Loading...
HomeMy WebLinkAboutTC 03-26-18 Meeting MinutesCOUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 TO: Board of Supervisors FROM: John A. Bishop, AICP, Assistant Director - Transportation RE: Transportation Committee Report for Meeting of March 26, 2018 DATE: March 27, 2018 The Transportation Committee met on Monday, March 26, 2018 at 8:30 a.m. Members Present Members Absent Gary Lofton Chairman (voting) Mark Davis (liaison Middletown) Judith McCann-Slaughter (voting) Barry Schnoor (voting) James Racey (voting) Gary Oates (liaison PC/voting) Lewis Boyer (liaison Stephens City) ***Items Not Requiring Board Action*** 1. Ruebuck Lane Petition: Staff received a petition from several residents who reside on Macbeth Lane (private lane) requesting the paving of Ruebuck Lane (state road). The Committee discussed the improvements of Ruebuck Lane to be added to the next Secondary Road Improvement Plan stopping at Macbeth Lane to increase the score for rustic paving treatment that is used to pave unpaved roads in the Secondary Road Improvement Plan. Staff will review the right-of-way. Upon motion by Ms. Judith McCann-Slaughter, seconded by Mr. Gary Oates, the Committee recommended that Staff included Ruebuck Lane in the next update of the Secondary Road Improvement Plan. 2. MPO Work Program: Staff provided a brief overview and provided clarity of the Winchester Frederick Metropolitan Planning Organization (MPO) work programs for the coming year. MEMORANDUM -2- The Committee discussed the potential studies or plans in long-range planning work programs. It was recommended that Staff present to the MPO Technical Advisory Committee as follows in prioritized order: 1. Route 7 2. Route11 North 3. Lenoir Drive 4. Exit 313-Route 50/Route 522 5. Hopewell Road/Cedar Hill Road spilt interchange 3. County Project Updates Tevis Street Extension/Airport Road/I-81 Bridge: VDOT has authorized Staff to proceed with a roundabout design with some clarifications to the 60% design. A meeting was held with the Department of Historic Resources (DHR), VDOT and the Shenandoah Valley Battlefield Foundation to clarify and dispose of comments received as part of the state environmental review process. The Board of Supervisors approved the draft agreement for the Northern Y which was discussed at the last Transportation Committee meeting and has been forwarded for execution. Renaissance Drive: Survey work on the site is complete and discussions are ongoing with FirstEnergy regarding powerline adjustments needed to accommodate the bridge. More details on the timelines and commitments required by FirstEnergy are expected this week. Boring locations for the Geotech study are being staked and the Geotech study is expected to be completed in early April. Upon completion of the Geotech, design begins in earnest and 30% bridge designer has provided some preliminary options. Staff is awaiting a response from CSX regarding the design review agreement. Coverstone Drive: No activity currently. Jubal Early Drive Extension and Interchange with Route 37: No activity currently. 4. Upcoming Agenda Items: April MPO Route 11 South Stars Study update May Begin Interstate, Primary, and Secondary Road Plan updates (dependent on VDOT projections becoming available) TBD Oakdale Crossing Traffic Calming Study 5. Other Business: Upcoming CTB hearing JAB/ks