TC 06-13-11 Meeting MinutesCOUNTY of FREDERICK Department of Planning and Development 540/665-5651 MEMO RAN D U M FAX: 540/665-6395 TO: Board of Supervisors FROM: John A. Bishop, AICP, Deputy Director - Transportation RE: Transportation Committee Report for Meeting of June 13, 2011 DATE: June 15, 2011 The Transportation Committee met on June 13, 2011 at 8:30 a.m. Members Present Members Absent Chuck DeHaven (voting) Mark Davis (liaison Middletown) James Racey (voting) George Kriz (liaison PC) Chris Collins (voting) Bryon Grigsby (voting) Gary Oates (liaison PC) Lewis Boyer (liaison Stephens City) ***Items Requiring Action*** 4. MPO Unified Planning Work Program (UPWP) Staff presented the draft MPO UPWP (attached as pages 4 through 23) to the Committee and particularly focused on concerns that had been raised over item 6 (page 19 of this report) which relates to bicycle and pedestrian planning in the region. Staff clarified that these are federal transit funds that are allowed to be used for various programs to promote bicycle and pedestrian traffic. Staff also noted that these particular funds are in jeopardy of being reallocated to another region if they are not used. Staff noted that programs such as partnering with local tourism to create maps, partnering with local schools for bicycle safety training for youth through the training of local teachers and purchase of needed equipment for that program, internet promotion, and various other activities, would be allowable uses of these funds. Staff also noted that some on the MPO were proposing the funds be used to purchase items such as bicycle helmets for distribution. Staff also sought clarification for what uses the Committee would be comfortable with. 107 North Kent Street, Suite 202 * Winchester, Virginia 22601-5000 The Committee was supportive of all the initiatives that are noted above with the exception of the giveaways of bicycle helmets and other items. Note: On page 3 of the UPWP (page 12 of this report), there is a reference to a figure 3. This is a typo and should be a reference to figure 2. There is no figure 3. The Committee did not have further questions and recommended endorsement of the plan. ***Items Not Requiring Action*** 1. Refuge Church Road Speed Concerns Staff advised the committee that Supervisor Ewing has been fielding complaints regarding unsafe driving and high speeds on Refuge Church Road. The committee has authorized staff to coordinate with VDOT on the issue and potentially return in July to request a speed study that could result in a speed limit reduction on that roadway. 2. Interstate and Primary Road Improvement Plans Attached please find the draft Interstate and Primary Road Improvement Plans (Pages 24 through 29 of this report). Priorities have not been changed from last year and the only adjustment being recommended by the Transportation Committee is the removal of bullet B of Item 1 of the Primary Plan in order to reflect the current state funding situation. This item will now go to the Planning Commission for a recommendation to the Board. The Committee has unanimously recommended approval as modified. 3. Traffic Calming In Canter Estates Staff advised the Committee that, with the opening of the connection between Wakeland Manor and Canter Estates, there has been an increase in traffic volume and speeding along Corrall Drive and Clydesdale Drive. The community is requesting that stop signs be considered at a number of intersections. 2 Staff has consulted with Supervisor Fisher, who is supportive, and the Committee has authorized staff to work with VDOT to review the intersections in question and make improvements as needed. 5. MPO Long Range Plan Staff updated the Committee on the status and timeline of the MPO Long Range Transportation Plan. The currently proposed timeline is attached (pages 30 through 31), and is expected to be modified to allow more time for localities to cooperate and include their decision-making bodies properly. The MPO has until July of 2012 to adopt the new plan. 3 UNIFIED PLANNING WORK PROGRAM (UPWP) FOR THE WINCHESTER — FREDERICK COUNTY ("WIN -FRED") METROPOLITAN PLANNING ORGANIZATION (MPO) WIN FRED ETFIOPOL ITA PL.f-N8K%'1 G ORGANIVNTION FY 2012 (July 1, 2011 - June 30, 2012) Adopted for Public Comment: April 27, 2011 Final Adoption: Winchester/Frederick County, Virginia Metropolitan Planning Organization C/o Northern Shenandoah Valley Regional Commission 103 East Sixth Street Front Royal, VA 22630 540-636-8800 www.winfredmno.org 4 Preparation Statement Prepared on behalf of the Win -Fred Metropolitan Planning Organization by the Northern Shenandoah Valley Regional Commission staff through a cooperative process involving the City of Winchester, County of Frederick, Town of Stephens City, Virginia Department of Transportation, Virginia Department of Rail and Public Transportation, Federal Highway Administration, and the Federal Transit Administration. The preparation of this program was financially aided through grants from the Federal Highway Administration, Federal Transit Administration, Virginia Department of Transportation and the Virginia Department of Rail and Public Transportation. '5 - Win -Fred Win -Fred MPO 1i FY2012 UPWP MMAFKFUED METROPOLITAN PLANNING 014GANIZATG0N MPO Policy Board Officers: Chair—Richard Shickle, Frederick County Vice Chair—John Willingham, City of Winchester Secretary/Treasurer—Executive Director of the NSVRC Voting Members: Richard Shickle, Frederick County Charles DeHaven, Jr., Frederick County John