Loading...
TC 05-22-17 Meeting AgendaCOUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202  Winchester, Virginia 22601-5000 TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation RE: May 22, 2017 Transportation Committee Meeting DATE: May 16, 2017 The Frederick County Transportation Committee will be meeting at 8:30 a.m. on Monday, May 22, 2017 in the first floor conference room of the Frederick County Administration Building, 107 North Kent Street, Winchester, Virginia. AGENDA 1. Interstate, Primary, Secondary Road Plan Updates 2. County Projects Update 3. Other Please contact our department if you are unable to attend this meeting. Attachments JAB/pd MEMORANDUM Item 1: Interstate, Primary, and Secondary Road Plan Updates It is time for our annual updates of the Interstate, Primary, and Secondary Road Plans. While the current drafts are not finalized, Staff will be providing them prior to the committee meeting. Attached please find the adopted plans from last year’s update for your reference. 2016/17-2021/22 SECONDARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 06/20/2016 Frederick County Planning Commission: 07/06/2016 Frederick County Board of Supervisors: 07/27/2016 MAJOR ROAD IMPROVEMENT PROJECTS 2016/2017 through 2021/2022 Major road improvement projects command the reconstruction of hardsurfaced roads to enhance public safety. Improvements required for road width, road alignment, road strength, and road gradient are considered major road improvements projects. RA N K R O U T E R O AD NA M E FR O M TO A V E RA G E DA I L Y TR A F F I C C O UN T DI S TA N C E MA G I S T E RI A L DI S TR I C T ES T I MA T E D C O S T AD V E R T I S E M E NT DA T E C O M M E N T S 1) 655 Sulphur Springs Road Route 50 .30 Mi East Rt. 656 6000 1.1 miles SH $7,505,445 After 2022 $5,798,052 Allocated 2) 661 Red Bud Road .47 Mi South Route 11 Int. Snowden Bridge Blvd. 1300 0.5 miles ST $2,000,000 After 2022 Partial Funded Relocation 3) 672 Brucetown Road Route 11 .35 Mi East 3200 0.35 miles ST $1,500,000 Significantly Variable UN/SH Partial Funded $100,000 Thru Plan 4) 788 East Tevis Street Route 522 W inchester City Limit N/A 0.44 miles SH $10,414,000 Revenue Sharing UN/SH Appited for R/S Funds 5) 788 East Tevis Street Route 522 I-81 N/A 0.40 miles SH $1,400,000 Revenue Sharing UN/SH Cover Overall Project Needs 6) 11 Martinsburg Pike Under 81 Overpass Exit 317 16000 0.20 miles ST $3,346,924 Revenue Sharing UN/SH LF Turn Lns SBound @ I-81 Overpass $1.9 Mil Short on Funding HB-2 7) 723 Carpers Valley Road At Clarke County line 1100 N/A SH $1,262,327 2017 Federal Bridge Replacement Funding 8) 788 Renaissance .24 Mi W est Route 11 Int. Shady Elm Road N/A .18 miles BC $1,635,658 UN/SH R/S Funds 9) 659 Valley Mill Road .5 Mi East Of Channing Dr. Rt. 7 N/A .65 miles RB $7,200,000 UN/SH R/S Funds Under Funded $5.2M 10) 645 Airport Road Extension Int Route 522 Int East Tevis Road N/A .4 Miles SH $5,600,000 UN/SH R/S Funds 11) 883 Snowden Bridge Blvd. Int. Route 11 Directly before Int. Milburn N/A .8 Miles ST $8,136,700 Under Const. R/S Funds 12) 1012 Town Run Lane 280 Ft. S. Stickley Drive Int. 210 Ft. N. Stickley Drive Int. N/A .1 Miles OP $150,000 £¤50 £¤11 £¤7 £¤522 £¤37 £¤522 £¤11 £¤11 £¤50 £¤37 £¤522 §¨¦81 §¨¦81 §¨¦81 Winchester Stephens City Frederick CountyMajor RoadImprovement Projects2016/2017 thru 2021/2022 0 1 20.5 Milesµ 1 2 3 4 5 6 78 9 10 11 12 1. Sulphur Springs Rd 2. Redbud Rd 3. Brucetown Rd 4. East Tevis Street 6. Martinsburg Pike 7. Carpers Valley Rd8. Renaissance Dr9. Valley Mill Rd 5. East Tevis Street 11. Snowden Bridge Blvd 10. Airport Rd Extension 12. Town Run Ln NON-HARDSURFACE ROAD IMPROVEMENT PROJECTS 2016/2017 through 2021/2022 Non-Hardsurface road improvement projects provide impervious resurfacing and reconstruction of non-hardsurfaced secondary roads. Non-Hardsurface improvement projects are prioritized by an objective rating system, which considers average daily traffic volumes; occupied structures; physical road conditions