CPPC 10-10-05 Meeting AgendaCOUNTY of FREDERICK
Department of Planning and Development
540/665-5651
MEMORANDUM
TO: Comprehensive Plans and Programs Subcommittee (CPPS)
FROM: Susan K. Eddy, Senior Planner
RE: October Meeting and Agenda
DATE: October 3, 2005
FAX: 540/665-6395
The Frederick County Comprehensive Plans and Programs Subcommittee (CPPS) will be meeting on
Monday, October 10th, 2005 at 7:30 p.m. in the Board of Supervisor's Room of the County
Administration Building, 107 North Kent Street, Winchester, Virginia. The CPPS will discuss the
following agenda items:
AGENDA
Discussion regarding updates to Frederick County's Eastern Road Plan.
2. Urban Development Area Study
Please contact our department if you are unable to attend this meeting.
BSS/SKE/bad
Attachments
Access is limited during the evening hours. Therefore, it will be necessary to enter the building
through the back double doors of the Board of Supervisors Room, located in the rear of the new
addition of the county building. I would encourage committee members and interested citizens to
park in the. County parking lot located in the rear of the building and follow the sidewalk to the
back double doors of the Board Room.
107 North Kent Street, Suite 202 a Winchester, Virginia 22601-5000
C
•
•
ITEM #1
Draft Revisions to the Eastern :Road Plan
As you are aware, the Metropolitan Planning Organization (MPO) has recently adopted their 2030
Transportation Plan for new and improved transportation corridors in Winchester and the urban
portion of Frederick County. Staff has been comparing the County's Eastern Road Plan to the MPO
plan.
Staff also compared the Eastern Road Plan to the County's Small Area Land Use Plans. Attached,
you will find staffs comparison. This is purely a draft, and is subject to change.
Staff is seeking comment from the CPPS regarding the new changes and updates to the Eastern Road
Plan. This is a discussion item in October, staff will be seeking a recommendation at the November
CPPS meeting.
It is important to note that the road plan will be part of a comprehensive review of the UDA of the
County's Comprehensive Policy Plan. This may involve a complete update of the road plan.
Including the information mentioned above, pleasefind attached a copy of the draft Eastern Road
Plan update, including a staff prepared map showing new roadway corridors and major road
improvements.
Draft Revisions: Eastern Road Plan
Northeast Land Use Plan
• Reconfiguration of Carroll Industrial Park "Loop Rd." This new major collector road
will terminate at Ebert Rd, which will be designated as an improved major collector road.
This has been identified in the land use plan and the Carroll Industrial Park Master
Development Plan (MDP).
• Addition of Cross Cannon Blvd, from Stephenson Rd south to US Route 11. This has
been identified in the Win -Fred MPO 2030 Transportation Plan (MPO) and the
Stephenson Village MDP.
• Addition of a new major collector road, extending west from Branson Spring Rd and US
Route 11, then south to Hopewell Rd. This has been identified in the land use plan.
• Addition of a new major collector road, extending east from Rest Church Rd and US
Route 11, then south to Woodbine Rd. This has been identified in the land use plan and
the Semples Rezoning.
• Reconfiguring Woodbine Rd as a new major collector road. This has been identified in
the Semples Rezoning
• Removing the "kinks" out of State Route 37.
• Addition of Brooke Rd extension from US Route 11 North to US Route 522 North. This
has been identified in the Winchester Area Transportation Study (WATS) and by the
MPO.
• Addition of a southbound on-ramp from Lenoir Dr to State Route 37. This has been
identified in the MPO plan.
• Reclassify US Route 11 from the West Virginia State line down to Exit 317 as improved
major collector. This is identified in the MPO plan.
37 West Land Use Plan
• Addition of Long Green Lane extension from US Route 522 south to US Route 50. This
has been identified in the land use plan.
• Addition of Apple Pie Ridge extension from US Route 522 to Long Green Lane. This
has been identified in the land use plan.
• Addition of Campus Blvd extension across State Route 37 from the Winchester Medical
campus to Long Green La. This has been identified in the land use plan, and the
Winchester Medical Center MDP.
Round Hill Land Use Plan
• Addition of the WWW MDP and Winchester Medical Center MDP road networks.
These have been identified in the land use plan and the MDPs.
• Addition of a flyover of Medical Center Dr from Hospital Dr across State Route 37 to
Perennial Dr. This has been identified in the Winchester Medical Center MDP.
• Realignment of Round Hill Road and US Route 50 intersection. This has been identified
in the WWW MDP.
Western Jubal Early Land Use Plan
• Addition of Jubal Early Dr extension from the Winchester city limit to State Route 37
with a new interchange at the Merrimans La flyover. This has been identified in both the
land use plan and the MPO plan.
• Addition of a new major collector road running from Jubal Early Drive south to Cedar
Creek Grade. This has been identified in both the land use plan and the MPO.
Route 11 South Corridor Land Use Plan
• Addition of the Stephens City by-pass major collector road from its new interchange with
I-81 south of exit 307 to Springdale Rd. This has been identified in the land use plan,
WATS, and the MPO.
• Addition of Shady Elm Rd as an improved collector from Apple Valley Rd to the new
intersection of the Stephens City by-pass and Springdale Rd, with a new interchange at
State Route 37. This has been identified in WATS and the MPO.
• Addition of Prosperity Rd extension to Soldiers Rest La and Shady Elm Rd as a new
major collector road. This has been identified in the land use plan, WATS, and the MPO.