R. Riley, Jr., Frederick County Michael Kehoe, Town of Stephens City James O'Connor, City of Winchester John Hill, City of Winchester John Willingham, City of Winchester Randy Kiser, Virginia Department of Transportation Alternate Voting Members: Tim Youmans, Perry Eisenach and Les Veach, City of Winchester Brian Henshaw, Town of Stephens City Jerry Copp and Terry Short, Virgina Department of 'Transportation Non -Voting Members: John Simkins, Federal Highway Administration Tony Cho, Federal Transit Administration Kenneth Pollock, Virginia Dept. of Rail & Public Transportation MPO Technical Advisory Committee (TAC) Chair—Tim Youmans, City of Winchester Vice Chair—Eric Lawrence, Frederick County Members: Patrick Barker, Frederick County John Bishop, Frederick County Eric Lawrence, Frederick County Kris Tierney, Frederick County Brian Henshaw, Town of Stephens City Jim Deskins, City of Winchester Tom Hoy, City of Winchester Tim Youmans, City of Winchester Perry Eisenach, City of Winchester Terry Short, Virginia Department of Transportation Jerry Copp, Virginia Department of Transportation Kenneth Pollock, Virginia Dept. of Rail & Public Transportation Serena `Renny' Manuel, Winchester Airport Renee Wells, Winchester Transit MPO Citizens Advisory Committee (CAC) Chair—R. William Bayliss, III Vice Chair—Walt Cunningham Members: Tim Stowe, Alan Toxopeus, Walt Cunningham, Frederick County Kelly Henshaw, Town of Stephens City Harry Smith, R. William Bayliss, III, Dr. John Crandell, City of Winchester Administrative & Staff Support Provided by Northern Shenandoah Valley Regional Commission Karen Taylor, Transportation Program Manager 6 Win -Fred MPO FY2012 UPWP WIN, F_R FD METROPOLITAN PLANNING ORGANIZATION Resolution By The Win -Fred Metropolitan Planning Organization Approving the FY 2012 Unified Planning Work Program (UPWP) WHEREAS, the FY 2012 Unified Planning Work Program will serve as the basis for all U.S. Department of Transportation (DOT) funding participation and will be included in all requests for DOT planning funds, and WHEREAS, this UPWP details all transportation and transportation -related planning activities anticipated within the area during the coming fiscal year, and WHEREAS, this UPWP has been reviewed and recommended for approval by the Technical Advisory Committee and the Citizens Advisory Committee; NOW THEREFORE BE IT RESOLVED, that the Win -Fred Metropolitan Planning Organization does hereby approve and adopt the FY 2012 Unified Planning Work Program on Signed: Secretary -Treasurer Win -Fred MPO FY 2012 UPWP Signed: Richard C. Shickle Chairman iv 1NINoAR ED METRGPOLITAN PLANNING ORGANIZATION TABLE OF CONTENTS FY 2012 UNIFIED PLANNING WORK PROGRAM WORK TASKS AND BUDGET/FUNDING INFORMATION Page No. Preparation Statement..................................................................................................................... ii Officers .......................................................................................................................................... iii Resolution...................................................................................................................................... iv Tableof Contents.............................................................................................................................v Listof Figures.................................................................................................vi INTRODUCTION............................................................................................................................1 WORK TASK 1: Program Management & Administration...........................................................4 WORK TASK 2: Transportation Improvement Program (TIP).....................................................6 WORK TASK 3: Federal or State Requested Planning Work Program Items ..............................7 WORK TASK 4: Public Mobility Program....................................................................................8 WORK TASK 5: Local Technical Assistance................................................................................9 WORK TASK 6: Pedestrian and Bicycle Facilities Inventory and Analysis...............................10 WORK TASK 7: Shady Elm Access Management Study Alternative Analysis ..........................11 WORK TASK 8: City of Winchester Transit System (WinTran) Planning.................................12 WORK TASK 9: Constrained Long Range Transportation Plan Update ...........................13 Proposed Revenues and Expenditures by Funding Source...........................................................................................................14 Win -Fred MPO v FY2012 UPWP WINooAFRED MEiROPOUTAN PLANNING JFGANIZATION LIST OF FIGURES Page No. Figure 1: Map of Winchester -Frederick County Urbanized Area and MPO Study Area 2 Figure 2: Proposed Revenues and Expenditures by Funding Source............................................................................................... 