CPPC 03-14-05 Meeting AgendaCOUNT' of FREDERICK
Department of Planning and Development
540/665-5651
MEMORANDUM
TO: Comprehensive Plans and Programs Subcommittee (CPPS)
FROM: Susan K. Eddy, AICP, Senior Planner S ��
RE: March Meeting and Agenda
DATE: March 7, 2005
FAX: 540/665-6395
The Frederick County Comprehensive Plans and Programs Subcommittee (CPPS) will be
meeting on Monday, March 14" 2005 at 7:30 p.m. in the first floor conference room of the
County Administration Building, 107 North Kent Street, Winchester, Virginia. The CPPS will
discuss the following agenda items:
AGENDA
1) Alterations to the Eastern Road Plan
2) Solenberger/Bridgeforth UDA Expansion Request
3) Tasker Woods UDA Expansion Request
4) UDA Study
Please contact the department if you are unable to attend this meeting.
Access to the County Administration Building for night meetings that do not occur in the
Board Room will be limited to the back door of the four-story wing. I would encourage
committee members to park in the county parking lot located behind the new addition or in
the Joint Judicial Center parking lot and follow the sidewalks to the back door of the four-
story wing. The door will be locked; therefore, please wait for staff to open the door.
SKE/dlw
Attachments
-1-
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
i
•
ITEM #1
Alterations to the Eastern Road Plan
The Frederick County Transportation Committee at its meeting on March 1, 2005 recommended
revisions to the Frederick County Eastern Road Plan. As the Eastern Road Plan is an element of
the Comprehensive Policy Plan, it is necessary for the CPPS to forward a recommendation on the
proposed revisions to the Planning Commission.
Two specific items are under consideration:
1. A new major collector road between Senseny Road and Route 7 (Berryville Pike); and
2. Modifications to the classification and location of several adjacent existing and proposed
roads.
The first map (attached) shows the relevant section of the existing Eastern Road Plan. The
second map shows the proposed network.
A new road from the southern end of the Canyon, LC property, as indicated on map 2, to the
intersection with Route 7 was proffered with the recently approved Haggerty rezoning. (This
road has also been referred to as the spine road.) A signalized intersection at Route 7 would be
provided, with Canyon, LC participating in the cost. The proposed revision to the Eastern Road
Plan would classify this road a major collector road and would show the extension of this major
collector road to Senseny Road, thus providing a connection between Senseny Road and Route 7.
This new collector road is not meant to be a replacement for a future Route 37 in this area.
Route 37 is still clearly shown on the Eastern Road Plan as a new major arterial road. The
proposed major collector has been designed to run parallel to the future Route 37. Proffered with
the Haggerty rezoning was the dedication of land for the future Route 37 on the Canyon, LC
property.
As the proposed major collector road would provide a connection between Senseny Road and
Route 7, is was sensible to reconsider other elements of the Eastern Road Plan in this area. The
current Eastern Road Plan shows a connection between Senseny Road and Route 7 via Morning
Glory Drive, a new road through three properties to the north, and Valley Mill Road. There are
some disadvantages to the currently planned connection. Morning Glory Road is a residential
street not designed to serve as a major collector road. Also, Valley Mill Road in this area has a
one lane bridge. In addition, there is no traffic light on Route 7 to accommodate the traffic from
Valley Mill Road.
In light of the new spine road to be provided with the Haggerty rezoning, it has been suggested
that the Eastern Road Plan be modified to eliminate the proposed minor collector between
Morning Glory Road and Valley Mill Road. Instead, it is proposed that a new major collector
road be established between a re-routed Valley Mill Road and the spine road on the Canyon LC,
-2-
property. The Haggerty rezoning included a proffer that land on the proposed route of such a
road on the Canyon, LC property would be reserved for access to adjacent properties.
Advantages of this proposal are that less traffic would use Morning Glory Road and the one lane
section of Valley Mill Road. In addition, the majority of the traffic in the area would access
Route 7 at a signalized intersection.
It should be noted that the construction of the aforementioned roads would be the responsibility
of the developers in this area.
The Transportation Committee considered these proposals at its meeting of March 1, 2005. Mr.
