Loading...
HRAB 06-20-06 Meeting AgendaMEMORANDUM TO: Historic Resources Advisory Board FROM: Candice E. Perkins, Planner II RE: June Meeting Agenda DATE: June 6, 2006 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAY: 540/665-6395 The Frederick County Historic Resources Advisory Board (HRAB) will be meeting on Tuesday, June 20, 2006, at 6:30 p.m., in the Board of Supervisors' Executive Session Room* in the Frederick County Administration Building, 107 North Kent Street, Winchester, Virginia. The HRAB will discuss the following items: AGENDA May 2006 Minutes 2. Hicks (Albin Center) Rezoning proposal, submitted by Artz & Associates Carriage Park Rezoning proposal, submitted by Patton Harris Rust & Associates 4 Other Please contact this office if you will not be able to attend the meeting. Thank you. *PLEASE NOTE MEETING LOCATION Access to this building is limited during the evening hours. Therefore, it will be necessary to enter the building through the rear door of the Board Room. I would encourage committee members to park in the county parking lot located behind the new addition (accessible off of Cameron Street). CEP/bad Attachments 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 Frederick County Historic Resources Advisory Board (HRAB) May 16, 2006 Held in the Board of Supervisors Executive Session Room of the County Administrative Building at 107 N. Kent Street, Winchester, VA. Members Present: Harold Lehman, Elizabeth Fravel, Travis Saunders, Maral Kalbian (Consultant), Martin Killingbeck, Gary Oates (Planning Commission Liaison). Members Absent: Rhoda Kriz (Chairman), Felicia Hart, Richard Crane, Virginia McClure. Staff. Candice Perkins- Planner II, Kevin Henry- Planning Technician Agenda Items: April 2006 Minutes, Hicks Rezoning (Artz & Associates), Red Hawk Rezoning (R.J. Turner). Other: None The meeting began at 6:30 P.M. The first agenda item was to review the April 2006 Minutes, which were approved unanimously. The meeting agenda was then amended to allow Mr. R.J. Turner to present his rezoning proposal first because the Hicks Rezoning proposal did not have any parties present to represent the application. During Mr. Turner's presentation, he pointed out the historical properties adjacent to the rezoning (abandoned barn, Dawson -Gaylord House, Wilt -Dunn -Arnold House, and Carper -Cunningham House). The proffers provided on this project protect the area along Sulphur Springs Road, which is an archeologically significant site (Anthony Baecher Pottery Shop). Mr. Turner mentioned that he was trying to provide a project similar to Homespun. Ms. Kalbian supplied the HRAB with the historical background of Sulphur Springs Road, stating that this road is one of the oldest in the County. It originally was the route taken to reach the Shenandoah River from Winchester. Mr. Turner pointed out that he would be willing to preserve the areas along Sulphur Springs Rd. where the rezoning is taking place. He also said that he will provide plaques on the property that identify historical locations within the property. The historical focus of the property will be centered around the house on the hill (Wilt -Dunn -Arnold House), should he be able to purchase the property. It was made clear to the members of the HRAB that this rezoning request is within the Urban Development Area (UDA). It will also be a low impact development with 2.71 dwellings per acre. Mr. Killingbeck indicated that he was in favor of this rezoning since it is within the UDA. Mr. Turner indicated that an archeology inspection needs to be done and that he was allowing the Virginia Department of Historic Resources to conduct an archeological dig on the site. The HRAB requested that a second historical plaque be provided via proffers. The historical plaques will be placed along the trail system near Sulphur Springs Road. Ms. Kalbian mentioned that the southern tier of the rezoning appeared to be more suitable for Commercial/Industrial land use. Staff referred to the Comprehensive Plan, which has no land use designation for the area Kalbian referenced. Some of the HRAB thought proposed Route 37 would have an impact on Sulphur Springs Rd. Oates provided the HRAB with information from the Eastern Road Plan, that Rt. 37 would not have an interchange at Sulphur Springs Rd. Mr. Killingbeck motioned that the HRAB recommend approval of the Red Hawk rezoning, and the motion was seconded by Mr. Saunders. The HRAB voted unanimously to recommend approval of the Red Hawk Rezoning proposal with the historic proffers as submitted. The HRAB then decided to discuss the Hicks Rezoning proposal, without the applicant present. It was decided that this proposal will be heard at the next meeting (June 20, 2006). In other news, Ms. Perkins mentioned that she received the ninth historical plaque application. Also she is attempting to set up a "feature property of the week" article with the Winchester Star that was previously mentioned at the April meeting. On a final note, Mr. Oates suggested that everyone in the HRAB receive a SWSA/UDA map. The meeting was then adjourned at 7:40 P.M. Item # 2 Hicks (Albin Center) Rezoning Proposal The HRAB has been asked to review and provide comment on the Hicks rezoning proposal, which has been submitted by Artz & Associates. The proposal seeks to rezone 2.07 acres from the RA (Rural Areas) Zoning District to the B2 (Business General) Zoning District. The property is located at 354 Bryarly Road (250 yards east of the intersection of Burnt Church Road and Route 522), in the Albin Rural Community Center. The applicant is proposing a two story office building which would consist of approximately 20,000 square feet (not to exceed 40,OOOsf). Prepared by the applicant and attached for your information are a location map and a copy of the proffers for the project. The Study of Civil War Sites in the Shenandoah Valley published by the National Park Service, does not identify the Albin Center rezoning site or the surrounding areas as being part of a battlefield. The Rural Landmarks Survey Report for Frederick County Virginia identifies four structures within the immediate area of the subject site, one structure is located on-site. The sites that are listed in the survey are: • House, Route 789 (#34-543) — was located on site has recently been demolished • House, Route 789 (#34-542) • Edwards House (#34-545) • Faith Revival Center (#34-544) The Rural Landmarks Survey does not identify any of these structures as potentially significant, nor do any of the structures qualify for the national or state register of historic places. On April 1, 2004, staff, along with the HRAB's consultant Maral Kalbian and David Edwards of the Virginia Department of Historic Resources, conducted a site visit to determine the historic significance of the Albin area. It was determined that the Albin Rural Community Center is potentially eligible as a historic district. This site visit was done as part of a previous HRAB submission for David Hicks. The applicant has attempted to address the impacts of the proposed development on the surrounding area in the proffer statement (attached). The applicant has proffered to limit the uses of the 2.07 acre parcel to the following: • General Business Offices • Finance, Insurance & Real Estate Offices • Legal Services • Engineering, Architectural and Surveying Services • Accounting, Auditing and Bookkeeping Services • Management and Public Relation Services • Health Services & Medical Office Uses • Deli/Specialty "to go" Foods • Sign and Banner Shops, General Retail • Instrument Repair, Video Rental The applicant has proffered to limit the number of freestanding business signs to two monument style signs (not to exceed 12' in height) on the 2.07 acre parcel. No specifications as to the proposed square footage of the sign have been provided. The Zoning Ordinance sign regulation allows a maximum size of 100 square feet for business signs and allows a maximum size of 150 square feet for franchise businesses. The applicant has also proffered that the building will be built in conformance with the rendering called "Alban Center" prepared by Design Concepts. -Attached Please find attached for your information a map of the site, the impact analysis and the proffer statement provided by the applicant. Representatives of the applicant will be available at the HRAB meeting to provide additional information on the proposed rezoning. Staff will be seeking comments from the HRAB on the historical elements possibly impacted by proposed development. The comments will be included in the rezoning application package for the Albin Center rezoning proposal when it is submitted. Pictures of the site have been provided by staff. HISTORIC RESGURCE A..1D1t71s0Ry BOA RX AREVIEW APPLICATION P Frederick County 107 North Kent Street, Suite 202 ]ME, ETINC DATE Winchester, Virginia 22601 Telephone: (540) 665-5651 Fax: (540) 665-6395 DATE P T AIbZI' ADDR ESS Gay PROJECT: u> in " .E�i t- 0 - 2Z V3 PROPERTY OWNERS NAME: vo YELEMONE NU1v EZR: AW 4 -- PROPERTY OdVI1ERS ADDRESS: "L 3 " /V 4 Fly r i c'— I/� �' —��e�# y2 AR,CRI TE'C MEISONER: Z Z + _ '; w. TELEPHONE 1:lUMBER: Description of Application: Please describe briefly the request of the application: (rezoning, master development plan, conditional use permit). Prease be sgecifc. ' Z /'-//"� This application is not complete until all of the following information has been provided to the Department of Planning and Development. Please check the materials that have been submitted. Copy of required application as described in 1.1 (1.1.1-1.1.4) Description of proposed development or construction project, including proposed uses and general timeframe for development (1.2) Status of any identified historic or arc aeological resources on the site or adjacent to the site (e.g, located in any identified historic area, survey area, or battlefield site or individually listed on a local, state or national historic register, relevant information on record with the Virginia Department of Historic Resources) and presence of other historic structures or significant landscape features or archaeological sites; (1.3) 4 Photographs (color) of all historic resources on the property (1.4) Please note that the applicant or his/her appointed representative must be present of the meeting. RJIr,'Z0r,iINNG Al'PLICATl" ON FOS FP.EDERICK C®UPITY, VIRGE A The following information shall be provided by the applicant: All parcel identification numbers, deed book and page numbers may be obtained from the Office of the Commissioner of Revenue, Real Estate Division, 107 North Ken'. Street, Winchester. . Appfcant: I'A Name: A c-Tz � c,--, r-/%ri&, - i 5 Address: Telephone: �;q 0 -& i� 7 --::5Z 7,-3 2. Property Owner (if different thin above) Name: Address: 3. Contact person if other than above Telephone.