Loading...
TC 12-17-12 Meeting Agenda�� COUNTY of FREDERICK Department of Planning g and Development 540/665-5651 FAX: 54W665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Deputy Director - Transportation~' a e RE: December I7, 2012 Transportation Committee Meeting DATE: December 10, 2012 The Frederick County Transportation Committee will be meeting at 8:30 a.m. on Monday, December 17, 2012 in the first floor conference room of the Frederick County Administration Building, 107 North Kent Street, Winchester, Virginia. AGENDA 1. MPO Work Plan Updates 2. VDOT Bridge Work 3. Other Please contact our department if you are unable to attend this meeting. Attachments 107 North Kent Street, Suite 202 • A;Vinchester, Virginia 22601-5000 Item 1: MPO Work Plan Updates Please review the attached ,update to the MPO Unified Planning Work Program and be prepared to discuss at the meeting as we determine what feedback, if any, is needed from the Frederick County Transportation Committee. 2 UNIFIED PLANNING 0 K PRO � � RA e'UP �� J ) FOR THE WINCHESTER — FREDEWCK CO VNTY ("WIN -FRIED") MET ROPOL1 T AN PLANNING ING ORCANIZATION (MPO) IVIFTROPOLITAN PLANNING OF3GANIZXCION FY 2013 (July 1, 2012 - June 30, 2013) Adopted for Public Comment: March 21, 2012 Final Adoption: May 16, 2012 Winch ester/Frederick County, Virginia Metropolitan Planning Organization C/o Northern Shenandoah Valley Regional Commission 400 Kendrick Lane, Suite E Front Royal, VA 22630 540-636-8800 www.winfredmpo.org Preparation Statement Prepared on behalf of the Win -Fred Metropolitan Planning Organization by the Northern Shenandoah Valley Regional Commission staff through a cooperative process involving the City of Winchester, County of Frederick, Town of Stephens City, Virginia Department of Transportation, Virginia Department of Rail and Public Transportation, Federal Highway Administration, and the Federal Transit Administration. The preparation of this program was financially aided through grants from the Federal Highway Administration, Federal Transit Administration, Virginia Department of Transportation and the Virginia Department of Rail and Public Transportation. Win -Fred MPO i1 FY2013 UPWP U11 FR D MEMPOUTAN PLANNING ORGANIZATION MPO Policy Board Officers: Chair—Richard Shickle, Frederick County Vice Chair—John Willingham, City of Winchester Secretary/Treasurer—Martha Shickle, Executive Director NSVRC Voting Members: Richard Shickle, Frederick County Charles DeHaven, Jr., Frederick County John R. Riley, Jr., Frederick County Michael Kehoe, Town of Stephens City Dale Iman, City of Winchester John Hill, City of Winchester John Willingham, City of Winchester Randy Kiser, Virginia Department of Transportation Alternate Voting Members: Tim Youmans, Perry Eisenach and Les Veach, City of Winchester Brian Henshaw, Town of Stephens City Terry Short, Virginia Department of Transportation Non -Voting Members: John Simkins, Federal Highway Administration Tony Cho, Federal Transit Administration Lisa DuMetz, Virginia Dept. of Rail & Public Transportation Rusty Harrington, Dept. of Aviation MPO Technical Advisory Committee (TAC) Chair—Tim Youmans, City of Winchester Vice Chair—Eric Lawrence, Frederick County Members: Patrick Barker, Frederick County John Bishop, Frederick County Eric Lawrence, Frederick County Kris Tierney, Frederick County Brian Henshaw, Town of Stephens City Jim Deskins, City of Winchester Tom Hoy, City of Winchester Tim Youmans, City of Winchester Perry Eisenach, City of Winchester Terry Short, Virginia Department of Transportation Lisa DuMetz, Virginia Dept. of Rail & Public Transportation Serena `Renny' Manuel, Winchester Airport Renee Wells, Winchester Transit MPO Citizens Advisory Committee (CAC) Chair—R. William Bayliss, III Vice Chair—Walt Cunningham Members: Tim Stowe, Alan Toxopeus, Walt Cunningham, Frederick County Kelly Henshaw, Town of Stephens City R. William Bayliss, III, Dr. John Crandell, City of Winchester Administrative & Staff Support Provided by Northern Shenandoah Valley Regional Commission Win -Fred MPO 1i1 oma• FY 2013 iIPWP ��� 12c MTROPOLITAN PLANNING ORGANIZATION WnFred Metropolitan Planning Organization 400 Kendrick Lane, Suite F Front Royal, Vfrginla 22630 Phone: 540-636-8800 Fax: 540-635-4147 Website: www.winfredrnPo.o Policy Board Chair: Richard C. SbicMe Frederick County Vice -Chair: John A. Willingham City of Winchester Secretary/ Treasures:: Martha F. Shickle NSVRC City of Winchester: *Daft fman City Manager *John W. IN Council Member *John .i Willingham Council Member Frederick County: *Richard C. Shickle Board of Supervisors *John R. Riley, Jr. County Administrator *Charles S. DeHavea, Jr. Board of Supervisors Stephens City: *Michael K. Kehoe Town Administrator/Engineer VDOT: *Randy Kiser District Administrator Va. Dept. of Rail & Public Trans: Lisa DuMetz Transit Planner Va. Dept. of Aviation: Rusty Harrington Manager, Planning & Environmental Federal Highway Administration: John Simldns Environmental Protection Specialist Federal Transit Administration: Tony Cho Transportation Program Specialist * Denotes doting Members- WINI,';G,.M�_�FRED METROPOLITAN PLANNING ORGANIZATION Resolution 12-05 By The WinFred Metropolitan Planni lag Organization Approving the FY 2013 Unified Planning Worts :Program i1JA .1 11 WHEREAS, the FY 2013 Unified Planning Work Program will serve as the basis for all U.S. Department of Transportation (DOT) funding participation and will be included in all requests for DOT planning funds, and WHEREAS, this UPWP details all transportation and transportation - related planning activities anticipated within the area during the coming fiscal year, and W11EREAS, this UPWP has been reviewed and recommended for approval by the Technical Advisory Committee and the Citizens Advisory Committee; NOW THEREFORE BE 1T RESOLVED, that the WinFred Metropolitan Planning Organization does hereby approve and adopt the FY 2013 Unified Planning Work Program on May 16, 2012. Signed: -n��� Richard C. Shickle Chairman, WinFred MPO Date: Signed: t � 1 a- Date: