TC 12-17-12 Meeting Agenda�� COUNTY of FREDERICK
Department of Planning g and Development
540/665-5651
FAX: 54W665-6395
MEMORANDUM
TO: Frederick County Transportation Committee
FROM: John A. Bishop, AICP, Deputy Director - Transportation~' a
e
RE: December I7, 2012 Transportation Committee Meeting
DATE: December 10, 2012
The Frederick County Transportation Committee will be meeting at 8:30 a.m. on Monday,
December 17, 2012 in the first floor conference room of the Frederick County Administration
Building, 107 North Kent Street, Winchester, Virginia.
AGENDA
1. MPO Work Plan Updates
2. VDOT Bridge Work
3. Other
Please contact our department if you are unable to attend this meeting.
Attachments
107 North Kent Street, Suite 202 • A;Vinchester, Virginia 22601-5000
Item 1: MPO Work Plan Updates
Please review the attached ,update to the MPO Unified Planning Work Program and be prepared
to discuss at the meeting as we determine what feedback, if any, is needed from the Frederick
County Transportation Committee.
2
UNIFIED PLANNING 0 K PRO � � RA e'UP �� J )
FOR THE
WINCHESTER — FREDEWCK CO VNTY ("WIN -FRIED")
MET ROPOL1 T AN PLANNING ING ORCANIZATION (MPO)
IVIFTROPOLITAN PLANNING OF3GANIZXCION
FY 2013
(July 1, 2012 - June 30, 2013)
Adopted for Public Comment: March 21, 2012
Final Adoption: May 16, 2012
Winch ester/Frederick County, Virginia
Metropolitan Planning Organization
C/o Northern Shenandoah Valley Regional Commission
400 Kendrick Lane, Suite E
Front Royal, VA 22630
540-636-8800
www.winfredmpo.org
Preparation Statement
Prepared on behalf of the Win -Fred Metropolitan Planning Organization by the Northern
Shenandoah Valley Regional Commission staff through a cooperative process involving the City
of Winchester, County of Frederick, Town of Stephens City, Virginia Department of
Transportation, Virginia Department of Rail and Public Transportation, Federal Highway
Administration, and the Federal Transit Administration.
The preparation of this program was financially aided through grants from the Federal Highway
Administration, Federal Transit Administration, Virginia Department of Transportation and the
Virginia Department of Rail and Public Transportation.
Win -Fred MPO i1
FY2013 UPWP U11
FR D
MEMPOUTAN PLANNING ORGANIZATION
MPO Policy Board
Officers:
Chair—Richard Shickle, Frederick County
Vice Chair—John Willingham, City of Winchester
Secretary/Treasurer—Martha Shickle, Executive Director NSVRC
Voting Members:
Richard Shickle, Frederick County
Charles DeHaven, Jr., Frederick County
John R. Riley, Jr., Frederick County
Michael Kehoe, Town of Stephens City
Dale Iman, City of Winchester
John Hill, City of Winchester
John Willingham, City of Winchester
Randy Kiser, Virginia Department of Transportation
Alternate Voting Members:
Tim Youmans, Perry Eisenach and Les Veach, City of Winchester
Brian Henshaw, Town of Stephens City
Terry Short, Virginia Department of Transportation
Non -Voting Members:
John Simkins, Federal Highway Administration
Tony Cho, Federal Transit Administration
Lisa DuMetz, Virginia Dept. of Rail & Public Transportation
Rusty Harrington, Dept. of Aviation
MPO Technical Advisory Committee (TAC)
Chair—Tim Youmans, City of Winchester
Vice Chair—Eric Lawrence, Frederick County
Members:
Patrick Barker, Frederick County
John Bishop, Frederick County
Eric Lawrence, Frederick County
Kris Tierney, Frederick County
Brian Henshaw, Town of Stephens City
Jim Deskins, City of Winchester
Tom Hoy, City of Winchester
Tim Youmans, City of Winchester
Perry Eisenach, City of Winchester
Terry Short, Virginia Department of Transportation
Lisa DuMetz, Virginia Dept. of Rail & Public Transportation
Serena `Renny' Manuel, Winchester Airport
Renee Wells, Winchester Transit
MPO Citizens Advisory Committee (CAC)
Chair—R. William Bayliss, III
Vice Chair—Walt Cunningham
Members:
Tim Stowe, Alan Toxopeus, Walt Cunningham, Frederick County
Kelly Henshaw, Town of Stephens City
R. William Bayliss, III, Dr. John Crandell, City of Winchester
Administrative & Staff Support
Provided by Northern Shenandoah Valley Regional Commission
Win -Fred MPO 1i1 oma•
FY 2013 iIPWP ��� 12c
MTROPOLITAN PLANNING ORGANIZATION
WnFred Metropolitan
Planning Organization
400 Kendrick Lane, Suite F
Front Royal, Vfrginla 22630
Phone: 540-636-8800
Fax: 540-635-4147
Website: www.winfredrnPo.o
Policy Board
Chair:
Richard C. SbicMe
Frederick County
Vice -Chair:
John A. Willingham
City of Winchester
Secretary/ Treasures::
Martha F. Shickle
NSVRC
City of Winchester:
*Daft fman
City Manager
*John W. IN
Council Member
*John .i Willingham
Council Member
Frederick County:
*Richard C. Shickle
Board of Supervisors
*John R. Riley, Jr.
County Administrator
*Charles S. DeHavea, Jr.
Board of Supervisors
Stephens City:
*Michael K. Kehoe
Town Administrator/Engineer
VDOT:
*Randy Kiser
District Administrator
Va. Dept. of Rail & Public Trans:
Lisa DuMetz
Transit Planner
Va. Dept. of Aviation:
Rusty Harrington
Manager, Planning & Environmental
Federal Highway Administration:
John Simldns
Environmental Protection Specialist
Federal Transit Administration:
Tony Cho
Transportation Program Specialist
* Denotes doting Members-
WINI,';G,.M�_�FRED
METROPOLITAN PLANNING ORGANIZATION
Resolution 12-05
By The
WinFred Metropolitan Planni lag Organization
Approving the FY 2013 Unified Planning Worts :Program
i1JA .1 11
WHEREAS, the FY 2013 Unified Planning Work Program will
serve as the basis for all U.S. Department of Transportation (DOT)
funding participation and will be included in all requests for DOT
planning funds, and
WHEREAS, this UPWP details all transportation and transportation -
related planning activities anticipated within the area during the
coming fiscal year, and
W11EREAS, this UPWP has been reviewed and recommended for
approval by the Technical Advisory Committee and the Citizens
Advisory Committee;
NOW THEREFORE BE 1T RESOLVED, that the WinFred
Metropolitan Planning Organization does hereby approve and adopt
the FY 2013 Unified Planning Work Program on May 16, 2012.