14 Win -Fred MPD vi FY2012 UPWP WiNFRED METROPOLITAN PLANNING ORGANIZATION INTRODUCTION The Unified Planning Work Program (UPWP) for transportation planning identifies all activities to be undertaken in the Win -Fred Metropolitan Planning Organization study area for Fiscal Year 2012 (July 1, 2011 - June 30, 2012). The UPWP provides a mechanism for the coordination of transportation planning activities in the region, and is required as a basis and condition for all federal funding assistance for transportation planning by the joint metropolitan planning regulations of the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA). The work tasks within this UPWP are reflective of issues and concerns originating from transportation agencies at the federal, state and local levels. The descriptions of the tasks to be accomplished and the budgets for these tasks are based on a best estimate of what can be accomplished within the confines of available federal, state and local resources. The Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) created a number of planning requirements. In October 1993, the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) issued final regulations regarding metropolitan planning. The Transportation Equity Act of the 21st Century (TEA -21), which became law in June 1998, reaffirmed the structure of the metropolitan planning process. Most of the modifications to the process were aimed at streamlining and strengthening the provisions included in ISTEA. On August 10, 2005, the latest federal legislation known as the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) was signed into law. The Win - Fred Metropolitan Planning Organization has developed this work program to address the final metropolitan planning regulations and the new requirements in SAFETEA-LU. Metropolitan Planning Area The Win -Fred MPO study area consists of the City of Winchester, the Town of Stephens City, the Urbanized Area of Frederick County, and the area of Frederick County projected to be urbanized by the year 2020. See Figure 1 for an illustration of the region. Based on the 2000 Census, the Win -Fred MPO Urbanized Area population was 53,559 and it encompasses a land area of approximately 103 sq. miles. /0 Win -Fred MPO 1 FY 2012 UPWP WIN%W�F�D PAFTROPOLITAN PLANNING ORGANIZATION Winchester -Frederick County MPO Boundary NS RC 1 0.5 0 Miles wil��FRED -- METROPOLITAN PLANNING 3RGANIZATlot! , , Il Responsibilities for Transportation Planning The Win -Fred Metropolitan Planning Organization is the organization responsible for conducting the continuing, comprehensive, and coordinated (3-C) planning process for the Winchester - Frederick County Urbanized Area in accordance with requirements of Section 134 (Title 23 U.S.C.) of the Federal Highway Act of 1962, and Section 5303 of the Federal Transit Act. The Win -Fred MPO is the official Metropolitan Planning Organization for the urbanized area, designated by the Governor of Virginia, under Section 134 of the Federal Aid Highway Act, and the joint metropolitan planning regulations of FHWA and FTA. The policy making body of the Win -Fred MPO is the Policy Board that consists of 8 voting members. These include 3 representatives from the City of Winchester, 3 representatives from Frederick County, 1 representative from the Town of Stephens City, and 1 representative from VDOT. Other agencies with non-voting membership on the Win -Fred MPO Policy Board include the Virginia Department of Rail and Public Transportation, Virginia Department of Aviation, Federal Highway Administration and Federal Transit Administration. The Northern Shenandoah Valley Regional Commission (NSVRC) staffs the Win -Fred MPO. The staff, in conjunction with the MPO's member agencies, collect, analyze and evaluate demographic, land use, and transportation data to gain a better understanding of the transportation system requirements of the area. Special studies, research, and other work tasks requested by the MPO are the staff s responsibility as well. Consultant assistance will be sought when required by the staff to complete work tasks. Staff also prepares materials for use at the Policy Board, Technical Advisory and Citizens Advisory Committee meetings as well as any existing sub -committee meetings. NSVRC staff will participate in all Win -Fred MPO meetings and provide required staff support and administration of the transportation planning program. In addition, staff members will represent the MPO at other meetings with federal, state, and local organizations. Total Proposed Funding by Federal Source for FY 2012 The primary funding source for transportation planning activities included in this work program are the FHWA Section 112 (PL), FTA Section 5303, and FHWA State Planning and Research (SPR). The proposed funding amounts (including state and local matching funds) for the Win - Fred MPO work program to be utilized by the NSVRC staff are shown in Figure 3. Wan -Fred MPO 3 FY2012 [IPWP %MFRED METROPOLITAN PLANNING OHGANIZA1ION WORK TASK 1: Program Management & Administration Objective and Description: This task includes ongoing activities that ensure proper management and operation of a continuing, comprehensive, and coordinated (3-C) planning process as described in the Memorandum of Understanding. The primary objectives of this task are as follows: Public Participation Plan (PPP): The encouragement of meaningful participation of local citizens in metropolitan transportation planning is one of the most important goals of the "3C" process and the Public Involvement Process. The Final Rule on Metropolitan Planning issued by U.S. DOT in October 1993 reemphasizes this goal by requiring that each MPO maintain: "...a proactive public involvement process that provides complete information, timely public notice, full public access to key decisions, and supports early and continuing involvement of the public in developing plans, TIPS..." Under this task, the Win -Fred MPO will continue to maintain a Public Participation Process and monitor its effectiveness. The