Martha F. Shickle Secretary -Treasurer, WinFred MPO TABLE OF CONTENTS FY 2013 UNIFIED PLANNING WORK PROGRAM WORK TASKS AND BUDGET/FUNDING INFORMATION Page No. PreparationStatement ..................................................................................................................... ii Officers............................................................................... ... Resolution...................................................................................................................................... iv Tableof Contents.............................................................................................................................v Listof Figures.................................................................................................vi INTRODUCTION............................................................................................................................ 7 WORK TASK 1: Program Management & Administration.........................................................10 WORK TASK 2: Transportation Improvement Program (TIP)...................................................12 WORK TASK 3: Federal or State Requested Planning Work Program Items ............................12 WORK TASK 4: Public Mobility Programs & Planning.............................................................13 WORK TASK 5: Local Technical Assistance..............................................................................15 WORK TASK 6: Pedestrian and Bicycle Planning.....................................................................16 WORK TASK 7: Access Management, Safety & Corridor Planning...........................................19 WORK TASK 8: Long Range Planning, Modeling, GIS & Data...............................................21 Proposed Revenues & Expenditures by Funding Source...............................................23 ........................................ Win -Fred MPO v _ FY 2013 UPWP ft-- _ D METROPOLITAN PLANNING ORGANIZATION LIST OF FIGURES No. Figure 1: Map of Winchester -Frederick County Urbanized Area and MPO Study Area 8 Figure 2: Proposed Revenues and Expenditures by Funding Source............................................................................................ 23 Win -Fred MPO vi . FY2013 UPWP VANrw`.® METROPOLITAN PLANNING ORGANIZAf ION MTRODUCTION The Unified Planning Work Program (UPWP) for transportation planning identifies all activities to be undertaken in the Win -Fred Metropolitan Planning Organization study area for Fiscal Year 2013 (July 1, 2012 - June 30, 2013). The UPWP provides a mechanism for the coordination of transportation planning activities in the region, and is required as a basis and condition for all federal funding assistance for transportation planning by the joint metropolitan planning regulations of the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA). The work tasks within this UPWP are reflective of issues and concerns originating from transportation agencies at the federal, state and local levels. The descriptions of the tasks to be accomplished and the budgets for these tasks are based on a best estimate of what can be accomplished within the confines of available federal, state and local resources. The Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) created a number of planning requirements. In October 1993, the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) issued final regulations regarding metropolitan planning. The Transportation Equity Act of the 21st Century (TEA -21), which became law in June 1998, reaffirmed the structure of the metropolitan planning process. Most of the modifications to the process were aimed at streamlining and strengthening the provisions included in ISTEA. On August 10, 2005, the latest federal legislation known as the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) was signed into law. The Win - Fred Metropolitan Planning Organization has developed this work program to address the final metropolitan planning regulations and the new requirements in SAFETEA-LU. Metropolitan Planning Area The Win -Fred MPO study area consists of the City of Winchester, the Town of Stephens City, the Urbanized Area of Frederick County, and the area of Frederick County projected to be urbanized by the year 2020. See Figure 1 for an illustration of the region. Based on the 2000 Census, the Win -Fred MPO Urbanized Area population was 53,559 and it encompasses a land area of approximately 103 sq. miles. Win -Fred MPO 7 FY2013 UPWP' F® METROPOLITAN PLANNING ORGANIZATION Figure 1 Wine-Fradarit-k r.minhi UPO Rminrinni y�..®..v..v...�v. .vwv..v.i —w .xrj ■v.■ w �vaaez:,e"Sjw Frederick County �s s MPO Bounder} tt { L 9\ 8` Winchester .ti• 37 �1 �EhT S?_ --22so Stephens Citti17 lr� A Bo', cc A egend Tw Town County MPO B 1 0.5 0 MilesWlkz� FK -to NERC �.r.:a METROPOLITAN PLANNING ORGANIZATION Responsibilities for Transportation Planning The Win -Fred Metropolitan Planning Organization is the organization responsible for conducting the continuing, comprehensive, and coordinated (3-C) planning process for the Winchester - Frederick County Urbanized Area in accordance with requirements of Section 134 (Title 23 U.S.C.) of the Federal Highway Act of 1962, and Section 5303 of the Federal Transit Act. The Win -Fred MPO is the official Metropolitan Planning Organization for the urbanized area, designated by the Governor of Virginia, under Section 134 of the Federal Aid Highway Act, and the joint metropolitan planning regulations of FHWA and FTA. The policy making body of the Win -Fred MPO is the Policy Board that consists of 8 voting members. These include 3 representatives from the City of Winchester, 3 representatives from Frederick County, 1 representative from the Town of Stephens City, and 1 representative from VDOT. Other agencies with non-voting membership on the Win -Fred MPO Policy Board include the Virginia Department of Rail and Public Transportation, Virginia Department of Aviation, Federal Highway Administration and