement App 2:
Poquoson Segment X 0.07 - 9.33 1.22 0.237 0.232 0.203 - 1.168 3.788 - 0.299 0.920 0.439 0.644 3,729,000$ 1.726 3,686,000$ 1.746 229 27
3635 A Hampton Roads Suffolk City Seaboard Coastline Trail Segment 1 X X 0.14 0.06 7.73 0.00 1.580 1.555 0.690 1.774 1.348 - - - 0.372 0.515 0.686 4,223,089$ 1.625 4,073,089$ 1.685 233 28
4022 D Hampton Roads Northampton County Median crossover to Rte 13 X X - - 0.51 0.49 - - - - 0.313 - - 0.011 0.166 1,120,000$ 1.479 1,120,000$ 1.479 243 29
3546 A Hampton Roads Chesapeake City
Mt Pleasant Road/Great Bridge Bypass
Interchange Improvement X 1.15 - 6.04 2.55 0.366 0.346 0.568 - 1.464
- - 0.052 1.085 0.986 0.818 6,000,708$ 1.363 5,963,508$ 1.371 252 30
3451 A Hampton Roads Hampton City Coliseum Drive Extension Phase B X 3.80 4.72 - - 0.631 0.626 0.037 0.132 3.906 1.359 0.013 - 4.068 1.915 2.920 24,193,124$ 1.207 23,345,623$ 1.251 264 31
5080 A Hampton Roads Isle of Wight County
U.S. Route 460 at U.S. Route 258 Turn
Lane Improvements X X 0.04 0.01 2.15 2.22 0.030 0.030 0.062 4.073 0.950
- 0.762 0.033 0.015 0.024 0.389 3,234,936$ 1.202 3,234,936$ 1.202 269 32
3646 A Hampton Roads Hampton City
Little Back River Peak Directional &
Two Way Left Turn Lane X 0.08 0.00 5.28 1.52 0.152 0.153 0.249 0.740 2.421 0.575 - 0.072 3.487 1.711 0.982 8,835,000$ 1.111 8,835,000$ 1.111 280 33
3636 A Hampton Roads Suffolk City
Route 58 Arterial Preservation Plan
Study Recommendations X X - 0.01 4.22 0.52 - - - 8.584 1.211
- - 0.128 0.005 0.007 0.613 6,600,000$ 0.929 6,600,000$ 0.929 299 34
3545 A Hampton Roads Chesapeake City George Washington Highway Widening X X 0.09 0.14 21.05 1.87 1.549 1.476 0.466 0.921 3.095 3.001 0.209 1.403 0.714 0.414 1.254 29,954,143$ 0.419 14,954,143$ 0.838 307 35
3631 A Hampton Roads Poquoson City
Victory Blvd Enhancement App 1:
Poquoson & York Segments X 0.07 0.02 22.47 0.86 0.506 0.496 0.209 0.551 2.476
4.427 0.406 1.294 1.416 0.777 1.217 17,045,000$ 0.714 15,432,000$ 0.789 311 36
4637 A Hampton Roads Norfolk City
Virginia Beach Blvd Improvements:
Glenrock Rd to Clarence St X X 0.32 0.10 10.07 0.31 0.006 0.006 1.602 1.900 9.807 3.284 - 4.209 14.572 12.446 3.914 54,760,141$ 0.715 54,760,141$ 0.715 323 37
3569 A Hampton Roads Virginia Beach City Laskin Road Phase III X X 0.22 0.09 9.35 0.08 0.179 0.172 1.130 2.457 4.462 3.881 0.122 0.850 5.041 4.196 1.791 31,503,154$ 0.568 25,800,000$ 0.694 332 38
4633 A Hampton Roads Norfolk City
Virginia Beach Blvd Improvements:
Glenrock Rd to Newtown Rd X X 0.32 0.10 12.65 0.22 0.105 0.105 1.602 1.900 10.409 4.668 - 8.826 14.715 12.961 4.157 61,003,077$ 0.681 61,003,077$ 0.681 335 39
3623 A Hampton Roads Suffolk City North Suffolk Connector X X 5.00 6.20 - - 0.123 0.122 0.133 0.262 7.181 2.747 0.325 0.664 0.558 0.764 3.127 46,064,948$ 0.679 45,964,948$ 0.680 336 40
3957 A Hampton Roads York County
Route 171 capacity enhancements
between Routes 134 and 782 X X 0.07 0.02 13.03 0.69 0.147 0.141 0.201 0.531 1.639 0.157 0.412 0.931 1.528 0.831 0.777 13,763,000$ 0.565 12,193,000$ 0.638 343 41
4108 A Hampton Roads York County
Route 171 capacity enhancements
between Routes 1740 and 782 X X 0.07 0.01 7.27 0.57 0.148 0.147 0.209 0.551 1.093
0.157 0.168 0.501 1.281 0.633 0.549 10,094,000$ 0.544 9,734,000$ 0.564 348 42
3708 A Hampton Roads Chesapeake City
Mt. Pleasant Road Improvements
Phase 1 X X 1.46 0.41 10.95 1.36 2.467 2.296 0.517 1.021 3.253 - - 0.383 0.891 0.828 1.425 30,500,283$ 0.467 28,200,283$ 0.505 352 43
3547 A Hampton Roads Chesapeake City
Freeman Avenue/Norfolk Portsmouth
Beltline Overpass X X - - - - - - - - 2.952
- - - 5.738 4.307 1.209 28,256,673$ 0.428 23,950,741$ 0.505 353 44
3589 A Hampton Roads Virginia Beach City General Booth Boulevard X X 0.18 0.01 3.40 0.04 0.023 0.023 0.892 1.941 2.004 10.541 - 0.779 0.871 0.425 0.825 20,026,357$ 0.412 18,000,000$ 0.459 361 45
3576 A Hampton Roads Virginia Beach City First Colonial Road X X 0.26 0.17 10.80 0.50 1.563 1.477 1.315 2.859 4.972 3.625 0.107 1.959 4.541 3.634 1.979 52,014,828$ 0.381 44,200,000$ 0.448 363 46
4225 A Hampton Roads James City County
Pocahontas Trail (Rt 60) Improvements
- Segments C & D X X 0.04 0.00 1.02 0.44 0.057 0.058 0.196 0.427 0.356 0.321 0.336 0.088 0.251 0.279 0.163 11,944,000$ 0.137 4,319,934$ 0.378 371 47
4290 A Hampton Roads James City County
Pocahontas Trail (Rt 60) Improvements
- Segments C,D & E1 X X 0.13 0.00 1.56 0.48 0.356 0.359 0.231 0.502 0.537
0.321 0.483 0.106 0.254 0.281 0.250 15,338,000$ 0.163 7,713,934$ 0.324 377 48
3624 A Hampton Roads Suffolk City
Route 460 Safety and Operations Study
Improvements X X - 0.16 27.06 0.95 0.612 0.588 - 6.078 3.124 - 7.648 0.595 0.057 0.109 1.365 59,242,290$ 0.230 59,242,290$ 0.230 392 49
4169 A Hampton Roads York County
Mooretown Rd/Lightfoot Rd
Intersection Improvements X - 0.01 1.61 2.45 0.009 0.009 - - 0.610
0.310 - - 0.461 0.664 0.250 12,868,713$ 0.194 11,534,305$ 0.217 394 50
5082 A Hampton Roads Isle of Wight County
U.S. Route 460 at Five Points
Intersection Improvements X X 0.03 - 0.54 0.38 0.001 0.001 0.051 - 0.092 - - 0.018 0.014 0.023 0.040 2,153,180$ 0.188 2,153,180$ 0.188 402 51
4581 A Hampton Roads Isle of Wight County
Broadwater (Route 620)
Reconstruction with No New Capacity X - - 3.61 2.22 0.004 0.004 - - 0.320
- - 0.012 0.001 0.001 0.163 8,732,351$ 0.186 8,732,351$ 0.186 403 52
3920 A Hampton Roads James City County Pocahontas Trail (Rt 60) Improvements X X 0.07 0.01 10.34 1.10 0.021 0.021 0.339 0.737 0.970
0.776 1.379 0.627 0.230 0.241 0.491 42,394,000$ 0.116 30,850,734$ 0.159 409 53
4085 D Hampton Roads Greensville County Low Ground Road Sidewalk Project X 0.00 - - - 0.001 0.001 0.005 - 0.001 - - - 0.001 334,455$ 0.017 334,455$ 0.017 425 54
3556 C Lynchburg Lynchburg City
Rivermont Ave. and Bedford Ave.
Intersection improvement X 0.01 0.00 4.89 4.46 0.000 - 0.053 0.063 3.281
- 0.350 0.005 1.357 485,000$ 27.973 485,000$ 27.973 11 1
4177 D Lynchburg Pittsylvania County Shula Drive Relocation X X - 0.00 14.85 16.61 - - - 3.120 14.037 0.048 - 0.007 5.588 4,768,466$ 11.719 4,768,466$ 11.719 29 2
3675 D Lynchburg
Danville Metropolitan Planning
Organization
Southern Virginia Mega Site at Berry
Hill Connector Road X 0.35 0.26 - - 0.302 0.342 - - 58.374
100.000 0.094 0.099 24.000 33,456,704$ 7.174 30,931,704$ 7.759 52 3
3821 D Lynchburg Halifax Town
Main St. (US501)-Mountain Rd.
