Loading...
TC 04-23-12 Meeting MinutesCOUNTY of FREDERICK Department of Planning and Development 540/665-5651 MEMORANDUM FAX: 540/665-6395 TO: Board of Supervisors FROM: John A. Bishop, AICP, Deputy Director -Transportation RE: Transportation Committee Report for Meeting of April 23, 2012 DATE: May 14, 2012 The Transportation Committee met on April 23, 2012 at 8:30 a.m. Members Present Chuck DeHaven (voting) James Racey (voting) Gary Oates (liaison PC) Lewis Boyer (liaison Stephens City) 1. Members Absent Mark Davis (liaison Middletown) Chris Collins (voting) Bryon Grigsby (voting) George Kriz (liaison PC) ***Items Not Requiring Action*** Secondary Road Improvement Program This item will be coming forward as a public hearing item on June 13. 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 2012/1131-20 7/19 SECONDARY ROAD _IMPROVEMENT PLAN for Fl-�EDERICK COUNTY, VIRGINIA, Frederick County Transportation Committee: 04/2312012 Frederick County Planning Commission: 05/16/12 Frederick County Board of Supervisors: 06/13/12 FREDERICK COUNTY MAJOR ROAD IMPROVEMENT PROJECT. 201212013 through 20171.02-sD1A Major road improvement projects command the reconstruction of hardsurfaced roads to enhance public safety. Improvements required for road width, road alignment, road strength, and road gradient are considered major road improvements projects. 2 UJ 3w w w l- 0 0 LU H z 0TT"i z z wv o LU LU z LU z a W W 0 n �o aQ� o Qo X o v LU a1� 1) 655 Sulphur Springs Route 50 .30 Mi East 6000 1.1 miles SH $7,249,073 2013 $5,798,052 Road Rt. 656 Allocated 2) 661 Red Bud Road 47 Mi Int. 1300 0.5 miles ST $2,000,000 UN/SH Partial South Snowden Funded Route 11 Bridge Relocation Blvd. $1,500;000 Partial 3) 672 Brucetown Road Route 11 .35 Mi East 3200 0.35 miles ST Significantly UN/SH Funded Variable $100,000 0.44 miles $10,414,000 Appited for 4) 788 East Tevis Street Route 522 Winchester N/A SH Revenue UN/SH R/S Funds Cit Limit Sharing 0.40 miles 5) 788 East Tevis Street Route 522 1-81 N/A SH $1,400,000 UN/SH Cover overall Revenue project needs Sharing 6) Renaisance Drive Route 11 .24 Mi. N/A .24 Mi. BC $2,001,000 UN/SH Locally Adm. Connector West of Revenue road through Rt. 11 Sharing commercial/ industrial area 7) 788 Renaissance 24 Mi Int. N/A18 Mi. BC $1,635,658 2013 R/S Funds West of Shady Elm Route 11 Road 17000 BC VDOT ADM 8) 11 Valley Pike Intersection N/A $100,000 UN/SH Rt. 706 Revenue Sharing 16000 0.2 Mi ST LF Turn Lns 9) 11 Martinsburg Pike Under 81 $1,621,808 UN/SH SBound @ Overpass Revenue 1-81 Overpass Exit 317 Sharing 10) 723 Carpers Valley RoadFAt Clarke 1100 N/A SH $1,262,327 Beyond Federal bridgeunty line 2013 replacement fundin 2 O 11 flo Stephens City `1® 01 Winchester 4r w wo T ru d- p 50 1. Sulpher Springs Rd 2. East Tevis Street f'W*AO 3. Brucetown Rd 4. Valley Pike 0**A05. Martinsburg Pike 6. Carpers Valley Rd 7. Renaisance Dr 8.Redbud Rd Frederick County Maj or Load Improvement Projects 2012/2013 thru 2017/2018 4. ;M,e, mum FREDERICK COUNTY HARDSURFACE ROAD IMPROVEMENT PROJECTS 20.12/2013 through 2017,/.7018 Hardsurface road improvement projects provide impervious resurfacing and reconstruction of non-hardsurfaced secondary roads. Hardsurface improvement projects are prioritized by an objective rating system, which considers average daily traffic volumes; occupied structures; physical road conditions including geometrics, drainage, and accident reports; school bus routing; and the time that project requests have been on the Secondary Road Improvement Plan. 3 W U J Z Z Y L' Q C9�H U �Lu :5 � (S LU 1�- Z O O g9� d IW-� Qv~i �H w W ~ 20 20 O Q=�V p aA CU W W� O 0 Q U 671 Woodside Road Rt. 11 0.4 East of 50 0.4 miles ST $144,000 UN/SH Potential Rural Rt. 11 Rustic/Funding by Others 3 127 P%O , Woodside Rd Lr Frederick County Hardsuriface Road Improvement Projects 2012/2013 thra 2017/2018 59 11 Ile Winchester �7 50 55 - i2 Stephens City `� 27 N 11 wL S Middletown i 0 2 4 8 Miles FREDERICK_ COUNTY HARDSURFACE ROAD