- 7 elephone: Name: ML,E Telephone: Z- j 4. Cheddist: Check the following items that have been included with this application. Location map Plat Deed to property Verification of taxes paid Agency Comments ✓' Fees impact Analysis Statement o% Proffer Statement 11 5. The Fede of Virginia allows os to request full disclosure of owners" -lip in relation to rezoning applications_ Please list below all owners or parties in interest of the land to be rezoned: 6. A) Current Use of the Property: Vim: 'A.r�'i' B) Proposed Use of the Property: 7. Adjoining Property: PARCEL ID NUMBER LJ111)E ZONING 8. Location: The property is located at (give exact location based on nearest road and distance from nearest intersection, using road names and route numbers): 4EE�1-5 -r /rye 77Z ' er ; e c=o,y -- 12 Information tion to l:e sdof"itted 1e1-auLtal ,� cilities )impact Ie oclei In order for the Planning Staff to use its capital facilities impact model, it is necessary for the applicant to provide information concerning the specifics of the proposed use. Otherwise, the planning staff will use the maximum possible density or intensity scenario for the proposed Zoning District as described on Page 9 of the application package. . Fru ---el Identificatior/Location: Parcel Identification Number Magisterial:, Fire Service:,�ey Rescue Servicer. -5 01 Districts High School: Middle School: Elementary School:_. 10.G]aing Change: List the acreage included in each new zoning category being requested. 11. The following informatiGn should he provided accordwng to the tyke of rezoning proposed Number of Units Proposed Single Fancily homes: Townhome: /V, /4 Multi -Family: /v, _ Non -Residential Lots: ! Mobile Home: IvIA Hotel Rooms: Office: Retail: Restaurant: S uare Footage of Pro osed Uses 13 Service Station: /Y Manufacturing: Warehouse: Other: 3,, 12. Sigaature: I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. I (we) understand that the sign issued when this application is submitted must be placed at the front property line at least seven days prior to the Planning Commission public hearing and the Board of Supervisors' public hearing and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Applicant(s): r j� �v .� �� Bate: �f, Da' e: 1 Owner(s): DAVI � %f � Date: /"y ,6, L7/r I Cam Date: �jtt� ,`-�•IE; Al F-- 14 David A. & Linda W hicks Rezoning Request Rte to B2 2.07 Ac.' FM # 42-A-249 Located at 354 Bryarly Road, Frederick County Gaainesboro Magisterial District Impact Analysis Statement Pur nose- The purpose of this rezoning request is to rezone 2.07 Ac. To B2 aid const-ruct a two story office building that architecturally fits info the immediate surrounding area. Baelrgrcnha Currently the property consists of a 2.01 Ac. Of mostly open land by deed dated June 24. 2005 and recorded instrument # 050013755 and conveyed to David A. and Linda W_ Hicks. Lova iGn- The parcel is located on the west side of Rte. 522 (N. Frederick Pike), it also fronts on Bryarly Road (Rte. 789). The site is approximately 1/8 of a mile south of the intersection of Burnt Church Roark and Rte. 522. Suirroundin Properties -The sit is bounded by Rte. 522 to the east, Bryarly Road to the west, to the ;north by RA zoned property with a conditional use permit for a hair salon approximately 40 feet from boundary and by RA zoned property to the sorzth which is vacant land. The nearest residence to the south is approximately 175 feet from boundary. The proposed rezoning would not have any sigraficant affect on adjoining properties, regarding noise, fumes, pollution, odors, glare or other nuisance features. Traffic Impacts -The proposed rezoning of this site for a tv✓o story Office building of approximately 23,000 SF would result in an increase of goo -�; E)o vehicles per day total based on the ITE Trip Generation Book. The 23,000 SF building as drown on attached plans reflects the inaximum density for the site at this time, due to required buffers and number of required parking spaces for general office use. The rnaximxurn density allowed under the zoning ordinance can not be achieved due to these restriction's and therefore does not apply to the projected vehicle p ---r day count. Currently the plan is proposed with a right in/right out entrance on Bryarly road and a right out, only entrance onto Rte. 522.This would allow for vehicles entering the site in tine morning with 50% coming.from each direction. We expect 90% of all exiting vehicles shall use rhe right out only entrance onto Rte. 522. Bryarly Road is currently a 20ft. wide pavement section with a speed limit of 45mph. This road section also currently handles 730 velricles :per day according to VDOT & latest traffic study, and would have no trouble handling the increase in traffic flow. We are unaware of any plans by the county or VDOT to widen or otherwise modify the existing road section. RTE. 522 is currently a four lane divided highway with a daily traffic count of VPD 18,000, based on VDOT's latest annual average daily traffic study. Traffic Impacts cont. VDOT has, also already stated that they have no objections to either a right out only entrance onto Rte. 522, or a right in/right out entrance provided the proper turn lanes are constructed as shown on attached plan. Sewage Conve�• an-ce- The proposed office building would be served by a drainfield of sufficient size to handle the building load. A reserve drain field site is also being provided. Both drainfield sates have excellent soil characteristics as deteradned by a local soil scientist, and are currently under review by the Health Department. pj.:er�jg¢�-Stonn drainage shall be handled by curb & gutter in association with an underground storm sewer system. Storm Water Management will be handled by the use of an. underground. detention/infiltration facility. wateL —SUARL Y —Water shall be supplied by a well located onsite. Water usage for tl'e proposed office building shall be minimal. Usage will be liinited to bathroom usage and the malting of coffee, etc. during an average eight hour day. Solid N�ilftstc jDisjgosal Fg-aeffities- The proposed usage of the site will minimize solid waste to the usual general office type: paper, etc. A screened 10 foot by 1Of oot concrete diunpster pad has been provided. Dmmpster shall be emptied twice weekly. Historic Sites and Structures -This site is of no known historical interest value and have no historic buildings or other appurtenances located on site. Also, there are no ltnowri sites or buildings of any historical significance within the immediate area surrounding the proposed site. Imr��acts o� Ca nuuunity Facilities -The impact of prcposed rezoning will be minimal on any community facilities. A) Schools -none B) Police -minimal C) Fire & Rescue -minimal (volunteer) D) Parks & Recreation -- none B) Solid Waste --- Minimal (private) Other Im acts -There is no other impacts associated with the rezoning request. Proffers -See attached list. 2 A r! z & Associates, PLC March 29,2006 ALBA v C'.��NTE R. TAX P.cARCI;L 42-((A))-249 GAINESBOI2,0 MAGISTERIAL ]DISTRICT Pr e'Kinie auAlatteJr-s Alban Center Pursuant to Section 15.2-2296 Ft. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zonii.g, the undersigned applicant 1lereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application #- for the rezoning of 2.07 acres from the RA, Rural Areas District to establish 2.07 acres of B2, Business General District, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the applicant and such to be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinuitce. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon this applicant and their legal successors, Heirs, or assigns. The subject property, more particularly described as the lands owned by David A. Dicks acid Linda W. hicks being all of Tax Map Parcel 42-((A))-249, atxd further described by Decd Instrument 05001375C recorded in the Frederick County Clerk of the court Office on June 24, 2005. March 29, 2006 Artz & Associates, PLC Preliminary Matters coot The applicant iiere'Oy proffers the following: A.) Laud Use Rdstx'ic A011s Alban Center TI -le applicants hereby proffer to limit the land uses for the 2.07 acre parcel_ to the fallowing: Land Use Sic —de—neral Business Offices Finance, Insurance & Real Estate Offices - Legal Services 81 Engineering, Architectural and Surveying 871 Services Accoutiting, Auditing and Booldweping 872 Services Management and Public Relation Services 874 Health Set -vices tai Medical office Uses: 80 Doctors, Dentists, Optometrists Deli/Specialty to go roods, Pizza, ice - Cream ETC. Limited Seating 7 or less) Sign & Batuieb Shop (Advertising) - General itetail histr!ament Repair 7699 Video Rental 784 B.) Sit_Across The applicants hereby proffer to limit a mwdulurn of 2 entrances, one entrance connection to North Frederick Pike (Route 522 north), and cEie entrance, connection to Btyarly Road (Rte. 789). 2 March 29, 2006 ,UtZ & ASSCe.aj-S, PLC Preliminary Matteis cant. Ajban Center 1. The applicants hereby proffer to limit the development on the 2.07 acre parcel to a maximum of 4.0,000 feet of structural area. 2. Tile applicant hereby proffers to limit the structural height to sixty feet from the first floor to the apex of the roof 3. The applicant hereby proffer to utilize similar construction materials on all building walls including brick, vinyl or dry vit, and that the roof will be stau'cting seam metal or dimensional shingle construction. 4. The applicants hereby proffer to develop the structure in substantial conformance with the perspective rendering entitled "ALBAN CENTER," prepared by Resign Concepts. �.) l��r�itness Sh �s T,he applicants he_•e'oy proffer to limit the number of freestanding business signs LO, (2) two on the 2.07 acre, parcel. The freestanding bus ness signs dre proffered to be of monument style construction will not exceed twelve (12) feet in height. E+..) outdoor Stornee The applicants hereby proffer to prohibit outdoor storage on the 2.07 acre parcel. T.) 1@ onetarry Cont rA —flo-n for five and Rescue Services The applicants hereby proffer to provide a cash payment of $2,000.00 to initigate impact to Fire and Rescue Services. The applicants will provide the cash payment to Treasurer of Frederick County, Virginia at the same time of building pern-rit issuance for the 2.07 acre parcel. March 29,2006 Artz & Associates, PLC Preliminary Matters coli[. G.) Sigruat res Alban Center The condition proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the applicant and owner. In the event the Frederick County Board of Supervisors grant this rezoning and accepts the condition, the proffered condition shall apply to the land rezoned in addition to other requirements set forth in the Frederick County- Code. Respectfully Submitted: By: Date Daviel A. hicks By: Linda W. 1 -licks Date Cogn-11911wealth of Virginia, City/CoLuity cf.,��" it �fi_w" .�.�_.F� .�� r : , To Wit: The foregoing instrument was acknowledged before me this _Yday of 2006 by "'fir-Ak )1 d) i- A-- � Q ( -' i E� _L_0' -030 otaty public My Conunnission Expires l � 4 Page 1 of 1 Parcel Un- Frederick n Frederick County Department of Geographic information Systems hftp://gis.co.frederick.va.,.ks/Frecance/Client/PublicAccessl/printt'raine.litml 1/27/2006 71 B � Ed cap ds Ln_ t. 1 301 Rt02 299--284 )ta nb(ir Ln. Rt. 852 )unbar St. 81 82 85 am 96 95 91 879 92 97 ►.� 102 25 98 � c � 198 ro 120119118 A � 6 241-9 125 115 L26 124 R crs 107 a 27 113 114 108 112 110 109 is 11 S 7 s Hudson/Ave:—,-, 130 2U2 to tf� 1 t� iQ t 131 132 247 IN e 846 24. 244 2 pts. 5 ,2531 244 2 pts_ 254 302-424 HICKS OFFICE BUILDING IF !' RTS 522 &7R9 19 war Cwt SS -..Stare x00 vno�e'. isnonx2 ax<x ' \' .. w�n�harer Vlrgnax2601 r„ns+n�ozxox+e JOB *0514[ r _ WINCHESTER, VIRGINIA 01/26/06, 1y � r � Mi'1 �� • r h 1 � e� ++ .•`� "VINs f � �. �i kY i1 r I r,4� w� {e , 0 1."2006 y r :4 _ •1 a - V : ♦t y • ,,... . ... +r ^`. . 3 �, �� �Mi ,� 4 ""Y��p��y^y, ���t � i� ,yY ,r 4\ ''� t.� { �j* _�' _ .•sr�,�..�«�� 1 an , .,,�5�� t •i ," r'.'i,S r, i a• r yi' d"'M_ fir, � Ei Oil" 7.r",dy '."T + , .Y `� ` `�' ,.e t v1 0 •. _ 'r.., j' iy,Kty,. T t' 'ar• fir. . '�:� � :.� ., ,. : "{ 'rn,_ . `a `�:M:+'!iNJ' �ee t�,':'.. �tZ •• _ Y: � ^a �3w,� � � - , g31' � ; • �•.�.�� pm IPp�A .. /,'.; ,,.:., t".•.. .. s -a- 4k:.y ;' �....{:. '�,`.> ..} .,M; �,• y, �R."r ='a,. s v ,may • i. ,, 1�., '4 • .,.. *�;.�. d ?', � l ®..s_ -,,r. �ar.. `y_ '.�.#,�.o++-.te� yr'-...:-.?P.,M. ., .�.y ^s. {�... sa",.-{+d. ..,r. .,...:�.y. 6 4k^r',♦-�. �+`1h:'?+��'� w. ��s i A ` •i�' wj._`, iis+�. ; Y� 't ...i t nes• q �5. �V iy JJ S C qr .�'^ 0.1 `2`006 `u VIRGINIA t de no. _ 34=543- Negative no(s).9808 DIVISION OF HISTORIC LANDMARKS - - r G ; HISTORIC DISTRICT/BRIEF SURVEY FORM MIV/16wn/Village Hamlet Albin County Frederick eet address or route number Route 789 U.S.G.S. Quad Winchester Astoric name Common name residential Building Style vernacular Present use 18901910, C. 1900--1920, Orivinal use residential Building Date(s)c- --c. 193C I. Construction Materials dwood frame ❑ brick bond: ❑ English ❑ Flemish ❑ course American ❑ stretcher ❑ other ❑ stone ❑ random rubble ❑ coursed rubble ❑ ashlar ❑ dressed ❑ rock -laced ❑ log: ❑ squared notching: ❑ V -no(& ❑ saddle ❑ square ❑ ctmta-cic block ❑ terra cotta ❑ steel Frame ❑ other . ❑ unsyumred ❑ hal! dovctai! ❑ full dovetail ❑ diamond 2. Cladding Material ❑ weatherboard ❑ composition siding ❑ vertical siding dstucco ❑ hoard & batten ❑ aluminum or vinyl siding ❑ shingle: ❑ cast iron ❑ wood ❑ sheet metal ❑ ashestos ❑ enameled metal ❑ asphalt ❑ glass ❑ bricktex ❑ other 3. 9 ries (number) 2 Lid low basement raised basement 4. Bpys (number): front 3 - side (church) M symmetrical ❑ asymmetrical 5. Roof Type ❑ shed parapet'? M garble ❑ pediment? ❑ parapet'? ❑ clipped end'? ❑ cross gable? ❑ central front gable? ❑ other G Roofing Material ❑ hipped ❑ pyramidal? ❑ mansard ❑ false mansard ❑ gambrel ❑ flat ❑ parapet? ❑ roof not visible ❑ shingle ❑ composition (asphalt, asbestos, etc.) wood (n, m cal wood seam ❑ corrugated ❑ pressed tin (sinndated shingles) ❑ the ❑ pantile ❑ flat ❑ slate ❑ not visible 7. Dormers (number) front—side side ❑ gable ❑ pediment'? ❑ shed ❑ hipped ❑ glazed 8. Primary Porch Style COlonial Revival stories 1 levels full height bays 3 materials wood description and decorative details Tuscan columns; paneled beams in entablature. 9. General supplementary description and decoration: 1/1 windows; story protruding bay entry w/ original door and tran 2 int. end flues; 4—light square atticwindowin Vab 10. Major additions and alterations: side porch, int. end ome new windows; new stucco; flue. ew front porch; rear 1—story II. Outbuildings: German lap storage barn; frame barn. --- ---------------------------------- 12. Landscape Features: MAture trees. 13. Significance:� One ofthe olderhousesin the communi of Albin. Surveyed by: tate: 8/89 Leslie Giles rt Y _ ? Al 7- y�, r N i Y � S y� File no. 34-542 Negative no(s)9808 i:. DIVISION O HISTORIC LANDMARKS -- ----- - ; HIS TORIC DISTRICT/BRIE SURVEY FORM City/ liwvn; Villa c Hamlet - - Albin -- --- - County Frederick iaddress or route numberRoute 789 U.S.G.S. (quad Winchester t. ric name Common name ------_.._ - ------ I'trscnt use Building Style vernacular w/ Folk Victorian Original uu residential Building Datc(s) c. 1870--19001 details -- -- c. 9T0-=1J�I6 --- 2 1. construction Materials LJ wood frame ❑ brick bond: OF nglish ❑ Flemish ❑ -course American ❑ stretcher ❑ other ❑ stone ❑ random rubble ❑ coursed rubble ❑ ashlar ❑ dressed ❑ rock -lined ❑ log: Clsyuarcd ❑ unsyuanrd notchinc: ' ❑ V -notch ❑ half dovetail ❑ saddle ❑ fill do%ctail I I square ❑ diamond H concrete block ❑ terra cotta ❑ steel frame I� other 2. (Madding Material !1 weatherboard ❑ composition siding ❑ vertical siding fstucco ❑ board & hatter ❑ aluminum or vinyl siding ❑ s1lfllfile: ❑ cast iron ❑ wood ❑ sheet flletal ❑ ashestos ❑ enameled metal ❑ aspllalt ❑ glass ❑ brlcktex ❑ mansard Dot her ❑ false mansard 3. Storics(nunlber) Flow basement t4 raised basement split level 4. Bayys (mlmher): front 3 side (church) C� .Symmetrical ❑ asymmetrical 5. Roof 11 pe ❑ shed ❑ hipped parapet'? El pyramidal'? gable ❑ mansard ❑ pediment'? ❑ false mansard ❑ parapet? ❑ gambrel ❑ clipped end'? ❑ flat ❑ cross gahic'? ❑ parapet? ❑ central front gable? ❑ roof not visible ❑ other -- -- - -- ---- - - -- - - — -- - -- 6. Rooling Material --_ i f� sh n>;Ic (composition (asphalt, asbestos, etc.) ❑ wood ❑ metal ❑ standing scan, ❑ corrugated ❑ pressed tin (simulated shingles) ❑ the ❑ pantile ❑ flat ❑ gkvcd ❑ slate ❑ not visible 7. I )ornicrs (nu ether): I ront ._— side ❑ gable ❑ pediment? ❑ shed ❑ hipped 8. hrimary Porch stvlc Colonial- Revival stories ---1 ---- - levels _. full bei hg_ t — - 3-- hays materials description and and decorative details Llnf Lined Doric coltunns; paneled beam entablature. 9. General supplementary description and decoration: 2/2 windows, 1/1 windows on 1st floor; 2 -story rear ell w/ side poi and ext. end chimney; decorative brackets in eaves; 2 -irrt Qnd -flues; boxedcornice;�rigrna�eer- w/ trans( 10. Mayor additions and alterations: above. Stucco added; 1 -story side porches enclosed. 11. Outbuildings: German lap frame garage; frame garage w/ quarters above; frame wash house(?). 12. Landscape Features: Mature trees. 