Public Participation Plan outlines the public outreach procedures to be followed by the MPO in developing and amending the Region's UPWP, Long-range Transportation Plan, Transportation Improvement Program (TIP) and other major studies. The PPP will also address Title VI and ADA issues as well. The Citizens Advisory Committee meets on a periodic basis to review and provide feedback to the Win -Fred MPO Technical Advisory Committee and Policy Board. The Citizens Advisory Committee will also conduct outreach activities such as public meetings and forums, neighborhood and association meetings, and other means to seek input from other agencies, organizations, and individuals interested in the transportation planning process, plans being prepared, or other transportation concerns. The MPO staff supports the work of the Citizens Advisory Committee. The concept of Environmental Justice has raised questions regarding equity and the inclusion of all individuals in the decision making process. The PPP will include procedures developed by the Win -Fred MPO to address environmental justice. Efforts will be made to better identify organizations and individuals not normally included in the transportation planning process on a continuing basis. This task will provide a continuing public involvement process that increases participation by community members in transportation plans, with a particular focus on improving participation by groups not previously involved in the transportation planning process. UPWP Preparation and Management: Implement the FY 2012 UPWP throughout the fiscal year and provide all required administrative functions including all accounting functions, personnel administration, office management, financial reporting, and contract administration. To meet the requirements of 23 CFR Part 420 and 23 CFR Part 450, the Win -Fred MPO, in cooperation with the Virginia Department of Transportation and the Virginia Department of Rail Win -Fred MPO 4 AW J� FY 2012 UPWP "FIDEWIN&A G METROPOLITAN PLANK N`u ORGANIZATION and Public Transportation, is responsible for the development of a Unified Planning Work Program (UPWP). The UPWP describes all regional transportation planning activities anticipated in the Win -Fred MPO study area for the following fiscal year that will utilize federal funding, including Title I Section 134 metropolitan planning funds, and Title III Section 8 metropolitan planning funds. The UPWP also identifies state and local matching dollars for these federal planning programs. This task provides for management of the FY 2012 UPWP including the following activities: • Maintain all required financial records and conduct annual independent audit • Hire and train staff • Maintain required files and records of MPO activities (i.e. minutes, meeting notices, etc.) • Preparation of quarterly progress reports and invoices • Preparation of required legal notices and advertisements • Preparation of resolutions adopted by MPO • Preparation of required grant applications and execution of contracts If during FY 2012, an amendment to the UPWP is deemed necessary, due to changes in planning priorities and/or the inclusion of new planning projects, staff will identify and detail such amendments for consideration by the MPO. This task also provides for the development of the upcoming UPWP for FY 2013. The document will incorporate suggestions from federal funding agencies, state transportation agencies, transit operating agencies, local governments participating in Win -Fred MPO, and the public through the MPO's public involvement process. General Administration: Support the activities of the Win -Fred MPO through the preparation of reports, presentations, agendas, minutes and mailings for all Policy Board, Technical and Citizens Advisory Committee meetings, as well as attendance at those meetings • Meeting arrangements for committees: Policy Board — 3rd Wednesday of Month, Technical Advisory Committee — 1 st Tuesday of Month, Citizens Advisory Committee — 2nd Tuesday of Month • Preparation and transmittal of meeting agenda packages • Transcribe and publish minutes • Staff attendance at MPO committee meetings and regional meetings as directed • Provide on-going training and development of staff and Board/Committee members • Attend training seminars and conferences • Coordination meetings with state and federal agencies • Circulate training opportunities to committee members • Prepare grant applications and administer grant funds • Prepare consultant requests for proposals and manage consultant activities Products: MPO staff support, detailed records documenting activities of the MPO including minutes for all committee meetings, preparation and submission of required progress reports and invoices to all federal and state agencies, detailed financial records, and a well-trained and informed MPO staff, Policy Board and Technical and Citizens Advisory Committee members. Estimated Budget: $125,000 Win -Fred MPO 5 FY 2012 UPWP WIt�1�FRED �� METROPOL?TAN PLANNING ORGANIZV VON WORK TASK 2: Transportation Improvement Program Objective and Description: As required by federal planning regulations, the Transportation Improvement Program (TIP) for the Win -Fred MPO is a four-year program of highway, transit, bicycle, pedestrian, safety, and transportation enhancement projects receiving federal funds. State and locally funded projects are also included in the TIP for coordination purposes. The TIP is updated each year and must be approved by the MPO Policy Board and