IMPROVEMENT P RODE CTS RATINGS UPDATED 201212013 through 2017/2018 U w� z W Z a� w� z z z 0 O �9>- W 0 a_j p Op O � U QQ 1) 709 Ridings Mill 1.30 miles Route 636 130 140 OP Road south Rt. 735 miles 2) 676 Warm Route 677 0.83 miles 230 0.83 ST Springs Road north miles 3) 671 Woodside Route 669 WV line 250 0.30 ST Road miles 4) 644 East Parkins Rt. 50 East Last residence 260 0.81 Mill Road miles SH 76 5) 707 Hollow Road WV Line Rt. 610 200 1.6 BC/GA 73 miles 6) 734 North Sleepy 1.27 Mi. S. W. 2.27 Mi. S. W. 140 1.0 GA 73 Creek Road of Rt. 522 of Rt. 522 mile 7) 692 Pack Horse 1.2 Mi. N. E. Rt. 671 200 1.4 GA 71 Road of Rt 600 miles 8) 629 Carter Lane Rt. 631 Rt. 625 290 1.8 BC 71 miles 9) 733 Fletcher Road Rt. 50 West Rt. 707 120 1.3 GA 70 miles 10) 638 Clark Road Rt. 625 Rt. 759 70 0.8 BC 69 miles 11) 607 Heishman Rt. 600 End of State 100 0.78 BC 68 Road Maintenance miles 12) 695 Middle Fork 2.3 Mi. N of WV Line 30 0.9 GA 68 Road Rt. 522 miles 13) 677 Old Baltimore Rt. 676 Rt. 672 200 1.2 GA 68 Road miles 14) 634 Cougill Road Rt. 635 Rt. 11 130 0.25 BC 67 miles 15) 612 Fishel Road Rt. 600 Rt. 600 30 1.6 BC 67 miles 16) 629 Laurel Grove Rt. 622 2.5 Mi. W. of 180 2.5 BC 63 Road Rt. 622 miles 1 17) 636 Canterburg Rt. 640 Rt. 641 130 1.5 OP 63 Road miles 18) 811 1 Timberlakes Rt. 671 ;En7dof State 180 0.25 ST 63 Lane tenance miles w - Z U aW0 J wQ - - — Z ;O 0 LL ZZW< LLI a w LL I- LL, <LL �<_ �Fe 2 2 0 ¢ o Qo 0 L) 19) 661 Wright Road Rt. 669 WV Line 140 1.84 ST 61 miles 20) 636 Huttle Road Rt. 709 Rt. 735 150 1.1 OP 60 miles 21) 730 Babbs Rt. 654 Rt. 677 50 0.9 GA 59 Mountain miles Road 22) 696 South Timber Rt. 522 Rt. 694 130 1.3 GA 56 Ridge Road miles 23) 616 McDonald Rt. 608 Mid- 0.44 Mile N. 85 0.45 BC 41 Road Int. Rt. 608 miles 24) 682 Glaize Rt. 608 Rt. 671 200 1.54 GA NA Orchard Rd Miles 25) 685 Light Road Rt. 600 Rt. 681 TBD GA NA 26) 731 Cattail Rd Rt. 608 Rt. 654 TBD GA NA 27) 608 Hunting TBD TBD TBD GA NA Ridge Rd 37 0 50 522 55 Stephens City ' 77 N , S to Middletown 22 0 2 4 8 Miles Frederick County 40%0 1, Ridings Mill Rd lJT TnscheduIed 4%02, Warm Springs Rd 40%03, Woodside Rd Flardsurface Road 0%04, East Parkins Mill Rd Improvement Projects Hollow Rd Al -ill 6, North Sleepy Creek Rd 7 Ratings Updated June 200 7, Pack Horse Rd.! I®� 2012/2013 thru 2017/201 8 �l 8, Carters Ln 0%09, Fletcher Rd 10, Clark Rd O ® 0%0111, Heishman Rd O t� 12, Middle Fork Rd 13, Old Baltimore Rd 1 127 4%014, Cougill Rd 15, Fishel Rd ®�a 4%x+16, Laurel Grove Rd *%*17, Canterburg Rd 18, Timberiakes Ln 22 I ® J @319, Wright Rd 120, Huttle Rd 0%10020, O 21, Babbs Mountain Rd 22, South Timber Ridge Rd *Ngf23, McDonald Rd 59 52 24, Glaize Orchard Rd t1 *V%025, Light Rd 0%026, Cattail Rd 0%027, Hunting Ridge Rd 37 Lo ® Winchester 37 0 50 522 55 Stephens City ' 77 N , S to Middletown 22 0 2 4 8 Miles DRAFT 2012-2013 INTERSTATE ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 0412312012 Frcderick County Planning Commission: 05116112 Frederick County Board of Super -visors: 06/13112 DRAFT I-81 Improvements: Provide additional travel lanes on the main line, collector -distributor lanes adjacent to the main line, modifications to existing interchange areas, and develop new interchange areas and bridge crossings of the main line as recommended by the WinFred MPO Long Range Plan. In addition, as the State continues to work toward an ultimate plan for the I-81 widening, the County of Frederick continues to support the study of Eastern Route 37 as a potential corridor on new location as an alternative for that effort. Moreover, the County of Frederick supports exploration of the potential for rail transportation as a component of the Interstate 81 Corridor improvements. Progress to Phase 1 of the FHWA approved interchange modification to Exit 310 (as illustrated on map as priority A) A) Relocate Exit 307 further south to alleviate existing and future congestion on Route 277. There is an urgent need to begin increased study of this