Jerry Copp, Resident Engineer with the VDOT Edinburg Residency, was in attendance to answer
questions. Committee members questioned the location of the spine road and the future Route
37, particularly at its intersection with Route 7. Mr. Copp assured committee members that it
appeared possible to accommodate both the spine road and the future Route 37 in this area.
Detailed design would take place at a later stage. The Transportation Committee unanimously
recommended the proposed revisions to the Eastern Road Plan.
A recommendation from the CPPS is sought.
-3-
ITEM #2
SolenbergerBridgeforth UDA Expansion Request
This request is for the expansion of the Urban Development Area (UDA) to include 262.53 acres
of land known as the Solenberger/Bridgeforth property in the quadrant bound by Route 37,
Cedar Creek Grade (Route 622), Merriman's Lane (Route 62 1) and the City of Winchester. The
request was submitted by Mr. Evan Wyatt of Greenway Engineering on behalf of the owners of
the subject properties.
The CPPS considered the SolenbergerBridgeforth UDA expansion request at its meetings on
September 13, 2004, October 11, 2004 and November 8, 2004. The subcommittee was generally
favorable to the UDA expansion request and was working towards modifying the existing
Western Jubal Early land use plan to include these properties. The principle unresolved issue of
these discussions was transportation improvements. On December 2, 2004 the Planning
Department received a request from Mr. Wyatt to withhold further consideration of the UDA
expansion request until March of 2005 to allow for additional analysis of the proposed
interchange at Route 3 7 and Jubal Early Drive.
Further analysis of the proposed interchange has since taken place. Recent transportation
projections (Vision Plan Modeling Results) from the Win -Fred Metropolitan Planning
Organization (MPO) indicate that planning for this interchange is still warranted. Mr. Jerry
Copp, Resident Engineer with the VDOT Edinburg Residency, has concurred with this finding.
Staff has revised the draft Western Jubal Early land use plan dated November 4, 2004, that was
considered by the CPPS, to reflect the comments made at the November 8th CPPS meeting. A
revised draft, dated March 7, 2005, is attached.
Since this item was considered in November, 2004, the Frederick County School Board passed a
resolution requesting that the West Jubal Early Land Use Plan include 25-30 acres for a multi -
campus school site. This resolution is dated January 18, 2005.
A recommendation from the CPPS to the Planning Commission on this UDA expansion request,
together with a suggested land use plan, is sought.
Note: The introduction to this UDA expansion request was previously included within the text of
the revised Western Jubal Early Land Use Plan. It will not be part of the land use plan ultimately
adopted by the Board of Supervisors. Therefore, it has been removed from the plan. In order
that CPPS members have the benefit of this introduction, it has been reproduced below.
A request to expand the Urban Development Area (UDA) to incorporate parcels owned by the
White and Marshall families was approved by the Frederick County Board of Supervisors in
February 2004. These parcels, totaling approximately 350 acres, are located in a quadrant of
land bound by Route 37 to the west, Merriman's Lane (Route 621) to the north, Cedar Creek
-4-
Grade (Route 622) to the south, and the City of Winchester to the east. The expansion of the
UDA did not incorporate all properties within this quadrant, as much of the acreage in the
southern portion of the quadrant (the Solenberger/Bridgeforth Property) was reserved for
agricultural use within the South Frederick Agricultural and Forestal District. The Western
tubal Early Land Use Plan (WJELUP) was adopted by the Frederick County Board of
Supervisors in February 2004 and is intended to guide future land use planning and development
for property within the quadrant that is captured by the UDA expansion.
In May of 2004 the Board of Supervisors removed 183 acres of land north of Cedar Creek Grade
included within the Solenberger/Bridgeforth property, from the South Frederick Agricultural and
Forestal District. A UDA expansion request has been submitted for the 262 acre
Solenberger/Bridgeforth property. Should the UDA expansion request be approved, this revised
Western Jubal Early Land Use Plan would cover the entire quadrant between the City of
Winchester to the east, Cedar Creek Grade (Route 622) to the south, Route 37 to the west and
Merriman's Lane and the City of Winchester to the north.
-5-
Note: changes to the plan as adopted by the Board of Supervisors on February 11, 2004 are
shown with bold text and strikethroughs.