• Addition of Tasker Rd extension from Lakeside Dr, across 1-81, to the Stephens City by-
pass as a new major collector road. This has been identified in the land use plan, WATS,
and the MPO.
• Addition of Squirrel La extension from Marlboro Rd / Fairfax St to Tasker Rd as a new
minor collector road. This has been identified in the land use plan, WATS, and the MPO.
• Addition of a new minor collector road from US Route 11, across from Shenandoah
Valley Baptist Church & Academy, east to the new Squirrel La extension. This has been
identified in the land use plan and the MPO.
• Addition of US Route I 1 South as an improved major collector running from Shawnee
Dr to just north of the Bartonsville Historic District. This has been identified in the land
use plan.
• Addition of a new minor collector road running from Stickley Dr and connecting it to
Aylor Rd. This has been identified by WATS and the MPO.
• Addition of Warrior Dr extension as a new major collector road, running south from
Fairfax Pike to Double Church Rd, then west to Town Run La, connecting with the
proposed Stephens City by-pass. This has been identified in the MPO plan.
Southern Frederick Land Use Plan
• Realignment of Papermill Road at its intersection with US Route 17/522 south to Justes
Dr. Also, its crossing of I-81 to be aligned with Battaile Dr with a new interchange at I-
81. This has been identified in the land use plan and the MPO plan.
• Addition of a new major collector road extending from Tasker Rd and State Route 37
north to Evendale La, and following that alignment to Papermill Rd. This has been
identified in the land use plan, the Crosspointe Rezoning, and the MPO plan.
• Continuation of Justes Dr as a major collector road extending to Victory Rd and Airport
Rd. This has been identified in the land use plan and the MPO.
• Addition of a new major collector road extending from Longcroft Rd west to future
Warrior Drive. This has been identified in the land use plan.
• Reclassify a new major collector road running East to West through the Crosspointe
project as a new minor collector road. This has been identified in the Crosspointe
Rezoning.
• Addition of a new minor collector road extending south from Chinkapin Dr to future
Tasker Road. This has been identified in the WATS plan.
• Addition of a new minor collector road extending north from Chinkapin Dr to a proposed
minor collector road in the Crosspointe project. This has been identified in the land use
plan.
• Reclassify current Chinkapin Dr to improved minor collector road.
• Realigning future East and West Parkins Mill Road to cross US Route 17/522 north of its
current intersection. This has been identified in the land use plan.
• Addition of a new minor collector road connecting US Route 17/522, through Canter
Estates, Phase 5, to future West Parkins Mill. This has been identified in the land use
plan, and the Canter Estates V MDP.
• Addition of a new minor collector road connecting Macedonia Church Rd to Marcel Dr.
This has been identified in the Tasker -Woods land use plan.
Route 50 East Corridor Land Use Plan
• Addition of a new major collector road extending west from Airport road and US Route
17/522 to future Warrior Drive. This has been identified in the land use plan, WATS,
and the MPO.
• Addition of a new major collector road extending south from US Route 50 and Prince
Frederick Dr to US Route 17/522, and then across I-81 to the Tevis St alignment in the
City of Winchester. This has been identified in the land use plan, WATS, and the MPO.
• Addition of a new major collector road extending east from Costello Dr to Arbor Ct.
This has been identified in the land use plan.
• Addition of a new major collector road extending south from Inverlee Way to the
proposed Costello Dr extension. This has been identified in the land use plan.
• Addition of a new minor collector road extending east from future Inverlee Way to
Greenwood Rd. This is not on any current plans, but staff feels that it is an important link
that needs to be identified for future growth.
Route 7 East Corridor Land Use Plan
• Remove improved minor road status on Valley Mill Rd from Brookland La to State
Route 7.
Other
• Future interchanges have been added to the Eastern Road Plan to better prepare for
upcoming growth in Frederick County.
1 `
11 �
522 �
37
r
0 0
50 SF ¢ e6
Rou Q• a Pi; 'd
r�0 �
Weems In 'j
cadarcra,k
Spring Rd f
Fy..........ro Bu�c�q
Fo, am a A 522 a
sea eaa o��o�cha.b agoo,,q�
P—Mlnfieltl�S" � lJM�Ad
j�,I/J t( •
Weatwootl CdAo
a L v rare �i
3� y
Fa HSP o�/6 qy } •
sa �
?rsr r
°ao _
as
West Parkins Mill Rdn �
EarParki
'rrRd
522 L-.,� •
�y V7 Mac akRd �.
Qae ..,hu h Rd /!
01,
� 9 f
WE
r
s
If N County Boundary
/ County Roadways
t Primary Roads
Secondary Roads
Terciary Roads
IV New Major Collector
f y'New Minor Collector
c}'4, Improved Major Collector
improved Minor Collector
IV New Major Artery
May 11, 2005
EASTERN ROAD PLAN
Frederick County, Virginia Department of Planning & Development
�' ✓ rte.7C lit,of
N
W+ r E
S
Eastern Road Plan
,l a Improved Major Collector
f /f' Improved Minor Collector
Major Artery
IV Improve Major Arterial
#` Improve Minor Arterial
Major Collector, New
^J Major Collector
eV Minor Collector, New
-x Minor Collector
/0 Ramp, New
Proposed Interchanges
DRAFT Revision
EASTERN ROAD PLAN
Frederick County, Virginia Department of Planning & Development
ITEM #2
Urban Development Area (UDA) Study
Updated materials regarding the continuing study and discussion of the UDA will be forwarded to
the CPPS following the October 4, 2005 meeting of the UDA Working Group.