Signed: -n���
Richard C. Shickle
Chairman, WinFred MPO
Date:
Signed: t � 1 a- Date:
Martha F. Shickle
Secretary -Treasurer, WinFred MPO
TABLE OF CONTENTS
FY 2013 UNIFIED PLANNING WORK PROGRAM
WORK TASKS AND BUDGET/FUNDING INFORMATION
Page No.
PreparationStatement ..................................................................................................................... ii
Officers............................................................................... ...
Resolution...................................................................................................................................... iv
Tableof Contents.............................................................................................................................v
Listof Figures.................................................................................................vi
INTRODUCTION............................................................................................................................ 7
WORK TASK 1: Program Management & Administration.........................................................10
WORK TASK 2: Transportation Improvement Program (TIP)...................................................12
WORK TASK 3: Federal or State Requested Planning Work Program Items ............................12
WORK TASK 4: Public Mobility Programs & Planning.............................................................13
WORK TASK 5: Local Technical Assistance..............................................................................15
WORK TASK 6: Pedestrian and Bicycle Planning.....................................................................16
WORK TASK 7: Access Management, Safety & Corridor Planning...........................................19
WORK TASK 8: Long Range Planning, Modeling, GIS & Data...............................................21
Proposed Revenues & Expenditures by Funding
Source...............................................23
........................................
Win -Fred MPO v _
FY 2013 UPWP ft-- _ D
METROPOLITAN PLANNING ORGANIZATION
LIST OF FIGURES
No.
Figure 1: Map of Winchester -Frederick County Urbanized Area and MPO Study Area 8
Figure 2: Proposed Revenues and Expenditures by Funding
Source............................................................................................ 23
Win -Fred MPO vi .
FY2013 UPWP VANrw`.®
METROPOLITAN PLANNING ORGANIZAf ION
MTRODUCTION
The Unified Planning Work Program (UPWP) for transportation planning identifies all activities
to be undertaken in the Win -Fred Metropolitan Planning Organization study area for Fiscal Year
2013 (July 1, 2012 - June 30, 2013). The UPWP provides a mechanism for the coordination of
transportation planning activities in the region, and is required as a basis and condition for all
federal funding assistance for transportation planning by the joint metropolitan planning
regulations of the Federal Highway Administration (FHWA) and the Federal Transit
Administration (FTA).
The work tasks within this UPWP are reflective of issues and concerns originating from
transportation agencies at the federal, state and local levels. The descriptions of the tasks to be
accomplished and the budgets for these tasks are based on a best estimate of what can be
accomplished within the confines of available federal, state and local resources.
The Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) created a number of
planning requirements. In October 1993, the Federal Highway Administration (FHWA) and the
Federal Transit Administration (FTA) issued final regulations regarding metropolitan planning.
The Transportation Equity Act of the 21st Century (TEA -21), which became law in June 1998,
reaffirmed the structure of the metropolitan planning process. Most of the modifications to the
process were aimed at streamlining and strengthening the provisions included in ISTEA. On
August 10, 2005, the latest federal legislation known as the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA-LU) was signed into law. The Win -
Fred Metropolitan Planning Organization has developed this work program to address the final
metropolitan planning regulations and the new requirements in SAFETEA-LU.
Metropolitan Planning Area
The Win -Fred MPO study area consists of the City of Winchester, the Town of Stephens City,
the Urbanized Area of Frederick County, and the area of Frederick County projected to be
urbanized by the year 2020. See Figure 1 for an illustration of the region.
Based on the 2000 Census, the Win -Fred MPO Urbanized Area population was 53,559 and it
encompasses a land area of approximately 103 sq. miles.
Win -Fred MPO 7
FY2013 UPWP' F®
METROPOLITAN PLANNING ORGANIZATION
Figure 1
Wine-Fradarit-k r.minhi UPO Rminrinni
y�..®..v..v...�v. .vwv..v.i —w .xrj ■v.■ w �vaaez:,e"Sjw
Frederick County �s
s
MPO Bounder} tt { L 9\
8`
Winchester .ti•
37 �1 �EhT S?_
--22so
Stephens Citti17
lr�
A
Bo', cc
A
egend
Tw
Town
County
MPO B
1 0.5 0 MilesWlkz� FK -to NERC
�.r.:a
METROPOLITAN PLANNING ORGANIZATION
Responsibilities for Transportation Planning
The Win -Fred Metropolitan Planning Organization is the organization responsible for conducting
the continuing, comprehensive, and coordinated (3-C) planning process for the Winchester -
Frederick County Urbanized Area in accordance with requirements of Section 134 (Title 23
U.S.C.) of the Federal Highway Act of 1962, and Section 5303 of the Federal Transit Act. The
Win -Fred MPO is the official Metropolitan Planning Organization for the urbanized area,
designated by the Governor of Virginia, under Section 134 of the Federal Aid Highway Act, and
the joint metropolitan planning regulations of FHWA and FTA.
The policy making body of the Win -Fred MPO is the Policy Board that consists of 8 voting
members. These include 3 representatives from the City of Winchester, 3 representatives from
Frederick County, 1 representative from the Town of Stephens City, and 1 representative from
VDOT. Other agencies with non-voting membership on the Win -Fred MPO Policy Board
include the Virginia Department of Rail and Public Transportation, Virginia Department of
Aviation, Federal Highway Administration and Federal Transit Administration.
The Northern Shenandoah Valley Regional Commission (NSVRC) staffs the Win -Fred MPO.
The staff, in conjunction with the MPO's member agencies, collect, analyze and evaluate
demographic, land use, and transportation data to gain a better understanding of the
transportation system requirements of the area. Special studies, research, and other work tasks
requested by the MPO are the staffs responsibility as well. Consultant assistance will be sought
when required by the staff to complete work tasks. Staff also prepares materials for use at the
Policy Board, Technical Advisory and Citizens Advisory Committee meetings as well as any
existing sub -committee meetings.