WESTERN JUBAL EARLY
LAND USE PLAN
Adopted by the Frederick County Board of Supervisors
February 11, 2004
(Revised draft March 7, 2005)
Guiding Principles
A new community of over 600 acres is planned in a portion of the County where previously
there was little but farmland. The area contains sensitive environmental features and these
will be preserved. This new community will be primarily residential with a mix of
commercial and residential uses. The community will be linked by an efficient road
system, multi-purpose trails and sidewalks.
Land Use
Residential
The land included within the WJELUP represents a transitional area between the City of
Winchester and the rural areas of western Frederick County. The WJELUP area is distinguished
by its pristine environmental resources and prime farmland soils and has therefore historically
supported both agricultural and low density residential land uses. Adjoining land within the City
of Winchester has developed extensively with urban and suburban residential uses, most notably
within the Meadow Branch, Morlyn Hills, Meadow Branch South, and Orchard Hill
subdivisions. Additionally, suburban residential land use has been established within the UDA
adjacent and north of the WJELUP area through the Merriman's Chase subdivision.
The predominant land uses envisioned within the WJELUP area are urban and suburban
residential uses. The residential designation is intended to continue the established land use
pattern in the vicinity of the WJELUP area. As such, new residential development within the
WJELUP area is expected to consist primarily of single family detached and single family small
lot units, and be compatible with the design of existing residential uses on adjoining property.
The gross residential density for residential developments within the WJELUP area should not
exceed four dwelling units per acre.
Mixed Use
Areas of mixed residential and commercial land use are designated along the planned route of
the Jubal Early Drive extension and near the intersection of Cedar Greek Grade and Route
37. The mixed use development pattern is intended to provide commercial services and
employment opportunities that are accessible for residents within the WJELUP area and the
adjacent community via alternative modes of transportation, such as pedestrian and bicycle
facilities. Enhanced accessibility is anticipated through the integration of land uses within the
mixed use areas and the connection of such areas to the surrounding residential neighborhoods
by a network of multi-purpose trails and sidewalks. It is further expected that residential and
commercial uses will be designed and configured in an integrated, not segregated, a
complementary and unified- manner to ensure development of a visually distinctive and
functionally efficient community.
The residential component of areas designated for mixed use development is not to exceed 75%
of the gross project land area for mixed use development, with the remaining acreage reserved
and planned for commercial use. Gross residential densities within mixed use areas should be
consistent with those of the surrounding residential neighborhoods and therefore not exceed four
dwelling units per acre. Residential densities in the mixed use areas are envisioned to be
achieved through a mixture of housing types.
The commercial component will comprise at least 25%, but no more than 50%, of the gross
project land area for mixed use development. The commercial component is envisioned to
consist of neighborhood scale commercial uses and high-end office uses. Priority will be given
to neighborhood scale commercial uses as these will serve the needs of residents and create
focal points for the new community. The :.,m e,.eia nt will b * t t the
i�va vaua vviii�
eenuner-eiA developtnei4 that has occuffed a4oiig haba4 Rafly Drive west of its kiter-seefien with
Valley Avenue. Strip commercial development is strongly discouraged. Consolidated
entrances will be encouraged to avoid multiple -entrances along Jubal Early and Cedar
Creek Grade. Other uses that might be acceptable in the areas planned for mixed uses are
religious uses and local government uses.
Transportation
The Winchester Area Transportation Study (WATS) identifies Jubal Early Drive extending in an
east -west direction from its terminus in the City of Winchester to a new interchange with the
Route 37 western by-pass. The a ierr eDevelopment i:e (r JDA) shoul
WJELUP incorporates the extension of Jubal Early Drive and the construction of the
interchange at Route 37 as the its principal transportation component f the W E Tl. The
extension of Jubal Early Drive through this portion of the UDA is envisioned as an urban divided
four -lane cross-section that includes landscaped medians as well as pedestrian and bicycle
facilities.
The final location and alignment of Jubal Early Drive should remain flexible to ensure that the
development of the future extension conforms to final transportation studies and engineering.
The design and alignment of the road will facilitate its connection with the new interchange
planned for Route 37. Indeed, the value of Jubal Early Drive as a regional transportation
improvement is dependant upon its ultimate connection to Route 37 via this new interchange.