(VA360) Turning Radius X - - 0.06 0.12 - - - - 1.225 2.264 - 0.003 0.564 738,925$ 7.629 738,925$ 7.629 53 4
4304 D Lynchburg Amherst County Route 29/Route 151 Intersection X X - 0.00 7.83 5.68 - - - 3.078 6.118 - - 0.015 2.487 3,300,027$ 7.536 3,300,027$ 7.536 56 5
3827 C Lynchburg Nelson County US Route 29 and Route 6 Intersection X - 0.00 6.62 6.13 - - - 2.322 4.743 - - 0.011 1.948 2,725,677$ 7.148 2,725,677$ 7.148 60 6
3554 C Lynchburg Lynchburg City
US 501 Bus - Langhorne and Vassar
Roundabout X - 0.01 4.59 11.69 - - - - 5.576
- - 0.006 2.314 6,100,000$ 3.794 6,100,000$ 3.794 124 7
3498 D Lynchburg Campbell County
Route 29 / 699 Intersection
Improvements X - - 4.13 2.57 - - - - 2.893 - - 0.021 1.150 3,086,810$ 3.727 3,086,810$ 3.727 126 8
3493 C Lynchburg Lynchburg City
RTE 221 - INTERSECTION
IMPROVEMENTS.X X 0.17 0.25 3.44 0.20 0.907 1.104 0.851 1.852 10.110
17.971 0.943 1.824 4.153 38,538,037$ 1.078 16,701,515$ 2.487 171 9
3664 D Lynchburg Danville City
Route 58 WBL from Airport Dr to
Kentuck Rd X X - 0.00 1.78 - 0.000 0.000 - 8.132 2.121 - 0.910 - 0.843 3,453,896$ 2.441 3,453,896$ 2.441 173 10
3633 C Lynchburg Nelson County Route 6/151 Intersection X - 0.02 4.82 5.87 - - - - 3.166 - - 0.012 1.496 6,534,825$ 2.289 6,534,825$ 2.289 184 11
3497 C Lynchburg Campbell County Route 29 Safety Improvements X X 0.13 0.56 28.80 0.81 0.719 0.817 - - 18.235 0.635 46.002 1.321 7.275 32,682,122$ 2.226 32,682,122$ 2.226 192 12
3831 C Lynchburg Nelson County Route 29 & Oak Ridge Road X - 0.00 0.17 0.15 - - - 0.191 2.254 4.923 - 0.005 0.901 4,133,471$ 2.179 4,133,471$ 2.179 196 13
4233 D Lynchburg Pittsylvania County Kentuck Road Improvements X - 0.00 4.20 3.13 0.003 0.002 - - 3.606 0.752 0.039 0.013 1.442 7,203,813$ 2.001 7,203,813$ 2.001 207 14
3555 C Lynchburg Lynchburg City
Wards Ferry Rd. and CVCC Campus
Drive Roundabout X X 0.31 0.83 2.18 0.92 0.979 1.495 0.166 0.492 3.683
3.685 - - 1.465 7,630,000$ 1.920 7,630,000$ 1.920 214 15
4221 D Lynchburg Danville City
Piedmont Drive Pedestrian Accessibility
Improvements X 0.11 - 4.69 1.43 0.030 0.031 0.173 - 2.708 - - 0.162 1.080 5,797,934$ 1.862 5,797,934$ 1.862 220 16
3745 D Lynchburg Altavista Town
Altavista Elementary School
Transportation Improvements X - - 0.09 0.31 - - - - 0.933
1.269 - - 0.372 2,680,995$ 1.388 2,680,995$ 1.388 251 17
4863 D Lynchburg Halifax County US 58/Route 751 Intersection X - 0.00 0.09 0.23 - - - 2.584 0.506 - - 0.001 0.202 1,835,214$ 1.101 1,835,214$ 1.101 281 18
3822 D Lynchburg Halifax Town
L.P. Bailey Mem. Hwy. (US501)-Bethel
Rd. (VA360) Roundabout X 0.03 0.02 0.46 0.76 0.011 0.006 0.080 0.211 1.700
1.889 0.444 0.004 0.712 6,839,605$ 1.041 6,839,605$ 1.041 289 19
3507 D Lynchburg Prince Edward County Interstection of Rt 692 and Rt 665 X - 0.00 0.40 1.97 - - - - 1.022 - - - 0.407 4,528,690$ 0.898 4,528,690$ 0.898 300 20
3820 D Lynchburg Halifax Town
North Main St. (US501)-Church St. (Rte.
1106) Re-alignment X 0.01 - 0.17 0.39 - - 0.010 - 0.209
- - 0.002 0.096 1,938,680$ 0.493 1,938,680$ 0.493 354 21
3495 D Lynchburg Campbell County Route 501 Passing Lanes X X - - 5.92 1.04 0.006 0.010 - - 3.028 - - 0.160 1.208 27,877,300$ 0.433 27,877,300$ 0.433 364 22
3656 D Lynchburg Danville City
Roundabout at Mt. Cross Rd. and
Dimon Dr.X 0.05 0.00 0.46 0.77 0.002 0.001 0.228 0.451 0.618
- - - 0.248 7,040,427$ 0.352 7,040,427$ 0.352 374 23
3496 C Lynchburg Campbell County Phase 2 Lynbrook Road Reconstruction X - 0.00 2.91 1.03 0.040 0.027 - - 1.444
- 0.036 0.098 0.579 18,668,395$ 0.310 18,668,395$ 0.310 381 24
4871 D Lynchburg Halifax County
Route 751 Corridor and US 58/751
Intersection (Phase 1&2)X - 0.00 0.06 0.27 0.008 0.003 - - 0.146 - 0.002 0.000 0.058 5,785,333$ 0.100 5,785,333$ 0.100 417 25
3867 C Lynchburg Nelson County
Route 151 at Tanbark Drive
intersection improvements X - - 0.03 0.03 - - - - 0.027 0.009 - - 0.011 5,491,202$ 0.019 5,491,202$ 0.019 424 26
3887 D Lynchburg Buckingham County
Rt.15 Southbound at Rt. 617 (Gravel
Hill Rd.)X - 0.00 - - - - - - 0.000 - - 0.001 0.000 4,267,892$ 0.000 4,267,892$ 0.000 430 27
3506 D Lynchburg Prince Edward County US 460 Interchange X X - - - - - - - - 0.000 - - 0.001 0.000 16,476,148$ 0.000 16,476,148$ 0.000 433 28
4129 A Northern Virginia DASH Alexandria Transit Company Citywide TSP on Major Corridors X 0.67 0.04 2.93 0.02 - - 3.392 1.341 27.238 11.264 - 0.066 43.422 34.959 10.354 2,230,000$ 46.430 2,110,000$ 49.071 5 1
3903 A Northern Virginia Arlington Transit
Crystal City Potomac Yard Transitway
Southern Extension X 0.93 0.09 0.68 0.00 - - 4.696 1.857 33.993 11.653 - 0.019 85.929 82.205 19.510 8,426,694$ 23.152 6,611,694$ 29.508 10 2
4098 A Northern Virginia Falls Church City
S Washington Multimodal
Improvements X X 0.22 - 1.19 0.01 0.026 0.033 1.119 - 15.504
2.634 - 0.105 29.845 19.016 6.291 9,009,337$ 6.983 2,827,010$ 22.255 16 3
3568 A Northern Virginia Alexandria City
Safety & Capacity Enhancements at
Duke/Taylor Run/Telegraph X X 0.06 - - - 0.029 0.036 0.321 - 18.122 - - 0.460 46.052 38.856 9.717 6,545,460$ 14.846 5,745,460$ 16.913 20 4
3510 A Northern Virginia Alexandria City
Access Improvements to the Landmark
Transit Hub X X 0.24 - 2.88 0.39 1.245 1.728 0.730 - 12.676
- - - 30.613 20.531 6.473 6,334,630$ 10.219 6,334,630$ 10.219 35 5
3779 A Northern Virginia Fairfax City Pickett Trail Connector X X 0.11 - - - 0.639 0.622 0.459 - 9.489 3.931 - - 19.455 9.740 4.016 5,965,444$ 6.732 5,965,444$ 6.732 66 6
3537 A Northern Virginia Loudoun County Route 50 Corridor Improvements X - 0.04 3.42 - 0.113 0.102 - - 1.992 8.347 0.840 - 1.445 2.158 0.797 5,000,000$ 1.595 1,292,500$ 6.169 76 7
3778 A Northern Virginia Fairfax City
Fairfax Blvd/Warwick Ave Intersection
Improvements X X 0.48 7.57 1.09 0.27 0.028 0.049 2.418 2.868 11.631
1.497 0.184 0.261 13.209 6.433 4.931 8,839,327$ 5.579 8,839,327$ 5.579 82 8
3930 A Northern Virginia Arlington Transit Crystal City Metro East Entrance X 4.38 1.05 3.14 0.01 1.229 1.055 22.069 43.630 68.116 42.056 - 0.020 100.000 100.000 29.032 90,765,000$ 3.199 52,900,000$ 5.488 83 9
3452 A Northern Virginia Alexandria City
West End Transitway Corridor
Investments X X 10.38 10.00 9.62 0.18 29.136 44.109 50.583 100.000 61.112
37.742 1.694 3.254 49.183 42.390 29.196 61,800,000$ 4.724 57,200,000$ 5.104 92 10
4134 A Northern Virginia DASH Alexandria Transit Company DASH Zero Emission Fleet Expansion X 2.41 0.13 2.78 0.02 - - 12.141 9.601 28.083 6.725 - 0.026 39.578 32.905 10.675 35,063,000$ 3.045 23,129,839$ 4.615 102 11
3487 A Northern Virginia Herndon Town
South Elden Street Corridor
Improvements X X 0.10 0.02 36.91 3.78 0.310 0.398 0.522 1.032 12.194 2.639 0.248 0.870 15.694 15.212 4.962 16,000,000$ 3.101 16,000,000$ 3.101 147 12
3799 A Northern Virginia Fairfax County Richmond Highway-Bus Rapid Transit X X 4.71 2.20 100.00 0.61 4.532 6.050 23.718 51.579 35.023 3.374 - 8.109 13.532 11.578 14.957 544,800,000$ 0.275 50,000,000$ 2.991 152 13
3499 A Northern Virginia Prince William County
I-95 Southbound Auxiliary Lane Project
(Exit 160 to 158)X X 12.59 5.39 15.03 0.10 3.277 3.482 - - 17.304 - 10.530 17.365 4.877 6.647 7.049 31,788,468$ 2.218 25,653,202$ 2.748 161 14
3561 A Northern Virginia Fairfax City
Eaton Place and Chain Bridge Road
Intersection Improvements X X 0.70 0.28 20.65 5.73 0.642 0.527 3.503 6.925 9.284
0.730 0.029 0.717 12.090 5.736 3.933 32,152,085$ 1.223 21,402,085$ 1.838 223 15
