CPPC 11-08-04 Meeting AgendaCOUNT' of FREDERICK int of Planning and Develapment 540/665-5651 MEMORANDUM FAX: 540/665-6395 MEMORANDUM \ V IC TO: Comprehensive Plans and Programs Subcommittee (CPPS) FROM: Susan K. Eddy, AICP, Senior Planner SKE RE: November Meeting and Agenda DATE: November 1, 2004 File Copy The Frederick County Comprehensive Plans and Programs Subcommittee (CPPS) will be meeting on Monday, November 8th, 2004 at 7:00 p.m. in the first floor conference room of the County Administration Building, 107 North Kent Street, Winchester, Virginia. The CPPS will discuss the following agenda items: AGENDA 1) Request for expansion of the Urban Development Area (UDA) to inch- 'P 2-'!.._,3 acres of land known as the Solenberger/Bridgeforth property in the quadrant bound by Route 37, Cedar Creek Grade (Route 622), Merriman's Lane (Route 621) and the City of Winchester. The request has been submitted by Evan Wyatt of Greenway Engineering on behalf of the owners of the subject properties. 2) Review of the 2005-2006 Capital Improvements Plan (CIP) 3) Rural Areas Study - Further discussion of the Rural Areas Study. 4) Other. Please contact the department if you are unable to attend this meeting. Thank you. Please note the earlier start time for this meeting. Access to the County Administration Building for night meetings that do not occur in the Board Room will be limited to the back door of the four-story wing. I would encourage committee members to park in the county parking lot located behind the new addition or in the Joint Judicial Center parking lot and follow the sidewalks to the back door of the four- story wing. The door will be locked; therefore, please wait for staff to open the door. SKE/bad Attachments 107 North Rent Street, Sui+P 202 o Winchester, Virginia 22501-5000 • • C: ITEM #1 Request for Expansion of the Urban Development Area (UDA) SolenbergerBridgeforth Property At a July 12, 2004 joint work session of the Board of Supervisors, Planning Commission and Comprehensive Plans and Programs Subcommittee (CPPS), eleven Comprehensive Policy Plan Amendment (CPPA) applications were reviewed. Of these eleven requests, two, including the Solenberger/Bridgeforth property, were considered by the Board of Supervisors to merit further study and formal action through the public hearing process. Included with the September CPPS agenda was a request that 262.53 acres of land known as the Solenberger/Bridgeforth property be included within the Urban Development Area (UDA) (CPPA application #08-04). A copy of the CPPA application, prepared by Evan Wyatt of Greenway Engineering on behalf of the owners of the subject properties, was included with that agenda. Also included with the September agenda was a map prepared by staff depicting the area of the UDA expansion request and a copy of the West Jubal Early Land Use Plan as adopted by the Board of Supervisors on February 11, 2004. This item was discussed at the September CPPS meeting and the October CPPS meeting. Mr. Wyatt gave a short presentation of the request at the September meeting. CPPS members voiced concern over the impacts that the proposed land use change would introduce. It was agreed at the September CPPS meeting that staff would prepare a new version of the West Jubal Early Land Use Plan that would incorporate the Solenberger/Bridgeforth property as well as language which addressed the potential impacts. A revised draft was discussed at the October meeting, but CPPS members felt that all of their concerns had not been fully addressed. A new draft of the West Jubal Early Land Use Plan is attached. 2 WESTERN JUBAL EARLY LAND USE PLAN Adopted by the Frederick County Board of Supervisors February 11, 2004 (Revised draft November 1, 2004) A request to expand the Urban Development Area (UDA) to incorporate parcels owned by the White and Marshall families was approved by the Frederick County Board of Supervisors in February 2004. These parcels, totaling approximately 350 acres, are located in a quadrant of land bound by Route 37 to the west, Merriman's Lane (Route 621) to the north, Cedar Creek Grade (Route 622) to the south, and the City of Winchester to the east. The expansion of the UDA did not incorporate all properties within this quadrant, as much of the acreage in the southern portion of the quadrant (the SolenbergerBridgeforth Property) was is reserved for agricultural use within the South Frederick Agricultural and Forestal District. The Western Jubal Early Land Use Plan (WJELUP) was adopted by the Frederick County Board of Supervisors in February 2004 and is intended to guide future land use planning and development for property within the quadrant that is captured by the UDA expansion. In May of 2004 the Board of Supervisors removed 183 acres of land north of Cedar Creek Grade included within the SolenbergerBridgeforth property, from the South Frederick Agricultural and Forestal District. A UDA expansion request has been submitted for the 262 acre SolenbergerBridgeforth property. This draft of the Western Jubal Early Land Use Plan would cover the entire quadrant between the City of Winchester to the east, Cedar Creek Grade (Route 622) to the south, Route 37 to the west and Merriman's Lane and the City of Winchester to the north. Guiding Principles A new community of over 600 acres is being envisioned in a portion of the County where previously there was little but farmland. The area contains sensitive environmental features and these will be preserved. This new community will be primarily residential with a mix of commercial and residential uses. The community will be linked by an efficient road system, multi-purpose trails and sidewalks. At the center of the community will be at least one school which will serve as a focus for educational and community activities. T anri T Tce R,-6,iPnil n 1 The land included within the WJELUP represents a transitional area between the City of Winchester and the rural areas of western Frederick County. The WJELUP area is distinguished by its pristine environmental resources and prime farmland soils and has therefore historically supported both agricultural and low density residential land uses. Adjoining land within the City of Winchester has developed extensively with urban and suburban residential uses, most notably within the Meadow Branch, Morlyn Hills, Meadow Branch South, and Orchard Hill -1- subdivisions. Additionally, suburban residential land use has been established within the UDA adjacent and north of the WJELUP area through the Merriman's Chase subdivision. The predominant land uses envisioned within the WJELUP area are urban and suburban residential uses. The residential designation is intended to continue the established land use pattern in the vicinity of the WJELUP area. As such, new residential development within the WJELUP area is expected to consist primarily of single family detached and single family small lot units, and be compatible with the design of existing residential uses on adjoining property. The gross residential density for residential developments within the WJELUP area should not exceed four dwelling units per acre. Mixed Use Areas of mixed residential and commercial land use are designated along the planned route of the Jubal Early Drive extension and near the intersection of Cedar Greek Grade and Route 37. The mixed use development pattern is intended to provide local commercial services and employment opportunities that are accessible for residents within the WJELUP area and the adjacent community via alternative modes of transportation, such as pedestrian and bicycle facilities. Enhanced accessibility is anticipated through the integration of land uses within the mixed use areas and the connection of such areas to the surrounding residential neighborhoods by a network of multi-purpose trails and sidewalks. It is further expected that residential and commercial uses will be designed and configured in a complementary and unified manner to ensure development of a visually distinctive and functionally efficient community. The residential component of areas designated for mixed use development is not to exceed 75% of the gross project land area for mixed use development, with the remaining acreage reserved and planned for commercial use. Gross residential densities within mixed use areas should be consistent with those of the surrounding residential neighborhoods and therefore not exceed four dwelling units per acre. Residential densities in the mixed use areas are envisioned to be achieved through a mixture of housing types. The commercial component will comprise at least 25%, but no more than 50%, of the gross project land area for mixed use development. The commercial component is envisioned to consist of neighborhood scale commercial uses and high-end office uses. Priority will be given to neighborhood scale commercial uses as these will serve the needs of residents and create focal points for the new community. T'_eommer-eia4component will be consistent with the eommercial development that has oeeuffed along jubal Early Drive west of its interseetion with Valley Avenue. Strip commercial development is strongly discouraged. Consolidated entrances will be encouraged to avoid multiple -entrances along Jubal Early and Cedar Creek Grade. Other uses that might be acceptable in the areas planned for mixed uses are religious uses and local government uses. Transportation The Winchester Area Transportation Study (WATS) identifies Jubal Early Drive extending in an east -west direction from its terminus in the City of Winchester to a new interchange with the -2- Route 37 western by-pass. The proposed expansion of the Urban Development Area (UDA) should incorporate the extension of Jubal Early Drive and the construction of the interchange at Route 37 as the principal transportation component of the WJELUP. The extension of Jubal Early Drive through this portion of the UDA is envisioned as an urban divided four -lane cross- section that includes landscaped medians as well as pedestrian and bicycle facilities. The final location and alignment of Jubal Early Drive should remain flexible to ensure that the development of the future extension conforms to final transportation studies and engineering. The design and alignment of the road will facilitate its connection with the new interchange planned for Route 37. Indeed, the value of Jubal Early Drive as a regional transportation improvement is dependant upon its ultimate connection to Route 37 via this new interchange. The initial eemponen A major collector road system is planned to facilitate traffic movement in a north -south direction to provide a connection between Jubal Early Drive and Cedar Creek Grade. The ultimate location of the north -south collector road should also --remain flexible to ensure that the development conforms to final transportation studies and engineering. however-, the WiELUP envisions design and eonsti-detion of only the initial segffleftt Of this eolleetor- road in order- to protect the adjoining South Freder-iek Agr-icultufa4 and Forestal Distri The Winchester Area Transportation Study (WATS) also identifies improvements to Cedar Creek Grade. Cedar Creek Grade is proposed to be widened to four lanes from the Winchester City line to Route 621, Merrimans Lane. The WATS study further identifies improvements to the Cedar Creek Grade/Route 37 interchange. The Frederick County Comprehensive Policy Plan Bicycle Plan identifies Cedar Creek Grade as a short-term destination route. The proposed expansion of the Urban Development Area (UDA) should therefore incorporate the improvements to Cedar Creek Grade, preferably to a four lane divided highway, and a bicycle lane. The development of new road systems, including a new interchange at Route 37, new signalization, and any improvements to existing road systems will be the responsibility of private property owners and developers, unless the Board of Supe ,;sars , ,.,Y, wtoines that publ o pr - ^+v � paft,o,ship^ are appropriate. In particular the new interchange with Route 37 should be guaranteed by the development community before build -out of the area. No rezonings should be approved until the County is certain that the transportation impacts of the new development will be mitigated. The study area will be designed so that residents will have access to alternative modes of transportation, such as pedestrian and bicycle facilities. The County will also encourage the extension of existing bus routes to serve the area. Ideally bus stops will be located at the mixed use centers and within the development. Fnvirnnmant The WJELUP designates environmental resources associated with the Abrams Creek corridor as Developmentally Sensitive Areas (DSA). These areas