NSVRC staff will participate in all Win -Fred MPO meetings and provide required staff support
and administration of the transportation planning program. In addition, staff members will
represent the MPO at other meetings with federal, state, and local organizations.
Total Proposed Funding by Federal Source for FY 2013
The primary funding source for transportation planning activities included in this work program
are the FHWA Section 112 (PL), FTA Section 5303, and FHWA State Planning and Research
(SPR). The proposed funding amounts (including state and local matching funds) for the Win -
Fred MPO work program to be utilized by the NSVRC staff are shown in Figure 2.
Win -Fred MPO 9�
FY 2013 UPWP
METROPOLITAN PLANNING ORGANIZATION
WORK TASK 1: Prograin Mfanagement & Administration
Objective and Description: This task includes ongoing activities that ensure proper management
and operation of a continuing, comprehensive, and coordinated (3-C) planning process as
described in the Memorandum of Understanding. The primary objectives of this task are as
follows:
Public Participation Plan (PPP): The encouragement of meaningful participation of local
citizens in metropolitan transportation planning is one of the most important goals of the "3C"
process and the Public Involvement Process. The Final Rule on Metropolitan Planning issued by
U.S. DOT in October 1993 reemphasizes this goal by requiring that each MPO maintain:
"...a proactive public involvement process that provides complete information, timely public
notice, full public access to key decisions, and supports early and continuing involvement of the
public in developing plans, TIPS..."
Under this task, the Win -Fred MPO will continue to maintain a Public Participation Process and
monitor its effectiveness. The Public Participation Plan outlines the public outreach procedures
to be followed by the MPO in developing and amending the Region's UPWP, Long-range
Transportation Plan, Transportation Improvement Program (TIP) and other major studies. The
PPP will also address Title VI and ADA issues as well.
The Citizens Advisory Committee meets on a periodic basis to review and provide feedback to
the Win -Fred MPO Technical Advisory Committee and Policy Board. The Citizens Advisory
Committee will also conduct outreach activities such as public meetings and forums,
neighborhood and association meetings, and other means to seek input from other agencies,
organizations, and individuals interested in the transportation planning process, plans being
prepared, or other transportation concerns. The MPO staff supports the work of the Citizens
Advisory Committee.
The concept of Environmental Justice has raised questions regarding equity and the inclusion of
all individuals in the decision making process. The PPP will include procedures developed by the
Win -Fred MPO to address environmental justice. Efforts will be made to better identify
organizations and individuals not normally included in the transportation planning process on a
continuing basis.
This task will provide a continuing public involvement process that increases participation by
community members in transportation plans, with a particular focus on improving participation
by groups not previously involved in the transportation planning process.
UPWP Preparation and Management: Implement the FY 2013 UPWP throughout the fiscal
year and provide all required administrative functions including all accounting functions,
personnel administration, office management, financial reporting, and contract administration.
To meet the requirements of 23 CFR Part 420 and 23 CFR Part 450, the Win -Fred MPO, in
cooperation with the Virginia Department of Transportation and the Virginia Department of Rail
Win -Fred MPO 10`"j'_
FY2013 UPWP WIN!iii&FRED
METROPOLITAN PLANNING ORGANIZATION
and Public Transportation, is responsible for the development of a Unified Planning Work
Program (UPWP). The UPWP describes all regional transportation planning activities anticipated
in the Win -Fred MPO study area for the following fiscal year that will utilize federal funding,
including Title I Section 134 metropolitan planning funds, and Title III Section 8 metropolitan
planning funds. The UPWP also identifies state and local matching dollars for these federal
planning programs.
This task provides for management of the FY 2013 UPWP including the following activities:
• Maintain all required financial records and conduct annual independent audit
• Hire and train staff
• Maintain required files and records of MPO activities (i.e. minutes, meeting notices, etc.)
• Preparation of quarterly progress reports and invoices
• Preparation of required legal notices and advertisements
• Preparation of resolutions adopted by MPO
• Preparation of required grant applications and execution of contracts
If during FY 2013, an amendment to the UPWP is deemed necessary, due to changes in planning
priorities and/or the inclusion of new planning projects, staff will identify and detail such
amendments for consideration by the MPO.
This task also provides for the development of the upcoming UPWP for FY 2014. The document
will incorporate suggestions from federal funding agencies, state transportation agencies, transit
operating agencies, local governments participating in Win -Fred MPO, and the public through
the MPO's public involvement process.
General Administration: Support the activities of the Win -Fred MPO through the preparation of
reports, presentations, agendas, minutes and mailings for all Policy Board, Technical and
Citizens Advisory Committee meetings, as well as attendance at those meetings:
• Meeting arrangements for Board/Committees: Policy Board — 3`d Wednesday of Month,
Technical Advisory Committee — 1 st Tuesday of Month, Citizens Advisory Committee —
2nd Tuesday of Month
• Preparation and transmittal of meeting agenda packages
• Transcribe and publish minutes
• Staff attendance at MPO committee meetings and regional meetings as directed
• Provide on-going training and development of staff and Board/Committee members
E Attend training seminars and conferences
Coordination meetings with state and federal agencies
Circulate training opportunities to committee members
Prepare grant applications and administer grant funds
Prepare consultant requests for proposals and manage consultant activities
Products: MPO staff support, detailed records documenting activities of the MPO including
minutes for all committee meetings, preparation and submission of required progress reports and
invoices to all federal and state agencies, detailed financial records, and a well-trained and
informed MPO staff, Policy Board and Technical and Citizens Advisory Committee members.
Estimated Budget: $108,333
Win -Fred MPO 11
FY2013 UPWP MN FEED
METROPOLITAN PLANNING ORGANIZATION
WORK r,AS?K 2: Transportation Improvement Program (TIP)
Objective and Description: As required by federal planning regulations, the Transportation
Improvement Program (TIP) for the Win -Fred MPO is a four-year program of highway, transit,
bicycle, , p —Uli , if y, transportation 1,^^ —f pr sects receiving federal funds. State
U1 m e edesu ian sa�e� and i �""u" eiuiui.VV
and locally funded projects are also included in the TIP for coordination purposes.