the Governor of Virginia. The TIP is required as a condition for all federal funding assistance for transportation improvements within the Win -Fred MPO study area. The general public and all other interested parties will be given an opportunity to review and comment on the proposed TIP as described under the Win -Fred MPO's adopted Public Participation Plan. To facilitate public review, MPO staff will provide visualization of TIP projects, post the TIP on our MPO website, and make the TIP accessible at public libraries, government offices, and upon request. This task provides for the maintenance of a regional Transportation Improvement Program and will require active support of all Win -Fred MPO committees and coordination with member agencies. Products: Processing of requested amendments and administrative modifications to the adopted TIP; visualization of TIP projects, Annual Listing of Projects for the next fiscal year, development and adoption of the next TIP. Estimated Budget: $5,000 Win -Fred MPO FY2012 UPWP WINS" FRED SME CROPOLITAN PLANNING ORGANIZATION WORK TASK 3: Federal or State Requested Planning Work Program Items Objective and Description: The MPO staff will work with federal and state agencies in support of projects and programs designed to coordinate transportation planning activities within the region. Products: Staff will prepare studies and reports as necessary for the completion of this work program item and as directed by the appropriate federal and/or state agencies. Estimated Budget: $10,000 Win -Fred MPO 7 FY2012 UPWP MND ,.IED (O 3: UROPOLIIAN PLANNING ORGANIZATION WORK TASK 4: Public Mobility Program Objective and Description: As a result of the adoption and continued development of the City and Countywide Transit Study, MPO staff will continue to coordinate with the Policy Board, Technical and Citizens Advisory Committees to further advance the study. Products: Creation of a Public Mobility Steering Committee to coordinate with the Policy Board, Technical and Citizens Advisory Committees to further advance the WinFred MPO City and Countywide Transit Study. Estimated Budget: $45,000 2edMPO $ WIN&AFRED `'] FYY201012 UPWP 1 METROPOLITAN PLANNING ORGANIZATION 1 . ll/....1. Ir- --- .. ...,... _..., - L—, , I III Ual --stance — Esnmatea nua et $200,000 MPO Staff, Local Government, and/or Consultant Objective and Description: This task is carried over from FYI 1. Technical staff from each locality and VDOT has compiled a list of potential projects that need attention throughout the region. This list is shown below. This task will cover staff or consultant completion of whichever of these projects the TAC and Policy Board determine to fund for completion in FY 2012. Projects not selected for completion for FY 2012 may be carried forward onto future UPWP's or may be removed from the list as determined by Policy Board action. Products: Technical reports and recommendations on selected projects. Project Specific Name/Location Highway Projects Route 11 from Bellview Ave to Salem Church Road Route 522 from Rivendell Ct to Apple Pie Ridge Rd Route 11 from North Avenue to the West Virginia line Route 277 from MPO boundary to Route 522 Route 522 from Cameron St. to Burnt Church Road Route 17/50 at I-81 to Clarke Co. Line Intersection of Route 522 and Papermill Rd Route 7 Multimodal Corridor Study Pedestrian and Bicycle Projects Pedestrian & Bicycle Facilities Inventory & Analysis Complete Streets Project General Plann Technical Support r ransportatron Planning Grant Program Support and Administration Roundabout Training Transportation Analysis and Modeling Airport Plannine Projects W of Study I Status Access Management/Corridor Plan Currently underway Signalization/Safety Improvements Plan not underway Access Management/Corridor Plan not underway Access Management/Corridor Plan not underway Access Management/Corridor Plan not underway Access Management/Corridor Plan not underway Intersection improvements plan not underway Further analysis of Alternative Submitted by the City of Winchester (Feb 2010) not underway Alternative modes of Transportation I not underway Alternative modes of 'Transportation I not underway Win -Fred MPO FY 2012 UPWP W'N�FRED NETROPOLIIAN PLANNING ORGANIZATION Comments/Descrintion Project being completed by VDOT staff in Richmond. Expected Completion 06/2011 Top crash location from 2030 Long Range Plan Product: Access Management/Corridor Plan Product: Access Management/Corridor Plan Product: Access Management/Corridor Plan Product: Access Management/Corridor Plan Product: Intersection improvements Plan Further analysis of the alternative reverse frontage roadway submitted by the City Development of an MPO Pedestrian and BLOS Inventory & Map Support of the "complete streets" concept. Complete Streets are those designed to accommodate all users. Provides flexible technical support & services for the MPO localities Submission of transportation planning grant opportunities Support & services for the MPO localities Coordination of a workshop for local planners and engineers on Roundabout training Support & services for the MPO localities This item allows the MPO to pursue various airport planning project WORK TASK 6: Pedestrian and Bicycle Facilities Inventory and Analysis Objective and Description: The purpose of this task is to evaluate the condition of existing pedestrian and bicycle facilities in the Winchester - Frederick County MPO area, to determine how walkable and bikeable the area is, and to assist the MPO jurisdictions