should be preserved through the development process with improvements limited to required road crossings and passive -3- recreational amenities. A conservation oriented approach to the design of residential and mixed use projects within the WJELUP area is encouraged to maximize DSA preservation. As such, the precise study and identification of DSA designated resources should occur as a critical first step in the design process for all development in the WJELUP area. Completion of this resource inventory and the delineation of preservation areas is to be followed and accommodated by layouts and engineering for building sites, lots, drainage and infrastructure. Full gross density credit will be provided for DSA designated land conserved through the development process. A portion of the Green Circle Trail, as developed by the City of Winchester, has been constructed on the north side of the Winchester -Western Railroad. The WJELUP envisions completion of this portion of the trail to Merriman's Lane. Additionally, a connector trail should be developed that extends from the existing trail along the railroad right-of-way to Cedar Creek Grade as an enhancement to the Green Circle Trail. The connecting trail should be located to enhance the interaction of the user with any environmental features or view sheds that are conserved through implementation of the WJELUP. The pedestrian/bicycle network developed in the WJELUP area should provide for a continuous flow from the Green Circle. Education/Public Facilities The West Jubal Early Land Use Plan area contains over 600 acres and the majority of this land is envisioned to be developed for residential uses. It is estimated that up to 2400 dwellings could be built in the study area. This would generate over 1200 new students for the Frederick County School System. This number of students concentrated in such a small area is unprecedented in the western part of Frederick County. It will be incumbent upon future development within the WJELUP area to provide sites for school facilities, to mitigate the impact of the large number of school children resulting from development in the WJELUP area. This is consistent with the Community Facilities and Services policies in the Comprehensive Policy Plan. Any school should be sited centrally within the study area to enable the maximum number of students to walk or bike to school. Schools quickly become the focus of a new community when they are at the center of the community. The final location and alignment of any school site should remain flexible to ensure that it conforms to final engineering studies and School Board considerations. It may also be necessary to provide other public facilities in this area to serve this new development. It would then be necessary for future development to provide a site for other public facilities to mitigate the impact of the large number of residents resulting from development in this area. Parks The West Jubal Early Area should contain a well defined park and open space system for both active and passive recreation. Central to this open space will be the Abrams Creek corridor which should be preserved as a developmentally sensitive area. Neighborhood -4- parks should also be located within the study area. As defined in the Comprehensive Policy Plan, neighborhood parks provide limited types of recreation for the entire family within easy walking distance. Examples of potential facilities in a neighborhood park include a playground, a swimming pool and tennis courts. The neighborhood parks should be located near the school and or neighborhood center and away from major streets. Also part of the park network will be the interconnected trail system as described above. -5- West Jubal Earl Land Use Plan South (DRAFT) Map Features UDA/SWSA Winchester City Boundary j Parcels f, Streams Lakes/P a n d sfWetl a n d s Planned Transportation Aj Road ROW VRoad CL Railroads N Existing Trails /•V•* Proposed Trails Planned Land Use 0 Developmentally Sensitive Areas ® Mixed Use Residential Use ® Educational Use Future Interchange N W E s 25 j =250 Feet Created by Frederick County Planning 11 Sept. 13, 2004 41,---o ITEM #2 Review of the 2005-2006 Capital Improvements Plan (CIP) The Comprehensive Plans and Programs Subcommittee (CPPS) will be reviewing and discussing the 2005-2006 Capital Improvements Plan (CIP). New capital project requests or modifications to previously endorsed requests have been prepared by the various county agencies and departments. Representatives from the various agencies and departments will be attending the meeting to discuss their requests with the CPPS. The role of the CPPS in this meeting will be to review the project requests in the context of the current Comprehensive Policy Plan to ensure that the requests are consistent with the adopted Plan. For your convenience, the existing Community Facility and Services and Parks and Recreation sections of the Comprehensive Policy Plan have been attached. Attached to this memo is a short summary of this year's CIP and a table outlining new and modified project requests. Also attached for your reference is the 2005-2006 CIP draft spreadsheet detailing expenditure estimates and a summary report outlining both new project and project modification requests. Also included with this agenda item are copies of the Individual Project Description and Justification Forms that have been submitted by the Frederick County Department of Public Works, Parks and Recreation Department, Handley Regional Library, Frederick County School Board, Clarke-Fauquier-Frederick-Winchester Community Corrections Center, Frederick County Fire and Rescue, and the Winchester Regional Airport. Please note that the School Board submitted additional CIP requests to the Planning Department on October 29`h. These have been included in your packet, but are not included in the summary description, summary table or draft spreadsheet. Staff will prepare a map consolidating the planned public facility locations for the November 8, 2004 meeting. Only those facilities for which there is a specific or generalized location will be mapped. The map element, if endorsed by the CPPS and ultimately adopted by the Board of Supervisors, would satisfy the Code of Virginia requirement for the 15.2-2232 Review. In essence, the code states that no public facility shall be constructed unless said facility is a "feature shown" within the comprehensive plan. Of course, proposed facilities that are not mapped would not satisfy the code requirement. Please contact me if you have any questions regarding this information. 