13. Significance: one of the older houses in the community of Albin. unr�rd he: Leslie Giles I Al ti ► f •', "-ti;, VW(: E N I A LINzative to. no(s) 9809DIVISION Ol; 1- ISTORIC LA1�J1�1Y1� RKS- - ----- t�_yy<;, I lis l U1lIC ufsTRICT/1312 E SURVEY FORM lvJ "`wn/ Villagcl Flamlct r Tress or route number mune csent use residential -iainal use residential Albin Route 789 Construction Materials IJ wand franc ❑ brick bond: ❑ English ❑ Flemish ❑ —_-course American ❑ stretcher ❑ other Cl Stone -- ❑ random rubble ❑� omposition siding ❑ coursed rubble M stucco ❑ ashlar ❑ dr"essed ❑ rock -laced ❑ log: ❑ cast iron I-1 Squared F1 m+srluared notching: ❑ enameled metal (A V -notch ❑ hall dovclail ❑ saddle ❑ full doxetail (-) Siluarc ❑ diamond D concrete block ❑ flat U terra colla ❑ parapet? ❑ steel Irante ❑ roof not visible LI other Cladding Material -- ealherhoard ❑� omposition siding ❑ vertical siding M stucco ❑ hoard car hatter ❑ alunlinum or vinvl siding ❑ Shingle: ❑ cast iron ❑ wood ❑ sheet metal ❑ asbestos ❑ enameled metal ❑ asphalt ❑ glass ❑ hricktex ❑ false mansard ❑ of hcr------- — Countv rreaericK II.S.G.S. Quad Winchester Common name The Edwards House Building Style vernacular Ruifdiriv Date(s) mid to late 19th cent. , c 3. ries (number) 2 St -- basement ❑ raised basement 4 Bays (number): front _2 --side (church) —Eyasymmetrical ❑ symmetrical 5. Itoof'lype ❑ shed ❑ hipped parapet? ❑ pyrarnidal'r Qgahle ❑ mansard ❑ pedimmnt? ❑ false mansard ❑ parapet? ❑ gambrel ❑ clipped end? ❑ flat ❑ cross gable? ❑ parapet? ❑ central Front gable? ❑ roof not visible ❑ other b. Roofing Material ❑ shingle ❑ composition (asphalt, ashcstos, ctc.) �- wood l� ruct.+l n~landingScant 1_1 con ugalcd ❑ pressed tin (Sinmlated shingles) ❑ rile ❑ pantile ❑ Ilat ❑glazed ❑ Slate ❑ not visible 1 7 Dornxi:s (number): liont —side _--- ❑ gable ❑ pediment? ❑ shed ❑ hipped - R. Primary Porch stvic _ Colonial Revival stories—1_____--.-__--- - - levels ___ full _height - hays —6 — materials wood , - concrete- block description and decorative details Short Tuscan columns on _decorative concrete block piers; wraps around house. 9. General supplcmentary description and (Iecoration: Leaded, stain )lass transom/1 window; transom over door; 2 -story )rotruding side bay; louvered shutters; 2 -story rear ring-- - ---- -- _----- ...- 10. Major additions and alterations: Colonial Revival rear wing. L Outhuildill s: Smokehouse and outhouse w/ pyramidal roo frame workshop w/ bricktex siding; concrete block offi, frame garage and shop. 12. I :uulscagoc I•catures: Mature trees; low stone retaining wallaround property. 13. Significance: One of the older houses in the community of Albin. Surveyed hv:I )ate: R/89 'Lesile Gil - Ir D !.44 G JA IZ . 'rrti •4 ti � � P .•...; Y 1 Ir D !.44 G JA IZ . i 2 v r ��• �e� � �4 rte,,. 4• li 4p 1� i 2 v r ��• �e� � �4 rte,,. 4• li 4p VIRGINIA I • do no. 34-544 ,� W 4 Ne gad qvc no(s)_9808-,- 9809DIVISION OF 1 -1 -IS - j. HISTORW DISTRICT/ BRIE SURVEY FORM tv/ liiwn/Vibe/Hamlet-- c Icl rens or route number lame csent use church -iginal use church ConstructiorilM aterials L9 wood frame ❑ brick bond: ❑ Fnglish Albin County Frederick Route 789 U.S.G.S. Quad Winchester Bethel Church Common name Faith Revival Center ❑ Flemish ❑ -course American ❑ stretcher ❑ other ❑ stone ❑ random rubble ❑ coursed rubble ❑ ashlar ❑ dressed ❑ rock -laced ❑ log: ❑ squared notching: ❑ V -notch ❑ saddle ❑ square D concrete block D terra cotta ❑ steel Itamc ❑ other _ ❑ unsquared ❑ hall dovetail ❑ full dovetail ❑ diamond Cladding Material -atherboard ❑ composition siding :rtical siding dstucco on bricktex ❑ hoard & batten ❑ aluminum or vinyl siding ❑ shingle: ❑ cast Iron ❑ wood ❑ sheet metal ❑ ashestos ❑ enameled metal ❑ asphalt ❑ glass ❑ hrick tc'x ❑other .---------._-- Building Style Gothic Revival Building Date(s)c. 1870--1900 3. Stn . (number) L=5 Q low basement ❑ raised basement 4. lky. (number): from - CJ symmetrical 5. Roof -lype ❑ shed parapet? gable ❑ pediment? ❑ parapet's ❑ clipped end? ❑ cross gable? Cl central front gable? ❑ other_— __ side (church) ❑ asynmietr ical ❑ hipped ❑ pyramidal? ❑ mansard ❑ false mansard ❑ gambrel ❑ flat ❑ parapet? ❑ roof not visible (e Rooling Material -- - ❑ shingle ❑ composition (asphalt, asbestos, etc.) ❑ wood Ed m al standing seam ❑ corrugated ❑ pressed tin (simulated shingles) ❑ life ❑ pantile ❑ Ilat ❑ glazed ❑ slate ❑ not visible 7. Dormers (number):- — I -rant side ❑ gable ❑ pediment? ❑ shed ❑ hipped 8. Primary porch style vernacular stories 1 _-- - — full height 1 levels _-- —g_ bays — materials wood, concrete, stucco description and decorative details Pedimented 1 -bay entry portico w/ Tuscan columns on stuccoed concrete block piers. 9. General supplementary description and decoration: 4/4 Gothic -ched windows; Gothic louvered shutters; 8 -light roun -ndow in front gable end; double entry; ext end flue; )ware vent window in front gable end. _ 0. Major additions and aiterdions Original 4/4 windows rtially hidden by storm window enclosures; rear wing bays right, 3 bays left) w/ shed roof; side parapet w roof.- and -stucco; -3 -7 -light- cellar__wind2w. . Outbuildings: German lap outhouse. Landscape Features: Mature trees; gravel parking lot. Significance: Church moved here from Old Bethel formerl; he Poor House Road in the 1920s --1930s. Surveyed by: Date: Lecke Gilles Item # 3 Carriage Park Rezoning proposal The HRAB has been asked to review and provide comment on the Carriage Park rezoning proposal, which has been submitted by Patton Harris Rust & Associates. The proposal seeks to rezone 45.44 acres from the RA (Rural Areas) Zoning District and MH1 (Mobile Home Community) District to the RP (Residential Performance) Zoning District. The property is located south and adjacent to Route 7, east and adjacent to the Blue Ridge Mobile Home Park (see location map). The applicant is proposing to construct 165 dwelling units with an overall density of 3.59 units per acre. While this site does not contain any significant structures, the Study of Civil War Sites in the Shenandoah Valley, published by the National Park Service shows that the subject site is included in the battlefield study area of the Third Battle of Winchester with portions of the site being identified as core area (see included map and impact analysis). This area of the County corresponds to phase two and three of the Third Battle of Winchester (see excerpts from the Study of Civil War Sites in the Shenandoah Valley). In an effort to recognize the importance of the battlefield, the applicant has proffered the following: • A tree save area that is a minimum of 50' in width shall be provided along the property frontage of Route 7 and Valley Mill Road in an effort to maintain the interpretive qualities of the Battle of Third Winchester • The impact analysis states that a pull off area on Valley Mill Road with a historic marker describing the events will be provide (staff would note that this has not been proffered). Please find attached for your information a map of the site, the impact analysis and the proffer statement provided by the applicant. Representatives of the applicant will be available at the HRAB meeting to provide additional information on the proposed rezoning. Staff will be seeking comments from the HRAB on the historical elements possibly impacted by proposed development. The comments will be included in the rezoning application package for the Carriage Park rezoning proposal when it is submitted. A photograph of the site has been provided by the applicant. HISTORIC RESOURCE ADVISORY BOARD REVIEW APPLICATION e { 1 inn Frederick County - 1 107 North Kent Street, Suite 202 MEETING DATE Winchester, Virginia 22601 Telephone: (540) 665-5651 Fax: 540 665-6395 DATE STAMP ADDRESS OF PROJECT: 2622 berrrvrite tike PROPERTY OWNERS NAME: Carriage Place, LLC TELEPHONE NUMBER: 34U.00/,. iloo PROPERTY OWNERS ADDRESS: 22A Ricketts Drive Winchester, VA 22601 ARCHITECT/DEISGNER: Patton Harris Rust & Associates TELEPHONE NUMBER: 540.667.2139 Description of Application: Please describe briefly the request of the application: (rezoning, master development plan, conditional usepermit). Please be specific. Rezoning of approximately 45 acres for single family residential use adjacent to Route 7 and Valley Mill Road. This application is not complete until all of the following information has been provided to the Department of Planning and Development. Please check the materials that have been submitted. k Copy of required application as described in 1.1 (1.1.1-1.1.4) X Description of proposed development or construction project, including proposed uses and general timeframe for development (1.2) X Status of any identified historic or archaeological resources on the site or adjacent to the site (e.g, located in any identified historic area, survey area, or battlefield site or individually listed on a local, state or national historic register, relevant infonnation on record with the Virginia Department of Historic Resources) and presence of other historic structures or significant landscape features or archaeological sites; (1.3) _K Photographs (color) of all historic resources on the property (1,4) PROPERTY IDENTIFICATION NUMBER (PIN): 55-A-161, 165A, 166, 167, 168, 174, 174D, 176 Name of Applicant: Patton Harris Rust & Associates Telephone Number 540 667.2139 Address: Stre E. cad' ly Stree uite 200 City Winchester State VA Zip Code 22601 Si nature:Print Name: Patrick R. Sowers Date: QS/3Q/06 Please note that the applicant or his/her appointed representative must be present at the meeting. Frederick County, Virginia IMPACT ANALYSIS STATEMENT AND REZONING APPLICATION MATERIALS FOR REZONING REVIEW AND APPROVAL OF CARRIAGE PARK Red Bud Magisterial District May 2006 Prepared by: Patton Harris Rust & Associates, pc 117 E. Piccadilly Street Suite 200 Winchester, Virginia 22601 Phone: 540-667-2139 Fax: 540-665-0493 May 2006 Carriage Park Table of Contents I. Application Form II. Impact Analysis A. Site History and Project Background B. Location and Access C. Site Suitability D. Traffic E. Sewage Conveyance and Water Supply F. Site Drainage G. Solid Waste Disposal Facilities H. Historic Sites and Structures I. Impact on Community Facilities III. Proffer Statement IV. Agency Comments V. Survey Plat and Deed VI. Tax Ticket January 2006 Carriage Park I. APPLICATION REZONING APPLICATION FORM FREDERICK COUNTY, VIRGINIA To be completed by Planning Staff Fee Amount Paid S Zoning Amendment Number Date Received PC Hearing Date BOS Hearing Date The following information shall be provided by the applicant: All parcel identification numbers, deed book and page numbers may be obtained from the Office of the Commissioner of Revenue, Real Estate Division, 107 North Kent Street, Winchester. 