in developing an improvement plan. A Bicycle Level of Service (BLOS) inventory study will be conducted evaluating the current bicycling conditions and creating a BLOS for the roadways included in the MPO area. The goal of the inventory and analysis will be to: ➢ Creation of a web oriented and printed bicycle map produced for the public to assist them in route selection ➢ Identification of appropriate route for inclusion in the community bicycle network ➢ Determination of "Weak links" in the network and site prioritization ➢ Evaluation of alternate treatments for improving bike -friendliness of a roadway ➢ Road project selection formulas can include a BLOS term to encourage implementation of bike planning goals Products: Development of an MPO Pedestrian and BLOS Inventory and Map Estimated Budget: $110,000 t9 Win -Fred MPO 10 FY2012 UPWP 1Ar RMORIEw MET ROPOLITAN PLANNING ORGANIZATION WORK TASK 7: Shady Elm Access Management Study Alternative Analysis Objective and Description: This task is carried over from FYI 1. This Phase III study is intended to build upon the results of the Route 37 Access Management Study. Using the modeling and base scenarios created in Phase 11, additional analysis, scenario modification will be done, and public input will be solicited to create a conceptual design that is federally approvable and reasonably implemented. This effort is also looking to create a Plan B scenario that suggests alternative courses of action should an ideal solution not present itself. Staff would anticipate use of a consultant in partnership with local staff, VDOT, and FHWA officials. Products: Access Management Study with implementation recommendations Estimated Budget: $100,000 0.0 Win -Fred MPO 11 FY2012 UPWP VANaAFRED METROPOLITAN PLANfi:ING ORGANIZAi ION WORK TASK S: City of Winchester Transit System (WinTran) Planning Objective and Description: The Winchester Transit System (WinTran) will conduct transit planning and administration efforts necessary to comply with FTA requirements in order to receive Section 5307 capital and operating_ grants. WinTran will coordinate with the MPO on transit planning activities. Funds will be used to deliver specific, tangible transit planning products. Products: Specific, tangible transit planning products as determined by WinTran and the WinFred MPO. Bud eg_t: $20,000 Win -Fred MPO FY2012 UPWP a� 12 WINFRFD METROPOLITAN PLANNING ORGANIZATION WORK TASK 9: Long Range Transportation Plan Update Objective and Description: This task is carried over from FYI 1. The Long Range Transportation Plan is a long-term capital improvement strategy used to guide the effective investment of public funds in multi -modal transportation facilities. Federal transportation legislation requires that all Metropolitan Planning Organizations (MPO) develop and maintain a Long Range Transportation Plan in order to guide policy makers in the expenditure of transportation funds. This Plan, which identifies and prioritizes transportation projects and programs over a given planning time horizon, must be fiscally constrained (i.e. the Plan can only contain those projects which can reasonably be planned, designed, and constructed within the projected limits of fiscal constraint). Projects must be identified within the Long Range Transportation Plan in order to be advanced onto the Transportation Improvement Program (TIP), the MPO's short-range capital improvement program. Long Range Transportation Plan projects typically include the construction and/or improvement of highway, transit, and bicycle/pedestrian facilities. The Long Range Transportation Plan should be developed consistent with regional land use planning policies in order to integrate land use and transportation planning initiatives to the greatest practical extent. As such, the Plan should include an evaluation of existing and proposed development trends, the preparation and analysis of population and employment forecasts, and the identification of alternative development scenarios. The project development process will include traffic analyses, an evaluation of existing and projected levels of service, and analysis of existing and proposed transportation infrastructure, and an evaluation recommended alternatives. Consistent with federal transportation planning legislation, the Long Range Transportation Plan development process will include a comprehensive public input and review process. Work Program items in the coming fiscal year will include: ➢ Modeling of the Constrained Long Range Plan ➢ Additional Plan Rewrites ➢ Draft Plan October 2011 ➢ Public Comment Initiative Revisions Based on Public Comments ➢ Final Plan December 2011 Products: • Draft and Final Report for the Plan Estimated Budget: $20,000 as Win -Fred MPO 13 FY2012 UPWP WINV FRED NIEINOPOLHTAN PLANNING ORGANIZATION Figure 2: Win -Fred MPO FY 2012 Proposed Revenues and Expenditures by Funding Source Proposed Revenues Highway Funding State Match 10% Transit Funding FTA 5303 80% State Match 10% Local Match 10% $666,551 Total MPO Expendit FHWA State Local $8,750 FTA State $3,750 Local ®'6 "x125,000 Total Trans ortation Improvement Program TIP p p 9 (TIP) Planning Match Match Subtotal 5303 Match $5,000 Match Subtotal MPO $500 80% 10% 10% Highway 80% 10% Public Mobility Program Local Technical Assistance 10% Transit Revenues $36,000 $4,500 $4,500 $45,000 Task 6: Pedestrian & Bicycle Facilities Invento Anal sis -$1-7,6-00-T$2,200 $2,200 FY 2012 New PL & Transit 5303 Revenues (1) FY 2010 Carryover PL 112 Funds available in FY 2012 $124,179 $15,523 1$15,522 $155,224..