The initial ,>,,mpai ent of A major collector road syste is planned to facilitate traffic movement
in a north -south direction to provide a connection between Jubal Early Drive and Cedar Creek
Grade. The ultimate location of the north -south collector road should alse-remain flexible to
ensure that the development conforms to final transportation studies and engineering. This
-2-
road is envisioned as an urban divided four -lane cross-section that includes landscaped
medians as well as pedestrian and bicycle facilities. ; however -,the AIJir�;? en-N4sioft
design and construction of enly the initiM segmefit of thir, eellector read in order- to pfateet t
u�vaaauag Nvuua rati. ,
The Winchester Area Transportation Study (WATS) also identifies improvements to Cedar
Creek Grade. Cedar Creek Grade is proposed to be widened to four lanes from the
Winchester City line to Route 621, Merrimans Lane. The WATS study further identifies
improvements to the Cedar Creek Grade/Route 37 interchange. The Frederick County
Comprehensive Policy Plan Bicycle Plan identifies Cedar Creek Grade as a short-term
destination route. The WJELUP therefore incorporate the improvements to Cedar Creek
Grade, to a four lane divided highway with a bicycle lane.
The development of new road systems, including a new interchange at Route 37, new
signalization, and any improvements to existing road systems will be the responsibility of private
property owners and developers, unless the Bear— of Supervisors de4ermines that publie private
n„-+ne fshi ,,. nate. In particular the new interchange with Route 37 should be
guaranteed by the development community before build -out of the area. No rezonings
should be approved until the County is certain that the transportation impacts of the new
development will be mitigated.
Note: Discussions at previous CPPS meetings on transportation centered on whether the
developers in the area should be responsible for all road improvements, or whether the
developers would be able to enter into a VDOT/County/developer partnership to fund
improvements. As this is a land use plan, not a rezoning, the CPPS could take out all references
to developer funding and keep only the elements of a land use plan.
The WJELUP incorporates alternative modes of transportation, such as pedestrian and
bicycle facilities. The County should also encourage the extension of existing bus routes to
serve the area. Ideally bus stops will be located at the mixed use centers and within the
development.
Environment
The WJELUP designates environmental resources associated with the Abrams Creek corridor as
Developmentally Sensitive Areas (DSA). These areas should be preserved through the
development process with improvements limited to required road crossings and passive
recreational amenities. A conservation oriented approach to the design of residential and mixed
use projects within the WJELUP area is encouraged to maximize DSA preservation. As such,
the precise study and identification of DSA designated resources should occur as a critical first
step in the design process for all development in the WJELUP area. Completion of this resource
inventory and the delineation of preservation areas is to be followed and accommodated by
layouts and engineering for building sites, lots, drainage and infrastructure. Full gross density
credit will be provided for DSA designated land conserved through the development process.
-3-
A portion of the Green Circle Trail, as developed by the City of Winchester, has been
constructed on the north side of the Winchester -Western Railroad. The WJELUP envisions
completion of this portion of the trail to Merriman's Lane. Additionally, a connector trail should
be developed that extends from the existing trail along the railroad right-of-way to Cedar Creek
Grade as an enhancement to the Green Circle Trail. The connecting trail should be located to
enhance the interaction of the user with any environmental features or view sheds that are
conserved through implementation of the WJELUP. The pedestrian/bicycle network
developed in the WJELUP area should provide for a continuous flow from the Green
Circle.
Education/Public Facilities
The WJELUP area contains over 600 acres and the majority of this land is envisioned to be
developed for residential uses. It is estimated that up to 2400 dwellings could be built in
the study area. This could generate up to 1,680 new students for the Frederick County
School System. This number of students concentrated in such a small area is
unprecedented in the western part of Frederick County. It will be incumbent upon future
development within the WJELUP area to provide a site for school facilities, to mitigate the
impact of the large number of school children resulting from development in the WJELUP
area. This is consistent with the Community Facilities and Services policies in the
Comprehensive Policy Plan.
Any school should be sited centrally within the study area to enable the maximum number
of students to walk or bike to school. Schools quickly become the focus of a new
community when they are at the center of the community. The final location and
alignment of any school site should remain flexible to ensure that it conforms to final
engineering studies and School Board considerations.
It may also be necessary to provide other public facilities in this area to serve this new
development. It would then be necessary for future development to provide a site for
other public facilities to mitigate the impact of the large number of residents resulting from
development in this area.
