Loading...
TC 05-07-02 Meeting AgendaCOUNTY of FR-EDERICK Department of Planning and Development 540/665-3-651 FAX: 540/665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: Jeremy F. Camp, Planner II RE: May Meeting & Agenda :'�L DATE: April 29, 2002 The Frederick County Transportation Committee will meet at 7.30p. m., on Tuesday, May 7, 2002, in the Board Meeting Room of the County Administration Building, 107 North Kent Street, Winchester, Virginia. The Transportation Committee will discuss the following items: AGENDA 1) 2002 Primary Road Improvement Plan (Public Hearing). 2) Other. 'Please contact the Department of Planning & Development if you have any questions regarding this information, or if you will be unable to attend this meeting. Thank you. JFC/ Attachment 107 North Kent Street o Winchester, Virginia 22601-5000 Item #I 2002 Primary Road Improvement Plan Please find attached the Draft 2002 Frederick County Primary Road Improvement Plan for your review and recommendation. The purpose of this plan is to advise the Commonwealth Transportation Board of the funding priorities for the Primary Road System in Frederick County. The Draft 2002 Frederick County Primary Road Improvement Plan maintains the same priorities as the 2001 Frederick County Primary Road Improvement Plan, with the exception that the priorities associated with the Route 37 project have been eliminated. The Board of Supervisors directed the Transportation Committee to reevaluate the priorities of the 2002 Primary Road Improvement Plan and forward a recommendation regarding the draft plan. PREFACE The 2002 Primary Road Improvement Plan for Frederick County, Virginia focuses on improvements to existing major and minor arterial systems within the county's Urban Development Area. The improvements recommended in this plan are components of the Winchester Area Transportation Study (WATS) and the Interstate 81 Improvement Study. The plan is intended to manage the traffic demands in Frederick County and the City of Winchester into the foreseeable future. These projects are listed in order of priority and will continue to appear on subsequent plans until funding has been secured for their completion. 2002 PRIMARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY _, 17, W, M. 2002 PRIMARY ROAD IMPROVEMENT PLAN 1) Route 277 - Phase 1 (East of Stephens City) From: 1-81/277 Interchange To: Route 636 (as indicated on map as priority 1) 2) Route 277 - Phase 2 (East of Stephens City) From: Route 636 To: Route 340/522 (as indicated on map as priority 2) • County staff to work with site developers to acquire dedicated right-of-way and achieve grading, drainage, and construction improvements in conjunction with development projects which occur along the corridor until such time that funding is available for construction. • Establish a construction schedule for the phased improvement of Route 277. • Program funding for the completion of right-of-way acquisition and construction of each phase as described above. 3) Route 11 (North and South of Winchester) A) Establish an Urban Four Lane System from the southern limits of the City of Winchester to the intersection of Route 37. (as indicated on map as priority 3A) B) Establish an Urban Four Lane System from the northern limits of the City of Winchester to the intersection of Route 761. (as indicated on map as priority 3B) 4) I-81 (East of Winchester) From: West Virginia line To: Warren County line Provide additional travel lanes on the main line, collector -distributor lanes adjacent to the main line, modifications to existing interchange areas, and develop new interchange areas and bridge crossings of the main line as recommended by the Interstate 81 Study and the Winchester Area Transportation Study (WATS). A) Route 669 Bridge Reconstruction (as indicated on map as priority 4A) B) Route 277, Exit 307, to Route 37 North (as indicated on map as priority 4B) C) Remainder of I-81 in Frederick County (as indicated on map as priority 4C) 5) Route 50/17 - Spot Safety Improvement Program funds to initiate engineering and design, right-of-way acquisition, and construction involving the relocation of the existing entrance to Carper's Valley Golf Club to align with the major collector road entering the Ravens Subdivision; to construct anew crossover at this intersection location with turn lanes on Route 50/17; and to eliminate the existing crossover serving Carper's Valley Golf Club. This spot safety improvement will ensure conformance with the Winchester Area Transportation Study (WATS) and the Frederick County Comprehensive Policy Plan's Eastern Road Plan. (as indicated on map as priority S) 6) Commuter Park and Ride Dots Establish anew park and ride facility along the Berryville Pike (Route 7) corridor. Work with the Lord Fairfax Planning District Commission to determine appropriate locations for park and ride facilities at other strategic locations within the County's Urban Development Area. (as indicated on map as priority 6) U. ICOMMI7-TEESITRANSPORTATIOMAgendas12002 Agendas WAY Agenda.wpd 2002 Primary Road Improvement Plan 1-81 Improvements 4A Priority One " s .. 0 Improvements 2002 Road Improvements Plan - 12 � I � Y ' _ � " � '� 671 1 Route 277 - Phase One Other Improvements 2 Route 277 - Phase Two N5 Route 50/17 Spot Safety Improvements N3A Route 11 South > #V6 Route 7 Commuter Park & Ride Lots 3B Route 11 North 2002 Primary Road Improvement Plan 1-81 Improvements 4A Priority One " 4B Priority Two 4C Priority Three 12 � I � Y ' _ � " � '� 671 Other Improvements N5 Route 50/17 Spot Safety Improvements 600 "r #V6 Route 7 Commuter Park & Ride Lots Roads Interstate 81 Primary N 7f. �� �, } tJ 4A T /V Secondary I RailRoad George Washington National Forest City & Town Boundaries � / z /.`.. s �, WINC STER 00 277' _ N 11 W G S 02468 Miles Created by the Department of Planning and Development, April 22, 2002