The TIP is updated each year and must be approved by the MPO Policy Board and the Governor
of Virginia. The TIP is required as a condition for all federal funding assistance for transportation
improvements within the Win -Fred MPO study area.
The general public and all other interested parties will be given an opportunity to review and
comment on the proposed It as described under the Win -Fred MPO's adopted Public
Participation Plan. To facilitate public review, MPO staff will provide visualization of TIP
projects, post the TIP on the MPO website, and make the TIP accessible at public libraries,
government offices, and upon request.
This task provides for the maintenance of a regional Transportation Improvement Program and
will require active support of the Win -Fred MPO Policy Board and Committees and coordination
with member agencies.
Products: Processing of requested amendments and administrative modifications to the adopted
TIP; mapping of TIP projects and Annual Listing of Projects for the next fiscal year.
Estimated Budget: $5,000
WORK TASK 3: Federal or State Requested Planning Work Program Items
Objective and Description: The MPO staff will work with federal and state agencies in support
of projects and programs designed to coordinate transportation planning activities within the
region.
Products: Staff will prepare studies and reports as necessary for the completion of this work
program item and as directed by the appropriate federal and/or state agencies.
Estimated Budget: $5,000
Win -Fred MPO 12
FY 2013 UPWP W I F IRUEQ
METROPOLITAN PLANNING ORGANIZATION
WORK TASK 4: Public Mobility Programs & Planning
Objective and Description: This work task includes required transportation planning assistance
for local (WinTran) and regional transit system operations and planning, Human Services system
providers, demand response transit (WinTran), commuter assistance, and travel demand
management.
Products:
1. Plan Development & Implementation
I. I. Coordination with the Policy Board, Technical and Citizens Advisory Committees to
further advance the action items in the WinFred MPO City and Countywide Transit
Study & MPO specific sections of NSVRC Public Mobility Plan; Regional Public
mobility workshop
1.2. Incorporate public mobility planning efforts into ongoing updates to Long Range
Transportation Plan
1.3. Tracking, review, and prioritization of Vision Plan/CLRP/TIP, 2009 City/County Transit
Plan, 2010 NSVRC Regional Mobility Coordination Plan & 2011 WinTran TDP public
mobility action items including but not limited to:
1.3.1. Local Transit Extension Options
1.3.2. Regional Transit Expansion
1.3.3. Demand Response Transit
1.3.4. Human Services -Public Transit
1.3.5. Park and Ride Expansion Options
1.3.6. Improve Commuter infrastructure and services
1.4. Quarterly Review and Presentation of Public Mobility Plan Items to MPO TAC and
Policy Board
1.5. Participate in DRPT SuperNova Regional Transit Study on behalf of MPO
1.6. Participate in Statewide Park & Ride Study on behalf of MPO
1.7. Participate in Strasburg Transit Feasibility Study on behalf of MPO
1.8. Participate in the regional Coordinated Human Services Public Mobility Planning
process
2. Public Involvement, Education, Encouragement & Outreach
2.1. Maintenance & updates of MPO public mobility web page including education/safety,
encouragement, route planning, and event information.
2.2. Participation in and development of materials for regional bicycle and pedestrian safety,
health, travel demand management & encouragement events including but not limited to:
Regional Commuter Outreach Events, Walk to School Day and Bike to Work Day
events.
2.3. Participate in Public Mobility Workshops as appropriate
3. Funding, Design & Policy
3.1. Assistance in preparation & submittal of public mobility transportation grant funding
opportunities
3.2. Development of MPO region transit friendly design guidelines (unfunded)
Win -Fred MPO 13
FY20I3 UPWP WN&aFUD
METROPOLITAN PLANNING ORGANIZATION
4. Mapping, Data & GIS
4.1. Mapping, data collection, and GIS database management in support of Public Mobility
Work Program Tasks
5. Title VI Compliance
5.1. Coordinate with DRPT to develop Title VI plan, incorporating demographic mapping &
analysis 2012 & incorporate into Public Participation Plan (PPP) as appropriate.
5.1.1. Identify the location of socioeconomic groups including elderly residents, zero -car
households. Low-income, minority and limited English proficient (LEP)
populations in the Win -Fred MPO area.
5.1.2. Develop GIS Maps to show the location of socioeconomic groups in the Win -Fred
MPO area. As needed, these maps will be referenced in on-going and proposed
transportation studies undertaken by the MPO.
5.1.3. Conduct a benefits and burdens analysis of future/proposed transportation projects
on socioeconomic groups during Long-range Plan Updates, Transit Study updates,
mobility plan and other planning efforts.
6. Public Mobility Studies
6.1 Bicycle and Pedestrian Access to Transit Study. WinTran shelter, bench and amenity
siting. Data analysis and recommendations for siting of benches, shelters and other
amenities along the WinTran service lines.
6.2 Study financing options for priority mobility projects
6.3 Transportation Provider Organization Structure (districts, authorities)
Estimated Budget: $10,000
Public Mobilitv Programs & Planning Work Task 4.7_ — City of Winchester Transit System
(WinTran) Planning
Objective and Description: The Winchester Transit System (WinTran) conducts transit planning
and administration efforts necessary to comply with FTA requirements in order to receive
Section 5307 capital and operating grants. WinTran will coordinate with the MPO on transit
planning activities. Funds will be used to deliver specific, tangible transit planning products.
Products:
7. Development & maintenance of Updated Ride Guide & Mapping (FY2012 project)
8. Development of ADA compliant Winchester Transit website (this would be a new website
that is not associated with the City of Winchester's website and would include general transit
route/time information, maps and plan your trip information.)
9. Improved marketing of transit services such as route and schedule kiosks at bus shelters or in
public areas (i.e., Apple Blossom Mall, visitor's center, hotels/motels, etc.)
10. Development of WinTran Safety/Security Plan
Estimated Budget: $30,000 (from $10,000)
Win -Fred MPO 14 4' .
FY20I3 UPWP N "'R,®
METROPOLITAN PLANNING ORGANIMATION
Work Task 5 - Local Technical Assistance - I< oirnatPri R1111UPt �2n firm (14Drl . ___, , ------ ., -
Obiective and Description: This is an annual UPWP task. Technical staff from each locality and VDOT has compiled a list of potential projects that need attention throughout
the region. This list is shown below. This task will cover staff or consultant completion of whichever of these projects the TAC and Policy Board determine to fund for
completion in FY 2013. Projects not selected for completion for FY 2013 may be carried forward onto future UPWPs or may be removed from the list as determined by Policy
Board action. Products: Technical reports and recommendations on selected projects.