Federal Transit Administration. The Northern Shenandoah Valley Regional Commission (NSVRC) staffs the Win -Fred MPO. The staff, in conjunction with the MPO's member agencies, collect, analyze and evaluate demographic, land use, and transportation data to gain a better understanding of the transportation system requirements of the area. Special studies, research, and other work tasks requested by the MPO are the staffs responsibility as well. Consultant assistance will be sought when required by the staff to complete work tasks. Staff also prepares materials for use at the Policy Board, Technical Advisory and Citizens Advisory Committee meetings as well as any existing sub -committee meetings. NSVRC staff will participate in all Win -Fred MPO meetings and provide required staff support and administration of the transportation planning program. In addition, staff members will represent the MPO at other meetings with federal, state, and local organizations. Total Proposed Funding by Federal Source for FY 2013 The primary funding source for transportation planning activities included in this work program are the FHWA Section 112 (PL), FTA Section 5303, and FHWA State Planning and Research (SPR). The proposed funding amounts (including state and local matching funds) for the Win - Fred MPO work program to be utilized by the NSVRC staff are shown in Figure 2. Win -Fred MPO 9� FY 2013 UPWP METROPOLITAN PLANNING ORGANIZATION WORK TASK 1: Prograin Mfanagement & Administration Objective and Description: This task includes ongoing activities that ensure proper management and operation of a continuing, comprehensive, and coordinated (3-C) planning process as described in the Memorandum of Understanding. The primary objectives of this task are as follows: Public Participation Plan (PPP): The encouragement of meaningful participation of local citizens in metropolitan transportation planning is one of the most important goals of the "3C" process and the Public Involvement Process. The Final Rule on Metropolitan Planning issued by U.S. DOT in October 1993 reemphasizes this goal by requiring that each MPO maintain: "...a proactive public involvement process that provides complete information, timely public notice, full public access to key decisions, and supports early and continuing involvement of the public in developing plans, TIPS..." Under this task, the Win -Fred MPO will continue to maintain a Public Participation Process and monitor its effectiveness. The Public Participation Plan outlines the public outreach procedures to be followed by the MPO in developing and amending the Region's UPWP, Long-range Transportation Plan, Transportation Improvement Program (TIP) and other major studies. The PPP will also address Title VI and ADA issues as well. The Citizens Advisory Committee meets on a periodic basis to review and provide feedback to the Win -Fred MPO Technical Advisory Committee and Policy Board. The Citizens Advisory Committee will also conduct outreach activities such as public meetings and forums, neighborhood and association meetings, and other means to seek input from other agencies, organizations, and individuals interested in the transportation planning process, plans being prepared, or other transportation concerns. The MPO staff supports the work of the Citizens Advisory Committee. The concept of Environmental Justice has raised questions regarding equity and the inclusion of all individuals in the decision making process. The PPP will include procedures developed by the Win -Fred MPO to address environmental justice. Efforts will be made to better identify organizations and individuals not normally included in the transportation planning process on a continuing basis. This task will provide a continuing public involvement process that increases participation by community members in transportation plans, with a particular focus on improving participation by groups not previously involved in the transportation planning process. UPWP Preparation and Management: Implement the FY 2013 UPWP throughout the fiscal year and provide all required administrative functions including all accounting functions, personnel administration, office management, financial reporting, and contract administration. To meet the requirements of 23 CFR Part 420 and 23 CFR Part 450, the Win -Fred MPO, in cooperation with the Virginia Department of Transportation and the Virginia Department of Rail Win -Fred MPO 10`"j'_ FY2013 UPWP WIN!iii&FRED METROPOLITAN PLANNING ORGANIZATION and Public Transportation, is responsible for the development of a Unified Planning Work Program (UPWP). The UPWP describes all regional transportation planning activities anticipated in the Win -Fred MPO study area for the following fiscal year that will utilize federal funding, including Title I Section 134 metropolitan planning funds, and Title III Section 8 metropolitan planning funds. The UPWP also identifies state and local matching dollars for these federal planning programs. This task provides for management of the FY 2013 UPWP including the following activities: • Maintain all required financial records and conduct annual independent audit • Hire and train staff • Maintain required files and records of MPO activities (i.e. minutes, meeting notices, etc.) • Preparation of quarterly progress reports and invoices • Preparation of required legal notices and advertisements • Preparation of resolutions adopted by MPO • Preparation of required grant applications and execution of contracts If during FY 2013, an amendment to the UPWP is deemed necessary, due to changes in planning priorities and/or the inclusion of new planning projects, staff will identify and detail such amendments for consideration by the MPO. This task also provides for the development of the upcoming UPWP for FY 2014. The document will incorporate suggestions from federal funding agencies, state transportation agencies, transit operating agencies, local governments participating in Win -Fred MPO, and the public through the MPO's public