TC 09-01-98 Meeting AgendaP 140pt
COUNTY ®f FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/678-0682
MEMORANDUM
TO: Transportation Committee
FROM: Michael T. Ruddy, Planner II_
SUBJECT: September Meeting and Agenda
DATE: August 26, 1998
The Frederick County Transportation Committee will hold a public hearing for the update of the Secondary
Road Improvement Plan at 7:30 p.m on Tuesday, September 1, 1998 in the Board Room of the Frederick
County Administration Building, 107 North Kent Street, Winchester, Virginia. The agenda for this meeting
is as follows:
AGENDA
1) Review and Update of 1999 -2000 Frederick County Secondary Road Improvement Plan.
2) Other.
Included in this agenda is a proposed draft of the 1999 -2000 Frederick County Secondary Road
Improvement Plan. The plan identifies the proposed major road improvement projects, hard surface road
improvement projects, and incidental construction projects. Staff will present a map that depicts the road
improvement projects during the meeting. Please contact our department if you are unable to attend this
meeting.
107 North Dent Street • Winchester, Virginia 22601-5000
DRAFT
FREDERICK COUNTY
SECONDARY ROAD IMPROVEMENT PLAN
MAJOR PROJECTS/ NEW HARD SURFACE/ INCIDENTAL CONSTRUCTION
1999-2000
Frederick County Transportation Committee
(Recommendation for approval on 1998)
Frederick County Planning Commission
(Recommendation for approval on 1998)
Adopted on , 1998 by the
Frederick County Board of Supervisors
MAJOR ROAD IMPROVEMENT PROJECTS
Major road improvement projects command the reconstruction of hardsurfaced roads to enhance
public safety. Improvements required for road width, road alignment, road strength, and road
gradient are considered major road improvement projects.
1999 - 2000. MAJORPROJECT ROAD E"RC1vE1VTE' l i< PLAN
FANKT.
ROUTE
FROM
TO
Tz7T
DIST
MAGIS
AD.DAT
1
628
Rt. 631
Rt. 732
2410
2.41 miles
BC
und. const.
2
656*
Rt. 657
Rt. 659
4237
1.01 miles
SHIST
10/99
3
647
Rt. 277
Rt. 642
7241
2.08 miles
OP
07/02
4
652
Rt. 1 I
Winchester City
limits
4,571
0.52 miles
BC
und. const.
5
Warrior
Drive, 719
Rt. 277
Rt. 642
NA
1.55 miles
OP
03/00
6
608
Rt. 50W
Rt. 616
1527
2.83 miles
BC
UN/SH
7
659
Rt. 820
Rt. 7
401
0.2 miles
ST
UN/SH
8
656
Rt. 655
Rt. 657
3041
1.39 miles
I SWST
UN/SH
9
Towns
curb and gutter improvements for the Town of Stephens City
UN/SH
10
Towns
curb and gutter improvements for the Town of Middletown
UN/SH
11
664
Rt. 761
Rt. 660
1898
1.1 miles
ST
UN/SH
12
660
Rt. 664
Rt. 7E
1268
2.13 miles
ST
UN/SH
13
622
City of Winchester to Rt. 37
9192
1.03 miles
BC
UN/SH
14
600
1.07 miles N Rt. 679 to Rt. 684
942
1.93 miles
GA
UN/SH
15
659
Rt. 656 1
Rt. 820
401
1.8 miles
ST
UN/SH
16
657
City of Winchester to Rt. 656
9197
1.6 miles
SH
UN/SH
17
739