Parks
The WJELUP area should contain a well defined park and open space system for both
active and passive recreation. Central to this open space will be the Abrams Creek
corridor which should be preserved as a developmentally sensitive area. Neighborhood
parks should also be located within the study area. As defined in the Comprehensive
Policy Plan, neighborhood parks provide limited types of recreation for the entire family
within easy walking distance. Examples of potential facilities in a neighborhood park
include a playground, a swimming pool and tennis courts. The neighborhood parks should
be located near the school and or neighborhood center and away from major streets. Also
part of the park network will be the interconnected trail system as described above.
-4-
Western
Jubal Early
Land Use Plan
(DRAFT)
Map Features
000 UDA/SWSA
e" UDA/SWSA Proposed
Winchester City Boundary
Parcels
/V Streams
40 Lakes/PondsNJetlands
Planned Transportation
N Road ROW
Road CL
Railroads
N Existing Trails
�` ProposedTrai's
Planned Land Use
Developmentally Sensitive Areas
® Mixed Use
Residential Use
Future Interchange
N
W E
5
500 250 0 500
Feet
Created by
Frederick County Planning
March 7, 2005
ITEM #3
Tasker Woods UDA Expansion Request
The Frederick County Board of Supervisors at its meeting on February 9, 2005 directed the
Planning Commission to study and return to the Board of Supervisors a land use plan and
recommendations regarding the inclusion of 89 acres of land (parcel 76-A-49 and 76 -A -48A) in
the Tasker Woods area into the Urban Development Area (UDA). The Comprehensive Plans
and Programs Subcommittee is the subcommittee of the Planning Commission responsible for
formulating land use policies in the County. Therefore a recommendation on the UDA
expansion and an appropriate land use plan for this area is sought from the CPPS.
While the Board of Supervisors resolution calling for this study only included two parcels, the
CPPS at its meeting of February 14, 2005 considered it reasonable to study the entire area
bounded by Tasker Road, Route 522 (Front Royal Pike) and the current UDA boundary.
Staff has provided background information on the study area below. CPPS members should be
prepared to discuss land use options for the study area at the CPPS meeting on March 14th. Staff
will then develop a land use plan which takes account of transportation, environmental features,
community facilities and design features, based on the direction given by the CPPS. This will be
considered further at the April CPPS meeting.
T and T TcP
The Eastern Frederick County Long Range Land Use Plan does not show any specific land use
for most of the study area. The land north of Tasker Road, near the intersection with Route 522
is shown as business use. At present all of the study area is zoned RA, with the exception of
parcel 76-A-53, north of Tasker Road, which is zoned B2. This B2 zoned parcel and the three
parcels north of Tasker Road on the west end of the study area (parcels 76-A-42, 76 -A -47A and
76 -A -47B) are in the Sewer and Water Service Area (SWSA).
The land to the east of the study area is in residential and agricultural use and is zoned RA (Rural
Areas). The land immediately to the west is in residential use and is zoned RA. Further to the
west is the Canter Estates development which is zoned RP (Residential Performance District)
and contains single family detached houses. Immediately north of the study area are the
Macedonia Methodist church and the Macedonia cemetery, both zoned RA. To the south is the
Eastgate Commerce Center which is zoned M1 (Light Industrial District) and contains light
industrial uses, and adjacent parcels zoned B2 (Business General District) which are vacant.
The study area is made up of 199 acres, with 19 parcels in multiple ownerships. The largest
tracts are the Allden Tracts 76-A-49 (49.84 acres) and 76 -A -48A (29.13 acres) and the B2 zoned
property owned by Wrights Run, LP (29.8 acres).
The 522 South - Planning Exercise Map (attached) shows basic parcel information for the study
area. It also includes a figure showing the maximum number of residential units that could be
-6-
allowed if the RA (Rural Areas District) zoned land was rezoned to RP (Residential Performance
District). This is based on the gross density allowed in the zoning ordinance, that is 4 dwellings
per acre for parcels over 100 acres, 5.5 dwellings per acre for parcels more than 10 acres and less
than 100 acres, and 10 dwellings per acres for parcels less than 10 acres.
The resulting 1,085 possible residential units is a maximum number, unlikely to be achieved as
roads and open space would be required.
Based on the potential of this site, its environmental constraints, surrounding land uses and the
transportation network, CPPS members should be prepared to discuss land uses in the study area.