involvement process. General Administration: Support the activities of the Win -Fred MPO through the preparation of reports, presentations, agendas, minutes and mailings for all Policy Board, Technical and Citizens Advisory Committee meetings, as well as attendance at those meetings: • Meeting arrangements for Board/Committees: Policy Board — 3`d Wednesday of Month, Technical Advisory Committee — 1 st Tuesday of Month, Citizens Advisory Committee — 2nd Tuesday of Month • Preparation and transmittal of meeting agenda packages • Transcribe and publish minutes • Staff attendance at MPO committee meetings and regional meetings as directed • Provide on-going training and development of staff and Board/Committee members E Attend training seminars and conferences Coordination meetings with state and federal agencies Circulate training opportunities to committee members Prepare grant applications and administer grant funds Prepare consultant requests for proposals and manage consultant activities Products: MPO staff support, detailed records documenting activities of the MPO including minutes for all committee meetings, preparation and submission of required progress reports and invoices to all federal and state agencies, detailed financial records, and a well-trained and informed MPO staff, Policy Board and Technical and Citizens Advisory Committee members. Estimated Budget: $108,333 Win -Fred MPO 11 FY2013 UPWP MN FEED METROPOLITAN PLANNING ORGANIZATION WORK r,AS?K 2: Transportation Improvement Program (TIP) Objective and Description: As required by federal planning regulations, the Transportation Improvement Program (TIP) for the Win -Fred MPO is a four-year program of highway, transit, bicycle, , p —Uli , if y, transportation 1,^^ —f pr sects receiving federal funds. State U1 m e edesu ian sa�e� and i �""u" eiuiui.VV and locally funded projects are also included in the TIP for coordination purposes. The TIP is updated each year and must be approved by the MPO Policy Board and the Governor of Virginia. The TIP is required as a condition for all federal funding assistance for transportation improvements within the Win -Fred MPO study area. The general public and all other interested parties will be given an opportunity to review and comment on the proposed It as described under the Win -Fred MPO's adopted Public Participation Plan. To facilitate public review, MPO staff will provide visualization of TIP projects, post the TIP on the MPO website, and make the TIP accessible at public libraries, government offices, and upon request. This task provides for the maintenance of a regional Transportation Improvement Program and will require active support of the Win -Fred MPO Policy Board and Committees and coordination with member agencies. Products: Processing of requested amendments and administrative modifications to the adopted TIP; mapping of TIP projects and Annual Listing of Projects for the next fiscal year. Estimated Budget: $5,000 WORK TASK 3: Federal or State Requested Planning Work Program Items Objective and Description: The MPO staff will work with federal and state agencies in support of projects and programs designed to coordinate transportation planning activities within the region. Products: Staff will prepare studies and reports as necessary for the completion of this work program item and as directed by the appropriate federal and/or state agencies. Estimated Budget: $5,000 Win -Fred MPO 12 FY 2013 UPWP W I F IRUEQ METROPOLITAN PLANNING ORGANIZATION WORK TASK 4: Public Mobility Programs & Planning Objective and Description: This work task includes required transportation planning assistance for local (WinTran) and regional transit system operations and planning, Human Services system providers, demand response transit (WinTran), commuter assistance, and travel demand management. Products: 1. Plan Development & Implementation I. I. Coordination with the Policy Board, Technical and Citizens Advisory Committees to further advance the action items in the WinFred MPO City and Countywide Transit Study & MPO specific sections of NSVRC Public Mobility Plan; Regional Public mobility workshop 1.2. Incorporate public mobility planning efforts into ongoing updates to Long Range Transportation Plan 1.3. Tracking, review, and prioritization of Vision Plan/CLRP/TIP, 2009 City/County Transit Plan, 2010 NSVRC Regional Mobility Coordination Plan & 2011 WinTran TDP public mobility action items including but not limited to: 1.3.1. Local Transit Extension Options 1.3.2. Regional Transit Expansion 1.3.3. Demand Response Transit 1.3.4. Human Services -Public Transit 1.3.5. Park and Ride Expansion Options 1.3.6. Improve Commuter infrastructure and services 1.4. Quarterly Review and Presentation of Public Mobility Plan Items to MPO TAC and Policy Board 1.5. Participate in DRPT SuperNova Regional Transit Study on behalf of MPO 1.6. Participate in Statewide Park & Ride Study on behalf of MPO 1.7. Participate in Strasburg Transit Feasibility Study on behalf of MPO 1.8. Participate in the regional Coordinated Human Services Public Mobility Planning process 2. Public Involvement, Education, Encouragement & Outreach 2.1. Maintenance & updates of MPO public mobility web page including education/safety, encouragement, route planning, and event information. 2.2. Participation in and development of materials for regional bicycle and pedestrian safety, health, travel demand management & encouragement events including but not limited to: Regional Commuter Outreach Events, Walk to School Day and Bike to Work Day events. 2.3. Participate in Public Mobility Workshops as appropriate 3. Funding, Design & Policy 3.1. Assistance in preparation & submittal of public mobility transportation grant funding opportunities 3.2. Development of MPO region transit friendly design guidelines (unfunded) Win -Fred MPO 13 FY20I3 UPWP WN&aFUD METROPOLITAN PLANNING ORGANIZATION 4. Mapping, Data & GIS 4.1. Mapping, data collection, and GIS database management in support of Public Mobility Work Program Tasks 5. Title VI Compliance 5.1. Coordinate with DRPT to develop Title VI plan, incorporating demographic mapping & analysis 2012 & incorporate into Public Participation Plan (PPP) as appropriate. 