1. Applicants: Name: Patton Harris Rust & Associates Telephone: (540) 667.2139 Address: 117 East Piccadilly Street Winchester, Virginia 22601 2. Property Owner (if different than above) Name: Carriage Place, LLC Telephone: Address: 22A Ricketts Drive Winchester, VA 22601 Winchester, Virginia 22601 3. Contact person(s) if other than above Name: Patrick Sowers 540.662.7160 Telephone: (540) 667.2139 4. Checklist: Check the following items that have been included with this application. Location Map Agency Comments Plat Fees Deed ofro p perty Impact Analysis Statement Verification of taxes paid Proffer Statement 11 5. The Code of Virginia allows us to request full disclosure of ownership in relation to rezoning applications. Please list below all owners or parties in interest of the land to be rezoned: Denver Quinnelly 6. A) Current Use of the Property: Mobile Home Park. Residential & Vacant B) Proposed Use of the Property: SF Detached & Attached 7. Adjoining Property: SEE ATTACHED. PARCEL ID NUMBER USE ZONING 8. Location: The property is located at (give exact location based on nearest road and distance from nearest intersection, using road names and route numbers). South & adjacent to Route 7, east & adjacent to Blue Ridge Mobile Home Park 2 12. Signature: I (we), the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance and to change the zoning map of Frederick County, Virginia. I (we) authorize Frederick County officials to enter the property for site inspection purposes. I (we) understand that the sign issued when this application is submitted must be placed at the front property line at least seven days prior to the Planning Commission public hearing and the Board of Supervisors' public hearing and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my (our) knowledge. Applicant(s) Date Date Carriage Park Rezoning Application Adjoining Property Owners Tax ID # Name Address Zoning Use 55-A-162 Ba lis Investments, LLC 2332 Middle Road, Winchester, VA 22601 RA Residential 55-A-163 -Baylis Investments, LLC 2332 Middle Road, Winchester, VA 22601 RA Residential 55-A-164 Robert E. & Gladdie R. Carter 1560 Valley Mill Road, Winchester, VA 22602 RA Residential 55-A7-165 Valley Mill Farm, LC 8705 C Street, Chesapeake Beach, VA 20732 RA Agricultural 55 -A -165D Valley NO Farm, LC 8705 C Street, Chesapeake Beach, VA 20732 RA Agricultural 55 -A -168A Brian Scott Williams 2718 Berryville Pike, Winchester, VA 22603 RA Residential 55-A-169 M ron L. & Lorie M. Ace 11240 Cleveland Avenue, Ft. Mers, FL. 33907 RA Retail &Services 55-A-170 David Bra P.O. Box 174, Clearbrook, VA 22624 RA Residential 55-A-171 Three WayPartnership504 Eagle Place, Winchester, VA 22601 RA Residential 55-A-172 William C. Whitmore, Jr. Etals P.O. Box 550, Purcellville, VA 20134 RA Residential 55 -A -174C Blue Ridge Associates 2432 Berryville Pike, Winchester, VA 22603 RA Residential 55-A-146 William D. Alexander 2663 Berryville Pike, Winchester, VA 22603 RA Residential 55-A-147 William A.'& Maria H. Balling 111 Burnt Factoa Road, Stephenson, VA 22656 RA Residential 55-A-159 Thomas R. Baggerly, Sr. 8904 Telford Court, Bristow, VA 20136 RA Residential 55-A-160 William W. & Ruby Lee Beck 2851 Berryville Pike, Winchester, VA 22603 RA Residential 55-A-174 Ph llis B. Holtkam Etals C/O ohn Bradfield 8225 Cambourne Court, Gaithersburg, MD 20877 RA A ricultural 55-4-1B ose h D. & Amy H. Sowers 111 Edd s Lane, Winchester, VA 22602 RA I Residential January 2006 Carriage Park IIe IMPACT ANALYSIS January 2006 Carriage Park SUMMARY AND JUSTIFICATION The Carriage Park property lies wholly within the Urban Development Area (UDA) and Sewer and Water Service Area (SWSA) of Frederick County, with direct access to eastbound Route 7. The site is located in close proximity to the Haggerty project, which was successfully rezoned in the past year for residential land uses. The development of the Carriage Park property will continue to establish the development pattern in the Route 7 corridor and will provide for the integration of the project with adjacent properties should they develop in a manner harmonious with the Comprehensive Plan. The rezoning of the site for a single family residential development consisting of approximately 165 dwelling units is consistent with the vision of the Comprehensive Policy Plan, which expressly calls for suburban residential uses to predominate within the UDA. The site is generally located in an area designated for residential land use on the Eastern Frederick Count,V Long Range Land Use Plan map. By using available land within the UDA, this rezoning promotes a dynamic housing market within the county's designated growth area, reducing development pressures in the County's rural areas. The project density of 3.59 dwelling units per acre is well within the zoning guideline of 5.5 dwelling units per acre for parcels between 10 and 100 acres. The applicant is confident that the proposed rezoning includes a proffer program that will appropriately and effectively mitigate the impacts of this development. The single family residential land use envisioned for the site is compatible with the development trend emerging in the area and is consistent with the land use policies of the Comprehensive Policy Plan. As such, this rezoning request merits favorable consideration and approval. aJ� Map Features County Boundary Tax Map Boundary Community Centers George Washington National Forest p Hamlets Lakes/Ponds Streams N Sewer Water Service Area •.•; • Urban Development Area Roads/Transportation � Interstates /V Primary Highways Secondary Roads Named Private Roads Unnamed Private Roads Proposed Route 37 Railroads Cities/Towns Middletown Stephens City ] Winchester Agricultural Districts ( Double Church IM Refuge Church South Frederick Zoning [ B1 (Business, Neighborhood District) 82 (Business, General District) B3 (Business, Industrial Transition District) EM (Extractive Manufacturing District) HE (Higher Education District) M1 (Industrial, Light District) �l M2 (Industrial, General District) MH1 (Mobile Home Community District) MS (Medical Services District) R5 (Residential, Recreational Community District) [� RA (Rural Areas District) RP (Residential Performance District) 29. - 44Ali� 22 23 b :een Spring 53 i r V _ i S. 1,01 1 ~ , r ,r 4� O meg X31 32 ;33 AWi rJain, S t ,�-• �,+: @ OTS fir l 42' 44Ali� 3s 53 � r V _ i S. 4 1 ~ , �.a 522 — 716 s 24 Rd'34 6Br4cetomn Leetown y Jordan Spnhgs QAt rnt Factory l i 56 66 H 11 :70 CARRIAGE PARK Patton, Harris, Rust & Associates, pc Cb y ZONING MAP 117 E. Picadilly St. Winchester, Virginia 22601 Q VOICE: (540) 667-2139 FAX: (540) 665-0493 FREDERICK COUN7Y, KRGlN64 35 46 May 2006 Carriage Park SITE BACKGROUND AND HISTORY The Carriage Park property consists of 45.44 acres of land located within the UDA within the Red Bud Magisterial District. Approximately 14.92 acres of the site are zoned MHl (Mobile Home Community) while the remaining 30.52 acres are zoned RA (Rural Areas). Two existing homes reside on the site, but will not pose as a hindrance to the intended development of the property. The site is located in an emerging residential area wherein public facilities have been installed through prior development and are readily available for extension into the site. Available facilities include water and sewer lines, and road infrastructure. The requested rezoning from RA (Rural Areas) and MH1 (Mobile Home Community) to RP (Residential Performance) will enable continued development within the UDA in accord with the Comprehensive Policy Plan. LOCATION AND ACCESS The Carriage Park property is bounded by Valley Mill Road to the East, Route 7 to the North, and Blue Ridge Mobile Home Park to the West (Figure 1). Access will provided via a single entrance on Route 7 for right in/right out turning movements. Additionally, an interparcel connector will be provided at the Southern boundary of the property to facilitate access to both the adjacent parcel and ValleyMill Road in the future. An emergency access connection will be provided between the Blue Ridge Mobile Home Park to the West to allow two way emergency access. Current transportation planning calls for the crossover at the Valley Mill Road intersection with Route 7 to be closed with Valley Mill relocated to eventually intersect with the proposed Haggerty "spine road." This will allow for private ownership of the existing one lane bridge on Valley NO Road that crosses Abrams Creek. Future extension of Carriage Park access to Valley Mill Road may allow future interparcel access, depending on future applicant desires should development occur to the South. fY Y tt G u 9 � L� y46 r `y- �µ+_ *� ltr.