3801 A Northern Virginia Fairfax County
Braddock Road Multimodal
Improvements Phase I X X 1.03 8.20 55.53 1.05 35.841 33.469 1.900 3.757 26.302
- 1.639 6.779 14.295 7.658 11.828 87,544,459$ 1.351 79,977,838$ 1.479 244 16
4075 A Northern Virginia Prince William County
Intersection Improvements at Old
Bridge Rd and Occoquan Rd X 0.03 0.13 1.55 0.37 0.585 0.490 0.043 0.114 4.239 - - 0.278 5.849 8.298 1.690 11,850,000$ 1.426 11,850,000$ 1.426 249 17
3780 A Northern Virginia Fairfax County
Seven Corners Ring Road (Phase 1A
Segment 1A)X X 0.52 0.78 1.47 1.64 1.896 2.286 0.014 0.027 24.516
0.349 0.000 0.005 43.986 30.591 9.841 94,800,000$ 1.038 82,800,335$ 1.188 270 18
3517 A Northern Virginia Loudoun County Belmont Ridge Road X 0.07 0.32 2.37 0.78 0.872 0.731 0.202 0.532 1.523 2.563 0.058 0.122 0.631 1.137 0.609 7,300,000$ 0.835 5,198,513$ 1.172 273 19
4277 A Northern Virginia Fairfax County
Route 28 Widening NB (McLearen
Road to Route 50)X X 0.00 0.00 3.56 0.05 4.599 5.709 - - 5.487
0.108 7.221 4.429 5.860 5.913 2.245 23,205,000$ 0.967 21,137,000$ 1.062 285 20
3536 A Northern Virginia Loudoun County
Route 50 Roundabout at Trailhead
Drive X - - 5.28 7.84 - - - - 0.984 - - 0.016 0.133 0.251 0.411 9,170,028$ 0.448 5,170,028$ 0.795 309 21
3591 A Northern Virginia Loudoun County
Route 15 & Braddock Road –
Roundabout X X - - 2.98 3.64 - - - - 0.476
- - 0.007 0.009 0.010 0.191 6,433,063$ 0.297 2,433,063$ 0.786 313 22
3482 A Northern Virginia Prince William County
Summit School Road Extension and
Telegraph Road Widening X X 0.49 2.06 - - 1.680 2.081 2.121 5.031 7.367 0.268 - 1.231 6.705 9.284 2.987 53,500,000$ 0.558 39,387,145$ 0.758 318 23
3502 A Northern Virginia Prince William County
Route 1 at Route 123 Interchange
Improvements X X 3.43 11.46 13.62 0.77 6.708 4.714 1.771 13.749 15.012
- 1.054 2.795 4.557 6.565 7.016 104,200,000$ 0.673 104,200,000$ 0.673 338 24
3800 A Northern Virginia Fairfax County
Braddock Road Multimodal
Improvements Phase II X X 0.87 0.24 36.65 0.67 0.787 0.463 4.291 8.484 11.239 - 0.330 7.775 12.676 5.298 4.556 74,350,018$ 0.613 69,250,018$ 0.658 340 25
3760 A Northern Virginia Fairfax County
Route 286 Widening from Route 29 to
Route 123 X X 1.02 1.28 41.92 0.20 14.873 14.746 0.652 1.289 10.877
- - 25.824 4.677 2.607 5.049 130,200,000$ 0.388 80,453,321$ 0.628 344 26
3592 A Northern Virginia Loudoun County Route 7 (Route 9 to Dulles Greenway) X X 5.49 8.22 22.71 0.22 2.142 0.465 - - 10.474 - 8.047 5.493 0.642 0.778 4.659 127,000,000$ 0.367 127,000,000$ 0.367 373 27
3531 A Northern Virginia Loudoun County Shellhorn Road (Route 643) Extension X X 2.32 3.42 - - 2.415 2.831 0.110 0.291 7.896
- 0.373 - 5.173 8.137 3.221 175,300,000$ 0.184 92,550,000$ 0.348 375 28
3787 A Northern Virginia Fairfax County
Richmond Highway Corridor
Improvements X X 0.58 0.86 96.13 1.54 2.269 3.595 2.937 5.806 13.382 0.838 1.393 8.315 8.496 7.108 5.865 372,000,000$ 0.158 194,203,000$ 0.302 383 29
3796 A Northern Virginia Fairfax County
Davis Drive Extension and Dulles Toll
Rd Rock Hill Overpass X X 1.15 1.65 - - 9.855 3.494 0.210 0.415 9.678
0.309 0.083 1.017 8.956 9.920 4.002 164,900,000$ 0.243 143,295,330$ 0.279 386 30
3828 A Northern Virginia Fairfax County Frontier Drive Extension X X 0.04 0.03 2.07 0.06 0.548 0.148 0.083 0.163 5.595 11.921 0.009 0.156 10.561 9.232 2.805 140,000,000$ 0.200 105,000,000$ 0.267 388 31
4056 A Northern Virginia Leesburg Town
Rte 15 Leesburg Bypass Interchange
with Edwards Ferry Road X X 0.63 0.18 27.82 1.79 1.747 3.268 3.169 6.264 4.455
- 1.158 3.609 1.864 2.330 2.258 125,800,000$ 0.179 112,344,505$ 0.201 398 32
3504 A Northern Virginia Prince William County
Route 15 Improvements with Railroad
Overpass X X 0.05 2.65 2.12 - 0.106 0.022 0.143 0.376 0.182
1.703 - - 0.784 0.760 0.909 58,900,000$ 0.154 47,770,959$ 0.190 400 33
4076 A Northern Virginia Prince William County
Wellington Rd Widening: University
Blvd to Balls Ford Rd X X 0.33 0.57 2.35 0.20 0.836 0.656 0.220 0.579 2.150 2.228 2.855 0.616 1.726 1.764 0.953 50,300,000$ 0.190 50,300,000$ 0.190 401 34
3505 A Northern Virginia Prince William County
Devlin Rd Widening:Linton Hall Rd to
Relocated Balls Ford Rd X X 0.07 0.18 7.28 0.78 1.735 0.353 0.373 0.737 2.151
1.614 0.003 0.743 1.380 1.499 0.920 52,080,420$ 0.177 49,680,420$ 0.185 404 35
3763 A Northern Virginia Dumfries Town Route 1 (Fraley Boulevard) Widening X X 0.31 0.26 11.60 0.71 3.028 4.621 0.690 1.365 3.535 8.966 2.038 1.954 0.775 0.742 1.574 141,800,000$ 0.111 89,316,999$ 0.176 405 36
3521 A Northern Virginia Prince William County
University Blvd Extension - Devlin Rd to
Wellington Rd X X 0.30 0.42 - - 0.075 0.013 0.041 0.109 1.261
4.265 0.805 - 1.288 1.392 0.639 41,090,328$ 0.155 37,190,328$ 0.172 407 37
4437 A Northern Virginia Prince William County
Rt 234 and Sudley Manor Dr
Interchange Improvements (SPUI)X X 1.38 1.62 31.20 1.41 0.839 0.940 0.493 1.298 4.219 - 1.017 1.470 3.291 3.109 2.556 177,100,000$ 0.144 177,100,000$ 0.144 412 38
3552 A Northern Virginia Loudoun County
Northstar Boulevard (Braddock Road
to Tall Cedars Parkway)X X 0.03 0.09 2.35 0.41 0.079 0.093 0.100 0.263 0.664
0.669 0.108 - 0.361 0.630 0.266 35,100,000$ 0.076 32,407,000$ 0.082 420 39
3925 B Richmond Prince George County Lower Appomattox River Trail X X 0.04 - - - 0.362 0.924 0.214 - 0.281 - - 0.017 0.128 0.037 0.139 44,000$ 31.640 44,000$ 31.640 9 1
4584 D Richmond Nottoway County
Roundabout for Darvills Rd. (VA 40) at
Military Rd.X - 0.01 13.99 100.00 - - - 0.621 48.661
- - 0.003 19.564 7,267,500$ 26.920 7,267,500$ 26.920 12 2
4044 B Richmond Henrico County
Parham Rd Traffic Signal & Sidewalk
Project X X 0.37 0.29 7.19 0.00 0.535 0.827 1.865 22.201 8.200 0.032 - 0.645 8.579 4.723 3.276 4,460,000$ 7.345 1,335,000$ 24.538 14 3
3713 B Richmond
Greater Richmond Transit Company
(GRTC)
A Scott's Addition BRT Station
Pedestrian Safety/Streetscape X 0.60 - 3.53 0.10 0.124 0.151 3.035 - 7.802
3.840 - 0.119 27.158 10.547 3.659 1,612,000$ 22.697 1,612,000$ 22.697 15 4
3430 B Richmond Richmond City
G US33 Leigh Street Streetscape
Improvements X X 0.20 - 6.31 2.04 0.407 0.551 1.032 - 15.716 35.898 - 0.214 21.378 9.446 7.872 6,608,000$ 11.913 6,608,000$ 11.913 27 5
4977 B Richmond Chesterfield County ITS Signal Upgrades X X - - 53.61 0.08 - - - - 27.388 29.738 - 24.315 0.786 0.559 11.351 10,440,000$ 10.873 10,440,000$ 10.873 30 6
3432 B Richmond Richmond City
I Boulevard Shared Use Path to Science
Museum BRT Station X X 0.09 - - - 0.105 0.100 0.452 - 6.859 2.112 - - 30.078 12.049 3.113 2,992,481$ 10.404 2,992,481$ 10.404 34 7
4880 D Richmond Nottoway County
Construct R-CUT at the end Lewistown
Plank Rd at 460 X - - 10.25 9.84 - - - - 7.561
- - 0.008 3.392 3,364,437$ 10.081 3,364,437$ 10.081 36 8
3868 B Richmond Charles City County Route 106/Route 5 Roundabout X 0.02 0.02 9.18 27.61 - - 0.047 0.124 7.639 - - 0.015 0.003 0.002 4.073 4,110,000$ 9.909 4,110,000$ 9.909 38 9
3428 B Richmond Richmond City E Maury Street Streetscape Phase II X X 0.07 0.03 0.59 0.48 0.492 0.429 0.342 0.405 9.570 14.784 0.133 0.052 20.358 10.387 4.244 4,618,000$ 9.189 4,618,000$ 9.189 41 10
3726 B Richmond
Greater Richmond Transit Company
(GRTC)
C Rvrfront/Orleans BRT Station
Pedestrian Safety/Streetscape X 0.16 0.00 1.40 0.25 - - 0.830 0.984 3.406 - - - 13.663 7.761 1.627 2,057,000$ 7.912 2,057,000$ 7.912 49 11
3549 B Richmond Henrico County