including geometrics, drainage, and accident reports; school bus routing; and the time that project requests have been on the Secondary Road Improvement Plan. RA N K R O U T E R O AD NA M E FR O M TO A V E RA G E DA I L Y TR A F F I C C O U N T DI S TA N C E MA G I S T E RI A L DI S TR I C T ES T I MA T E D C O S T AD V E R T I S E M E NT DA T E C O M M E N T S 671 Woodside Road Route 11 0.4 East of Route 11 50 0.4 miles ST $144,000 UN/SH $20,000 Allocated Potential Rural Rustic/Funding by Others 671 Woodside Road Route 669 WV Line 270 0.30 miles ST $91,500 2017 CTB Unpaved Roads Funding 661 W right Road Route 669 WV Line 240 1.84 miles ST $561,200 2018 CTB Unpaved Roads Funding 629 Carter Lane Route 631 Route 625 220 1.8 miles BC $549,000 2019 CTB Unpaved Roads Funding 692 Pack Horse Road 1.2 Mi NE of Rt. 600 Route 671 210 1.4 miles GA $427,000 2020 CTB Unpaved Roads Funding 629 Laurel Grove Road Route 622 1.25 Mi W of Rt. 622 200 1.25 miles BC $376,000 2021 CTB Unpaved Roads Funding 629 Laurel Grove Road 1.25 Mi W of Rt. 622 2.5 Mi W of Rt. 622 200 1.25 miles BC $376,000 2022 CTB Unpaved Roads Funding 707 Hollow Road WV state line Rt. 610 Muse Road 190 1.8 miles GA $495,000 CTB Unpaved Roads Funding *NOTE: Projects are placed on the scheduled list based upon VDOT revenue projections. Changes to those projections can lead to projects being delayed or removed from the scheduled list. £¤522 £¤37 £¤259 £¤277 £¤55 £¤50 £¤11 £¤127 £¤522 £¤7 £¤11 £¤37 £¤50 £¤522 §¨¦66 §¨¦81 §¨¦81 §¨¦81 Winchester Stephens City Middletown Frederick CountyNon-Hardsurfaced RoadImprovement Projects2016/2017 thru 2021/2022 µ 0 4 82 Miles 1 2 3 4 5 6 7 1. Woodside Rd 2. Woodside Rd 3. Wright Rd 4. Carter Ln 5. Pack Horse Rd 6. Laurel Grove Rd 7. Laurel Grove Rd 8. Hollow Rd 8 UNSCHEDULED NON-HARDSURFACE ROAD IMPROVEMENT PROJECTS RATINGS NOT UPDATED 2016/2017 through 2021/2022 RA N K R O U T E R O AD NA M E FR O M TO A V E RA G E DA I L Y TR A F F I C C O UN T DI S TA N C E MA G I S T E RI A L DI S TR I C T RA T IN G C O M M E N T S 1) 677 Old Baltimore Road Route 676 Route 672 220 1.2 Miles GA 77 2) 730 Babbs Mountain Road Route 654 Route 677 90 .90 Miles GA 73 3) 695 Middle Fork Road 2.3 Mi N of Route 522 WV Line 50 .90 Miles GA 68 4) 811 Timberlakes Ln 671 671 280 0.25 Miles ST 68 5) 644 East Parkins Mill Road Route 50 Clark Co. Ln 200 .81 Miles SH 67 6) 733 Fletcher Road Route 50 Route 707 170 1.3 Miles GA 66 7) 612 Fishel Road Route 600 Route 600 60 1.6 Miles BC 66 8) 636 Canterburg Road Route 640 Route 641 140 1.5 Miles OP 63 9) 638 Clark Road Route 625 Route 759 90 0.8 Miles BC 63 10) 607 Heishman Lane Route 600 End of State Maintenance 70 0.78 Miles BC 62 11) 682 Glaize Orchard Road Route 608 Route 671 240 1.54 Miles GA 61 12) 667 Sir John’s Road Route 672 Last Residence 290 2.37 Miles ST 60 13) 696 South Timber Ridge Road Route 522 Route 694 220 1.3 Miles GA 59 14) 634 Cougill Road Route 635 Route 11 120 0.25 Miles BC 58 15) 636 Huttle Road Route 709 Route 735 110 1.1 Miles OP 53 16) 685 Light Road Route 600 Route 681 80 1.3 Miles GA 51 17) 616 McDonald Road Route 608 .44 Mi N of Route 608 60 .45 Miles BC 51 18) 731 Cattail Road Route 608 Route 654 60 1.7 Miles GA 51 19) 608 Hunting Ridge Road Route 682 2.41 Miles West of Route 682 90 2.41 Miles GA 51 20) 671 Shockeysville Road Route 690 .90 Miles West of 690 120 .90 Miles GA 47 21) 671 Mount Olive Road Route 50 Route 600 110 .77 Miles BC 40 Note: Project ratings are updated only when funding is available to promote projects to the scheduled list. £¤522 £¤50 QR3 !(5 !(6 !(14 !(10 !(12 !(4 !(18 !(2 !(16 !(15 !(9 !(17 !(8 !(1 !(7 !(11!(19 !(13 !(21 !