5.1.1. Identify the location of socioeconomic groups including elderly residents, zero -car households. Low-income, minority and limited English proficient (LEP) populations in the Win -Fred MPO area. 5.1.2. Develop GIS Maps to show the location of socioeconomic groups in the Win -Fred MPO area. As needed, these maps will be referenced in on-going and proposed transportation studies undertaken by the MPO. 5.1.3. Conduct a benefits and burdens analysis of future/proposed transportation projects on socioeconomic groups during Long-range Plan Updates, Transit Study updates, mobility plan and other planning efforts. 6. Public Mobility Studies 6.1 Bicycle and Pedestrian Access to Transit Study. WinTran shelter, bench and amenity siting. Data analysis and recommendations for siting of benches, shelters and other amenities along the WinTran service lines. 6.2 Study financing options for priority mobility projects 6.3 Transportation Provider Organization Structure (districts, authorities) Estimated Budget: $10,000 Public Mobilitv Programs & Planning Work Task 4.7_ — City of Winchester Transit System (WinTran) Planning Objective and Description: The Winchester Transit System (WinTran) conducts transit planning and administration efforts necessary to comply with FTA requirements in order to receive Section 5307 capital and operating grants. WinTran will coordinate with the MPO on transit planning activities. Funds will be used to deliver specific, tangible transit planning products. Products: 7. Development & maintenance of Updated Ride Guide & Mapping (FY2012 project) 8. Development of ADA compliant Winchester Transit website (this would be a new website that is not associated with the City of Winchester's website and would include general transit route/time information, maps and plan your trip information.) 9. Improved marketing of transit services such as route and schedule kiosks at bus shelters or in public areas (i.e., Apple Blossom Mall, visitor's center, hotels/motels, etc.) 10. Development of WinTran Safety/Security Plan Estimated Budget: $30,000 (from $10,000) Win -Fred MPO 14 4' . FY20I3 UPWP N "'R,® METROPOLITAN PLANNING ORGANIMATION Work Task 5 - Local Technical Assistance - I< oirnatPri R1111UPt �2n firm (14Drl . ___, , ------ ., - Obiective and Description: This is an annual UPWP task. Technical staff from each locality and VDOT has compiled a list of potential projects that need attention throughout the region. This list is shown below. This task will cover staff or consultant completion of whichever of these projects the TAC and Policy Board determine to fund for completion in FY 2013. Projects not selected for completion for FY 2013 may be carried forward onto future UPWPs or may be removed from the list as determined by Policy Board action. Products: Technical reports and recommendations on selected projects. General Planning Comments/Description Technical Support Provides flexible technical support & services for the MPO localities Transportation Planning Grant Research, Preparation & Submittal Submission of transportation planning grant applications Program Support and Administration Support & services for the MPO localities Roundabout Training Coordination of a workshop for local planners and en ineers on Roundabout training Transportation Analysis and Modeling Support & services for the MPO localities Airport Planning Projects This item allows the MPO to pursue various airport planning projects Freight and Rail Planning Projects This item allows the MPO to pursue various freight and rail planning 2rojects Pedestrian and Bicycle Projects Complete Streets Project Alternative modes of Transportation Underway Support of the "complete streets" concept. in FY12 Complete Streets are those designed to accommodate all users. Project Specific Name/Location Type of Study Status Route 17/50 at I-81 to Clark County Line Access Management/Intersection Plan Not Underway Product: Access Management/Intersection Plan Intersection of Route 522 and Papermill Road Intersection Improvement Plan Not UnderwayProduct: Intersection Improvement Plan Route 7: further analysis of the alternative reverse frontage roadway submitted by the City of Winchester in Further Analysis of project Not Underway Addendum to the Route 7 Multimodal Corridor Study February 2010 Route 522 from Rivendell Court to Apple Pie Ridge Rd. Signalization/Safety Improvements Not Top crash location from the 2030 MPO Long Range Transp. Plan Underway Plan Route 11 from Bellview Ave to Salem Church Road Access Management/Intersection Plan Complete Project completed by VDOT Staff in Richmond (Central Office Route 277 from MPO Boundary_to Route 522 Access Management/Intersection ement/Intersection Plan g VDOT Study AwaitingVDOT SYIP Design / Construction Project Results g � I 1 from North Avenue (south of W W ck St) to the WVA line orrAccess an Corridor Ad Safety Study Not Underway Awaiting further direction Win -Fred MPO FY 2013 UPWP 1 N-i*0 F METROPOLITAN PLANNING ORGANIZATION WORK TASK 6: Pedestrian and Bicycle Planning Objective and Description: The purpose of this task is to provide ongoing bicycle, pedestrian, safe routes to school, complete streets, universal accessibility and other non -motorized transportation safety and facility programming, planning, data monitoring, and technical assistance to the MPO, agencies and member jurisdictions. Products: Specific tasks and deliverables associated with this work item may include: Plan Development & Implementation 1.1. Tracking of LRTP priority and MPO Bicycle and Pedestrian Mobility Plan Bicycle and Pedestrian project implementation 1.2. Participation in update to NSVRC update to Northern Shenandoah Valley Regional Bicycle & Pedestrian Plan on behalf of MPO 1.3. Incorporate bicycle and pedestrian planning efforts into ongoing updates to Long Range Transportation Plan 1.4. Participation in update to Virginia Outdoors Plan Update on behalf of MPO 2. Education, Encouragement & Outreach 2.1. Maintenance & updates of MPO Bicycle & Pedestrian Information Web Page including education/safety, encouragement, route planning, and event information. 