��� e�SP,� � : t� . � e . a� - gam. ... •i # lan 44 dti� i ati S c� , t P .y� � A �, r� �.r �'�, �+.•`�5 � � � h 4-' 3 a � I Ir 2A om .L 1y* '' �y � �, `day"4S T- .� 'F'�i• '{�y .�� fq� . . * � � , ��._.. ' 131Y Y i fS of S ii 4 �- x . ; • 3 I'. - 4 - f 4 1'� - k i.,kRl Y .y 1 Sy L i rim{ y -7 CARMACE PARS Patton, l (u l sr RushAssociates, c p t c�' LOCATION MAP 117 E Pisedilly SL Winchester, Virginity 226al VO (541) 667-20 F (540) 665-019. FREDERICK Cf UNTr WRO1144 FlGUFi'F l May 2006 Carriage Park SITE SUITABILITY The site does not contain conditions that would preclude or substantially hinder development activities. The following table provides an area summary of environmental features: Carriage Park Property Environmental Features Total Project Area 45.44 acres Area in Flood Plain 10.50 acres 23.1% Area in Steep Slopes 0 acres 0% Area in Wetlands 0 acres 0% Lakes & Ponds 0.25 acres .01% The General Soil Map of the Soil Survey of Frederick County,ViMini indicates that the soils comprising the subject parcels fall under the Weikert-Berks-Blairton soil association, with the particular geology being Martinsburg shale and slopes ranging from 3% to 25%. Such geology is prevalent on land located east of Interstate 81 and is not identified as prime farmland by the Frederick County Comprehensive Plan. The site is predominantly wooded and no history of agricultural use has been identified. Two stream channels traverse the property, including Ash Hollow Run which runs parallel to Route 7 at the Northern boundary of the property. Ash Hollow Run flows into Abrams Creek which crosses the Eastern boundary of the site prior to crossing under Route 7 and ultimately terminating at Opequon Creek. Riparian buffers required by ordinance will be preserved on either side of the stream channel. Additionally, the design of the project will respect the 100 year flood plain associated with these stream channels (Figure 2). The majority of sensitive environmental areas identified will be placed in permanent open space. The National Wetlands Inventory does not identify any wetlands on the Carriage Park property, however any potential wetlands associated with the stream channels will be located within the project's open space. A small pond located on the Western portion of the property will be maintained within the open space required for the development as well. May 2006 Carriage Park TRAFFIC A traffic impact analysis (TIA) was prepared for this application using composite data collected from other studies in the area as well as actual traffic counts. Using traffic generation figures from the I.T.E. Trip Generation Manual, 7t" Edition, the TIA projects that the proposed development will produce 1,348 vehicle trips per day (VPD). The TIA further indicates that study area roads and intersections have the capacity to accommodate the trips generated by this project at acceptable and manageable level of service conditions. Access to the site will be provided via a right-in/right-out entrance on Route 7. Project generated as well as background traffic suggests the installation of a stoplight where Route 7 intersects both Valley Mill Road and Woods NO Road where the development of the Red Bud Run subdivision is nearing completion. Signalization at Woods Mill Road has been proffered as part of the Red Bud Run development and is currently under constriction. The County's Eastern Road Plan provides for Valley Mill Road to connect with Haggerty project. Valley Mill Road's current intersection with Route 7 will be converted to a right-in/right-out entrance. The eventual closing of the crossover at the intersection of Valley Mill and Route 7 will move westbound project generated trips from the Valley NO intersection to the future Haggerty spine road intersection at the existing Opequon Wastewater Treatment Plan entrance where greater site distances and signalization provided by the Haggerty project will provide for a safer U turn movement. SEWAGE CONVEYANCE AND WATER SUPPLY A 30 inch sewer main runs parallel to Valley Mill Road before following Route 7 to the Opequon Waste Water Treatment Plant. Sewer service will be provided to the site through connection with this main utilizing a master meter station. Using a standard rate of 200 gallons per day/dwelling unit, it is projected that the proposed development would produce 32,200 gallons of sewer flow per day. Water service will be provided by connection to the existing 8 inch line that serves the adjacent Blue Ridge Mobile Home Park. Water consumption for the project will be roughly equivalent to the projected sewage generation of 32,200 gallons per day. May 2006 Carriage Park SITE DRAINAGE Site drainage collects and leaves the site to the north and east via Ash Hollow Run and Abrams Creek prior to draining into Opequon Creek It is anticipated that low impact development techniques together with good erosion control practice will mitigate adverse stormwater discharge impacts. The preservation of riparian buffers and developing with respect to the existing floodplain will provide significant mitigation of nutrient losses. Actual specification of temporary and permanent facilities will be provided with final engineering and will comply with all County, State and Federal regulations. SOLID WASTE DISPOSAL FACILITIES The following table shows a projection of solid waste generation as a part of this project. Unit Type Units Waste Generation Total Waste (lbs) Single Family Detached 69 12 lbs/day 828 Single Family Attached 92 9.lbs/day 828 Total 1,656 lbs Consideration of curbside pick-up would be an improvement to solid waste issues associated with increased dumpster use in the County. HISTORIC SITES AND STRUCTURES The Frederick County Rural Landmarks Survey does not identify any structures of historic importance on the subject site. According to the National Park Service Study of Civil War Sites in the Shenandoah Valley of Virginia, the subject site is included in the battlefield study area of the Third Battle of Winchester with the northern portions of the site along Route 7 identified as core battlefield area. The Property's location coincides with the early phases of the battle when General Sheridan's Union troops advanced through Berryville Canyon towards Jubal Early's confederate troops just outside of May 2006 Carriage Park Winchester. Portions of the battlefield in the vicinity of the site, such as the adjoining mobile home park, have lost integrity according to the National Park Service study. Recognizing the importance of the Property's location with respect to the preliminary phases of the Third Battle of Winchester, the Applicant has proffered to maintain the existing tree coverage on the Property within 50 feet of the Property boundary on both Route 7 and Valley Mill Road. Additionally, a pull off area located on Valley Mill Road with a historic marker describing the events that occurred during the Third Battle of Winchester would compliment the interpretive qualities of the core battlefield provided by the proffered tree save area. IMPACT ON COMMUNITY FACILITIES The Applicant has proffered monies in accordance with the newest Frederick County Fiscal Impact Model to mitigate the projected fiscal impact on community facilities attributable to the proposed rezoning. Specifically, the applicant has proffered to contribute $23,290 per single family detached unit and $17,731 per single family attached (i.e. townhome) at the time of building permit issuance. The total contribution is proffered to be allocated as follows: Single Family Detached ■ Fire and Rescue: $720.00 per unit ■ General Government: $320.00 per unit ■ Public Safety: $658.00 per unit ■ Library: $267.00 per unit ■ Parks and Recreation: $2,136.00 per unit ■ School Construction: $19,189.00 per unit TOTAL: $23,290.00 per unit Single Family Attached ■ Fire and Rescue: ■ General Government: ■ Public Safety: ■ Library: ■ Parks and Recreation: ■ School Construction: $528.00 per unit $245.00 per unit $503.00 per unit $204.00 per unit $1,634.00 per unit $14,618.00 per unit TOTAL: $17,731.00 per unit January 2006 Carriage Park PROPOSED PROFFER STATEMENT Carriage Park Proffer Statement PROPOSED PROFFER STATEMENT REZONING: RZ. # : RA (Rural Areas) and MH2 (Mobile Home Community) to RP (Residential Performance) PROPERTY: 45.44 Acres +/-; Tax Map Parcels 55-A-161, 55-A 165A, 55-A-166, 55-A-167, 55-A 168, 55-A 174, 55-A 176, 55-A 174D (the "Property') RECORD OWNER APPLICANT: PROJE CT NAME ORIGINAL DATE OF PROFFERS: REVISION DATE (S): Carriage Place, LLC Carnage Place, LLC Carriage Park January 25, 2006 February 2, 2006 May 23, 2006 The undersigned hereby proffers that the use and development of the subject property ("Property'), as described above, shall be in strict conformance with the following conditions, which shall supersede all other proffers that may have been made prior hereto. In the event that the above referenced RP conditional rezoning is not granted as applied for by the applicant ("Applicant"), these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are contingent upon final rezoning of the Property with "final rezoning" defined as that rezoning which is in effect on the day following the last day upon which the Frederick County Board of County Supervisors (the "Board") decision granting the rezoning may be contested in the appropriate court. If the Board's decision is contested, and