General Planning
Comments/Description
Technical Support
Provides flexible technical support & services for the MPO
localities
Transportation Planning Grant Research, Preparation &
Submittal
Submission of transportation planning grant applications
Program Support and Administration
Support & services for the MPO localities
Roundabout Training
Coordination of a workshop for local planners and
en ineers on Roundabout training
Transportation Analysis and Modeling
Support & services for the MPO localities
Airport Planning Projects
This item allows the MPO to pursue various airport planning
projects
Freight and Rail Planning Projects
This item allows the MPO to pursue various freight and rail
planning 2rojects
Pedestrian and Bicycle Projects
Complete Streets Project
Alternative modes of Transportation
Underway
Support of the "complete streets" concept.
in FY12
Complete Streets are those designed to accommodate all users.
Project Specific
Name/Location
Type of Study
Status
Route 17/50 at I-81 to Clark County Line
Access Management/Intersection Plan
Not Underway
Product: Access Management/Intersection Plan
Intersection of Route 522 and Papermill Road
Intersection Improvement Plan
Not UnderwayProduct:
Intersection Improvement Plan
Route 7: further analysis of the alternative reverse
frontage roadway submitted by the City of Winchester in
Further Analysis of project
Not Underway
Addendum to the Route 7 Multimodal Corridor Study
February 2010
Route 522 from Rivendell Court to Apple Pie Ridge Rd.
Signalization/Safety Improvements
Not
Top crash location from the 2030 MPO Long Range Transp.
Plan
Underway
Plan
Route 11 from Bellview Ave to Salem Church Road
Access Management/Intersection Plan
Complete
Project completed by VDOT Staff in Richmond (Central
Office
Route 277 from MPO Boundary_to
Route 522
Access Management/Intersection ement/Intersection Plan
g
VDOT
Study
AwaitingVDOT SYIP Design / Construction Project Results
g �
I 1 from North Avenue (south of
W
W ck St) to the WVA line
orrAccess an
Corridor Ad Safety Study
Not
Underway
Awaiting further direction
Win -Fred MPO
FY 2013 UPWP 1 N-i*0 F
METROPOLITAN PLANNING ORGANIZATION
WORK TASK 6: Pedestrian and Bicycle Planning
Objective and Description: The purpose of this task is to provide ongoing bicycle, pedestrian,
safe routes to school, complete streets, universal accessibility and other non -motorized
transportation safety and facility programming, planning, data monitoring, and technical
assistance to the MPO, agencies and member jurisdictions.
Products:
Specific tasks and deliverables associated with this work item may include:
Plan Development & Implementation
1.1. Tracking of LRTP priority and MPO Bicycle and Pedestrian Mobility Plan Bicycle and
Pedestrian project implementation
1.2. Participation in update to NSVRC update to Northern Shenandoah Valley Regional
Bicycle & Pedestrian Plan on behalf of MPO
1.3. Incorporate bicycle and pedestrian planning efforts into ongoing updates to Long Range
Transportation Plan
1.4. Participation in update to Virginia Outdoors Plan Update on behalf of MPO
2. Education, Encouragement & Outreach
2.1. Maintenance & updates of MPO Bicycle & Pedestrian Information Web Page including
education/safety, encouragement, route planning, and event information.
2.2. Participation in and development of materials for regional bicycle and pedestrian safety,
health, travel demand management & encouragement events including but not limited to:
Walk to School Day and Bike to Work Day events.
3. Safe Routes to School Planning
3.1. Assistance in preparation of School Travel Plans for MPO region Elementary & Middle
Schools
3.2. Assistance in preparation & submittal of Safe Routes to School Grant Applications
3.3. Coordinate the development of regional bicycle and pedestrian safety outreach materials
including materials and/or programming for elementary and middle school age
programming
4. Funding, Design & Policy
4.1. Assistance in preparation & submittal of non -motorized transportation grant funding
opportunities
4.2. Preparation of Regional Complete Streets Design & Policy Guidance
Mapping, Data & GIS
5.1. Maintenance & updates to MPO Region Bicycle & Pedestrian Map
5.2. Develop Bicycle and Pedestrian counts program for MPO
5.3. Maintenance & updates to Bicycle and Pedestrian Facility GIS database
6. Bicycle & Pedestrian Studies
6.1. Participate in planning and design for MPO LRTP priority project of upgrading freight
rail crossings in MPO region
Win -Fred MPO 16,
FY2013 UPWP Wi1Viii6FRED
MEMOPOL11'AN PLANNING ORGANIZArION
6.2. Manage completion of FY2012 Pedestrian & Bicycle Facilities Inventory and Analysis
Staff would anticipate use of a consultant in partnership with local staff, VDOT, DRPT
and FHWA officials.
1) Bicycle and Pedestrian Suitability / Level of Service Analyses for roadway segments,
intersections and roadway crossings along with neighborhood level analysis of
walkability and bikeability.
Task 1 Deliverable(s)
a. Maps & Tables — all at full MPO extent with City and Town inset maps. Specific
LOS assessment tools should follow the guidance of those suggested in the 2010
Highway Capacity Manual (HCM) References on Multi -modal Level of Service.
b. Bicycle Segment (On & off-street) LOS / Suitability + Mapped for Public
c. Bicycle Intersection (On & off-street) LOS / Suitability
d. Pedestrian Segment LOS / Suitability + Mapped for Public
e. Pedestrian Midblock Crossing LOS / Suitability
f. Pedestrian Intersection Crossing LOS / Suitability
g. Neighborhood scale Walkability Analysis including valuation for access to transit,
block lengths, interconnectivity, assessment of land use attractors and generators,
presence of bicycle and pedestrian facilities, and housing/employment density
analysis
h. Neighborhood scale Bikeability Analysis including valuation for access to transit,
block lengths, interconnectivity, assessment of land use attractors and generators,
presence of bicycle and pedestrian facilities, and housing/employment density
analysis
i. Technical Memo summarizing Task 2 analyses and summarizing results and
recommendations
2) Identification of appropriate routes for inclusion in the community bicycle /pedestrian
network
Task 2 Deliverable(s) (25% of project hours/costs)
a. Map & Table of Existing, programmed, planned and recommended (new)
links/projects (Use 2007 WinFred bike/ped mobility plan as baseline)
b. Develop Prioritization Criteria for Network Links & Projects (Criteria, Safety,
schools, access to transit, multiple user types, cost ease of implementation etc.)