9 SUMMARY OF THE PROPOSED 2005-2006 CAPITAL IMPROVEMENTS • The proposed CIP consists of 40 capital projects, an increase over the 33 projects included in the previous CIP. • County contributions toward capital projects (excluding debt service) are estimated to be $67.3' million over the upcoming five-year period, a decrease from the $73.7' million in expenditures projected in the previous CIP. With debt service included, the proposed CIP estimates total County costs for capital projects to be 77.9 million. • The proposed CIP includes ten (10) new capital projects, which are as follows: • Two (2) new projects from the Department of Public Works (County Administration): • Expansion of the Greenwood Road convenience site to deal with new residential growth in the area. • Relocation of the Gainesboro convenience site to accommodate fencing and control illegal dumping. • Four (4) new projects from the Department of Parks and Recreation: • An indoor swimming pool to provide space for recreation and space to house programs provided by the Parks and Recreation Department.2 • A new playground in Sherando Park. • Renovations of the swimming pools at both Clearbrook and Sherando Parks by adding water slides and spray grounds. • A Field House to later accompany the new indoor pool that would provide space for indoor recreation activities and special events .2 • Three (3) new projects from the Frederick County Public Schools: • Acquisition of land for the new transportation facility.' • Construction of the new transportation facility which would provide an area for storage and Beet maintenance of public school vehicles as well as other county vehicles.' • Renovations to James Wood High School that would update the facility and provide adequate infrastructure for new technology. • One (1) new Winchester Regional airport Authority project: • Terminal building renovations to repair several areas of wear including the exterior surface, a leaking roof, and an aging HVAC system. • All of the capital projects included with the previous CIP will be carried over to the proposed 2004-2005 CIP with the exception of construction of the new middle school, which is nearly completed. 1 - Please note that these figures do not include County contributions toward the Construction of the School Department Transportation Facility, School Administration Building Renovations, AylorMiddle School Renovations, or James Wood High School Renovations. Figures are not available at this time. 2 - The indoor swimming pool and field house were considered a single project in the 2004-2005 CIP. 3 - Land Acquisition and Construction of a new transportation facility were considered a single project in the 2004-2005 CIP. PROPOSED 2005-2006 CAPITAL IMPROVEMENTS PLAN SUMMARY OF NEW PROJECT REQUESTS AND PROJECT MODIFICATION REQUESTS Frederick County Administration Project Type of Request 2004-2005 Local 2005-2006 Local Expenditure Request Expenditure Request Public Safety Center Modification N/A $13,000,000 New Animal Shelter Modification $1,540,000 $2,501,000 Greenwood Citizens' New N/A $200,000 Convenience Site Modification $993,000 $993,000 Expansion Gainesboro Citizens' New N/A $220,000 Convenience Site Handley Regional Library Project Type of Request 2004-2005 Local 2005-2006 Local Expenditure Request Expenditure Request Bowman Library - Modification $237,500 $228,468 Parking Lot & Sidewalk Extension Library facility in Modification $993,000 $993,000 Northwestern Frederick County Frederick County Parks and Recreation Project Type of Request 2004-2005 Local 2005-2006 Local Expenditure Request Expenditure Request Indoor Pool New N/A $9,000,000 Playground - Sherando New N/A $88,000 Park Water Slide/Spray Ground New N/A $1,000,000 - Clearbrook & Sherando Park Parkland in Eastern Modification $2,250,965 $2,302,737 Frederick County Parkland in Western Modification $1,377,858 $1,409,549 Frederick County Open Play Areas - Modification $377,921 $386,591 Clearbrook Park Skateboard/In-Line Modification $479,718 $490,752 Hockey Park - Sherando Park Lake, Trails, and Parking Modification $838,925 $858,001 with Two Irrigated Multi - Purpose Fields - Sherando Park Softball Complex - Modification $503,345 $514,922 Sherando Park Baseball Complex Modification $1,032,982 $1,056,741 Renovations - Sherando Park Soccer Complex - Modification $1,151,611 $1,178,435 Sherando Park Tennis/Basketball Modification $394,734 $403,887 Complex - Clearbrook Park Tennis/Picnic Area - Modification $635,211. $649,882 Sherando Park Expenditure Request Shelter/Stage - Clearbrook Modification $390,833 $401,254 Park Transportation Facility New N/A Maintenance Compound - Modification $201,100 $205,725 Sherando Park Transportation Facility New N/A Access Road with Parking Modification $811,125 $829,789 and Trails - Sherando Park Administration Building Modification N/A Field House New I N/A 1 $7,040,000 Frederick County Public Schools Project Type of Request 2004-2005 Local 2005-2006 Local Expenditure Request Expenditure Request 411 Elementary School Modification $10,500,000 $5,900,000 Transportation Facility New N/A $750,000 (Land Acquisition) Transportation Facility New N/A N/A (Construction) Administration Building Modification N/A N/A Renovations Replace Gainesboro Modification $10,500,000 $12,400,000 Elementary School R.E. Aylor Middle School Modification N/A N/A Renovations James Wood HS New N/A N/A Renovation * Note: Cost estimates for Public School projects do not reflect debt service. Winchester Regional Airport Project 'Type of Request 2004-2005 Local 2005-2006 Local 2005-2006 Local Expenditure Request Expenditure Request Land Acquisition - Modification $141,000 $17,300 Parcels 31, 46, & 53 Corrections Center Terminal Building New N/A $110,000 Renovation Expansion Land Acquisition- Parcels Modification $173,000 $173,000 47, 47A, & 48 Upgrade Airfield Lights Modification $4,000 $4,000 Land Acquisition- Parcels Modification $70,000 $70,000 50,51,&52 Airfield Maintenance Modification $210,000 $210,000 Building Clarke-Fauquier-Frederick-Winchester Community Corrections Center (CCC) Project Type of Request 2004-2005 Local 2005-2006 Local Expenditure Request Expenditure Request CFFW Community Modification $1,165,320 $2,264,000 Corrections Center Secure Detention Modification N/A N/A Expansion Note: 2005-2006 Requests that are identical to those included in the 2004-2005 C.LP. are not included FREDERICK COUNTY, VIRGINIA CAPITA ZPROVEMENTS PLAN 2005-2006 Department Interest From Any I COUNTY CONTRIBUTION PER FISCAL YEAR Notes County Priority Projects 2005-06 2006-07 2007-08 2008-09 2009-10 Contributions I (CA) Public Safety Center C N/A ** N/A - PPEA N/A - PPEA N/A - PPEA 13,600,000 2 (CA) New Animal Shelter 2,501,000 0 200,000 $200,000 2,501,000 3 (CA) Annex Facilities 0 215,000 250,000 E 465,000 4 (CA) Relocation of Roundhill Fire/Rescue 0 N/A* $0 0 5 (CA) Greenwood Citizens Conv. Site Exp. 20,000 180,000 1,000,000-. $1;000;000 200,000 6 (CA) Gainesboro Citizens Conv. Site 40,000 180,000 1,409,549 $1;409,549 220,000 1 (HL) Bowman- Parking Lot/Sidewalk Ext. 228,468 0 490,752 $490,752. 