project. (as illustrated on map as priority B) B) Widen I-81 from Fairfax Pike to Route 37 North. This should include the relocation of the 277 Interchange. From: Route 277, Exit 307 To: Route 37 North, Exit 310 (as illustrated on snap as priority C) D) Widen Remainder of I-81 in Frederick County From: West Virginia line To: Warren County line (as illustrated on map as priority D) E) Spot Improvements on I-81 in Frederick County. Provide spot improvements at various interchanges to increase capacity and/or enhance safety for the motoring public. DRAFT 2012-2013 PRIMARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA Frederick County Transportation Committee: 04/2312012 Frederick County Planning Commission: 05/16112 Frederick County Board of Supervisors: 06/13/12 DRAFT 1) Route 37 Bypass A. Route 37 - Phase 1 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the southern segment of the Route 37 Eastern Bypass from Interstate 1-81 to Front Royal Pike (Route 522 South). (As illustrated on map as priority IA) B. Route 37 - Phase 2 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between existing Route 37 around Stonewall Industrial Park and Route 7. (As illustrated on map as priority IB) C. Route 37 - Phase 3 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between Route 7 and Route 522. (As illustrated on map as priority I C) 2) Route 277 (East of Stephens City) From: I-81/Route 277/Route 647 Intersection (East of Stephens City) To: Route 340/Route 522 South Intersection (East of Double Toll Gate) Phase 1: From the 1-81/277 Interchange to Route 636 (As indicated under note for priority IB) Phase 2: From Route 636 to Route 340/Route 522 (As indicated on map as priority 2) Improve to a four lane divided roadway with County staff to work with site developers to acquire dedicated right-of-way and achieve grading, drainage, and construction improvements in conjunction with development projects which occur along the corridor until such time that funding is available for construction. Establish a construction schedule for the phased improvement of Fairfax Pike (Route 277). Program funding for the completion of right-of-way acquisition and construction of each phase as described above. DRAFT 3) Route I l (North and South of Winchester) A) Establish an Urban Divided Four Lane System From: Southern limits of the City of Winchester To: 0.4 miles south of intersection of Route 37 South, Exit 310 (As illustrated on map as priority 3A) B) Establish an Urban Divided Four Lane System From: Northern limits of the City of Winchester To: Intersection of Merchant Street (As illustrated on map as priority 3B) C) Establish an Urban Divided Four Lane System From: Intersection of Merchant Street To: West Virginia line (As illustrated on map as priority 3C) 4) South Frederick County Parkway From: Relocated Exit 307 To: Intersection with Route 277 approximately 1 Mile west of the intersection of Route 277 and Route 522 This is a planned new roadway with limited access points serving a mixture of predominantly commercial and industrial development. There is need to study this project in conjunction with the Exit 307 relocation and planning for Route 277 improvements noted in item 3. Phasing of this project is not yet clearly defined, however general phasing would be from West to East with the clear first phase being from relocated Exit 307 to Warrior Dr. (As illustrated on map as priority 4) 5) Commuter Park and Ride Lots Establish a new park and ride facility along the Berryville Pike (Route 7) corridor. Work with the Northern Shenandoah Valley Regional Commission to determine appropriate locations for park and ride facilities at other strategic locations within the County's Urban Development Area. For Park and Ride locations in Frederick County the primary goal should be that they are situated in such a manner that they reduce traffic in Frederick County in addition to adjacent localities. (As illustrated on map as priority 5)