Loading...
TC 04-24-17 Meeting AgendaCOUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202  Winchester, Virginia 22601-5000 TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation RE: April 24, 2017 Transportation Committee Meeting DATE: April 18, 2017 The Frederick County Transportation Committee will be meeting at 8:30 a.m. on Monday, April 24, 2017 in the first floor conference room of the Frederick County Administration Building, 107 North Kent Street, Winchester, Virginia. AGENDA 1. Security Drive 2. Hood Way 3. Route 50 Speed Limit 4. County Projects Updates 5. Other Please contact our department if you are unable to attend this meeting. Attachments JAB/pd MEMORANDUM Item 1: Security Drive Attached, please find materials submitted by Greenway Engineering representing Navy Federal Credit Union. To accommodate their expansion, there is a need to abandon a portion of right-of-way and seek adoption of a shorter section into the state system of highways. Mr. Evan Wyatt will be speaking on this item and Staff is seeking a recommendation to the Board of Supervisors. Item 2: Hood Way Attached please find materials provided by VDOT and Dennie Dunlap in support of a road abandonment of Hood Way. This road abandonment is to aid in facilitating changes to their site to facilitate traffic circulation. Staff is seeking a recommendation to the Board of Supervisors. Item 3: Route 50 Speed Limit Supervisor Ewing has received numerous concerns regarding the speed limit on Route 50 to the east of Poorhouse Road. With the development of the Lutheran Home property and introduction of the new signal at National Lutheran Boulevard with their associated extra trips and conflicting movements, many of the nearby residents feel the speed limit should be maintained at 45 until Poorhouse Road. Attached please find a preliminary determination by VDOT traffic engineering regarding a potential reduction in speed limit. Staff is seeking a recommendation to the Board of Supervisors on whether to request VDOT perform a full speed study of the area. Item 4: County Projects Update Snowden Bridge Boulevard: Stub connection from Snowden to Milburn is nearly complete and that will be the last step of the project prior to requesting adoption into the state system of highways. Tevis Street Extension/Airport Road/I-81 Bridge: Bridge design is ongoing and draft environmental documents for VDOT have been received. Bridge Design has reached 75% and comments have been received for that. Pennoni is incorporating the recent round of comments on the TIA as well as incorporating additional scenarios to evaluate a potentially reduced section for the Northern Y. Staff has had numerous coordination meetings with VDOT to try to streamline the process and speed review comments. Renaissance Drive: Awaiting TPOF agreements from VDOT. Evaluating with the Board of Supervisors the status of revenue sharing matching funds prior to beginning design. Completing new project documentation for CSX through the County Attorney. Valley Mill Road Realignment: Private partner has indicated a desire not to continue the project. Staff is following up to clarify their intentions. Coverstone Drive: No activity at this time. Jubal Early Drive Extension and Interchange with Route 37: Staff has participated in a number of recent meetings regarding the status of previous design work and permits. Item 5: Other