$70,275 Shady Elm Access Management Studv $8,784 $8,000 $8,000 $16,000 $2,000 $2,000 $8,784 $87,843 $243,067 (2) FY 2009 5303 Funds (3) $152,073 $19,009 1$19,009 $190,091 $2,000 $20,000 ' Constrained Long Range Transportation Plan Update $11,200 $190,091 FY 2010 5303 Funds (4) $4,800 $600 $600 $20,000 $46,186 $5,773 i $5,773 $57,732 $57,732 FY 2011 5303 Funds (5) �� $70,254 $8,782 $8,782 $87,818 $87,818 Estimated FYI Carryover Funds to FYI (6) $70;275 $8,784 ''1$8,784 $87,843 $87,843 Subtotal: FY12 Revenues 9276 52a ti�� c'1n Ali a»�� RA„ ,�.,., ..,., -r� ��� �.--•o Total FY12 Proposed Revenues Proposed Expenditures FH A Planning 80% State Match 10% Local Match 10% FTA 5303 80% State Match 10% Local Match 10% $666,551 Total MPO Expendit Task 1: Program Management and Administration $70,000 $8,750 '$8,750 $30,000 $3,750 $3,750 ®'6 "x125,000 Task 2: Trans ortation Improvement Program TIP p p 9 (TIP) $2,800 $350 ,$350 ,$1,200 $150 $150 $5,000 Task 3: State/Federal Requested Work Tasks $4,000 $500 $500 $4,000 $500 $500 $10,000 Task 4: Task 5: Public Mobility Program Local Technical Assistance $0 $72,000 $0 1$9,000 $0 $9,000 $36,000 $4,500 $4,500 $45,000 Task 6: Pedestrian & Bicycle Facilities Invento Anal sis -$1-7,6-00-T$2,200 $2,200 $72,000 $70,400 1$9,000 $8,800 $9,000 1$8,800 $180,000 Task 7: Shady Elm Access Management Studv ,$64,000 $8,000 $8,000 $16,000 $2,000 $2,000 $110,000 $100,000 Task 8: Winchester Transit S stem WinTran) Plannin $0 $0 $0 $16,000 '$2,000 $2,000 $20,000 Task 9: Constrained Long Range Transportation Plan Update $11,200 $1,400 $1,400 $4,800 $600 $600 $20,000 Subtotal: FY12 Expenditures 1241 600 j$30,200 1$30,200 j$250.400 $31 300$31,300 -'$615,000 Y } Estimated Contingency/Reserve Funds for Project Support $34,652 $4,332 $4,331 1 $6,590 $823 $823 :651,551 Total FY12 Proposed Expenditures1=--Tl66® (1) FY12 funding estimates from VDOT for Highway and VDRPT for 5303 Funds (4) FY10 Carryover FTA 5303 Funds: not expended in FY10 (2) FY10 PL Carryover Funds Not Expended (5) FYI Carryover FTA 5303 Funds: not expended in FYI (3) FY09 Carryover FTA 5303 Funds: not expended in FY09 (6) Estimated Figure: For Information Purposes Only 14 May -11 2011-2012 INTERSTATE ROAD IMPROVEMENT PIAN for FREDERICK COUNTY, VIRGINIA DRAFT Frederick County Transportation Committee: 06/13/2011 Frederick County Planning Commission: Frederick County Board of Supervisors: I-81 Improvements: Provide additional travel lanes on the main line, collector -distributor lanes adjacent to the main line, modifications to existing interchange areas, and develop new interchange areas and bridge crossings of the main line as recommended by the WinFred MPO Long Range Plan. In addition, as the State continues to work toward an ultimate plan for the I-81 widening, the County of Frederick continues to support the study of Eastern Route 37 as a potential corridor on new location as an alternative for that effort. Moreover, the County of Frederick supports exploration of the potential for rail transportation as a component of the Interstate 81 Corridor improvements. A) Progress to Phase 1 of the FHWA approved interchange modification to Exit 310 (as illustrated on map as priority A) B) Relocate Exit 307 further south to alleviate existing and future congestion on Route 277. There is an urgent need to begin increased study of this project. (as illustrated on map as priority B) C) Widen I-81 from Fairfax Pike to Route 37 North. This should include the relocation of the 277 Interchange. From: Route 277, Exit 307 To: Route 37 North, Exit 310 (as illustrated on map as priority C) D) Widen Remainder of 1-81 in Frederick County From: West Virginia line To: Warren County line (as illustrated on map as priority D) E) Spot Improvements on I-81 in Frederick County. Provide spot improvements at various interchanges to increase capacity and/or enhance safety for the motoring public. c�!57 2011-2012 PRIMARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA -P-4- I.Jr a I L Frederick County Transportation Committee: 06/13/2011 Frederick County Planning Commission: Frederick County Board of Supervisors: 1) Route 37 Bypass A. Route 37 - Phase I Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the southern segment of the Route 37 Eastern Bypass from Interstate 1-81 to Front Royal Pike (Route 522 South). (As illustrated on map as priority ]A) B. Note: It is intended that the first phase of Fairfax Pike (Route 277), as identified under item #2, shown below, he programmed for construction following the completion of Phase I of the Route 37 Eastern Bypass. (As illustrated on map as priority IB) C. Route 37 - Phase 2 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between existing Route 37 around Stonewall Industrial Park and Route 7. (As illustrated on map as priority I C) D. Route 37 - Phase 3 Initiate final engineering and design, acquire right-of-way, and establish a construction phase schedule for the preferred alternative between Route 7 and Route 522. (As illustrated on map as priority ID) 2) Route 277 (East of Stephens City) From: I-81/Route 277/Route 647 Intersection (East of Stephens City) To: Route 340/Route 522 South Intersection (East of Double Toll Gate) Phase 1: From the 1-81/277 Interchange to Route 636 (As indicated under note for priority 1B) Phase 2: From Route 636 to Route 340/Route 522 (As indicated on map as priority 2) Improve to a four lane divided roadway with County staff to work with site developers to acquire dedicated right-of-way