228,468 2 (HL) New Library 0 514,922 48,000 945,000 993,000 1 (PR) Indoor Swimming Pool 9,000,000 0 1;178,435 $1,178,435 9;000,000 2 (PR) Playground - SP 88,000 0 649,882 $649,882 88,000 3 (PR) Water Slide/Spray Ground (CB, SP) 1,000,000 0 205,725 $205,725 1,000,000 4 (PR) ,Park Land East FC 2,302,737 7,040,000 $7,040,000 2,302,737 5 (PR) Park Land West FC 1,409,549 750,000 $750,000 D 1,409,549 6 (PR) Open Play Areas -CB D 386,591 0 $0: 386,591 7 (PR) . Skateboard Park/In-Line Hockey - SP D 490,752 0: $0 D 490,752 8 (PR) Lake/Trails/Parking/MP Fields - SP A,B 858,001 17,300 $865,000 A, B 858,001 9 (PR) Softball Complex - SP A 0 514,922 $865,000 A, B 514,922 10 (PR) Baseball Complex Renovation - SP A 0 1,056,741 $350;000 A 1,056,741 11 (PR) Soccer Complex - SP F N/A ** 1,178,435 $10,776,200 F 1,178,435 12 (PR) Tennis/Basketball Complex $10,600,000 $77,922;025 403,887 403,887 13 (PR) Tennis/Picnic Areas - SP CA -County Administration RJ - Regional Jail 649,882 PR - Parks and Recreation 649,882 14 (PR) Shelter/Stage - CB PS - Public Schools 401,254 RA - Regional Airport 401,254 15 (PR) Maintenance Compound -SP 10/29/04 205,725 205,725 16 (PR) Access Road with Parking & Trails -SP 829,781 824,781 17 (PR) Field House 7,040,000 7,040,000 1(PS) #11 Elementary School 5,900,000 51900,000 2(PS) Transportation Facility (Land) 750,000 750,000 3(PS) Transportation Facility (Construction) N/A* N/A* N/A* N/A* N/A* 0 4(PS) Administration Building Renovations N/A* N/A* N/A* N/A* N/A* 0 5(PS) Replace Gainesboro Elem. School 1,000,000 5,500,000 5,900,000 12,400,000 6(PS) R.E. Aylor Middle School Renovations N/A* N/A* N/A* N/A* N/A* 0 7(PS) James Wood HS Renovation N/A* N/A* N/A* NIA* N/A* 0 1(RA) Land Acquistion - Parcels 31, 46, 53 14,000 3,300 17;300 2 (RA) Terminal Building Renovation 10,000 100,000 110,000 3 (RA) Land Acquisition - Parcels 47, 47A, 48 13,000 160,000 173,000 4 (RA) Upgrade Airfield Lights 1,000 3,000 4;000 5 (RA) Land Acquisition - Parcels 50, 51, 52 10,000 60,000 70,000 6 (RA) Airfield Maintenance Building 210,000 210,000 1 (RJ) CFFW Community Corrections Center N/A - PPEA N/A - PPEA N/A - PPEA N/A - PPEA N/A - PPEA 2,264,000 2 (RJ) Secure Detention Expansion N/A** N/A** N/A** N/A** N/A** N/A** TOTALS $20,565,468 $11,573,930 $9,085,098 $2,848,529 $7,985,000 $67,322,025 A = Partial funding from Virginia Department of Aviation (VDOA) grants D = Project costs not identified at time of printing B = Partial funding from Federal Aviation Administration (FAA) grants E = Partial funding from private donations. C = Satellite facility for Treasurer, the Sheriff, and the proposed Fairfax Pike Fire Station. F= This assumes the state will be reimbursing 50% of the construction costs. N/A* - Project Scope Not Determined N/A** - Funding Source Not Determined, Therefore, Debt Service Uncertain Interest From Any TOTAL COUNTY Total Project Notes Debt Service COSTS Costs N/A - PPEA 13;000,000 ' $13,000,000 0 2,501;000 : $2,501,000 C N/A ** 465;000 $465,000 D N/A ** 0 $0 0 200,000 $200,000 0 220,000 $220,000 0 228,468 $228,468 E 0 993,000 $993,000' 0 9;000,000 $0 0 88!000 $88,000 0 1,000,000-. $1;000;000 0 2,302,737 $2;302,737 0 1,409,549 $1;409,549 0 386,591 $386,591 0 490,752 $490,752. 0 858,001 $858,001 0 514,922 $514,922 0 1;056,741 $1,056,741. 0 1;178,435 $1,178,435 0 403,887 $403,887 0 649,882 $649,882 0 401,254 3401,254 0 205,725 $205,725 0 829,78I $829,781 0 7,040,000 $7,040,000 5,400,000 11,300,000 $11;300;000 0 750,000 $750,000 D N/A * 0 $0. D N/A* 0 $0: 5,200,000 17,600,000. $17,600,000 D N/A* 0: $0 D N/A * 0 $0 A,B 0 17,300 $865,000 A, B 0 110,000 $550,000 A 0 173,000 $865,000 A, B 0 4,000 $200,000 A 0 70,000. $350;000 A 0 210,000 $300,000 F N/A ** 2,264;000 $10,776,200 F N/A ** N/A ** $8,818,283 $10,600,000 $77,922;025 $88,798,208 Department Priority Abbreviations: CA -County Administration RJ - Regional Jail PR - Parks and Recreation HL - Handley Library PS - Public Schools RA - Regional Airport 10/29/04 COMMUNITY FACILITIES AND SERVICES PARKS & RECREATION 2003 COMPREHENSIVE POLICY PLAN Community Facilities and Services As development continues in Frederick County, there is a need to carefully plan for the facilities and services that will be required. Planned development will effect the expenditures and facilities that will be needed. It will also effect the location and types of facilities that must be provided. There is a need to carefully monitor growth and to plan land use and facilities in a coordinated fashion. This can be accomplished through annual comprehensive planning and capital improvements planning. Schools The Frederick County Public School system is composed of ten elementary schools serving students in grades kindergarten through fifth grade; three middle schools serving grades six through eight; and, two high schools serving grades nine through twelve. The Northwest Regional Education Programs (NREP) is a regional program that provides special education services to students from Frederick and Clarke Counties and the City of Winchester. Approximately 57% of the students attending NREP who receive services are from Frederick County. The Dowell J. Howard Center provides vocational education services for high school students and adults, and is also the location of The Learning Center, a high school alternative program. In addition to the seventeen school facilities, twenty-two modular classrooms are used at six school sites to reduce overcrowding due