the Applicant elects not to submit development plans until such contest is resolved, the term rezoning shall include the day following entry of a final court order affirming the decision of the Board which has not been appealed, or, if appealed, the day following which the decision has been affirmed on appeal. The headings of the proffers set forth below have been prepared for convenience or reference only and shall not control or affect the meaning or be taken as an interpretation of any provision of the proffers. The improvements proffered herein shall be provided at the time of development of that portion of the Property adjacent to or including the improvement or other proffered requirement, unless otherwise specified herein. The term "Applicant" as referenced herein shall include within its meaning all future owners and successors in interest. When used in these proffers, the "Generalized Development Plan," shall refer to the plan entitled "Generalized Development Plan, Carriage Park" dated January 5, 2006 (the "GDP"), and shall include the following: LAND USE: 1.1 Residential development on the Property shall not exceed a maximum of 165 single family dwelling units. Page 1 of 6 Cama ge Park Proffer Statement 1.2 The project shall be developed pursuant to an annualized phasing plan. Certificates of occupancy for no more than 75 dwelling units shall be issued within any twelve (12) month period, beginning from the date of rezoning approval. 2. CONDITIONS PRECEDENT TO THE ISSUANCE OF PERMITS AND PLAN APPROVALS: 2.1 The Property shall be developed as one single and unified development in accordance with applicable ordinances, regulations, and design standards, and this Carriage Park Proffer Statement as approved by the Board. FIRE & RESCUE: 3.1 The Applicant shall contribute to the Board the sum of $720.00 per single family, detached dwelling unit for fire and rescue purposes, payable upon the issuance of a building permit for each detached unit. 3.2 The Applicant shall contribute to the Board the sum of $528.00 per single family, attached dwelling unit for fire and rescue purposes, payable upon the issuance of a building permit for each attached unit. 4. SCHOOLS: 4.1 The Applicant shall contribute to the Board the sum of $19,189.00 per single family, detached dwelling unit for school purposes, payable upon the issuance of a building permit for each detached unit. 4.2 The Applicant shall contribute to the Board the sum of $14,618.00 per single family, attached dwelling unit for school purposes, payable upon the issuance of a building permit for each attached unit. 5. PARKS & OPEN SPACE: 5.1 The Applicant shall contribute to the Board the sum of $2,136.00 per single family, detached dwelling unit for recreational purposes, payable upon the issuance of a building permit for each detached unit. 5.2 The Applicant shall contribute to the Board the sum of $1,634.00 per single family, attached dwelling unit for recreational purposes, payable upon the issuance of a building permit for each attached unit. 6. LIBRARIES: 6.1 The Applicant shall contribute to the Board the sum of $267.00 per single family, detached dwelling unit for library purposes, payable upon the issuance of a building permit for each detached unit. Page 2 of 6 Carnage Park Proffer Statement 6.2 The Applicant shall contribute to the Board the sum of $204.00 per single family, attached dwelling unit for library purposes, payable upon the issuance of a building permit for each attached unit. 7. PUBLIC SAFETY: 7.1 The Applicant shall contribute to the Board the sum of $658.00 per single family, detached dwelling unit for public safety purposes upon issuance of a building permit for each detached unit. 7.2 The Applicant shall contribute to the Board the sum of $503.00 per single family, attached dwelling unit for public safety purposes upon issuance of a building permit for each attached unit. GENERAL GOVERNMENT: 8.1 The Applicant shall contribute to the Board the sum of $320.00 per single family, detached dwelling unit for general governmental purposes upon issuance of a building permit for each detached unit. 8.2 The Applicant shall contribute to the Board the sum of $245.00 per single family, attached dwelling unit for general governmental purposes upon issuance of a building permit for each attached unit. 9. CREATION OF HOMEOWNERS' AND PROPERTY OWNERS' ASSOCIATION: 9.1 The residential development shall be made subject to a homeowners' association (hereinafter "HOA") that shall be responsible for the ownership, maintenance and repair of all common areas, including any conservation areas that may be established in accordance herewith not dedicated to the County or others, for each area subject to their jurisdiction, and shall be provided such other responsibilities, duties, and powers as are customary for such associations or as may be required for such HOA herein. 9.2 In addition to such other duties and responsibilities as may be assigned, an HOA shall have title to and responsibility for (i) all common open space areas not otherwise dedicated to public use, (ii) common buffer areas located outside of residential lots; (iii) common solid waste disposal programs, if they decide to use a commercial collection company, (iv) responsibility for the perpetual maintenance of any street, perimeter, or road buffer areas, all of which buffer areas shall be located within easements to be granted to the HOA if platted within residential or other lots, or otherwise granted to the HOA by appropriate instrument and (v) responsibility for payment for maintenance of streetlights. Page 3 of 6 Carriage Park Proffer Statement 10. WATER & SEWER 10.1 The Applicant shall be responsible for connecting the Property to public water and sewer, and for constructing all facilities required for such connection. All water and sewer infrastructure shall be constructed in accordance with the requirements of the Frederick County Sanitation Authority and the Frederick Winchester Service Authority. 11. ENVIRONMENT: 11.1 Stormwater management and Best Management Practices (BMP) for the Property shall be provided in accordance with the Virginia Stormwater Management Regulations, First Ed. 1999, Chapter 2, Table 2-3 which results in the highest order of stormwater control in existing Virginia law at the time of construction of any such facility. 12. TRANSPORTATION: 12.1 Transportation improvements shall be designed and constructed consistent with the study entitled "A Traffic Impact Analysis of the Carriage Park Property," prepared by Patton Harris Rust & Associated, dated May 6, 2005 (the "TIN). The Applicant shall privately fund all transportation improvements required of this project. 12.2 New access points to the Property from Route 7 shall be limited to a single right -in right -out access point in the location depicted on the GDP. Said entrance shall include an eastbound deceleration lane and shall meet all applicable County and State regulations. (See 1 on GDP) 12.3 Applicant shall provide an inter -parcel connector in the location depicted on the GDP to facilitate integration of the Property with future development. (See 2 on GDP) 12.4 The Applicant shall provide a private, gated connection between the internal road network for the project and the existing road network in the adjacent Blue Ridge Mobile Home Park for emergency access in the location depicted on the GDP. (See 3 on GDP) 12.5 The Applicant shall enter into an agreement with the Virginia Department of Transportation that is binding for a period of five years from the date of final rezorun� approval with ano tion for an additional five years for the installation of a left turn lane for Westbound Route 7 at the intersection of Route 7 and Woods Mill Road. If or when, in the opinion of VDOT, the turn lane is required, the Applicant shall construct a left turn lane at said intersection within 180 days of receiving written notice from the Virginia Department of Transportation. Page 4 of 6 Carriage Park Proffer Statement 12.6 The Applicant shall enter into an agreement with the Virginia Department of Transportation that is binding for a period of five ears from the date of final rezoiun� approval with an option for an additional five years for the installation of an extended left turn lane for Eastbound Route 7 at the intersection of Route 7 and Valley Mill Road to lengthen the existing turn lane located at the intersection. If or when, in the opinion of VDOT, the turn lane is required, the Applicant shall construct a left turn lane at said intersection within 180 days of receiving written notice from the Virginia Department of Transportation. 13. HISTORIC RESOURCE PROTECTION 13.1 A tree save area that is a minimum of 50 feet in width shall be provided along the Property frontage of Route 7 and Valley Mill Road in an effort to maintain the interpretive qualities of the Battle of Third Winchester. Crossing, clearing, or grading of said tree save area shall be prohibited except for the single proposed entrance and any necessary utilities. SIGNATURES APPEAR ON THE FOLLOWING PAGES Page 5 of 6 Carriage Park Proffer Statement Respectfully submitted, Carriage Place, LLC Title: STATE OF VIRGINIA, AT LARGE FREDERICK COUNTY, To -wit: The foregoing instrument was acknowledged before me this day of , 2006, by My commission expires Notary Public Page 6 of 6 1� ( r' 1. r'�^,i I � r ..� t� � � � `� �E- �_`i 1, ra ,�"- `._� � j - �, \, ��`\ .�J����1! �� �-,.,. �.