N Laburnum Avenue Pedestrian and
Transit Improvements X X 0.11 0.01 4.04 0.00 0.027 0.038 0.572 20.380 4.828
0.021 0.316 0.438 4.332 1.612 2.093 3,054,000$ 6.853 2,689,000$ 7.784 51 12
4972 B Richmond Chesterfield County
Superstreet - Route 60 at Woolridge
Road/Old Buckingham Road X 0.30 0.09 64.73 0.40 0.027 0.010 0.759 1.200 22.083 10.933 0.276 20.174 1.574 1.242 10.026 13,239,000$ 7.573 13,239,000$ 7.573 55 13
3710 C Richmond Dinwiddie County Route 600/Route 601 Roundabout X 0.01 - 8.03 10.90 0.005 0.000 0.020 - 6.718 - - 0.007 2.705 3,700,000$ 7.310 3,700,000$ 7.310 59 14
4001 B Richmond Powhatan County Jude's Ferry Road & Route 60 X - 0.01 6.72 1.78 0.001 - - - 4.371 5.536 0.012 0.190 0.049 0.062 1.747 2,471,870$ 7.069 2,471,870$ 7.069 61 15
3923 C Richmond Prince George County
Roundabout at Middle Road and Prince
George Drive X - 0.01 6.65 15.13 - - - - 7.802 - - 0.008 3.114 4,530,105$ 6.874 4,530,105$ 6.874 63 16
3706 B Richmond
Richmond Regional Transportation
Planning Organization
Route 60 Corridor Solution Set and
Pedestrian Facilities X 0.41 - 22.04 0.89 3.714 3.773 2.042 - 11.035
1.838 - 3.258 4.450 1.955 4.444 6,920,000$ 6.422 6,920,000$ 6.422 70 17
3431 B Richmond Richmond City
H Clay Street Streetscape
Improvements X X 0.03 0.00 0.47 0.63 0.079 0.082 0.146 0.288 6.824 2.280 - 0.021 28.796 11.155 3.116 5,757,267$ 5.412 5,757,267$ 5.412 84 18
3433 B Richmond Richmond City
J CSX Bridge Replacement for Walking
and Biking X X 0.03 - 0.24 0.43 0.000 0.000 0.153 - 6.326 - - - 29.446 10.826 2.779 13,613,000$ 2.042 5,713,000$ 4.865 96 19
4767 B Richmond Chesterfield County
Alverser at Old Buckingham
Roundabout X 0.12 0.00 7.11 7.58 0.219 0.049 0.372 0.981 5.186 0.521 - - 1.920 0.903 2.065 4,358,434$ 4.738 4,293,434$ 4.810 98 20
3951 B Richmond Henrico County
W Broad Street Pedestrian and Transit
Improvements X X 0.62 0.68 26.61 0.50 0.975 1.541 3.114 3.693 11.939
1.485 - 1.063 6.435 3.894 4.757 10,857,000$ 4.381 10,857,000$ 4.381 106 21
3928 B Richmond Chesterfield County
Route 1 (Falling Ck. Wayside - Food
Lion) Bike/Ped Imprvemnt X X 0.09 - 7.66 1.46 0.975 1.456 0.257 - 3.321
0.275 - 0.401 0.904 0.672 1.448 3,331,242$ 4.347 3,331,242$ 4.347 107 22
4045 B Richmond Goochland County
I-64 at Oilville Road (Rte. 617)
Interchange X - 0.20 4.82 7.81 - - - - 4.389
2.125 - 0.001 0.004 0.003 1.753 4,077,842$ 4.299 4,077,842$ 4.299 111 23
3738 B Richmond Chesterfield County
Route 360/Courthouse Road
Intersection Improvement X X 0.24 0.37 3.56 0.55 0.574 0.485 0.598 0.946 4.608
6.963 2.279 0.747 0.697 0.306 1.889 4,527,000$ 4.172 4,527,000$ 4.172 113 24
3996 B Richmond Powhatan County Dorset Road & Route 60 X - 0.00 9.74 3.62 0.001 0.000 - - 4.596 1.718 1.510 0.134 0.050 0.059 1.843 4,422,750$ 4.166 4,422,750$ 4.166 114 25
4743 D Richmond Nottoway County
Intersection Improvements at Burke's
Tavern Rd at Rt. 360 X - - 0.63 2.80 - - - - 1.463 - - 0.001 0.587 1,435,200$ 4.093 1,435,200$ 4.093 115 26
3725 B Richmond
Greater Richmond Transit Company
(GRTC)
B Shockoe Bottom BRT Station
Pedestrian Safety/Streetscape X 0.16 - 1.59 1.94 0.002 0.001 0.819 - 3.505 - - - 16.290 8.214 1.968 4,900,000$ 4.017 4,900,000$ 4.017 117 27
4685 B Richmond Chesterfield County
RT 60 at Courthouse Road/Huguenot
Road Quadrant Intersection X 0.23 5.22 50.93 0.31 3.111 1.566 0.079 0.124 27.284 20.307 0.297 24.203 1.898 1.072 11.034 31,060,000$ 3.553 31,060,000$ 3.553 135 28
4010 B Richmond Powhatan County Carter Gallier Phase II X 0.23 0.28 2.53 0.18 - - - - 6.617 17.009 0.019 - 0.028 0.041 2.686 7,641,557$ 3.515 7,641,557$ 3.515 136 29
3690 B Richmond
Richmond Regional Transportation
Planning Organization
Broad Street Pedestrian and Transit
Improvements, Phase 2 X 0.56 0.00 18.40 0.32 0.238 0.368 2.803 5.541 9.666
0.342 - 2.128 9.928 5.373 3.851 10,962,000$ 3.513 10,962,000$ 3.513 137 30
4681 B Richmond Chesterfield County
Superstreet - US 360 at Deer Run and
Mockingbird X X 0.40 - 28.74 0.19 0.133 0.082 2.034 - 14.025 11.284 - 10.691 0.982 0.898 5.628 17,219,000$ 3.269 17,219,000$ 3.269 140 31
4983 D Richmond Clarksville Town Route 58/49 Roundabout X X - 0.02 5.51 3.73 - - - - 2.784 0.931 - 0.028 1.723 5,287,500$ 3.259 5,287,500$ 3.259 142 32
3673 B Richmond Hanover County
Creighton Road/Walnut Grove Road
Roundabout X 0.05 0.11 8.95 10.87 0.007 0.000 0.075 0.198 4.474 - - 0.010 0.305 0.175 2.259 6,976,601$ 3.238 6,976,601$ 3.238 144 33
3695 B Richmond Hanover County
Route 301 Southbound Safety & Traffic
Operations Improvement X - - 0.51 0.21 0.000 0.000 - - 0.541
0.343 - 0.118 0.771 0.624 0.218 762,893$ 2.852 762,893$ 2.852 155 34
4139 B Richmond Henrico County
W Broad Street Intersection
Improvements at Parham Road X X 0.35 0.27 14.21 0.53 0.072 0.113 1.777 2.108 7.468
0.219 0.203 1.985 8.678 4.968 2.975 10,637,000$ 2.797 10,637,000$ 2.797 159 35
3424 B Richmond Richmond City A - Gillies Creek Greenway X X 0.22 - 0.01 0.02 0.077 0.107 1.125 - 2.588 - - 0.008 10.820 6.337 1.170 4,344,000$ 2.694 4,344,000$ 2.694 164 36
4260 B Richmond Henrico County
W Broad Street Operational
Improvements at Short Pump X X 0.02 0.38 16.00 0.64 0.541 0.576 0.125 0.148 7.672
4.282 0.478 2.510 2.850 2.335 3.105 11,834,500$ 2.624 11,834,500$ 2.624 166 37
4575 B Richmond Chesterfield County
Hopkins Road at Chippenham Parkway
Interchange Improvement X 0.14 0.78 49.18 1.90 0.300 0.442 0.362 0.572 15.540 0.276 0.071 0.214 1.332 0.517 6.221 24,424,000$ 2.547 24,424,000$ 2.547 169 38
4683 B Richmond Chesterfield County
Superstreet - US 360 at Winterpock
and Spring Run X X 0.06 0.93 31.24 0.21 0.501 0.413 0.202 0.160 14.933 10.356 2.953 11.754 0.864 0.929 5.999 26,455,000$ 2.268 26,455,000$ 2.268 187 39
4645 D Richmond Nottoway County Rt 307 left turn lane at Rt 616 X - 0.00 2.71 1.37 - - - - 1.643 - - - 0.694 3,069,000$ 2.263 3,069,000$ 2.263 188 40
3427 B Richmond Richmond City
D US1/US301 Freight Corridor
Improvements X X 0.10 0.09 5.64 1.55 0.135 0.283 0.502 0.695 6.182 0.088 0.736 0.456 20.403 10.292 2.932 14,647,217$ 2.002 14,647,217$ 2.002 206 41
3707 C Richmond Dinwiddie County
Route 1 Widening from I-85 Exit 63B to
Route 1302 X 0.04 0.02 3.15 0.89 0.176 0.081 0.203 0.401 1.636
0.863 0.084 0.176 0.795 4,098,689$ 1.940 4,098,689$ 1.940 211 42
4893 B Richmond Henrico County
W Broad Street Intersection
Improvements at Dominion and Cox X X 0.25 - 11.41 0.62 0.468 0.254 1.259 - 6.714 3.868 - 3.294 4.682 3.226 2.724 14,462,000$ 1.884 14,462,000$ 1.884 217 43
4258 C Richmond Hopewell City
W Randolph Rd & N 6th Ave
Intersection Improvements X 0.10 0.00 0.99 1.21 0.002 0.002 0.312 0.822 0.593 - - 0.020 0.371 1,973,000$ 1.878 1,973,000$ 1.878 219 44
3426 B Richmond Richmond City C US360 Hull Street Phase III X X 0.16 - 8.32 0.85 0.908 1.264 0.792 - 4.467 - - 0.761 5.618 2.746 1.897 11,664,209$ 1.626 11,664,209$ 1.626 237 45
3645 B Richmond Hanover County Pole Green Road Widening X 0.11 0.13 6.19 0.45 0.420 0.326 0.128 0.337 2.374 1.606 0.445 0.486 0.450 0.312 1.174 20,000,000$ 0.587 7,637,000$ 1.538 241 46
4030 B Richmond Goochland County
Rte 288 - New SB Auxiliary Lane South
of U.S. 250 X X 2.41 0.76 2.87 0.13 1.718 1.240 - - 5.781 9.804 - 0.118 0.345 0.416 2.364 17,460,000$ 1.354 17,460,000$ 1.354 254 47
3922 C Richmond Prince George County
Roundabout at Middle Road(Rt 646) &
Jefferson Park Rd (630)X - 0.01 1.15 0.93 - - - - 0.832
0.751 - 0.004 0.415 4,058,312$ 1.023 3,123,344$ 1.329 257 48
