Loading...
TC 12-17-12 Meeting Minutes2r, COUNTY of FREDERICK Department of Planning and Development 540/665-5651 MEMORANDUM FAX: 540/665-6395 TO: Board of Supervisors FROM: John A. Bishop, AICP, Deputy Director - Transportation RE: Transportation Committee Report for Meeting of December 17, 2012 DATE: January 2, 2013 The Transportation Committee met on December 17, 2012 at 8:30 a.m. Members Present Chuck DeHaven (voting) Gene Fisher (voting) James Racey (voting) Gary Oates (liaison PC) Lewis Boyer (liaison Stephens City) 1. MPO Work Plan Members Absent Mark Davis (liaison Middletown) Bryon Grigsby (voting) Christopher Collins (voting) ***Items Requiring Action*** None ***Items Not Requiring Action*** Staff presented the updated MPO Work Plan to the Committee for review and comment. The Committee has requested a staff update regarding progress to date on the Shady Elm study. The Committee would also like for the area of Route 11 North between I-81 and Route 37 to be studied for possible intersecting roadway realignments and intersection closures, but noted that this should be part of a future work program and not a further amendment to this one. 107 North Kent Street, Shite 202 • Winchester, Virginia 22601-5000 2. VDOT Bridge Work VDOT requested feedback from the Committee regarding the maintenance of traffic plans for bridge deck replacement over the Opequon Creek on Route 522 South. One alternative was considerable cheaper and took only one construction season to build but had greater traffic impacts, while the other alternative involved additional bridge construction at significantly higher cost and took two construction seasons. After assurance from VDOT that the delays associated with the less costly alternative are manageable (correspondence copied below), the Committee consensus was to stay with that alternative. Chuck, here is the additional information the committee requested on the above project. I was in error, it is the South bound section that is proposed for replacement. Estimated cost is $1.693 million. Proposed Ad date is October of 2014 2011 traffic counts reflect 14,000 AADT with 12% being trucks three axels or more (this is north and south bound) Proposed bridge with is approximately 43 feet Anticipated speed limit during construction is 45MPH Best estimate of reduced travel time during construction is 15-20 minutes during peak hours (no anticipated stop and go) Proposed one construction season with crossover traffic control and two construction seasons with staged traffic control Estimated construction cost increase with two stage traffic control is $400,000 Chuck if possible, we would like for you to do a poling of the members instead of waiting for January meeting. This will allow design to gain a month. Thank you for your assistance and please let me know if you need any additional information. W Edwin Z. Carter Assist. Residency Administrator VDOT-Edinburg Residency (540)984-5605 Fax(540)984-5607 Edwin. Ca rterOVDOT.Virg in ia. Gov 2 3. Other MPO Bicycle Plan Intersections for Consideration As the Bicycle and Pedestrian study moves forward, Frederick County was asked for a list of at least 12, but up to 15 intersections, to be considered for more detailed study. Staff provided the attached list to the Committee which was endorsed. Potential Intersections for MPO Bicycle and Pedestrian Stud VVdf f IUf a11U %-I'dig/ 1 aiarno�e Warrior and Tasker Warrior and Montgomery Circle Warrior and Westmoreland Route 277 and Sherando Park Senseny and Greenwood Channing and Farmington Channing and Woodrow/Canyon Channing and Nassau/Highcliffe Valley Mill and Rt 7 Rt 7 and Gateway Drive Rt 7 and Blossom Drive Rt 522 and Apple Pie Ridge Rt 522 and Fox Drive Rt 522 and Rivendell/Westminster