•-�'' r { ' \. it ,• ` ,i ` N` 1 ♦ E F i _ site, Acliss _.. �J tal ency Acca c - r o - --'6j SINGLE FAMIRY DETACHED DS \ Z r ! 92 SINGLE FAMIRY b_ \ \\' - �ATTA HED (T9WNHOMES' C , \L _ ! , CARRIAGE PARK Patton, Harris, Rust & Associates, pc GENERLIZED DEVELOPMENT PLAN 117 E. Picadilly 5t. Winchester, Virginia 22601 O Q VOICE: (540) 667-2139 FAX: (540) 665-0493 FREDERICK COUIV rK 1IRGINIA CIVIL WAR SITES IN THE SHENANDOAH VALLEY OF VIRGINIA OPEQUON OR TmRD WINCHESTER (19 SEPTEMBER 1864) County: Frederick, VA and City of Winchester General Location: Area east of Winchester from I-81 along Berryville Pike (VA 7) to Opequon Creek. Also combat north of Red Bud Run W to USI 1. Stephenson's Depot. Star Fort. Collier Redoubt. Size of Study/Core Areas: 11,670/4,914 acres GIS Integrity of Study/Core Areas: 54/47 percent; Fair/ Poor Field Assessment of Study Area Integrity: Poor USGS Quadrants: Winchester, Stephenson Campaign: Sheridan's Valley Campaign Principal Commanders: [c] Lt. Gen. Jubal Early; [u] Maj. Gen. Philip Sheridan. Forces Engaged: [c] Four divisions (Gordon, Rodes, Ramseur, Breckinridge/Wharton), two cavalry divisions (Fitz Lee, Lomax), about 15,200; [u] Three infantry corps (Wright, Emory, Crook), cavalry corps (Torbert), about 39,236. Casualties: [c] 3,611 (226k/1,567w/1,818m&c); [u] 5,018 (697k/3,983w/338m). Significance: Opequon or Third Winchester (fought 19 September 1864) was the largest and most desperately contested battle of the Civil War in the Shenandoah Valley, resulting in more than 9,000 casualties. The battle was a turning point of the war in the Valley, marking the rise of Sheridan and the decline of Confederate power. Sheridan defeated the Confederate army again three days later at Fisher's Hill (22 September), forcing it to retreat up the Valley to near Waynesboro. The CS army of Lt. Gen. Jubal A. Early suffered about 23 percent casualties. Casualties for the larger Union army under Maj. Gen. Philip Sheridan exceeded 5,000, nearly 20 percent. The Union XIX Corps sustained 40 percent casualties (2,074 93 men) and lost every regimental commander during its assaults on the Middle Field and Second Woods. The most severe fighting and casualties occurred in the large parcel east of I-81, north of rte. 7, west of rte. 656, and south of rte. 661. The Middle Field ranks with some of the most sanguinary fields of the Civil War, witnessing more than 3,000 casualties. CS general Robert E. Rodes and US general D. A. Russell were both killed within a few hundred yards of the Dinkle Barn site at the entrance to Winchester Mall. DESCRIPTION OF THE BATTLE Phase One. US Advance (19 September): Maj. Gen. Philip Sheridan's army advanced from the vicinity of Berryville on the Winchester -Berryville Pike about 0200 hours, 19 September 1864. At earliest light, Brig. Gen. James Wilson's cavalry division crossed the Opequon at Spout Spring and advanced through a defile known as Berryville Canyon, followed by the US infantry (VI Corps, XIX Corps, and Crook's corps). At the canyon's mouth the cavalry met the first elements of Maj. Gen. Stephen Ramseur's CS division and drove them back on their supports. Johnston's brigade deployed across the pike and held back the Union advance, while the rest of the division came into line to cover the Berryville Pike and Senseny Road farther to the south. The US cavalry launched several mounted and dismounted charges, driving the CS infantry back about 150 yards to the vicinity of the Dinkle Barn. Here Ramseur stiffened his defense with artillery, and the US cavalry withdrew as its infantry began to deploy. Wilson's division moved to cover the US left flank where it remained for the rest of the battle. Phase Two. Cavalry Action: About 0200 hours Brig. Gen. Wesley Merritt's cavalry division of three brigades (Custer, Devin, Lowell) advanced toward Seiver's and Locke's fords from the vicinity of Berryville. Their crossings were resisted by Brig. Gen. John McCausland's cavalry brigade dismounted behind barricades. The Reserve brigade (Lowell) pushed across at Seiver's Ford against fitful opposition. Custer's brigade met heavier resistance at Locke's Ford and made several mounted charges before securing a foothold on the western bank. By 0800 hours both wings were across the creek, but the cavalry did not advance for several hours. About 1030 hours, McCausland's skirmishers withdrew, and Merritt's division moved cautiously forward. Waiting for them was CIVIL WAR SITES IN THE SHENANDOAH VALLEY OF VIRGINIA Wharton's infantry division about a mile west of the fords, deployed across the roads in woods and behind stone fences. About 1100 hours, the US cavalry began testing the CS defenses with skirmishers and artillery. Custer launched one mounted attack but was quickly repulsed. About noon, Sheridan's main infantry attack was under- way, and Wharton's division withdrew to cover the CS left flank on the Valley Pike north of Winchester. Merritt continued forward along Charles Town Road. Custer followed the line of the Winchester & Potomac Railroad. About 1400 hours Merritt's division converged with Averell's cavalry division on the Valley Pike near Stephenson's Depot. (See phase seven.) Phase Three. Deployment of US Infantry: In the mean- time, the Union infantry bogged down in the narrow confines of Berryville Canyon, dashing Sheridan's hopes of quickly taking Winchester and defeating the CS army in detail. Maj. Gen. Horatio Wright's VI Corps of three divisions (Getty, Ricketts, Russell) emerged from the canyon in order. Getty's division deployed south of the pike with its left flank resting on Abrams Creek Ricketts' division formed north of the pike on Getty's right and extending to Redbud Run. Russell's division was held in reserve. The XIX Corps of two divisions (Dwight and Grover) did not begin crossing until after 0900 hours and eventually deployed north of the pike into the First Woods, connecting with Ricketts' right. Sheridan established his headquarters near the Berryville Pike, probably south of the road on the Eversole Farm. As the US infantry deployed, the CS batteries opened a furious fire from behind the Dinkle Barn. Union batteries swung into action on both sides of the pike to engage the CS guns. In the meantime, Lt. Gen. Jubal Early concentrated his scattered divisions. Rodes' division, marching from near Stephenson's Depot, deployed to the left and rear of Ramseur's division in the West Woods. Gordon's division extended the line across the Hackwood Farm to Redbud Run. Wharton's infantry and Fitz Lee's cavalry division drew a line across the Valley Pike north of town near Stephenson's Depot. CS batteries deployed on high ground along Baker Lane north and south of the West Woods, and north of Redbud Run. Skirmishing contin- ued along Ramseur's front. Phase Four. Fighting in Middle Field: At 1140 hours, a US signal gun boomed and Grover's division of four 94 brigades (Birge, Molineux, Sharpe, and Shunk) launched its attack from the First Woods across Middle Field toward the Second Woods behind which Gordon's division waited. CS horse artillery north of Redbud Run played havoc with the flanks of Grover's attacking line. Birge's brigade reached the woods, driving back skirmish- ers, but then came up against Gordon's main line and were staggered. Sharpe's brigade came up on Birge's left, and the fighting became desperate. The Confederate line broke, falling back across the Hackwood property. Seven CS cannon in the Hackwood Lane fired canister pointblank into the US attackers, throwing them back. Gordon now launched a counterattack with two brigades, driving Birge and Sharpe out of the Second Woods and back across Middle Field. Grover ordered Molineux to advance and plug the gap that had opened between Birge and Sharpe. The firing was so intense that Molineux's flanks seemed to "melt away." Shunk's brigade was thrown forward to bolster the wavering Union line, coming in on Molinewes right rear. Shunk closed to within sixty yards of the CS line in the Second Woods. The two lines delivered pointblank volleys into each others' ranks. Gordon again counterattacked, and the Union attack collapsed. The wreckage of Grover's division went streaming back across the Middle Field to the safety of the First Woods. The CS horse battery (Breathed) north of Redbud Run again worked execution among the retreating division. Every regimental com- mander in Grover's division was killed or wounded; casualties totaled nearly 1,500. Beal's brigade of Dwight's division deployed in the treeline at the east end of the Middle Field and advanced into "that basin of Hell" to stem the retreat. Gordon's men waiting along the treeline of the Second Woods laid down a murderous fire. The Union brigade did not reach within 200 yards of the Second Woods before being pinned down. They ex- pended all of their ammunition before retreating back to the First Woods. The 114th New York suffered casualties of 60 percent (188 of 350 effectives). McMillan's brigade, personally directed by Corps commander Maj. Gen. William Emory, advanced. They reached a shallow ravine about 200 yards from the Second Woods, where two regiments (8VT and 12CT) clung on for nearly two hours. By 1300 hours, the main thrust of the XIX Corps attack was blunted and its ranks decimated. By 1400 hours, firing on this end of the field sputtered out from sheer exhaustion. MAP 35: OPEQUON INTEGRITY - 1991 (Numbers keyed to battle phases) View of Property frontage along Route 7. Photo taken at Valley Mill Road Crossover.