(20 £¤259 £¤277 £¤55 £¤50 £¤11 £¤127 £¤522 £¤7 £¤11 £¤37 £¤37 £¤50 £¤522 £¤522 §¨¦81 §¨¦66 §¨¦81 BACK CREEK GAINESBORO STONEWALL OPEQUON SHAWNEE REDBUDWinchester Stephens City Middletown Frederick CountyUnscheduledNon-Hardsurfaced RoadImprovement ProjectsRatings Not Updated2016/2017 thru 2021/2022 µ 0 4 82 Miles 1. Old Baltimore Rd 2. Babbs Mountain Rd 3. Middle Fork Rd 4. Timberlakes Ln 5. East Parkins Mill Rd 6. Fletcher Rd 7. Fishel Rd 8. Canterburg Rd 9. Clark Rd 10. Heishman Ln 11. Glaize Orchard Rd 12. Sir John's Rd 13. South Timber Ridge Rd 14. Cougill Rd 15. Huttle Rd 16. Light Rd 17. McDonald Rd 18. Cattail Rd 19. Hunting Ridge Rd 20. Shockeysville Rd 21. Mount Olive Rd 2016-2017 PRIMARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 6/20/2016 Frederick County Planning Commission: 07/06/2016 Frederick County Board of Supervisors: 07/27/2016 1) Route 37 Bypass A. Route 37 - Phase 1 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the southern segment of the Route 37 Eastern Bypass from Interstate 1-81 to Front Royal Pike (Route 522 South). (As illustrated on map as priority 1A) B. Route 37 - Phase 2 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between existing Route 37 around Stonewall Industrial Park and Route 7. (As illustrated on map as priority 1B) C. Route 37 - Phase 3 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between Route 7 and Route 522. (As illustrated on map as priority 1C) 2) Route 277 (East of Stephens City) From: I-81/Route 277/Route 647 Intersection (East of Stephens City) To: Route 340/Route 522 South Intersection (East of Double Toll Gate) Improve to a four lane divided roadway with County Staff to work with site developers to acquire dedicated right-of-way and achieve grading, drainage, and construction improvements in conjunction with development projects which occur along the corridor until such time that funding is available for construction. Establish a construction schedule for the phased improvement of Fairfax Pike (Route 277). Program funding for the completion of right-of-way acquisition and construction of each phase as described above. 3) Route 11 (North and South of Winchester) A) Establish an Urban Divided Four Lane System From: Southern limits of the City of Winchester To: 0.4 miles south of intersection of Route 37 South, Exit 310 (As illustrated on map as priority 3A) B) Establish an Urban Divided Six Lane System From: Northern limits of the City of Winchester To: Intersection of Cedar Hill Road (As illustrated on map as priority 3B) C) Establish an Urban Divided Four Lane System From: Intersection of Cedar Hill Road To: West Virginia line (As illustrated on map as priority 3C) 4) Route 7 – Establish a 6 Lane Cross Section From: Exit 315 Interchange To: Future Route 37 Interchange (As illustrated on map as priority 4) 5) Route 50 East and West A) Establish a 6 Lane Cross Section From: The Interchange at Exit 313 To: The Future Route 37 Interchange (As illustrated on map as priority 5A) B) Establish a 6 Lane Cross Section From: The Interchange with Route 37 To: Poorhouse Road (As illustrated on map as priority 5B) 6) South Frederick County Parkway From: Relocated Exit 307 To: Intersection with Route 277 approximately 1 mile west of the intersection of Route 277 and Route 522 This is a planned new roadway with limited access points serving a mixture of predominantly commercial and industrial development. There is a need to study this project in conjunction with the Exit 307 relocation and planning for Route 277 improvements noted in item 3. Phasing of this project is not yet clearly defined, however general phasing would be from West to East with the clear first phase being from relocated Exit 307 to Warrior Drive. (As illustrated on map as priority 6) 7) Commuter Park and Ride Lots Establish a new park and ride facility along the Berryville Pike (Route 7) corridor. Work with the Northern Shenandoah Valley Regional Commission to determine appropriate locations for park and ride facilities at other strategic locations within the County’s Urban Development Area. For Park and Ride locations in Frederick County the primary goal should be that they are situated in such a manner that they reduce traffic in Frederick County in addition to adjacent localities. (As illustrated on map as priority 7) 1A 2 3C 3A 1B 1B 1C 2 3B 5A 5B 4 6 Winchester Stephens City £¤37 £¤50 £¤11 £¤7 £¤522 £¤11 £¤37 £¤50 £¤37 £¤37 £¤37 £¤37 £¤37 £¤11 £¤522 £¤50 §¨¦81 §¨¦81 §¨¦81 §¨¦81 2016 - 2017Primary RoadImprovementPlan 0 1 20.5 Miles Rt37 By pass Phases Priority 1A Priority 1B Priority 1C Rt277 East of StephensCity Priority 2 Rt11 North & South Priority 3A Priority 3B Priority 3C Rt7 Priority 4 Rt50 Priority 5A Priority 5B South Frederick County Parkway Priority 6 Commuter - Park & Ride Lots !