Rt. 673
Rt. 522N
2763
1.66 miles
GA
UN/SH
18
636
Rt. 277
Rt. 642
874
1.6 miles
OP/SH
UN/SH
19
644
City of Winchester to Rt. 522S
4835
1.36 miles
SH
UN/SH
1999` 2000 Road Improvement Plan
Page -2-
2999 - 2004 MAJOR PROJECT ROAD 1WRt` VEIVUNT PLAN (Continued)
FANKT
ROUTE
FROM TO
ADT
DIST
MAGIS
AD DAT
622
Rt. 629 Rt. 37
3211
5.86 miles
BC
U N/SH
F2221
657
Rt. 656 to Clarke County
4779
2.07 miles
ST
UN/SH
23
641
Rt. 647
Rt. 277
2980
0.68 miles
OP
UN/SH
24
761
Rt. 11N
Rt. 664
2239
1.13 miles
ST
UN/SH
25
659
Rt. 7
Rt. 656
4524
1.09 miles
SH/ST
UN/SH
26
636
Rt. 277 to 1.5 miles south (277)
522
1.5 miles
OP
UN/SH
27
600
Rt. 753
Rt. 614
2075
1.8 miles
BC
UN/SH
28
655
Rt. 50E
Rt. 656
3176
0.79 miles
SH
UN/SH
29
642
0.2 miles west Rt 1070 to Rt. 1031
8046
0.9 miles
OP/SH
UN/SH
30
661
Rt. 663 1
Rt. I IN
7229
1.21 miles
ST/GA
UN/SH
31
628
Rt. 621 to City of Winchester
2722
1.25 miles
BC
UN/SH
32
627
Interstate 81
Rt. 11 S
5187
0.49 miles
OP
UN/SH
11 33
704 1
Rt 751
Rt 693
282
T
BC I
12ILQILL—
ABBREVIATIONS AND SYMBOLS:
ADT - Average Daily Secondary Traffic Tabulation Counts. (1995 Tabulations)
DIST - Distance of total improvement length in miles.
MAGIS - Magisterial District in which road improvement will occur.
AD.DAT - Scheduled Advertisement Date for road improvement project to begin.
656* - Improvements to Route 656 will include the intersection of Route 656 and Route 659, as well
as the "S" curve leg of Route 656.
1999 - 2000 Road Improvement Plan Page -3-
HARDSURFACE ROAD IMPROVEMENT PROJECTS
Hardsurface road improvement projects provide impervious resurfacing and reconstruction of non-
hardsurfaced secondary roads. Hardsurface improvements are considered by the Road Rating System
adopted by Frederick County on October 7, 1997.
1999
-:2000 NEWHAtRDSURFAOE ROAD 0WROVEl NT PLAN
IFANKT
ROUTE
FROM
TO
ADT
DIST
MAGIS
AD -DAT
1
695
1.09 to 2.3 miles north Rt. 522
83
1.21 miles
GA
und. const.
2
692
Rt. 600 to 12 mi. NE Rt. 600
137
1.2 miles
GA
und. const.
3
625
Rt. 624
Rt. 635
150
0.5 miles
BC
07/99
4
633
Rt. 625
Rt. IIS
91
1.4 miles
OP/BC
07/00
ABBREVIATIONS:
ADT - Average Daily Traffic Count. (1995 Tabulations)
DIST - Distance of road segment to be improved.
MAGIS - Magisterial District in which incidental construction will occur.
AD.DAT - Scheduled Advertisement Date for road improvement project to begin.
1999 - 2000 Road Improvement Plan
Page -4-
''..UN$CfWDUI":HAMSEMA".ROADBUROVMENTPROilCTS
RANK
ROUTE
FROM
TO
ADT
DIST
MAGIS
RATING
1
689
N Rt. 600
S Rt. 600
63
42 miles
GA
90
2
704
Rt. 683
WV line
174
3.3 miles
BC
86
3
618
Rt. 622
Rt. 608
92
3.3 miles
BC
83
4
679
0.3 miles west Rt. 608 to
0.5 miles east Rt. 600
94
2.5 miles
GA
79
5
676
0.83 mile south Rt.671 to
Rt.677
168
0.87 miles
GA
75
6
692
1.2 mi. NE Rt. 600 to Rt.