and achieve grading, drainage, and construction improvements in conjunction with development projects which occur along the corridor until such time that funding is available for construction. Establish a construction schedule for the phased improvement of Fairfax Pike (Route 277). Program funding for the completion of right-of-way acquisition and construction of each phase as described above. G2 -E 3) Route 11 (North and South of Winchester) A) Establish an Urban Divided Four Lane System From: Southern limits of the City of Winchester To: 0.4 miles south of intersection of Route 37 South, Exit 310 (As illustrated on map as priority 3A) B) Establish an Urban Divided Four Lane System From: Northern limits of the City of Winchester To: Intersection of Merchant Street (As illustrated on map as priority 3B) C) Establish an Urban Divided Four Lane System From: Intersection of Merchant Street To: West Virginia line (As illustrated on map as priority 3C) 4) South Frederick County Parkway From: Relocated Exit 307 To: Intersection with Route 277 approximately 1 Mile west of the intersection of Route 277 and Route 522 This is a planned new roadway with limited access points serving a mixture of predominantly commercial and industrial development. There is need to study this project in conjunction with the Exit 307 relocation and planning for Route 277 improvements noted in item 3. Phasing of this project is not yet clearly defined, however general phasing would be from West to East with the clear first phase being from relocated Exit 307 to Warrior Dr. (As illustrated on map as priority 4) 5) Commuter Park and Ride Lots Establish a new park and ride facility along the Berryville Pike (Route 7) corridor. Work with the Northern Shenandoah Valley Regional Commission to determine appropriate locations for park and ride facilities at other strategic locations within the County's Urban Development Area. For Park and Ride locations in Frederick County the primary goal should be that they are situated in such a manner that they reduce traffic in Frederick County in addition to adjacent localities. (As illustrated on map as priority 5) MR WinFred MPO Constrained Long Range Transportation Plan 2035 Update Project Schedule Fiscal Year 2011 - Fourth Quarter Tasks (April —.dune 30, 2011) Completion Date Staff Responsibility Draft Vision List/Cur, crit CLAP .rune 2011 City/County/Town Staff presentations cc) 0.V/C=ounty/1"own Data and Map Updates June 30, 2011 Tyler Klein/Wendi Stine Review all tables and figures presented in the 2030 Plan and update with new data as available for 2035 Plan. To be inserted into the document for narrative sections to describe. ➢ Finalize population forecasts and TAZ allocations; coordinate with local jurisdictions to assure projections meet local expectations. Preliminary Revisions June 30, 2011 Karen Taylor/Tyler Klein ➢ Begin review of the 2030 document to identify sections to be deleted or edited and any new information that should be included for all sections for 2035 Plan. Initiate Plan Review/ Rewrites if necessary to 2035 Plan Karen Taylor/Tyler Klein ➢ Introduction June 30, 2011 ➢ Plan and Goals June 30, 2011 ➢ Plan Process & Public June 30, 2011 Involvement (Shell) Fiscal Year 2012 — First Quarter Tasks (July — September 30, 2011) DRAFT CLRP Approval - Policy Board July 20 or 27, 2011 Karen Taylor - Update CLRP and present a list of draft candidate projects to the TAC, CAC and Policy Board in July for approval: ➢ Technical Advisory Committee July 12, 2011 ➢ Citizens Advisory Committee July 12, 2011 ➢ Policy Board July 20 or July 27, 2011 (TBA by the Policy Board) - s",Vsl�-10 staff will deliver all materials for modeling to VDOT by July 29, 2[ 1.1 MPO Staff will present monthly progress reports to the Technical Advisory Committee 0 WinFred MPO Constrained Long Range Transportation Plan 2035 Update Project Schedule Completion Date Staff Responsibility Modeling August 2011 ➢ Provide necessary information for Modeling to occur VDOT Review of Modeling results by TAC/CAC/Policy ➢ Technical Advisory Committee August 9, 2011 ➢ Citizens Advisory Committee August 9, 2011 ➢ Policy Board August 17, 2011 Additional Plan Rewrites/Modeling August 31, 2011 Tyler Klein/Karen Taylor ➢ Incorporate MPO Vision Plan; MPO Constrained Long -Range Plan into 2035 Plan ➢ Incorporate Existing Transportation Conditions; Future 2035 No -Build Transportation Conditions into 2035 Plan ➢ Additional modeling of the CLRP projects if request by the Technical Advisory Committee (Must be approved by the MPO Policy Board) Final Edits for Draft Release September 15, 2011 Martha Shickle/ Karen Taylor i=iscai Year 2012 -.Second Quarter Tasirs (October - December .31, 2011) Draft Plan Presented October 2011: Martha Shickle/Karen Taylor ➢ Technical Advisory Committee October 4, 2011 ➢ Citizens Advisory Committee October 11, 2011 ➢ Policy Board October 19, 2011 Public Comment Initiative October 20, 2011 Karen Taylor ➢ 20 day public comment period October 20, 2011- November 8, 2011 Public Comment Revisions November 18, 2011 Karen Taylor/Tyler Klein Draft Plan presented to City/County/Town foilowing public comment- revisions Final Plan Presented December 2011 ➢ Technical Advisory Committee ➢ Citizens Advisory Committee Policy Board City/County/Town Staff Martha Shickle/Karen Taylor December 6, 2011 December 13, 2011 December 21, 2011 or January 18, 2012 (Meeting date to be determined by Policy Board) MPO Staff will present monthly progress reports to the Technical Advisory Committee 31