(Priority 7 3B 2016-2017 INTERSTATE ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 6/20/2016 Frederick County Planning Commission: 07/06/2016 Frederick County Board of Supervisors: 07/27/2016 I-81 Improvements: Provide additional travel lanes on the main line, evaluate collector-distributor lanes adjacent to the main line, modifications to existing interchange areas, and develop new interchange areas and bridge crossings of the main line as recommended by the WinFred MPO Long Range Plan. In addition, as the State continues to work toward an ultimate plan for the I-81 widening, the County of Frederick continues to support the study of Eastern Route 37 as a potential corridor on new location as an alternative for that effort. Moreover, the County of Frederick supports exploration of the potential for rail transportation as a component of the Interstate 81 Corridor improvements. A) Phase 1 of the FHWA approved interchange modification to Exit 310 (as illustrated on map as priority A) B) Relocate Exit 307 further south to alleviate existing and future congestion on Route 277. Note: Relocation study is underway. (as illustrated on map as priority B) C) Widen I-81 from Fairfax Pike to Route 37 North. This should include the relocation of the 277 Interchange. From: Route 277, Exit 307 To: Route 37 North, Exit 310 (as illustrated on map as priority C) D) Widen Remainder of I-81 in Frederick County From: West Virginia line To: Warren County line (as illustrated on map as priority D) E) Spot Improvements on I-81 in Frederick County. Provide spot improvements at various interchanges to increase capacity and/or enhance safety for the motoring public. §¨¦81 §¨¦66 §¨¦81 £¤11 £¤522 £¤522 £¤11 £¤50 £¤522 £¤11 £¤11 £¤522 £¤522 £¤7 £¤50 £¤522 £¤50 £¤50 £¤11 £¤37 £¤37 Winchester Middletown StephensCity 2016 - 2017Interstate RoadImprovement Plan 0 2.5 51.25 Miles Priority A Priority B Priority C Make Safety & Operational Improvements at Exit 310!( Widen I81 fromRt277 N to Rt37 N Widen Remainder of I81Priority D !(Urgent Need for Increased StudyRelocate Exit 307 at RT 277 Item 2: County Projects Update Snowden Bridge Boulevard: Stub connection from Snowden Bridge Boulevard to Milburn Road is complete and that will be the last step of the project prior to requesting adoption into the State System of Highways. Tevis Street Extension/Airport Road/I-81 Bridge: Bridge design is ongoing and draft environmental documents for VOT have been received. Bridge design has reached 75% and comments have been received. Pennoni is incorporating the recent round of comments on the TIA as well as, incorporating additional scenarios to evaluate a potentially reduced section for the Northern Y. The updated TIA is expected June 7, 2017. Comments have been received on the roundabout from the roundabout committee in Richmond, and our consultant is working on addressing those. Renaissance Drive: TPOF agreements have been received from VDOT. Evaluating with the Board of Supervisors on the status of revenue sharing matching funds prior to beginning of design. Completing new project documentation for CSX through the County Attorney. Valley Mill Road Realignment: Private partner has indicated a desire not to continue the project. Staff is following up to clarify their intentions. Coverstone Drive: No activity at this time. Jubal Early Drive Extension and Interchange with Route 37: Staff has participated in a number of recent meetings regarding the status of previous design work and permits. Item 3: Other Secondary fund allocation discussion Strategic work plan meeting update CTB meeting update