671
137
1.4 miles
GA
73
7
734
1.27 miles SW Rt.522N to
2.27 miles SW Rt. 522N
99
1 mile
GA
73
8
612
Rt. 600
Rt. 600
92
1.6 miles
BC
67
9
629
Rt.631
Rt. 625
149
1.8 miles
BC
64
10
695
2.3 miles north Rt. 522 to
WV
83
0.9 miles
GA
62
11
733
Rt. 50W
Rt. 707
61
1.3 miles
BC
61
12
607
Rt. 600
end State
Mainten.
113
0.78 miles
BC
60
13
638
Rt. 625
Rt. 759
86
0.8 miles
BC
60
14
709
Rt. 636
Rt. 735
133
2.7 miles
OP
59
636
Rt. 640
Rt. 641
46
1.5 miles
OP
59
16
j1715
636
Rt. 709
Rt. 735
147
1.1 miles
OP
55
644
Rt. 50E
Clarke Co.
69
0.81 miles
SH
54
1999 - 2000 Road Improvement Plan Page -5-
ABBREVIATIONS:
MAGIS - Magisterial District in which incidental construction will occur.
ADT - Average Daily Traffic Count. (1995 Tabulations)
DIST - Distance of road segment to be improved.
RATING - Point total for road segment based on Road Rating System Policy adopted by the Board
of Supervisors on October 7, 1997.
1999 - 2000 Road Improvement Plan
INCIDENTAL CONSTRUCTION
Page -6-
Incidental construction projects are defined as minor construction projects that cost less than
$100,000. Examples involve drainage improvements, site distance improvements, spot widening,
replacing overflow pipes with box culverts, and the application of cold mix on existing road surfaces.
The Virginia Department of Transportation determines if a proposed projects qualifies for Incidental
Construction based on the overall scope of the improvement.
1999 - 2000 WMEN')l'AL CONS'TRUCTItAN PLAN
F7�
ROUTE
FROM
TO
DESCRIPTION
MAGIS
F/Y
1
661
Intersection Rt. 661 / F-732
New Turn Lane; Widen
Railroad Crossing; Enhance
Signalization
GA/ST
99/00
2
T-1102
Rt. 11 to 0.14 Mi. E.
Widen/New Base & Overlay
OP
99/00
3
688
at 0.02 Mi. W. Rt. 684
Install Drop Inlet & Pie
GA
99/00
4
704
1.27 M. S. Rt. 632 to 2.5 M.S
Improve Sight Distance
BC
99/00
5
600*
County wide improvement
Install Guardrail
N/A
99/00
6
671
0.08 M.E. Rt. 742 to 0.07
M.W. Rt. 742
Improve Alignment
ST
99/00
7
656
500'N. Rt. 659 to 1500'N
Rt. 659
Install Guardrail
ST
99/00
8
631
0.2 M.E. Rt. 628 to 0.27 M.E.
Widen Shoulder
BC
99/00
9
689
Rt. 600 to 1.93 M.S.
Spot Widen
GA
99/00
10
College Park Subd. Improvements
165 lbs. Plant Mix
SH
99/00
11
Wakeland Manor Subd. Improvements
165 lbs. Plant Mix
SH
99/00
12
621
0.90 Mile South Route 50
Rubberized Crossing &
Flashing Lights
BC
00/01
13
641
From Rte. 636 to 0.15 Mile
E. Rte. 636
Realign Road to South to
Improve Sight Distance
OP
00/01
14
661
From Rte. 671 to 0.10 Mile S.
Rte. 671 1
Widen Curve to Improve Sight
Distance
ST
00/01
1999 - 2000 Road Improvement Plan Page -7-
19", _ 2000 i1�lClli ENTAL Ct NS R 7C #l�t�T PLAN ( ti ucd
RANK
ROUTE
FROM
TO
DESCRIPTION
MAGIS
F/Y
15
664
0.10 Mile E. Rte. 11
Imp. Drainage;
ST
00/01
Remove Box
Culverts; Inst. Pipe
16
670
At 0.25 Mile S. Rte. 669
Inst. Box Culvert to
ST
00/01
Improve Drainage
17 `
836
From Rte. 11 to 0.14 Mi. E. Rte.
