TC 10-22-18 Meeting AgendaCOUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation RE: October 22, 2018 Transportation Committee Meeting DATE: October 17, 2018 The Frederick County Transportation Committee will be meeting at 8:30 a.m. on Monday, October 22, 2018 in the first-floor conference room of the Frederick County Administration Building, 107 North Kent Street, Winchester, Virginia. AGENDA 1. Transportation Forum Discussion 2. Highway Safety Improvement Program (HSIP) 3. I-81 Corridor Study 4. County Project Updates 5. Upcoming Agenda Items 6. Other Please contact our Department if you are unable to attend this meeting. Attachments JAB/pd MEMORANDUM Item 1: Transportation Forum Discussion Topic Synopsis Ongoing discussion item to plan for the fall Transportation Forum. Analysis N/A Recommended Action N/A Item 2: Highway Safety Improvement Program (HSIP) Topic Synopsis Mr. David Morris of the VDOT Staunton District Traffic Engineering Staff, will be attending to discuss the HSIP with the Committee and update the Committee on Traffic Engineering activities in Frederick County. Analysis N/A Recommended Action N/A Item 3: I-81 Corridor Improvement Study Topic Synopsis Staff will be attending the 3rd meeting for the I-81 Corridor Improvement Study on October 17, 2018 and reporting back to the Committee. Analysis N/A Recommended Action Staff expects there will likely be a need to forward recommended feedback to the Board of Supervisors. Item 4: County Project Updates Tevis Street Extension/Airport Road/I-81 Bridge: Additional final comments from VDOT have been addressed on the 100% design and Staff is awaiting final plan clearance. Final plats have been received and distributed to VDOT, County Attorney, and the County’s private partner for approval and signature. Upon final plan clearance, bid tabulations will be finalized and bid package assembled for advertisement. Renaissance Drive: Staff has been advised by our consultant that 30% design and cost estimate should be delivered within a week of this mailing. Northern Y: 30% design is underway. Coverstone Drive: No activity at this time. Jubal Early Drive Extension and Interchange with Route 37: No activity at this time. Item 5: Upcoming Agenda Items November Capital Improvement Plan Non-Hardsurface Road Paving Program TBD Oakdale Crossing Traffic Calming Study Item 6: Other