to increased enrollment and to address the need for additional space due to changes in educational programs. During the past several decades, student enrollment in the school division has increased steadily. The most significant increase has occurred throughout the 1990's with school enrollment growing by 2,318 students. This increase, from 8,223 students in 1990 to 10,408 students in 1999, represents a 28% growth in student enrollment in the school division. Student enrolhnent in Frederick County has notably exceeded the state average, which was 11.3% for the same period of time. In order to meet the need for additional school space, a number of school construction and renovation projects have occurred throughout the 1990's. Despite the completion of these capital facilities projects, four of the ten elementary schools will exceed 90% of their capacity at the opening of school in the fall of 2000. These schools are Bass -Hoover (96%), Indian Hollow (91 %), Senseny Road (105%) and Stonewall (95%). Construction of classroom additions to Armel and Middletown Elementary Schools, which were completed in the fall of 1998, resulted in an increase in student capacity and a reduction in the percent of practical capacity utilized at each of these sites. Orchard View Elementary School in the Back Creek Magisterial District will open for students in the fall of 2000 and Robinson Elementary will be closed. As students matriculate from elementary school to the middle school and high school levels, the need to provide additional space for the increase in student population and to meet changing educational requirements will necessitate the development of new facilities and the renovation of existing Frederick County 8 - 1 Comprehensive Plan Community Facilities and Services facilities. The Capital Improvements Plan reflects the need to address space requirements for middle and high school enrollment that has exceeded 90% of capacity in three of the five schools despite the use of nineteen modular classrooms at five different locations, and the increased use of the Dowell J Howard Center for secondary programs. A major renovation project at James Wood Middle School and the construction of a third county high school on Berryville Pike are two projects planned to address the increase in middle and high school student population. During the 1990's, the need to renovate or replace older facilities and provide facilities to accommodate residential growth in the county has resulted in significant allocations for capital facilities costs in the school division. The rate of residential growth continues to impact the school system, particularly in southern and eastern Frederick County as subdivisions are developed in the Urban Development Area (UDA). In addition, careful monitoring of residential growth outside of the UDA, which has accounted for approximately one-third of new residential building permits issued throughout the 1990's, is necessary to accurately predict enrollment trends. Along with growth in student enrollment, the school division is faced with the responsibility of providing instruction in order to prepare students to work and live in the 21" century. The use of technology as a tool in nearly every facet of education has dramatically changed the way in which instructional services are provided to students. Required technology -related instruction at all levels will continue to necessitate increased expenditures for computer and computer-related hardware and software. Mandates from the federal and state governments, particularly in special education services, will require localities to expend additional financial resources to meet educational requirements. The requirements associated with technology -related instruction and the provision of appropriate special education services to students will create the need for investment in future capital projects within the school division. Major efforts have been made by the school division and the Board of Supervisors to consolidate services in order to serve the residents of Frederick County more effectively and efficiently. Cooperative agreements have been developed relative to sharing school facilities for recreational use by a wide variety of community organizations; maintenance of school grounds provided by the Department of Parks and Recreation, resulting in a greater utilization of space; and maintenance of the County Office Complex provided by the school division's Building and Grounds Department. Frederick County 8 - 2 Comprehensive Plan Frederick County Schools rederick Co�mty Department of Planning and Development Winchester, VA December 200D )tr_2000 School Ed. Program VOC t Q7 Re ids r r� f� C a, Junction A' tP' a' esbor ore j 1 learbroo I � Hayfield Rou d Win es � ti CS ati S S St ns ne School Types / s Elementary School �{ N Middle School v t - High School W E M dleta � + �°� �01 Co S Vo -Tech School o Hamlets Roads re N Major Roads Minor Roads Co. ID School Name Type 1 Apple Pie Ridge Elementary ES 2 Armel Elementary ES 3 Sass -Hoover Elementary ES 4 Crainesboro Elementary ES 5 Indian Hollow Elementary ES 6 Middletown Elementary ES 7 Orchard View Elementary ES 8 Redbud Run Elementary ES 9 Senseny Road Elementary ES 10 Stonewall Elementary ES 11 Frederick County Middle MS 12 James Wood Middle MS 13 R.E. Aylor Middle MS 14 James Wood High HS 15 Sherando High HS 16 Dowell J. Howard Voc. VOC 17 Northwestern Reg, Yea r Community Facilities and Services Emergency Services The Frederick County Fire and Rescue Department was established in 1990 to provide support and guidance for the eleven volunteer fire and rescue companies that provide fire suppression and emergency medical services to the citizens of Frederick County. Each volunteer fire and rescue company provides fire suppression service, eight provide advanced life support emergency medical service, one provides basic life support emergency medical service, and two provide first responder level medical care. The County Fire and Rescue Companies are as follows: Company 11 - Stephens City Volunteer Fire and Rescue Company Company 12 - Middletown Volunteer Fire and Rescue Company Company 13 - Clearbrook Volunteer Fire and Rescue Company Company 14 - Gore Volunteer Fire and Rescue Company Company 15 - Round Hill Community Volunteer Fire and Rescue Company Company 16 - Gainesboro Volunteer Fire and Rescue