Spot Widen &
ST
00/01
11
Improve Drainage
18
1054
Fredericktowne Subdivision
165 lbs. Plant Mix
OP
00/01
Improvements
19
692
From 0.91 Mi. S. Rte. 522 to 1.07
Replace Pipe; Inst.
GA
00/01
Mi. S. Rte. 522
Box Culvert;
Realign Road &
Intersection.
20
600
From 0.28 Mi. N. Rte. 689 to 0.35
Spot Widen to Imp.
GA
00/01
Mi. N. Rte. 689
Sight Distance
21
752
From 0.63 Mi. S. Rte 705 to 0.72
Spot Widen
GA
00/01
Mi. S. Rte. 705
22
608
From 0.02 Mi. E. Rte 618 to 0.08
Spot Widen to Imp.
BC
00/01
Mi. E. Rte. 618
Sight Distance
23 1
600*
County Wide Improvement
Install Guard Rail
n/a
00/01
ABBREVIATIONS:
MAGIS - Magisterial District in which incidental construction will occur
F/Y - Fiscal Year in which incidental construction will occur.
The number 600 reflects a VDOT project number and is not intended to depict Rt. 600.
Guardrail installation will be along various secondary roads throughout Frederick County as
determined by VDOT.
1999 - 2000 Road Improvement Plan
Page -8-
NEW ROAD IMPROVEMENT PROJECTS INCORPORATED INTO
1999 - 2000 SECONDARY ROAD IMPROVEMENT PLAN UPDATE
MAJOR ROAD IMPROVEMENT PROJECTS -
No new projects were requested for the 1999 - 2000 update.
(Both Route 621 projects identified on the 1998 - 1999 plan have been removed).
HARDSURFACE ROAD fWROVEMENT PROJECTS:
No new projects qualified for the 1999 - 2000 update.
INCIDENTAL CONSTRUCTION:
Project # 12: Merrimans Lane (621) - rubberized railroad crossing & flashing lights.
Project # 13: Double Church Road (641) -improve sight distance.
Project # 14: Welltown Pike (661) -improve sight distance.
Project # 15: Stephenson Road (664) - improve drainage.
Project # 16: Ruebuck Lane (670) - improve drainage.
Project # 17: Walters Mill Lane (836) - spot widen and improve drainage.
Project # 18: Apply plant mix throughout the Fredericktowne subdivision as needed to improve
various roads in which pavement failure is a problem.
Project # 19: Chapel Hill Road (692) - improve drainage and sight distance.
Project # 20: Brush Creek Road (600) - improve sight distance.
Project # 21: Knob Road (752) - spot widen.
1999 - 2000 Road Improvement Plan
Project # 22: Wardensville Grade (608) - improve sight distance.
Project # 23: Install guardrail - County wide improvement.
ROAD IMPROVEMENT PROJECTS FUNDED UNDER
1998 - 1999 SECONDARY ROAD CONSTRUCTION BUDGET
MAJOR ROAD IMPROVEMENT PROJECTS:
Page -9-
No major road improvement projects were funded from the 1998 - 1999 Road Improvement Plan.
HARDSURFACE ROAD IMPROVEMENT PROJECTS:
No hardsurface road improvement projects were funded from the 1998 - 1999 Road Improvement
Plan.
INCIDENTAL CONSTRUCTION:
Intersection of Tasker Road (Route 642) and Aylor Road (Route 647) - install new signalization.
Lakeside Subdivision - apply plant mix throughout the as needed to improve various roads in which
pavement failure is a problem.
Pinetop Road (617) - spot widen
Hollow Road (707) - spot widen
Fishel Road (612) - spot widen
Jordan Springs Road (664) - replace pipe culvert with box culvert
Laurel Grove Road (629) - spot widen
Heishman Lane (607) - spot widen
Back Creek Road (704) - spot widen