2.2. Participation in and development of materials for regional bicycle and pedestrian safety, health, travel demand management & encouragement events including but not limited to: Walk to School Day and Bike to Work Day events. 3. Safe Routes to School Planning 3.1. Assistance in preparation of School Travel Plans for MPO region Elementary & Middle Schools 3.2. Assistance in preparation & submittal of Safe Routes to School Grant Applications 3.3. Coordinate the development of regional bicycle and pedestrian safety outreach materials including materials and/or programming for elementary and middle school age programming 4. Funding, Design & Policy 4.1. Assistance in preparation & submittal of non -motorized transportation grant funding opportunities 4.2. Preparation of Regional Complete Streets Design & Policy Guidance Mapping, Data & GIS 5.1. Maintenance & updates to MPO Region Bicycle & Pedestrian Map 5.2. Develop Bicycle and Pedestrian counts program for MPO 5.3. Maintenance & updates to Bicycle and Pedestrian Facility GIS database 6. Bicycle & Pedestrian Studies 6.1. Participate in planning and design for MPO LRTP priority project of upgrading freight rail crossings in MPO region Win -Fred MPO 16, FY2013 UPWP Wi1Viii6FRED MEMOPOL11'AN PLANNING ORGANIZArION 6.2. Manage completion of FY2012 Pedestrian & Bicycle Facilities Inventory and Analysis Staff would anticipate use of a consultant in partnership with local staff, VDOT, DRPT and FHWA officials. 1) Bicycle and Pedestrian Suitability / Level of Service Analyses for roadway segments, intersections and roadway crossings along with neighborhood level analysis of walkability and bikeability. Task 1 Deliverable(s) a. Maps & Tables — all at full MPO extent with City and Town inset maps. Specific LOS assessment tools should follow the guidance of those suggested in the 2010 Highway Capacity Manual (HCM) References on Multi -modal Level of Service. b. Bicycle Segment (On & off-street) LOS / Suitability + Mapped for Public c. Bicycle Intersection (On & off-street) LOS / Suitability d. Pedestrian Segment LOS / Suitability + Mapped for Public e. Pedestrian Midblock Crossing LOS / Suitability f. Pedestrian Intersection Crossing LOS / Suitability g. Neighborhood scale Walkability Analysis including valuation for access to transit, block lengths, interconnectivity, assessment of land use attractors and generators, presence of bicycle and pedestrian facilities, and housing/employment density analysis h. Neighborhood scale Bikeability Analysis including valuation for access to transit, block lengths, interconnectivity, assessment of land use attractors and generators, presence of bicycle and pedestrian facilities, and housing/employment density analysis i. Technical Memo summarizing Task 2 analyses and summarizing results and recommendations 2) Identification of appropriate routes for inclusion in the community bicycle /pedestrian network Task 2 Deliverable(s) (25% of project hours/costs) a. Map & Table of Existing, programmed, planned and recommended (new) links/projects (Use 2007 WinFred bike/ped mobility plan as baseline) b. Develop Prioritization Criteria for Network Links & Projects (Criteria, Safety, schools, access to transit, multiple user types, cost ease of implementation etc.) c. Technical Memo documenting Task 3 process, products and recommendations 3) Evaluation of alternate treatments for improving bicycle, pedestrian and access to transit friendliness of a roadway Win -Fred MPO 17 FY 2013 UPWP IfflK ` RKRED METROPOLITAN PLANNING ORGANIZATION Task 3 Deliverable(s) (10% of project hours/costs) a. Develop best management practices for implementation of complete streets in region b. Update roadway cross-sections referencing VDOT Roadway design manual, AASHTO guidance, 2010 HCM & VDOT June 2010 release of "Accommodations Defined" c. Technical Memo documenting Task 4 products 4) Creation of a web oriented and printed bicycle and hails map and promotional materials produced for the public to assist them in route selection and safety education Task 4 Deliverable(s) (30% of project hours/costs) a. Web Version of Map (format tbd) & map data suitable for submittal to google maps b. Recommendations for expansion of MPO public mapping to include wider array of surrounding NSVRC jurisdictions that may choose to participate c. Map shall note available transit routes and include information on bicycles on buses d. Map shall include cyclist and pedestrian safety information and laws e. Development of project web -site for use as project review destination and ongoing public information sharing f. Development of education and encouragement tool -kit g. Develop regional bicycle and pedestrian safety campaign recommendations including suggested media materials h. Technical memo that includes mapping process, implementation recommendations, web site products, education, safety and encouragement products. i. Existing and Programmed (funded) Facility User Map suitable for printing S) Public Involvement and Report Presentation Task 5 Deliverable(s) (10% of project hours/costs) a. Facilitate project kickoff/scoping conference call with member jurisdictions, agency and MPO staff b. Facilitate public stakeholder and MPO TAC meeting to review task 1 & 2 analysis results and kickoff mapping task c. Monthly project update conference calls and memos d. Preparation of a final report including all task deliverables and technical memos e. Presentation of final task products to MPO Policy Board Estimated Budget: $103,000 (from $80,000) Win -Fred MPO 18 FY 2013 I7PWP illilhC.