c. Technical Memo documenting Task 3 process, products and recommendations
3) Evaluation of alternate treatments for improving bicycle, pedestrian and access to transit
friendliness of a roadway
Win -Fred MPO 17
FY 2013 UPWP IfflK ` RKRED
METROPOLITAN PLANNING ORGANIZATION
Task 3 Deliverable(s) (10% of project hours/costs)
a. Develop best management practices for implementation of complete streets in
region
b. Update roadway cross-sections referencing VDOT Roadway design manual,
AASHTO guidance, 2010 HCM & VDOT June 2010 release of
"Accommodations Defined"
c. Technical Memo documenting Task 4 products
4) Creation of a web oriented and printed bicycle and hails map and promotional materials
produced for the public to assist them in route selection and safety education
Task 4 Deliverable(s) (30% of project hours/costs)
a. Web Version of Map (format tbd) & map data suitable for submittal to google
maps
b. Recommendations for expansion of MPO public mapping to include wider array
of surrounding NSVRC jurisdictions that may choose to participate
c. Map shall note available transit routes and include information on bicycles on
buses
d. Map shall include cyclist and pedestrian safety information and laws
e. Development of project web -site for use as project review destination and ongoing
public information sharing
f. Development of education and encouragement tool -kit
g. Develop regional bicycle and pedestrian safety campaign recommendations
including suggested media materials
h. Technical memo that includes mapping process, implementation
recommendations, web site products, education, safety and encouragement
products.
i. Existing and Programmed (funded) Facility User Map suitable for printing
S) Public Involvement and Report Presentation
Task 5 Deliverable(s) (10% of project hours/costs)
a. Facilitate project kickoff/scoping conference call with member jurisdictions,
agency and MPO staff
b. Facilitate public stakeholder and MPO TAC meeting to review task 1 & 2 analysis
results and kickoff mapping task
c. Monthly project update conference calls and memos
d. Preparation of a final report including all task deliverables and technical memos
e. Presentation of final task products to MPO Policy Board
Estimated Budget: $103,000 (from $80,000)
Win -Fred MPO 18
FY 2013 I7PWP
illilhC.---111:a�- FRED
METROPOLITAN PLANNING ORGANIZATION
WORK TASK 7: Access Management, Safety & Corridor Planning
Objective & Description: Corridor and area studies provide more detailed study of projects
identified in the LRTP. Corridor studies can also provide assessment of potential projects for
inclusion in LRTP plan updates. The following corridors and areas have been prioritized for
further study in the FY2013 work program. Analysis of each corridor or area may include but is
not limited to: access management; corridor simulation (software); intersection evaluation;
operations evaluation; transit / bicycle / pedestrian connections and parking
availability/accessibility/issues. Estimated Budget of $182,500 to be distributed based on priority
work products.
Products
1. Shady Elm Access Mannement Study Alternative Analysis
Objective and Description: This task is carried over from FYI 1. This study is intended to build
upon the results of previous Route 37 Access Management Studies. Using the modeling and
base scenarios created in earlier phases, additional analysis, scenario modification will be done,
and public input will be solicited to create a conceptual design that is federally approvable and
reasonably implemented. This effort is also looking to review existing study results, determine
the need for additional scenarios, make phasing recommendations, and identify implementation
options for short-term improvements. Staff would anticipate use of a consultant in partnership
with local staff, VDOT, and FHWA officials.
Products Access Management Study with short, mid and long-term phasing and implementation
recommendations
Estimated Budget: $0 (from 82,500)
2. US 522 from Cameron Street to Burnt Church Road — Corridor Land Use
& Transportation Study
Objective and Description: This study would focus on opportunities for short and long-term
coordination between existing and proposed land use with anticipated or recommended
transportation network improvements. Analysis will include assessment of existing and proposed
land use, access management, and crash analyses. Staff would anticipate use of a consultant in
partnership with local staff, VDOT, DRPT and FHWA officials.
Study Area: http:// .cg o/mEs/bsbu8
Products: Corridor access study identifying opportunities and constraints for corridor, crash
analysis, access management recommendation, and a listing of recommended short, mid and
long-term transportation and land use recommendations.
Budget: $35,000 (from $25,000)
3. Realignment of Shawnee Drive and Opequon Church bane
Win -Fred MPO 19
FY 2013 UPWP _ _ F 93W
METROPOLITAN PLANNING ORGANIZATION
4. Widening and Extension of Monticello Avenge
Objective and Description: This study will focus on the immediate impacts of the
realignment of Shawnee Drive at the intersection with Valley Avenue to connect
with Opequon Church Lane and the long tem. impacts of the widening of
Monticello Avenue. The Study may be scoped in segments or as a whole. Staff
would anticipate use of a consultant in partnership with local staff, VDOT, DRPT
and FHWA officials.
Products: Study identifying options for realignment strategies and overall impacts
of freight and vehicular movement in the project area.
Budget: $147,060
Win -Fred MPO 20
FY 2013 UPWP —
VANaAF�D
METROPOLITAN PLANNING ORGANIZATION
WORK TASK g: Long Range Planning, Modeling, GIS & Data
Objective and Description: Many of the federal required Long Range
Transportation Activities have been identified in the UPWP as stand alone tasks.
NIT t_ rr t. () + + t.o the .,mbiella lnnn range r�lannina talk to
wom >aari is meant w v. he recurring rn b g ninnnina
include updates to the Long Range Plan, as well as support for travel modeling, GIS
and database management. It is anticipated that the transition of Regional Travel
Demand Model management from VDOT Central Office to MPO will be
completed in FYI 3. VDOT will continue to provide technical assistance for model
development, updates and statewide data collection activities, and fund software
maintenance, upgrades and training. PE / NEPA study modeling for SYIP projects
will be completed by VDOT not by MPO's. This task provide staff and/or
consultant technical assistance in modeling scenarios, model enhancements,
network and land use updates and completion of studies necessary for maintenance
of the model. Model maintenance provides support for required long range planning
activities, funding applications and support of any future air quality analysis in
support of regional early action air quality conformity compacts. GIS activities
support the regional travel demand model maintenance and all other UPWP work
tasks.