4202 B Richmond Henrico County Springfield Road Improvements X 0.34 2.63 3.08 0.79 1.289 0.738 0.071 0.187 3.018 - 0.077 0.272 2.136 1.571 1.215 9,150,000$ 1.328 9,150,000$ 1.328 258 49
4641 B Richmond Ashland Town
Ashcake Road Pedestrian
Improvements X 0.05 - 4.88 0.82 0.149 - 0.139 - 1.704
- - 0.426 0.196 0.195 0.724 5,582,250$ 1.296 5,582,250$ 1.296 261 50
3859 B Richmond Goochland County Three Chopt Rd Reconnection X X 0.42 0.49 - - 0.001 - 0.014 0.037 5.279 14.509 0.003 0.067 0.413 0.533 2.124 18,829,345$ 1.128 18,829,345$ 1.128 277 51
4006 B Richmond Powhatan County Jude's Ferry Road & Route 711 X - 0.00 6.94 3.85 - - - - 3.022 0.078 - - 0.000 0.000 1.239 11,603,055$ 1.068 11,603,055$ 1.068 283 52
3665 B Richmond
Richmond Regional Transportation
Planning Organization I-95 at Route 10 Interchange, Phase 2 X 0.85 2.93 4.45 0.00 3.985 5.461 0.943 13.653 7.336 6.003 6.974 - 0.427 0.267 3.733 35,378,791$ 1.055 35,378,791$ 1.055 287 53
3425 B Richmond Richmond City
B James River Branch - Rail to Trail
Greenway X X 0.09 - 0.63 0.31 0.511 0.563 0.475 - 2.866
- - - 8.893 4.892 1.142 11,020,605$ 1.036 11,020,605$ 1.036 290 54
3924 C Richmond Prince George County
Intersection Improvements at Route
460 & Queen Street X X - 0.00 0.26 0.41 - - - 3.325 0.882 0.436 - 0.005 0.359 3,469,550$ 1.034 3,469,550$ 1.034 291 55
3472 C Richmond Colonial Heights City Boulevard Modernization, Phase II X X 0.13 0.15 7.74 0.97 0.518 0.580 0.400 1.053 3.370 - 0.050 0.994 1.510 17,738,770$ 0.851 14,705,213$ 1.027 292 56
3727 C Richmond Hopewell City
Courthouse Road Pedestrian
Improvements X 0.02 - 4.99 1.20 0.059 0.032 0.116 - 2.196 - - - 0.901 8,860,000$ 1.017 8,860,000$ 1.017 294 57
3565 B Richmond
Richmond Regional Transportation
Planning Organization
I-64 Widening (Exit 205 Bottoms
Bridge to Exit 211 Rte. 106)X 1.83 2.22 21.77 0.07 0.213 0.146 - - 17.586
27.162 49.496 7.524 0.011 0.014 8.947 100,107,000$ 0.894 100,107,000$ 0.894 301 58
4403 C Richmond
Tri-Cities Area Metropolitan Planning
Organization
I-85 NB to I-95 SB - Tri-Cities MPO HB2
Priority 1 X 0.61 1.17 16.14 0.01 1.660 1.921 0.860 13.388 6.782 - - 0.297 3.564 40,026,162$ 0.890 40,026,162$ 0.890 302 59
3722 B Richmond
Richmond Regional Transportation
Planning Organization
Route 288 Northbound - Hard Shoulder
Running X 6.25 7.56 2.29 0.08 0.259 0.092 - - 4.012
0.481 0.153 0.853 0.122 0.130 1.627 20,925,000$ 0.778 20,925,000$ 0.778 314 60
5035 C Richmond Petersburg City
I-85 NB to I-95 SB-Tri-Cities MPO HB2
Priority #1 X X 0.61 1.17 13.79 0.01 1.658 1.852 1.076 13.813 1.676 0.313 0.282 0.289 3.104 40,026,162$ 0.775 40,026,162$ 0.775 315 61
3490 B Richmond New Kent County
Route 106 at I-64 Overpass and
Intersection Improvements X X - 0.02 - - - - - 2.520 3.105
8.014 - 0.000 0.005 0.005 1.245 16,407,950$ 0.759 16,407,950$ 0.759 317 62
3429 B Richmond Richmond City
F Forest Hill Avenue Phase II
Improvements X X 0.15 - 3.23 0.35 0.913 0.375 0.769 - 4.516 - - 0.134 13.090 6.446 1.904 26,945,000$ 0.707 26,945,000$ 0.707 325 63
3676 B Richmond
Richmond Regional Transportation
Planning Organization
I-95 at Willis Road Interchange
Improvement - Roundabout X 0.38 0.05 19.89 0.73 0.004 0.003 - 11.478 3.324
10.577 4.785 1.549 0.368 0.305 4.392 67,478,436$ 0.651 62,278,436$ 0.705 326 64
3761 B Richmond Goochland County
I-64 at Ashland Rd. (Rte. 623)
Interchange X X 0.18 1.06 8.09 0.01 0.988 0.869 0.716 12.074 6.396 4.024 0.121 0.009 0.129 0.198 2.557 41,073,617$ 0.623 41,073,617$ 0.623 345 65
4043 B Richmond Henrico County Carolina Avenue Improvements X X 0.05 0.06 4.59 0.44 0.194 0.343 0.275 0.543 4.261 3.013 0.476 0.820 5.944 2.606 1.720 35,518,000$ 0.484 33,783,000$ 0.509 351 66
4644 B Richmond Chesterfield County
Nash Road Extension from Beach Road
to Route 10 X X 1.90 2.30 - - 1.439 0.322 - - 2.336 2.022 0.110 0.932 0.260 0.196 0.972 33,606,000$ 0.289 20,681,576$ 0.470 355 67
3711 B Richmond
Richmond Regional Transportation
Planning Organization
Route 288 Southbound - HSR and
Interchange Improvements X 5.57 6.73 2.93 0.08 0.150 0.106 - - 4.074
1.144 0.207 0.961 0.158 0.158 1.654 35,232,000$ 0.469 35,232,000$ 0.469 356 68
3571 B Richmond Henrico County Magellan Parkway Extension Project X 0.74 0.91 - - 1.333 1.431 0.511 14.135 1.872 0.686 0.038 0.784 2.136 1.530 1.532 32,900,000$ 0.466 32,900,000$ 0.466 357 69
3678 B Richmond
Richmond Regional Transportation
Planning Organization
Meadowville Technology Parkway at I-
295 Widening X 1.40 4.70 0.11 0.52 1.511 0.750 0.131 0.258 2.330
0.084 - 0.000 0.107 0.097 0.941 21,775,000$ 0.432 21,775,000$ 0.432 365 70
3599 B Richmond Hanover County Atlee Station Road - Phase 2 X 0.07 0.10 3.96 0.50 0.482 0.073 0.218 0.575 2.422 1.769 0.057 0.267 0.690 0.587 0.987 31,529,239$ 0.313 26,529,239$ 0.372 372 71
4925 D Richmond Blackstone Town South Main Street- 10th to Fair Street X 0.02 - 0.43 0.52 0.124 0.122 0.116 - 0.424
- - 0.019 0.184 6,087,563$ 0.302 6,087,563$ 0.302 382 72
5065 C Richmond Petersburg City
I-95 and South Crater Road-MPO HB2
Priority #2 X X - 0.00 - - - - - 4.927 1.208 2.332 0.111 0.056 0.665 23,381,673$ 0.285 23,381,673$ 0.285 385 73
4524 B Richmond Ashland Town Vaughan Road Extended X X 0.74 0.89 - - 0.048 - 0.005 0.014 0.391 - 0.007 0.057 0.139 0.126 0.166 6,562,000$ 0.253 6,562,000$ 0.253 389 74
3767 C Richmond Colonial Heights City
Lakeview Avenue Modernization, Phase
II X X 0.03 - 1.58 0.60 0.088 0.009 0.105 - 0.648 - - - 0.326 14,544,264$ 0.224 14,044,264$ 0.232 391 75
4405 C Richmond
Tri-Cities Area Metropolitan Planning
Organization
I-95 and South Crater Road - MPO HB2
Priority 2 X - 0.00 - - - - - 4.927 0.502
- 0.111 - 0.277 23,381,673$ 0.119 23,381,673$ 0.119 414 76
3724 C Richmond Hopewell City Cedar Level Road Southern Segment X 0.03 0.01 0.39 0.17 0.127 0.015 0.089 0.234 0.289 - 0.016 0.018 0.125 11,235,912$ 0.111 11,235,912$ 0.111 416 77
4400 C Richmond
Tri-Cities Area Metropolitan Planning
Organization
I-95 NB to I-85 SB Flyover Ramp - Tri-
Cities MPO Priority 3 X 0.25 0.24 3.23 0.84 0.024 0.020 - 10.349 2.789
- 3.653 0.129 1.395 166,369,000$ 0.084 166,369,000$ 0.084 419 78
3679 B Richmond
Richmond Regional Transportation
Planning Organization
Route 288 at Bailey Bridge Connector
Flyover X 0.87 0.99 - - 0.309 0.311 0.260 0.309 1.212 1.244 0.057 0.114 0.703 0.513 0.512 73,493,000$ 0.070 62,493,000$ 0.082 421 79
3764 B Salem Roanoke City
Orange Avenue (US 460)
Improvements X X 0.13 - 5.88 1.57 0.032 0.034 0.196 - 8.635
17.484 - 0.285 1.745 0.833 3.460 2,818,704$ 12.276 2,818,704$ 12.276 25 1
3597 D Salem Franklin County
Roadway Improvements on Rtes
220/619(Pleasant Hill/Sontag)X X - 0.02 15.27 13.13 0.000 0.000 - 4.617 13.561 0.472 2.162 0.023 5.422 5,928,000$ 9.147 5,928,000$ 9.147 43 2
4126 D Salem Franklin County
Roadway Improvements on Rtes
220/919 (Grassy Hill)X X - 0.04 16.23 5.39 - - - 7.179 10.845
1.498 - 0.072 4.466 6,958,000$ 6.418 6,958,000$ 6.418 72 3
4141 B Salem Roanoke County
Williamson Road Sidewalk
Improvements X 0.03 - 3.53 0.83 0.384 0.379 0.045 - 2.064 1.073 - - 0.879 0.413 0.823 1,934,000$ 4.254 1,662,220$ 4.949 93 4
3553 D Salem Franklin County
Roadway improvements on Routes 122
& 636 (Lost Mountain Rd)X 0.05 0.00 1.32 0.32 0.033 0.029 0.161 0.424 11.016
18.768 - 0.056 4.775 9,759,000$ 4.893 9,759,000$ 4.893 94 5
5086 D Salem
Roanoke Valley-Alleghany Regional
Commission
U.S. 220 and Route 697/Wirtz Rd.