Land use issues that need to be considered as part of this study include:
• Suitability of the area for residential, commercial and industrial use;
• If suitable for residential use, what housing types are appropriate;
• Suitability of the area for mixed use development, if so, which mix; and
• Consideration of the many small parcels along Route 522 and how to integrate them
into the wider study area.
Environmental Features
Environmental features in the study area include several ponds and four intermittent streams.
Transportation
Route 522 (Front Royal Pike) is classified as a minor arterial road. The Comprehensive Policy
Plan defines minor arterial roads as major roads providing important travel routes through
portions of the County. Minor arterials serve to provide access between collector roads and
major arterials. Minor arterials provide access to large areas of land or corridors with intensive
development. Higher speeds and free traffic flow are maintained over large portions of the
minor arterial.
The Frederick County Eastern Road Plan designates Tasker Road and White Oak Road as
improved major collectors and shows a new major collector linking the north end of White Oak
Road with Route 522. Major collector roads are defined in the Comprehensive Policy plan as
major roads providing access between large areas of land and arterial roads. They collect traffic
from minor collectors and local roads. Major collectors provide important through routes
between arterial roads and for travel within the County. Free traffic flows are maintained on
major collectors.
Given the existing road plans, any land use plan for this area should discourage individual
entrances on Route 522, Tasker Road and White Oak Road.
Other transportation issues that need to be considered as part of this land use study include:
• New roads within the study area;
• Safety on Route 522;
• Intersections on Route 522;
• Interparcel connectors; and
• Bike and pedestrian facilities.
Design Principles
As this is a land use plan, it is appropriate to consider design principles.
Design considerations include:
• Road layout (grid, cul-de-sac, etc.)
• Corridor enhancements on Route 522 and Tasker Road;
• Trees;
• Setbacks;
• Location and type of open space;
• Signage; and
• The church and cemetery as a visual focal point.
Community Facilities
The study will also need to include an analysis of community facilities including schools, public
water and public sewer.
-8-
Note: 522 South
Total Acreage: 149 ac. N
Planning Exercise
Total # Units: 1085 units
o z5o soo �,000
WE
Dept of Planning &Development Y„
March 02, 2005 -DRAFT Feet s
C
•
•
ITEM #4
Urban Development Area (UDA) Study
Continuation of discussions on the UDA study.
-9-
k01--'deA ou+ +o CPft of� 3 l g-1os
A small working group coordinated by Mr. George Kriz met on March 1, 2005 as a
follow up to the February Comprehensive Plans and Programs Subcommittee meeting.
The group discussed potential approaches to the study of the Urban Development Areas
of Frederick County and also discussed potential goals of the study. The following
summary of possible goals, and the identification of stakeholder/participant groups, has
been forwarded by Mr. Kriz for your review and input. Input from the members of the
CPPS would be appreciated as the working group continues to devise a strategic
approach to the UDA Study. Comments can be forwarded through staff or directly to Mr.
Kriz.
Possible Goals
Provide a range of housing types including affordable housing
Create mixed use areas with commercial and residential
Determine need for additional industry -what type and where to be located
Incorporate the MPO and other transportation plans to provide adequate
transportation including all types and modes of transportation
Set aside open areas for parks
Incorporate lands for schools in conjunction with the School Board
Incorporate the plans of the FCSA into the area
Look at criteria and areas where the UDA should be expanded
Identify and sustain green infrastructure
Develop a tracking method for land already rezoned, number of housing units that
are scheduled to come on track each year by year. Again this may be an
accomplishment, but it needs to be stated up front.
Develop a supply/demand model.
Transitional zoning from RA and the UDA.
Restructure the ordinance and design standards
In the future, we should hold meetings with the following groups to get their input:
Frederick County Sanitation Authority
School Board and Administrators
Parks & Recreation Administration
Transportation ?????
Design & Engineering Community
Top of Virginia Builders
Home Owners Associations
City of Winchester Planners & City Council
Public Meetings
Others?????
ka(\AeCj. c)( -I+ -4-o COPS o n 3 114 10,5
Historical Resources
One potentially significant historic structure, the Stuart Brown House is located in the
WJELUP area. It has been identified as potentially significant property in the Frederick
County Rural Landmarks Survey (#34-1239). Protection of this structure is encouraged.