Products
1. Ongoing Updates to Long Range Transportation Plan
1.1. CLRP Project Tracking
1.2. Ongoing Scenario Analysis
1.3. 2035 LRTP & CLRP Amendments as needed
1.4. Compliance with federal regulations for long range planning
2. Complete Transfer of Maintenance of Regional Travel Demand Model Maintenance from
VDOT to MPO
3. Ongoing Maintenance of Regional Travel Demand Model
3.1. Base and future year Network maintenance
3.2. Participation in training in support of Regional Travel Model maintenance and
development (includes travel)
3.3. Development and analysis of various scenarios including:
3.3.1. 2035 MPO LRTP Vision Plan or any subset thereof
3.3.2. 2035 MPO Proffered network
3.3.3. Modeling in support of MPO grant applications
4. Land Use Updates at TAZ Level for population, households, and employment for Census
/ Base Year 2010 and future years 2035
4.1. Explore opportunities for the acquisition of updated employment data at the TAZ
level through partnerships with the Virginia Employment Commission or
commercial purchase
4.2. Incorporation of updated land use into base year and future year model scenarios
Win -Fred MPG 21
,v
FY 2013 UPWP H r: RED
METROPOLITAN PLANNING ORGANIZA'11ON
Update of regional Origin & Destination Studies and incorporation into base and future
year model scenarios
6. WinFred MPO Commuter Market Study
7. GIS mapping, data collection, and database management in support of all MPO UPWP
work tasks (including GIS software maintenance for 2 users at 50% of total cost)
Estimated Budget: $60,000 (from $50,000)
Win -Fred MPO 22
FY 2013 UPWP me
W�
METROPOLITAN PLANNING ORGANIZATION
Figure 2: Win -Fred MPO FY 2013 Proposed Revenues and Expenditures by Funding Source
Highway Funding T 't F d' r
iP or posed Revenues
IFY13
11
FHWA
Planning
80%
State _
Match
10%
LocalFTA
Match
10%
Subtotal
Highway
I un Ing
State Local ems,
5303 Match Match Subtotal
80% 10% 10% Transit
Totals
MPO
FY13
Revenues
0
FY 2013 New PL 112 Funds (1)
FY 2011 Carryover PL112 Funds available in FY 2013 (2)
FY 2010 5303 Funds (3)
FY 2011 5303 Funds (4)
:FY 2012 5303 Funds (5)
Subtotal: FY13 Revenues
$130,877
$229,088
$359,965
$16,360
$28,636
$44,996
$16,359
$28,636
$44,995
$163,596`$163,596
$286,360
$449,
11$286,360
$70,254
$70,275
$70,275
1210,804
$8,782 $8,782 $87,818
$8,784 $8,784 $87,843
$8,784 $8,784 $87,843
$26,350 $26,350 $263,504
$87,818
$87,843
$87,843
$713,460
Total FY13 Proposed Revenues
Pro fedr1 #1Ce
p4
-
Task 1: Program Management and Administration
70/30
x
FLEW � Stoe
n' M.tolt
$60,667 $7,583 $7,583
$75,833
1$26,000
$3,250
$3,250 $32,500
$713,460
�.ditures
"$108,333
Task 2: Transportation Improvement Program (TIP)
70/30
$2,800
$350
$350
$3,500
$1,200
$150
$150 1$1,500
$5,000
Task 3: State/ Federal Requested Work Tasks
5o/so
$2,000
$250
$250
$2,500
$2,000
$250
$250 $2,500
$5,000
Task 4: Public Mobility Programs and Planning
0/100
$0
$0
$0
$0
$16,000
$2,000
$2,000 $20,000
$20,000
Task 5: Local Technical Assistance
50150
$8,000
$1,000
$1,000
$10,000
$8,000
$1,000
$1,000 $10,000
$20,000
� I
Task 6: Pedestrian & Bicycle Planning
20180
1$12,800
$1,600
$1,600
1$16,000
$51,200
$6,400
$6,400 $64,000
$80,000
Task 7: Access Management, Safety & Corridor Planning
84116
$122,000
$15,250
$15,250
$152,500
$23,600
$2,950
$2,950 $29,500
$182,000
I
Task 8: Long Range Planning, Modeling, GIS and Data
70130
$28,000
$3,500
$3,500
$35,000
$12,000
$1,500
1$1,500 $15,000
$50,000
Subtotal: FY13 Expenditures
$236,267
$29,533
$29,533
$295,333
$140,000
$17,500 $17,500 $175,000
!$470,333 Q
Estimated Contingency/Reserve Funds for Project Support
Total FY13 Proposed Expenditures
$200,470
1$88,504
1$470,333
(1) ESTIMATED FY13 PL Funding estimates from VDOT for Highway
(2) ESTIMATED: FYI PL Carryover Funds: not Expended in FYI
(3) FYI Carryover FTA 5303 Funds: not expended in FYI
(4) FYI Carryover FTA 5303 Funds: not expended in FYI
(5) FYI Carryover FTA 5303 Funds: not expended in FYI
Page 23
Item 2: VDOT Bridge Work
Mr. Ed Carter of VDOT would like to review maintenance of traffic as they plan the attached
Opequon Creek Bridge Project.
N
e,�arr ao n'e�,e�✓LR+yi4Y!!Kn'iLl.�i. alilz
ki
> - .-' O4.».ro/. ✓:-O:n.0 O N�f enF o.^.v.A�+ Y.. ,`$oe: .ce{on3 /w>.