Company Company 17 - Star Tannery Volunteer Fire and Rescue Company Company 18 - Greenwood Volunteer Fire and Rescue Company Company 19 - North Mountain Volunteer Fire and Rescue Company Company 20 - Reynolds Store Volunteer Fire and Rescue Company Company 21 - Millwood Station Volunteer Fire and Rescue Company Staffing of the fire and rescue stations is accomplished by volunteers from each of the communities and is supplemented by twenty-four career fire and rescue personnel employed by Frederick County. The volunteers provide 24 hour a day, seven day a week coverage in all of the fire and rescue stations. The career fire and rescue personnel staff nine of the eleven stations, ten hours a day, five days a week as well as providing 24 hour coverage on two advanced life support response vehicles. These vehicles operate from Company 16 and 18. The Fire and Rescue Department office is divided into three Divisions. These Divisions are Operations, Training, and Life Safety. The office is headed by a full-time Director who is employed by the County. The Director is responsible for supervision of all of the Departments operations. This includes the supervision of all career personnel, coordinating the service delivery of the volunteer companies, overseeing emergency services planning, providing volunteer and career training programs, disaster and hazardous material coordination, and managing Department resources. The office also has two full-time support staff personnel, an administrative assistant and a secretary. The Operations Division is divided into three Battalions, having a Fire/Rescue Lieutenant - Field Supervisor to oversee the career fire and rescue personnel. These Field Supervisors also work with the volunteer chiefs to coordinate daily activities within each company. The Life Safety Division is responsible for fire prevention, life safety education programs, fire code enforcement, and fire investigations. The Life Safety Division is headed by a full-time Fire/Rescue Frederick County 8-4 Comprehensive Plan Community Facilities and Services Battalion Chief - Fire Marshal employed by the County. The division is supported by a full-time Fire/Rescue Lieutenant - Assistant Fire Marshal. The Fire Marshals are on call on a 24-hour basis to provide fire investigations, technical support to volunteer companies, and to respond to emergencies. The Training Division is responsible for developing, providing and overseeing training programs for the volunteer and career fire and rescue personnel. This Division is headed by a full-time Fire/Rescue Battalion Chief - Training Officer employed by the County. The Training Officer is also the Career Development Advisor, responsible for overseeing the administration of the Career Development Program. Future challenges for the Fire and Rescue Department include meeting fire and rescue equipment needs, maintenance and expansion of current fire and rescue stations, developing water systems for fire protection, meeting training and certification requirements, increasing emergency medical service, improving radio communications, providing service for the regional airport as required by the Federal Aviation Authority regulations, and developing additional fire and rescue stations to meet future growth within the County. The County of Frederick, had a population of 34,150 in 1980 and an estimated population of 57,000 in 1999 according to the University of Virginia Center for Public Services. This was a population increase of 22,850 with no development of new fire and rescue stations. This growth has increased the response time for existing fire and rescue stations and will undoubtedly lead to the need for additional fire and rescue services. Planning for future fire station locations and equipment needs has been accomplished by developing a five-year strategic plan. This plan identifies future station sites and equipment needs based on projected service demands and response times. The plan encourages the dedication of sites for new fire and rescue stations within the identified areas during the rezoning process. A recent response study was conducted and concluded the need for five additional fire and rescue stations in the next five years. These stations are to cover the areas of: Green Springs/White Hall Rt. 522 South/Rt. 277 East Middle Road/Cedar Creek Grade Apple Pie Ridge/Route 522 Route 7/Redbud Road The response study justifies the need for new fire and rescue stations. The study indicates that in many areas a ten minute total response time is not being met. Increased calls to each fire station create a situation where the 2nd due station has to cover additional areas while the V due station is still out. Non-residential areas such as retail, office, and industrial require increased fire protection because specialized equipment is necessary to insure safety for these land uses. Other land uses Frederick County 8 - 5 Comprehensive Plan Community Facilities and Services identified as target hazards continue to grow. These include land uses such as schools, nursing homes, daycare centers, and industrial facilities. These land uses have a higher risk of injury due to the specific demographics of persons utilizing these facilities. Existing road conditions; primarily those with gravel or dirt surfaces and horizontal and vertical curvatures, located outside of the county's Urban Development Area (UDA) create longer response times. The greatest factor contributing to the need for new fire and rescue stations is the rapid population growth and increases in dwelling units within and outside of the UDA. The development of new fire and rescue stations could provide an opportunity to extend satellite services provided by other county departments and agencies. Allocation of space could be created within new fire and rescue stations for community services provided by the Sheriff's Office, the Treasurer's Office, the Voter Registrar's Office, and the Commissioner of the Revenue's Office; as well as office space for members of the Board of Supervisors. Airport The Winchester Regional Airport is a 376 -acre, all weather, 24-hour general aviation airport with a 5,500 foot runway located southeast of Interstate 81, Exit 313A. The facility currently has 75 tie down spaces, two 12,000 square foot public clear span hangars, 52 T -hangars and three private corporate hangars. Based