Intersection Improvements X - 0.07 6.93 1.47 0.030 0.030 - 7.130 12.472 11.552 4.043 0.116 4.964 11,240,000$ 4.416 11,240,000$ 4.416 104 6
3995 B Salem Botetourt County
Route 220 at International Parkway
Intersection Improvements X X 0.01 - 7.26 1.98 - - 0.020 - 4.024
4.148 - 0.079 0.010 0.002 1.629 4,551,000$ 3.578 4,251,000$ 3.831 122 7
3681 B Salem Roanoke City
Valley View Blvd / Aviation Drive
Pedestrian Improvements X 0.06 - 1.09 0.16 0.268 0.265 0.095 - 2.815 2.655 - 0.044 5.713 2.509 1.124 3,022,859$ 3.720 3,022,859$ 3.720 127 8
3806 B Salem Roanoke County
Route 419 and Route 220 Diverging
Diamond Interchange X X 0.20 0.03 26.37 1.65 0.895 0.882 1.029 2.034 15.235
14.975 0.041 0.939 3.721 2.108 6.072 17,505,000$ 3.469 16,755,000$ 3.624 132 9
3858 D Salem Patrick County
Claudville Hwy Intersection
Improvement X - - 1.55 2.86 - - - - 1.901 - - 0.008 0.757 2,104,000$ 3.598 2,104,000$ 3.598 133 10
3627 D Salem Bedford County
Camp Jaycee Road (Route 697)
Intersection at US460 X X - 0.00 4.99 0.90 - - - 3.332 2.934
0.003 - 0.116 1.206 3,733,000$ 3.231 3,733,000$ 3.231 145 11
3527 D Salem Galax City
E. Stuart Drive Sidewalk Project - Phase
II X X 0.05 - 2.49 0.24 0.148 0.156 0.081 - 1.401 0.168 - 0.287 0.558 2,013,000$ 2.773 2,013,000$ 2.773 160 12
4223 D Salem Martinsville City
Martinsville - Focus Area 3: Ailcie
Street to Pine Hall Rd.X 0.03 0.00 3.74 4.98 0.027 0.027 0.043 0.114 4.125
0.622 0.006 0.011 1.658 6,054,000$ 2.739 6,054,000$ 2.739 162 13
3524 D Salem Galax City
E. Stuart Drive Sidewalk Project - Phase
I X X 0.06 - 1.78 0.45 0.598 0.731 0.087 - 1.867
1.085 - 0.098 0.743 2,983,000$ 2.492 2,983,000$ 2.492 170 14
4132 D Salem Franklin County
Roadway Improvements on Rtes
220/613 (Naff Road)X X - 0.00 5.84 1.19 - - - 7.313 5.427 4.010 - 0.045 2.537 10,389,000$ 2.442 10,389,000$ 2.442 172 15
3839 C Salem
New River Valley Metropolitan
Planning Organization I-81/Route 8 (Exit 114) Park & Ride Lot X 0.06 0.03 0.40 0.00 0.041 0.039 0.315 17.730 2.808 0.079 - 0.036 1.121 4,731,000$ 2.370 4,731,000$ 2.370 178 16
5029 B Salem Botetourt County Route 220 Superstreet Improvement X X - 0.07 8.93 0.94 - - - - 3.672 2.249 - 0.850 0.020 0.005 1.481 6,361,000$ 2.329 6,361,000$ 2.329 182 17
3811 B Salem Roanoke County Old Cave Spring Road Improvements X - 0.01 1.94 0.85 0.008 0.009 - - 1.348 0.564 0.003 0.208 1.293 0.785 0.539 2,561,000$ 2.105 2,561,000$ 2.105 199 18
4228 C Salem Montgomery County
Route 8 Widening and Pedestrian
Improvements X X 0.02 - 0.93 1.12 0.001 0.001 0.028 - 1.221
1.275 - 0.008 0.513 3,571,000$ 1.436 2,471,548$ 2.074 201 19
3628 D Salem Bedford County
Timber Ridge Road (Route 803) &
US460 Intersection X - 0.00 7.74 2.23 - - - - 4.304 - - 0.085 1.718 8,700,000$ 1.975 8,700,000$ 1.975 208 20
4041 C Salem Giles County Route 100 Safety Improvements X X - 0.00 7.13 3.86 0.008 0.007 - - 3.735 - - - 1.562 7,935,000$ 1.969 7,935,000$ 1.969 209 21
3971 B Salem Salem City
Downtown Salem - College Avenue
Improvements X X 0.03 0.00 1.51 2.09 0.081 0.078 0.158 0.344 1.618 1.522 0.011 0.019 1.156 0.539 0.766 4,366,000$ 1.753 4,366,000$ 1.753 228 22
3543 C Salem Montgomery County
Intersection Improvements at Route
460/637 X X - 0.00 4.82 3.52 - - - - 2.553
0.099 - 0.029 1.186 6,812,000$ 1.741 6,812,000$ 1.741 231 23
4053 B Salem Roanoke City
Main Street (Rte 221) Corridor
Improvements X 0.14 0.04 0.52 0.49 0.056 0.057 0.425 1.120 1.516
- 0.001 0.019 9.910 4.781 1.117 30,696,924$ 0.364 6,696,924$ 1.668 235 24
3720 B Salem Roanoke City 13th Street Southeast Improvements X 0.52 0.29 0.66 0.59 0.029 0.030 0.272 0.537 2.338 0.557 0.003 0.023 7.132 3.243 1.013 7,302,000$ 1.387 7,102,000$ 1.426 250 25
3477 B Salem
Roanoke Valley Transportation
Planning Organization
I-81 Northbound Improvements
between Exit 140 and 141 X 0.21 0.19 1.06 0.05 0.953 0.967 - 14.803 4.564
0.898 12.398 0.093 0.505 0.219 1.950 14,446,000$ 1.350 14,446,000$ 1.350 255 26
4000 B Salem Botetourt County
Glebe Road Alignment and
Bike/Pedestrian Improvements X X 0.00 - - - - - 0.003 - 0.696 2.007 - - 0.011 0.002 0.277 2,823,000$ 0.981 2,060,404$ 1.344 256 27
3478 B Salem
Roanoke Valley Transportation
Planning Organization
I-81 Southbound Improvements
between Exit 141 and 140 X 0.71 0.19 1.95 0.07 0.709 0.734 - 13.871 5.296 2.545 13.717 0.163 0.468 0.202 2.270 23,515,000$ 0.965 17,515,000$ 1.296 262 28
3562 C Salem Christiansburg Town
N. Franklin Street - Depot Street
Intersection Improvements X 0.11 0.02 1.38 0.61 0.036 0.031 0.537 0.636 0.937
0.081 0.016 0.093 0.388 3,075,000$ 1.263 3,075,000$ 1.263 263 29
3841 C Salem
New River Valley Metropolitan
Planning Organization
I-81/Route 8 (Exit 114) Interchange
Improvements X 0.06 1.83 6.65 2.32 - - 0.193 0.508 4.274 1.260 - 0.108 1.706 13,879,000$ 1.229 13,879,000$ 1.229 268 30
3735 D Salem Carroll County
Interstate 77, Exit 1 and Route 620
Improvements X X - 0.00 2.78 0.89 0.023 0.024 - 12.262 3.346
- - - 1.334 11,614,000$ 1.149 11,614,000$ 1.149 275 31
3755 B Salem Vinton Town
Walnut Avenue Corridor Improvements
Phase 2 Project X 0.04 0.01 1.51 1.34 0.057 0.057 0.109 0.288 1.445
0.679 0.018 - 3.286 1.588 0.751 6,845,000$ 1.098 6,845,000$ 1.098 282 32
3467 D Salem Martinsville City
Martinsville - Focus Area 1: Albert
Harris Ele.X 0.05 - 2.71 1.39 0.004 0.004 0.083 - 1.690
- - - 0.705 7,510,000$ 0.939 7,510,000$ 0.939 297 33
4170 C Salem Pulaski County
Route 11 Traffic Improvements Project -
Pulaski County X X 0.12 0.01 2.28 0.34 0.212 0.194 0.584 0.693 1.118
0.381 0.508 - 0.581 6,823,000$ 0.851 6,823,000$ 0.851 305 34
4632 B Salem Botetourt County
Route 220 Superstreet and Route 640
Improvement X X - 0.07 9.74 0.93 - - - - 3.808
1.913 - 1.127 0.019 0.004 1.538 19,391,000$ 0.793 19,391,000$ 0.793 310 35
3810 B Salem Roanoke County McVitty Road Improvements X - 0.02 3.14 1.24 0.013 0.013 - - 1.742 0.072 - 0.098 1.756 1.074 0.697 9,998,000$ 0.697 9,998,000$ 0.697 330 36
3479 B Salem
Roanoke Valley Transportation
Planning Organization Orange Avenue Improvements X 0.48 0.70 14.24 0.56 0.797 0.787 0.795 2.095 11.782
12.615 3.338 2.623 6.598 3.254 4.772 77,195,000$ 0.618 72,635,000$ 0.657 341 37
3564 C Salem Christiansburg Town
Peppers Ferry Road to Cambria Street
Connector Route X X 0.72 0.69 - - 1.861 0.916 0.204 0.402 2.190 2.004 0.060 - 0.874 13,556,000$ 0.645 13,456,000$ 0.650 342 38
4002 D Salem Henry County King's Mountain Road Widening X - 0.01 2.15 0.78 0.002 0.002 - - 1.298 - - 0.167 0.517 8,818,000$ 0.586 8,818,000$ 0.586 347 39
3542 C Salem Montgomery County Prices Fork/ Peppers Ferry Intersection X X 0.03 0.05 1.02 0.62 0.035 0.034 0.047 0.123 0.715 0.054 0.255 0.036 0.285 5,495,000$ 0.519 5,495,000$ 0.519 350 40
4032 D Salem Henry County NBL Route 220 Relocation X X - - 1.55 0.82 - - - - 1.026 - - 0.037 0.409 8,826,000$ 0.464 8,826,000$ 0.464 358 41
3475 B Salem
Roanoke Valley Transportation
Planning Organization