---111:a�- FRED METROPOLITAN PLANNING ORGANIZATION WORK TASK 7: Access Management, Safety & Corridor Planning Objective & Description: Corridor and area studies provide more detailed study of projects identified in the LRTP. Corridor studies can also provide assessment of potential projects for inclusion in LRTP plan updates. The following corridors and areas have been prioritized for further study in the FY2013 work program. Analysis of each corridor or area may include but is not limited to: access management; corridor simulation (software); intersection evaluation; operations evaluation; transit / bicycle / pedestrian connections and parking availability/accessibility/issues. Estimated Budget of $182,500 to be distributed based on priority work products. Products 1. Shady Elm Access Mannement Study Alternative Analysis Objective and Description: This task is carried over from FYI 1. This study is intended to build upon the results of previous Route 37 Access Management Studies. Using the modeling and base scenarios created in earlier phases, additional analysis, scenario modification will be done, and public input will be solicited to create a conceptual design that is federally approvable and reasonably implemented. This effort is also looking to review existing study results, determine the need for additional scenarios, make phasing recommendations, and identify implementation options for short-term improvements. Staff would anticipate use of a consultant in partnership with local staff, VDOT, and FHWA officials. Products Access Management Study with short, mid and long-term phasing and implementation recommendations Estimated Budget: $0 (from 82,500) 2. US 522 from Cameron Street to Burnt Church Road — Corridor Land Use & Transportation Study Objective and Description: This study would focus on opportunities for short and long-term coordination between existing and proposed land use with anticipated or recommended transportation network improvements. Analysis will include assessment of existing and proposed land use, access management, and crash analyses. Staff would anticipate use of a consultant in partnership with local staff, VDOT, DRPT and FHWA officials. Study Area: http:// .cg o/mEs/bsbu8 Products: Corridor access study identifying opportunities and constraints for corridor, crash analysis, access management recommendation, and a listing of recommended short, mid and long-term transportation and land use recommendations. Budget: $35,000 (from $25,000) 3. Realignment of Shawnee Drive and Opequon Church bane Win -Fred MPO 19 FY 2013 UPWP _ _ F 93W METROPOLITAN PLANNING ORGANIZATION 4. Widening and Extension of Monticello Avenge Objective and Description: This study will focus on the immediate impacts of the realignment of Shawnee Drive at the intersection with Valley Avenue to connect with Opequon Church Lane and the long tem. impacts of the widening of Monticello Avenue. The Study may be scoped in segments or as a whole. Staff would anticipate use of a consultant in partnership with local staff, VDOT, DRPT and FHWA officials. Products: Study identifying options for realignment strategies and overall impacts of freight and vehicular movement in the project area. Budget: $147,060 Win -Fred MPO 20 FY 2013 UPWP — VANaAF�D METROPOLITAN PLANNING ORGANIZATION WORK TASK g: Long Range Planning, Modeling, GIS & Data Objective and Description: Many of the federal required Long Range Transportation Activities have been identified in the UPWP as stand alone tasks. NIT t_ rr t. () + + t.o the .,mbiella lnnn range r�lannina talk to wom >aari is meant w v. he recurring rn b g ninnnina include updates to the Long Range Plan, as well as support for travel modeling, GIS and database management. It is anticipated that the transition of Regional Travel Demand Model management from VDOT Central Office to MPO will be completed in FYI 3. VDOT will continue to provide technical assistance for model development, updates and statewide data collection activities, and fund software maintenance, upgrades and training. PE / NEPA study modeling for SYIP projects will be completed by VDOT not by MPO's. This task provide staff and/or consultant technical assistance in modeling scenarios, model enhancements, network and land use updates and completion of studies necessary for maintenance of the model. Model maintenance provides support for required long range planning activities, funding applications and support of any future air quality analysis in support of regional early action air quality conformity compacts. GIS activities support the regional travel demand model maintenance and all other UPWP work tasks. Products 1. Ongoing Updates to Long Range Transportation Plan 1.1. CLRP Project Tracking 1.2. Ongoing Scenario Analysis 1.3. 2035 LRTP & CLRP Amendments as needed 1.4. Compliance with federal regulations for long range planning 2. Complete Transfer of Maintenance of Regional Travel Demand Model Maintenance from VDOT to MPO 3. Ongoing Maintenance of Regional Travel Demand Model 3.1. Base and future year Network maintenance 3.2. Participation in training in support of Regional Travel Model maintenance and development (includes travel) 3.3. Development and analysis of various scenarios including: 3.3.1. 2035 MPO LRTP Vision Plan or any subset thereof 3.3.2. 2035 MPO Proffered network 3.3.3. Modeling in support of MPO grant applications 4. Land Use Updates at TAZ Level for population, households, and employment for Census / Base Year 2010 and future years 2035 4.1. Explore opportunities for the acquisition of updated employment data at the TAZ level through partnerships with the Virginia Employment Commission or commercial purchase 4.2. Incorporation of updated land use into base year and future year model scenarios Win -Fred MPG 21 ,v FY 2013 UPWP H r: RED METROPOLITAN PLANNING ORGANIZA'11ON Update of regional Origin & Destination Studies and incorporation into base and future year model scenarios 6. WinFred MPO Commuter Market Study 7. GIS mapping, data collection, and database management in support of all MPO UPWP work tasks (including GIS software maintenance for 2 users at 50% of total cost) Estimated Budget: $60,000 (from $50,000) Win -Fred MPO 22 FY 2013 UPWP me