. ._:._ _ -v...,.. :. :. .... L1...on: gq.9HC 9/.and d.�e.c,F.'evf.'ona ,6.- ys.,.ay B^aW�. •:
Cwcarof.'en aee,.r Chv. 0/P.O a/Fe// ba � aa.Aed v. •q � b.'ew� es 'B•
Aevf� �"�T • � h Fee%' ,q� .Sv// r-.ai an a i �
gdyw/r�C=nyne.o QTta fmn� � nd moo �n obpfhs � 49e"a.�d
tC�^Fdu�nj /iv/iee da inafeml F a. 1�
e�*^!;^naSv//beemvGd vn vypjdaecv' i
M{P1 hb/s••CJ/r.. OIi.07 fH/ afv�}1asf...++ia0'•� Fx n Q Ni- rw.-/of.'en/�'n 4-5;
- B' ovltafinenfi µ '
Fevf.:rg oF� /a as �• ehga, ev/h
n/a,>,a/nb,G,-t,►.. a/I. db-dge �e a."'an,aos'»� �°Sp'��ee%e..f�d q;„ea,. ,..s' �.n.e,t;n. w,i s .' ,.
. --- Qc+InrG✓.Pa fvn ,✓.ms wh:eh Gump .T +>+ Bid o.-. aaiM an'
pµ -e �.mvrb� wnd v. -a g.)...., /v'.. aafmv/.i,9 P�/ Pe-�•a e -./y.
B.M. , Ma.% and evp ,:, bvaa ,fo'Syrome.-v ssFf. L/ s/v. O
E®T/Mg'PCO QlAP"WT/CA'
ELCY'rV T/QNt-.Y - - -
dmAw// /'*^>/,•-• 11.e L se oro Ilo0
Jb. .10 .
JI'- JI%w ..ae <+b.,hr n<+r-faeF fo em
eo ea
aW^� i •.waA u.e r.oss
t M/ JRM•Malz Sc
Mq..J.dI Ae-Aqe ,d.d
oM .I•Rer JG .', 1.�
I V'-h'IPf dJ,J d,llc ',
I gbie+rlvr M'-Im 9.a.
I c// ez,000
J "1
$�!I # #.
Q'WS. O/ GXOGJ' fY OSJ. LY. GtIS. 6/R/tl.ro LY.OJ /I E,(!
��• M�YY Awu'.Gn
L0 I
v -g Chrd �,
F __ Q Cft .{`wy� O - _ L .ganC Leee%en R.OM/. �Wiie.rca_
I
I
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF HIGHWAYS
yJr�L '-f
PROPOSED BRIDGE
716
0 I,
6ps du/l OVER OPEOUCV CREEK-4.OMi. FROM
V
V1ESTER
p;dj-'v' STA.639+45-RT522-PROJ. 2634 -D4 -FREDERICK COLKNh� 3-ld-0"STEEL BEAM SPANS
3, "
l
}� `/�!,/9�°
ce..wFa.✓ ,, avd Ry vye
ML
x-3,yI
J erJj LJ
Bvr P9
�Brr PM IZ
.fMI J
Brr PC
Baur Pp 4'u
3errwN t'•C'
' � Fgvr Firv�r�ov
OF. TIi/LQ N %iaUTMCNT Fi°
OPEQWN CREEK BRIDGE
DETAILS OF ABUTMENT'
AND PIERS
Ornx o r
AueuerE111
,
A 1ue
RK.w,e, Vn. 1949
,'''R'.° . :li}
CNJ
M
m
A
LC
m
Fl"wr �LOIMPlaAI
DGE
s`
W=Z, Vn- Awus�. 1944
OV -10
Hyl
!R.•INDVEq•JC SECT/wV •�•!�•
;S'n"ce e('AGurmenr LVeklvo//
t –
–__+----------------
–
e•k�-ei>• i I
-----------------
1Db [npi rah 4 �
___ __ _ /m'r a JPv'rn
---JMN q --� _, _ -----------
-------
--'----- i
__–__–_-------_
Ben,• �, on. 96.M'ac
_---�---------- –---
Tb's Rrl C - ----
-L --------------- --------ce" ------
--- --------
P&AIV Norc:-
Be��q 4y •ti //�� e•n,
wrlA rJ ♦,
J Jpa. o tel' -C- –�S•J_
.Jf'uara.n • /
fh; s L
pbalr-G•,..-..�s-
rils Put
sod &rkmr1ov
'lyrvey Mbar about t
1
1 � /�OJT'/QgI,L, F7Np CURB DErglL$
– -- j' P^•^r ed br Ar/ed vrlA H=1 Mp4rH
Br! C.pan AaM 'w1 q^I'a// C ✓hlen
� q•G.
J4
y , t
G
PiM
DrmLJ OVER F'/Ena
-
9�els / '.2j' Ihroeph rap p/•r�
r. `� /�Qeh�l..Ouv✓ Via. bmm/Y
r Y
9.:
Drrviea OVtR Fiexlrmi£rvre OerR/ea ar BrARINO Mr.
aero« rKGw Pr.prvoc..cAa ro o cw•o e.o-:,� pn/»e o,+ +o t,e
� o ad I,.,oe/• corn e.,dJ � �,...,.,
ruhvCp/ cWeur t r
777
I
OErAILZ OVER KERS
OPEQUON CREEK BRIDGE
DETAILS OF SUPERSTRUCTURE}'` C
arra cPe DEP eTBn�occ Er+Hs6ueera 1{
Rrertr--. z A—, 11919
M
CV -10
.i3t, UW/Q3•
R
�.
G-1.«el/35•
P 1
ee-�' NGS
N
t lPi3.•t.
B
P/'{�OLg• 9rdcYp i
1
1 � /�OJT'/QgI,L, F7Np CURB DErglL$
– -- j' P^•^r ed br Ar/ed vrlA H=1 Mp4rH
Br! C.pan AaM 'w1 q^I'a// C ✓hlen
� q•G.
J4
y , t
G
PiM
DrmLJ OVER F'/Ena
-
9�els / '.2j' Ihroeph rap p/•r�
r. `� /�Qeh�l..Ouv✓ Via. bmm/Y
r Y
9.:
Drrviea OVtR Fiexlrmi£rvre OerR/ea ar BrARINO Mr.
aero« rKGw Pr.prvoc..cAa ro o cw•o e.o-:,� pn/»e o,+ +o t,e
� o ad I,.,oe/• corn e.,dJ � �,...,.,
ruhvCp/ cWeur t r
777
I
OErAILZ OVER KERS
OPEQUON CREEK BRIDGE
DETAILS OF SUPERSTRUCTURE}'` C
arra cPe DEP eTBn�occ Er+Hs6ueera 1{
Rrertr--. z A—, 11919
M
CV -10
Item 3: Other
Staff updates.