I-81 Southbound Improvements from
Exit 150 to Weigh Station X - - 1.43 0.15 0.002 0.002 - - 1.155 1.989 - 0.051 0.050 0.020 0.462 24,037,000$ 0.192 24,037,000$ 0.192 399 42
3480 D Salem
Roanoke Valley-Alleghany Regional
Commission
I-81 Northbound Safety Improvements
MM167.4 to MM169.5 X - - 9.16 0.22 0.072 0.061 - - 5.343
0.220 8.623 0.277 2.351 134,646,000$ 0.175 134,646,000$ 0.175 406 43
3503 C Salem Christiansburg Town
Cambria Street to North Franklin Street
Connector Route X X 0.39 0.37 - - 0.041 0.038 0.174 0.343 0.438
0.416 0.023 - 0.176 15,160,000$ 0.116 15,060,000$ 0.117 415 44
3602 D Salem Patrick County Squirrel Spur X - 0.00 - - 0.000 0.000 - - 0.000 - - - 0.000 5,403,000$ 0.000 5,403,000$ 0.000 431 45
3647 D Staunton Bath County
Hot Springs - US 220 & VA 615
Intersection Improvements X 0.48 - 3.00 10.71 0.018 0.017 0.728 - 5.664
0.069 - - 2.401 560,769$ 42.820 560,769$ 42.820 7 1
3918 D Staunton Warren County
Rte. 340/522 SB/I-66 WB On-Ramp
Extension X X - - - - 0.000 0.000 - - 3.058 7.142 - 0.015 1.654 518,664$ 31.884 518,664$ 31.884 8 2
3929 D Staunton Warren County
John Marshall Hwy./Rte. 55 East Safety
Improvement Project X X - - 23.11 1.28 - - - - 5.669
0.801 - 0.060 4.114 1,633,637$ 25.184 1,633,637$ 25.184 13 3
3662 D Staunton Shenandoah County
I-81 Exit 291 Northbound Ramp
Widening X X - 0.01 0.17 0.50 - - - - 3.629 6.610 - 0.000 1.672 781,701$ 21.384 781,701$ 21.384 18 4
3921 D Staunton Warren County Rte. 340/522 Lighting Project X - - 25.04 1.18 - - - - 10.083 3.596 - - 5.191 3,149,948$ 16.480 3,149,948$ 16.480 21 5
3730 D Staunton Page County
Intersection Improvements US-
211/340 Big Oak Rd X - 0.03 12.47 14.76 - - - - 10.835 0.044 - 0.070 4.642 3,310,977$ 14.020 3,310,977$ 14.020 24 6
3962 C Staunton Rockingham County US 11 N (North Valley Pike) Sidewalk X X 0.02 - 1.61 0.29 0.181 0.294 0.030 - 9.151
19.371 - - 3.645 3,037,558$ 12.000 3,037,558$ 12.000 26 7
3611 C Staunton Waynesboro City East Main Streetscape X X 0.11 - 11.96 4.17 0.020 0.035 0.560 - 6.631 1.916 - 0.062 2.679 2,249,987$ 11.908 2,249,987$ 11.908 28 8
3698 C Staunton Augusta County
RT 254 - RT 640 Intersection Safety
Project X - - 2.45 5.47 - - - - 2.838
- - 0.003 1.132 1,165,137$ 9.718 1,165,137$ 9.718 39 9
3689 C Staunton Staunton City
Edgewood Road Sidewalk
Improvements X 0.08 - 3.44 3.06 0.012 0.009 0.114 - 2.355 0.051 - 0.012 0.953 1,098,071$ 8.677 1,098,071$ 8.677 45 10
3637 C Staunton Waynesboro City 13th and Rosser Roundabout X 0.06 0.07 1.15 1.51 - - 0.301 0.356 1.165 0.200 - 0.017 0.464 578,937$ 8.011 550,990$ 8.417 46 11
3700 C Staunton Staunton City
North Augusta Sidewalk--Lambert St to
Terry Court X 0.04 - 5.01 2.41 0.260 0.128 0.060 - 2.960 0.371 - 0.020 1.182 1,477,371$ 8.004 1,477,371$ 8.004 48 12
4247 C Staunton Winchester City
Traffic Signal Improvements on Valley
and Gerrard Corridors X X - 0.99 4.18 0.31 0.017 0.034 - - 1.907
0.640 2.232 0.520 0.968 1,227,000$ 7.888 1,227,000$ 7.888 50 13
4224 C Staunton
Win-Fred Metropolitan Planning
Organization
I-81 Exit 317 Accel/Decel Lane
Extensions X - 0.01 0.40 0.05 0.010 0.021 - 16.257 4.488 5.388 7.127 0.005 2.262 3,209,056$ 7.049 3,209,056$ 7.049 62 14
3588 C Staunton Harrisonburg City
University Blvd/Evelyn Byrd Ave Road
Diet & Sidewalk X X 0.17 - 0.55 0.01 0.514 0.631 0.844 - 5.767
11.454 - 1.147 2.297 3,515,278$ 6.535 3,515,278$ 6.535 69 15
3701 C Staunton Staunton City
North Augusta Sidewalk--Terry Court to
Meadowbrook Rd X 0.03 - 2.94 1.66 0.060 0.047 0.052 - 1.631 - - - 0.673 1,058,211$ 6.359 1,058,211$ 6.359 73 16
3905 D Staunton
Staunton-Augusta-Waynesboro
Metropolitan Planning Organization
I-81 Mt. Sidney Rest Area NB
Acceleration Lane Extension X - 0.01 5.68 0.91 0.018 0.009 - 13.984 5.703
0.817 3.412 0.008 2.387 3,787,466$ 6.301 3,787,466$ 6.301 74 17
3979 C Staunton Rockingham County US 33 & Rt 620 Turn Lanes X X - 0.01 0.77 0.31 - - - - 1.414 2.139 0.909 0.085 0.577 977,984$ 5.901 977,984$ 5.901 77 18
3629 D Staunton Shenandoah County
Shenandoah Co. / Oranda Road Park
and Ride Expansion X X 0.08 0.16 1.76 0.00 0.047 0.046 0.411 15.832 3.089 - - - 1.503 2,553,730$ 5.887 2,553,730$ 5.887 79 19
4326 C Staunton BRITE Transit
Bus Stop Improvements on US 250 at
Sangers Lane/Brand Road X 0.06 0.02 1.20 0.00 0.001 0.000 0.294 15.824 3.653
1.197 - 0.028 1.476 2,521,999$ 5.854 2,521,999$ 5.854 80 20
3601 D Staunton
Northern Shenandoah Valley Regional
Commission Linden Park and Ride Lot Extension X 0.09 0.18 1.06 0.00 0.496 0.444 0.343 17.013 2.123 0.167 - - 1.391 2,406,633$ 5.782 2,406,633$ 5.782 81 21
3610 C Staunton Waynesboro City Broad Street Streetscape X X 0.12 - 11.71 2.70 0.037 0.039 0.627 - 6.495 3.199 - 0.111 2.660 5,059,579$ 5.257 5,059,579$ 5.257 88 22
4617 D Staunton Woodstock Town
Ox Road Bicycle and Pedestrian
Improvements X 0.01 - 2.49 1.13 0.081 0.087 0.042 - 1.499 0.675 - - 0.772 1,468,870$ 5.254 1,468,870$ 5.254 89 23
4246 C Staunton Winchester City
Pleasant Valley Road Traffic
Improvements at Cork Street X - - 1.98 1.19 - - - - 0.910
0.264 - 0.060 0.485 992,570$ 4.881 992,570$ 4.881 95 24
3699 C Staunton Augusta County
Woodrow Wilson Complex Short Term
Access Improvements X X 1.64 0.30 2.85 2.12 0.333 0.171 - - 4.791 6.610 0.060 0.061 2.063 4,294,032$ 4.804 4,294,032$ 4.804 99 25
3697 D Staunton Augusta County
Weyers Cave Road (Rt. 256) Turn Lane
Project X X 0.08 0.11 0.75 0.00 0.027 0.032 0.391 23.651 6.746
4.854 - 0.090 2.683 5,692,135$ 4.713 5,692,135$ 4.713 100 26
4027 C Staunton
Harrisonburg-Rockingham
Metropolitan Planning Organization
US 33 (Market Street) and I-81 Exit 247
Improvements X 0.13 0.00 4.65 0.44 0.323 0.320 0.632 1.249 8.877 14.823 0.062 1.226 3.535 47,870,806$ 0.738 7,634,231$ 4.630 101 27
4028 C Staunton
Harrisonburg-Rockingham
Metropolitan Planning Organization
Mount Crawford Park and Ride Lot
Improvements X 0.04 0.06 0.78 0.00 0.080 0.067 0.223 15.373 3.346 1.257 - 0.154 1.361 3,069,962$ 4.433 3,069,962$ 4.433 103 28
4237 C Staunton
Win-Fred Metropolitan Planning
Organization
I-81 Exit 313 Bridge Capacity
Improvement X 0.25 - 6.25 0.54 0.744 0.785 0.768 - 4.462 6.129 - 1.405 2.270 34,114,400$ 0.666 5,264,400$ 4.313 109 29
3659 C Staunton Frederick County Route 11 - Shawnee Improvement X X 0.03 0.00 2.67 1.63 0.338 0.567 0.141 0.167 2.672 4.195 0.059 0.071 1.404 3,279,714$ 4.280 3,279,714$ 4.280 112 30
4128 C Staunton
Northern Shenandoah Valley Regional
Commission
Route 11 South Corridor
Enhancements X 0.06 - 13.54 1.18 2.503 4.287 0.176 - 6.230 2.324 - - 3.103 8,006,185$ 3.876 8,006,185$ 3.876 120 31
3587 C Staunton Harrisonburg City Carlton Street Improvements X X 0.03 - 0.69 1.56 0.006 0.009 0.135 - 0.846 0.015 - 0.020 0.337 1,063,148$ 3.170 1,063,148$ 3.170 146 32
3817 D Staunton Woodstock Town Route 42 Corridor Improvements - East X 0.06 0.01 14.14 2.41 0.116 0.124 0.174 0.457 6.083 0.837 0.147 0.773 3.071 10,232,265$ 3.001 10,232,265$ 3.001 151 33