W� METROPOLITAN PLANNING ORGANIZATION Figure 2: Win -Fred MPO FY 2013 Proposed Revenues and Expenditures by Funding Source Highway Funding T 't F d' r iP or posed Revenues IFY13 11 FHWA Planning 80% State _ Match 10% LocalFTA Match 10% Subtotal Highway I un Ing State Local ems, 5303 Match Match Subtotal 80% 10% 10% Transit Totals MPO FY13 Revenues 0 FY 2013 New PL 112 Funds (1) FY 2011 Carryover PL112 Funds available in FY 2013 (2) FY 2010 5303 Funds (3) FY 2011 5303 Funds (4) :FY 2012 5303 Funds (5) Subtotal: FY13 Revenues $130,877 $229,088 $359,965 $16,360 $28,636 $44,996 $16,359 $28,636 $44,995 $163,596`$163,596 $286,360 $449, 11$286,360 $70,254 $70,275 $70,275 1210,804 $8,782 $8,782 $87,818 $8,784 $8,784 $87,843 $8,784 $8,784 $87,843 $26,350 $26,350 $263,504 $87,818 $87,843 $87,843 $713,460 Total FY13 Proposed Revenues Pro fedr1 #1Ce p4 - Task 1: Program Management and Administration 70/30 x FLEW � Stoe n' M.tolt $60,667 $7,583 $7,583 $75,833 1$26,000 $3,250 $3,250 $32,500 $713,460 �.ditures "$108,333 Task 2: Transportation Improvement Program (TIP) 70/30 $2,800 $350 $350 $3,500 $1,200 $150 $150 1$1,500 $5,000 Task 3: State/ Federal Requested Work Tasks 5o/so $2,000 $250 $250 $2,500 $2,000 $250 $250 $2,500 $5,000 Task 4: Public Mobility Programs and Planning 0/100 $0 $0 $0 $0 $16,000 $2,000 $2,000 $20,000 $20,000 Task 5: Local Technical Assistance 50150 $8,000 $1,000 $1,000 $10,000 $8,000 $1,000 $1,000 $10,000 $20,000 � I Task 6: Pedestrian & Bicycle Planning 20180 1$12,800 $1,600 $1,600 1$16,000 $51,200 $6,400 $6,400 $64,000 $80,000 Task 7: Access Management, Safety & Corridor Planning 84116 $122,000 $15,250 $15,250 $152,500 $23,600 $2,950 $2,950 $29,500 $182,000 I Task 8: Long Range Planning, Modeling, GIS and Data 70130 $28,000 $3,500 $3,500 $35,000 $12,000 $1,500 1$1,500 $15,000 $50,000 Subtotal: FY13 Expenditures $236,267 $29,533 $29,533 $295,333 $140,000 $17,500 $17,500 $175,000 !$470,333 Q Estimated Contingency/Reserve Funds for Project Support Total FY13 Proposed Expenditures $200,470 1$88,504 1$470,333 (1) ESTIMATED FY13 PL Funding estimates from VDOT for Highway (2) ESTIMATED: FYI PL Carryover Funds: not Expended in FYI (3) FYI Carryover FTA 5303 Funds: not expended in FYI (4) FYI Carryover FTA 5303 Funds: not expended in FYI (5) FYI Carryover FTA 5303 Funds: not expended in FYI Page 23 Item 2: VDOT Bridge Work Mr. Ed Carter of VDOT would like to review maintenance of traffic as they plan the attached Opequon Creek Bridge Project. N e,�arr ao n'e�,e�✓LR+yi4Y!!Kn'iLl.�i. alilz ki > - .-' O4.».ro/. ✓:-O:n.0 O N�f enF o.^.v.A�+ Y.. ,`$oe: .ce{on3 /w>. . ._:._ _ -v...,.. :. :. .... L1...on: gq.9HC 9/.and d.�e.c,F.'evf.'ona ,6.- ys.,.ay B^aW�. •: Cwcarof.'en aee,.r Chv. 0/P.O a/Fe// ba � aa.Aed v. •q � b.'ew� es 'B• Aevf� �"�T • � h Fee%' ,q� .Sv// r-.ai an a i � gdyw/r�C=nyne.o QTta fmn� � nd moo �n obpfhs � 49e"a.�d tC�^Fdu�nj /iv/iee da inafeml F a. 1� e�*^!;^naSv//beemvGd vn vypjdaecv' i M{P1 hb/s••CJ/r.. OIi.07 fH/ afv�}1asf...++ia0'•� Fx n Q Ni- rw.-/of.'en/�'n 4-5; - B' ovltafinenfi µ ' Fevf.:rg oF� /a as �• ehga, ev/h n/a,>,a/nb,G,-t,►.. a/I. db-dge �e a."'an,aos'»� �°Sp'��ee%e..f�d q;„ea,. ,..s' �.n.e,t;n. w,i s .' ,. . --- Qc+InrG✓.Pa fvn ,✓.ms wh:eh Gump .T +>+ Bid o.-. aaiM an' pµ -e �.mvrb� wnd v. -a g.)...., /v'.. aafmv/.i,9 P�/ Pe-�•a e -./y. B.M. , Ma.% and evp ,:, bvaa ,fo'Syrome.-v ssFf. L/ s/v. O E®T/Mg'PCO QlAP"WT/CA' ELCY'rV T/QNt-.Y - - - dmAw// /'*^>/,•-• 11.e L se oro Ilo0 Jb. .10 . JI'- JI%w ..ae <+b.,hr n<+r-faeF fo em eo ea aW^� i •.waA u.e r.oss t M/ JRM•Malz Sc Mq..J.dI Ae-Aqe ,d.d oM .I•Rer JG .', 1.� I V'-h'IPf dJ,J d,llc ', I gbie+rlvr M'-Im 9.a. I c// ez,000 J "1 $�!I # #. Q'WS. O/ GXOGJ' fY OSJ. LY. GtIS. 6/R/tl.ro LY.OJ /I E,(! ��• M�YY Awu'.Gn L0 I v -g Chrd �, F __ Q Cft .{`wy� O - _ L .ganC Leee%en R.OM/. �Wiie.rca_ I I COMMONWEALTH OF VIRGINIA DEPARTMENT OF HIGHWAYS yJr�L '-f PROPOSED BRIDGE 716 0 I, 6ps du/l OVER OPEOUCV CREEK-4.OMi. FROM V V1ESTER p;dj-'v' STA.639+45-RT522-PROJ. 2634 -D4 -FREDERICK COLKNh� 3-ld-0"STEEL BEAM SPANS 3, " l }� `/�!,/9�° ce..wFa.✓ ,, avd Ry vye ML x-3,yI J erJj LJ Bvr P9 �Brr PM IZ .fMI J Brr PC Baur Pp 4'u 3errwN t'•C' ' � Fgvr Firv�r�ov OF. TIi/LQ N %iaUTMCNT Fi° OPEQWN CREEK BRIDGE DETAILS OF ABUTMENT' AND PIERS Ornx o r AueuerE111 , A 1ue RK.w,e, Vn. 1949 ,'''R'.° . :li} CNJ M m A LC m Fl"wr �LOIMPlaAI DGE s` W=Z, Vn- Awus�. 1944 OV -10 Hyl !R.•INDVEq•JC SECT/wV •�•!�• ;S'n"ce e('AGurmenr LVeklvo// t – –__+---------------- – e•k�-ei>• i I ----------------- 1Db [npi rah 4 � ___ __ _ /m'r a JPv'rn ---JMN q --� _, _ ----------- ------- --'----- i __–__–_-------_ Ben,• �, on. 96.M'ac _---�---------- –--- Tb's Rrl C - ---- -L --------------- --------ce" ------ --- -------- P&AIV Norc:- Be��q 4y •ti //�� e•n, wrlA rJ ♦, J Jpa. o tel' -C- –�S•J_ .Jf'uara.n • / fh; s L pbalr-G•,..-..�s- rils Put sod &rkmr1ov 'lyrvey Mbar about t 1 1 � /�OJT'/QgI,L, F7Np CURB DErglL$ – -- j' P^•^r ed br Ar/ed vrlA H=1 Mp4rH Br! C.pan AaM 'w1 q^I'a// C ✓hlen � q•G. J4 y , t G PiM DrmLJ OVER F'/Ena - 9�els / '.2j' Ihroeph rap p/•r� r. `� /�Qeh�l..Ouv✓ Via. bmm/Y r Y 9.: Drrviea OVtR Fiexlrmi£rvre OerR/ea ar BrARINO Mr. aero« rKGw Pr.prvoc..cAa ro o cw•o e.o-:,� pn/»e o,+ +o t,e � o ad I,.,oe/• corn e.,dJ � �,...,., ruhvCp/ cWeur t r 777 I OErAILZ OVER KERS OPEQUON CREEK BRIDGE DETAILS OF SUPERSTRUCTURE}'` C arra cPe DEP eTBn�occ Er+Hs6ueera 1{ Rrertr--. z A—, 11919 M CV -10 .i3t, UW/Q3• R �. G-1.«el/35• P 1 ee-�' NGS N t lPi3.•t. B P/'{�OLg• 9rdcYp i 1 1 � /�OJT'/QgI,L, F7Np CURB DErglL$ – -- j' P^•^r ed br Ar/ed vrlA H=1 Mp4rH Br! C.pan AaM 'w1 q^I'a// C ✓hlen � q•G. J4 y , t G PiM DrmLJ OVER F'/Ena - 9�els / '.2j' Ihroeph rap p/•r� r. `� /�Qeh�l..Ouv✓ Via. bmm/Y r Y 9.: Drrviea OVtR Fiexlrmi£rvre OerR/ea ar BrARINO Mr. aero« rKGw Pr.prvoc..cAa ro o cw•o e.o-:,� pn/»e o,+ +o t,e � o ad I,.,oe/• corn e.,dJ � �,...,., ruhvCp/ cWeur t r 777 I OErAILZ OVER KERS OPEQUON CREEK BRIDGE DETAILS OF SUPERSTRUCTURE}'` C arra cPe DEP eTBn�occ Er+Hs6ueera 1{ Rrertr--. z A—, 11919 M CV -10 Item 3: Other Staff updates.