3888 D Staunton Broadway Town
VA 259 Left Turn Lanes onto Spar Mine
Rd & Hawks Hill Dr X - 0.00 0.90 1.11 - - - - 1.301 0.743 - 0.014 0.525 1,837,537$ 2.856 1,837,537$ 2.856 154 34
3528 C Staunton Winchester City
Traffic Improvements on Jubal Early
Drive at Pleasant Valley X X 0.07 0.12 0.38 0.10 0.009 0.018 0.103 0.272 1.217 3.034 0.040 0.181 0.623 2,217,750$ 2.808 2,217,750$ 2.808 158 35
4714 D Staunton Woodstock Town Route 42 Corridor Improvements X 0.07 0.01 17.36 2.25 0.129 0.152 0.219 0.577 7.600 1.029 0.264 0.350 3.636 15,102,827$ 2.407 15,102,827$ 2.407 175 36
3658 C Staunton Frederick County
Exit 317 NB Ramp Realignment to
Redbud Rd Location X X - 0.05 1.63 1.15 0.021 0.015 - - 2.650 5.726 - 0.002 1.348 5,940,244$ 2.269 5,940,244$ 2.269 186 37
4174 C Staunton
Win-Fred Metropolitan Planning
Organization
I-81 Winchester Shoulder Improvement
Project X - - 22.59 0.19 - - - - 8.369
7.833 - - 4.441 19,975,027$ 2.223 19,975,027$ 2.223 193 38
4882 D Staunton
Staunton-Augusta-Waynesboro
Metropolitan Planning Organization I-81 SB TCL MM 236.5 to MM 234.6 X 0.87 0.52 6.28 0.25 1.426 1.860 - 14.140 12.863
4.854 22.895 0.055 5.209 25,788,423$ 2.020 25,788,423$ 2.020 202 39
3906 C Staunton
Staunton-Augusta-Waynesboro
Metropolitan Planning Organization
I-64 Exit 94 westbound off-ramp
improvements X - 0.03 0.52 0.11 0.122 0.171 - 6.219 1.749
0.758 1.230 0.313 0.697 3,464,163$ 2.012 3,464,163$ 2.012 205 40
4631 D Staunton Woodstock Town
Water Street Bicycle and Pedestrian
Improvements X 0.02 - 0.77 0.36 0.095 0.107 0.072 - 0.392 0.062 - - 0.218 1,129,171$ 1.934 1,129,171$ 1.934 213 41
4244 C Staunton Winchester City
Millwood Avenue Traffic
Improvements X X - - 1.69 0.64 0.002 0.005 - - 1.634 3.034 - 0.207 0.838 4,394,780$ 1.907 4,394,780$ 1.907 216 42
3926 C Staunton Rockingham County VA 276 Left Turn Lanes @ VA 253 X X - - 1.16 0.88 - - - - 0.467 - - 0.021 0.279 1,499,062$ 1.861 1,499,062$ 1.861 221 43
3914 D Staunton
Central Shenandoah Planning District
Commission
I-81 NB TCL from MM 236.5 to MM
237.75 X 1.13 0.41 1.55 0.10 1.188 0.891 - 14.140 6.522
2.617 8.601 0.023 2.643 14,846,099$ 1.780 14,846,099$ 1.780 226 44
3608 D Staunton
Northern Shenandoah Valley Regional
Commission
Intersection Improvements,Route 79 at
Route 55 X - 0.05 2.32 1.59 0.014 0.007 - - 1.060 0.502 0.073 0.105 0.762 4,598,373$ 1.658 4,598,373$ 1.658 236 45
4514 D Staunton Page County
Intersection Improvement US 340 and
Route 660 X - - 0.90 1.53 - - - - 0.792
- - 0.012 0.405 2,604,297$ 1.555 2,604,297$ 1.555 239 46
4231 C Staunton
Win-Fred Metropolitan Planning
Organization I-81 Exit 307 Roundabouts X - 0.14 7.91 3.12 0.053 0.087 - - 4.933 3.075 0.239 0.008 2.122 14,135,128$ 1.501 13,727,749$ 1.546 240 47
3445 C Staunton
Harrisonburg Department of Public
Transportation
HARRISONBURG TRANSIT CENTER AND
PARK AND RIDE X 0.46 0.53 - - 0.870 1.216 1.150 20.006 8.352
10.442 0.056 0.323 3.326 22,228,637$ 1.496 22,228,637$ 1.496 242 48
3615 D Staunton Broadway Town
VA 259 Brock's Gap Rd/ Lee St
Pedestrian Improvements X 0.03 - 0.92 0.22 0.102 0.058 0.050 - 0.962
0.743 - - 0.389 2,683,120$ 1.451 2,683,120$ 1.451 246 49
3717 D Staunton Covington City East Madison Sidewalk Improvements X 0.04 - 1.41 0.55 0.058 0.057 0.061 - 0.868 - - - 0.348 2,437,527$ 1.427 2,437,527$ 1.427 248 50
4060 D Staunton Clifton Forge Town
Ridgeway Street/U.S. 60
Bicycle/Pedestrian Improvements X 0.05 0.03 1.03 0.17 0.118 0.122 0.151 0.398 0.770
0.249 0.116 0.016 0.323 2,624,706$ 1.231 2,624,706$ 1.231 267 51
3609 C Staunton Waynesboro City Lew Dewitt - Rosser Connector X X 1.68 3.03 3.73 0.08 0.073 0.012 0.108 0.214 3.916 4.273 0.012 0.215 1.706 14,356,591$ 1.188 14,356,591$ 1.188 271 52
3663 D Staunton Berryville Town East Main Street Section 2 X 0.01 - 0.06 0.09 - - 0.015 - 0.585 0.982 - - 0.258 2,261,577$ 1.142 2,261,577$ 1.142 276 53
3661 D Staunton Berryville Town East Main Street Section 1 X 0.01 - - - - - 0.015 - 0.564 0.982 - - 0.235 2,228,767$ 1.056 2,228,767$ 1.056 286 54
3716 D Staunton Covington City Edgemont Drive Improvements X - 0.02 0.57 0.41 0.054 0.102 - - 0.863 0.773 0.012 0.006 0.363 3,742,156$ 0.970 3,742,156$ 0.970 296 55
3992 D Staunton Lexington City
South Main Street Pedestrian
Improvements X 0.02 0.01 1.16 0.61 0.265 0.289 0.065 0.172 0.879 0.059 0.038 - 0.369 3,964,791$ 0.930 3,964,791$ 0.930 298 56
4732 C Staunton Frederick County
522/Costello Turn Lane/Intersection
Operations Improvements X X - 0.00 1.43 0.60 - - - - 0.739 0.485 - 0.186 0.373 4,435,082$ 0.840 4,435,082$ 0.840 306 57
3702 C Staunton Augusta County
Woodrow Wilson Complex Long Term
Access Improvements X X 1.71 0.30 - - 0.869 0.255 0.350 0.692 3.537 6.560 0.164 0.080 1.519 18,699,156$ 0.812 18,699,156$ 0.812 308 58
3585 C Staunton Harrisonburg City Mt. Clinton Pike Road Improvements X X 0.07 0.07 2.71 1.31 0.050 0.069 0.347 0.685 2.347
1.542 0.138 0.060 0.934 14,786,934$ 0.632 13,124,790$ 0.712 324 59
4124 D Staunton
Northern Shenandoah Valley Regional
Commission
I-81 Exit 300 at I-66E Northbound
Widening X 1.68 0.46 4.82 0.18 0.677 0.412 - 15.100 4.500 - 9.310 0.131 2.571 36,453,285$ 0.705 36,453,285$ 0.705 327 60
3913 D Staunton
Central Shenandoah Planning District
Commission I-81 NB TCL Extension, Exits 191-195 X 1.12 1.88 7.14 0.16 0.963 1.735 - 16.264 11.512
2.009 22.369 0.108 4.768 70,482,329$ 0.676 70,482,329$ 0.676 337 61
3911 D Staunton
Central Shenandoah Planning District
Commission
I-81 NB/SB inside shoulder
improvements from Exit 200 to 205 X - - 11.06 0.14 - - - - 4.786 - - 0.322 1.940 29,244,220$ 0.664 29,244,220$ 0.664 339 62
3586 C Staunton Harrisonburg City Erickson Avenue Turn Lanes X X 0.06 0.01 - - 0.174 0.263 0.293 0.578 0.416 0.318 0.182 - 0.166 3,966,272$ 0.418 3,598,883$ 0.460 359 63
3657 C Staunton Frederick County
Route 11 Corridor and Old
Charlestown Road Roundabout X X - 0.02 0.92 0.74 - - - - 0.459 - - 0.005 0.232 5,408,094$ 0.429 5,408,094$ 0.429 367 64
3614 D Staunton Broadway Town Sunset Drive Sidewalk Improvements X 0.01 - 0.20 0.24 0.004 0.000 0.010 - 0.193
- - - 0.077 2,442,314$ 0.317 2,442,314$ 0.317 380 65
4103 D Staunton Buena Vista City Rockbridge Avenue Sidewalk X 0.05 - 0.04 0.05 0.049 0.062 0.079 - 0.268 0.327 - - 0.107 3,595,460$ 0.298 3,595,460$ 0.298 384 66
3434 D Staunton Front Royal Town Happy Creek Phase Two X 0.03 - 0.23 0.05 0.174 0.113 0.106 - 0.893 1.206 - - 0.364 16,894,680$ 0.216 13,078,086$ 0.279 387 67
3616 D Staunton Covington City Paper Trail Pedestrian Bridge X 0.04 - - - 0.250 0.309 0.109 - 0.102 - - - 0.042 2,577,006$ 0.163 2,577,006$ 0.163 408 68
3613 D Staunton Broadway Town Linville Creek Greenway X 0.03 - - - 0.018 0.001 0.093 - 0.017 - - - 0.007 1,567,220$ 0.043 1,567,220$ 0.043 423 69
3715 D Staunton Covington City Jackson Street Improvements X 0.02 - - - 0.026 0.033 0.072 - 0.028 0.016 - - 0.012 10,254,306$ 0.011 10,254,306$ 0.011 426 70