aircraft total 80, and range in size from single engine to large cabin class business aircraft. Services available include 24-hour U.S. Customs and Immigrations, 24-hour on call line service, automated weather observation system, computerized weather and flight planning equipment, full instrument landing system, and rental car service. The Winchester Regional Airport Authority was formed by the Virginia General Assembly on July 1, 1987. The Authority consists of representatives from the City of Winchester, Frederick, Clarke, Shenandoah, and Warren counties. Since its formation, the Winchester Regional Airport Authority has embarked on an extensive airport improvement program. Major capital improvements have been accomplished in order to comply with Federal safety and design standards. Completed construction projects include a 1,100 -foot runway extension, pavement resurfacing of the entire runway, relocation of the taxi way and the creation of safety areas at each end of the runway. New buildings constructed under this program include a modern general aviation terminal, a 12,000 square foot clear span hangar, a maintenance hanger with Fixed Base Operator offices, and 42 T -hangar units. Other completed projects include airfield lighting upgrade, installation of a 40,000 gallon above ground fuel storage facility, security fencing of the Airport perimeter, and the installation of a precision instrument approach that provides better all weather access to the Airport. Collaborating with Frederick County and the Virginia Department of Transportation, the Authority has also made improvements to primary access roads to the airport. Sewer and water service has also been established. To date, more than $14 million dollars has been invested in Airport capital Frederick County 8 - 6 Comprehensive Plan Community Facilities and Services improvements, equipment, and promotions through funding received from the Federal Aviation Administration, Virginia Department of Aviation and the local jurisdictions. Remaining capital projects include the relocation of Airport Road to remove a portion of the road that infringes on controlled airspace and land acquisition along Bufflick Road for noise abatement. Land to accommodate the road relocation project has been acquired by the Airport over the past year in order to provide the Virginia Department of Transportation a one hundred foot right of way. Through the support of the member jurisdictions, the Winchester Regional Airport will continue to evolve into a modern first class air transportation facility which will assist economic development endeavors in the attraction of new industrial and commercial businesses to the region. Handley Library Library service is provided to Frederick County through the Handley Regional Library, which also serves Clarke County and the City of Winchester. Currently, there are 21,107 active registered library card holders in Frederick County. During the 1998 fiscal year, Frederick County residents borrowed 208,988 items from the Handley Library, the Clarke County Library, and the Bookmobile. The regional system supports education, preschool through post -secondary, by providing assistance and research materials for projects and papers, and by being open nights, Saturdays, some Sundays, and during the summer when schools are closed. It is also an important resource for adults seeking to improve their skills and for introducing preschoolers to books and reading. The library also provides the business community and the public with information for their research needs as well as recreational reading. Bookmobile service to the residents of southern and western Frederick County was expanded in July 1996, as the result of an agreement between the library and Trinity Lutheran Church in Stephens City. This agreement has allowed the library to use the church parking lot on Wednesdays and Thursdays as a Bookmobile stop. In addition, Trinity has allowed the library to offer story hours for children in the church social hall. During fiscal year 1998, nearly 1,000 children and adults have attended the story hours. The regional library system continues to be below per capita state standards in the areas of books, square footage, seating, and periodical holdings; however, important steps have been taken to remedy this. The Frederick County Board of Supervisors hired Lukmire Partnership of Arlington, Virginia, to design a 35,000 square foot library for a site at the corner of Tasker Road and Lakeside Drive, just east of Stephens City. Construction of this new facility is anticipated to begin in the fall of 1999 and be open for public use in the fall of 2001. Other capital improvements are proceeding simultaneously, including a complete renovation of the historic Handley Library which involves roof repairs and replacement, and interior renovations. In addition, a volunteer -directed campaign to raise Frederick County 8 - 7 Comprehensive Plan Community Facilities and Services t three million dollars for books for the regional system, which began in November 1997, is more than one-half of the way towards its goal. County Offices In 1996, the County completed construction of a 68,000 square foot building adjacent to the Frederick County Administration Building. Funding for this new building was obtained through the issuance of a bond. The construction incorporated the existing 32,000 square foot Frederick County Administration Building, and provide a county government complex totaling 100,000 square feet. Most of the County's departments and agencies are now housed in this new county government complex in downtown Winchester. In 1998, the County modified the Capital Improvements Plan to provide for a Public Safety Facility for the Sheriff's Department and the Fire and Rescue Department; as well as for Annex Facilities that would situate satellite offices throughout the County for representatives of the Treasurer's Office, the Commissioner of Revenue's Office, and the Sheriff s Department. The provision of these facilities is intended to improve emergency response time, enhance public safety, and provide more efficient service to County residents. The location of these facilities are envisioned to occur within areas of dense population, as well as along arterial and major collector road corridors. Refuse Collection, Landfill, and Recycling Twelve refuse collection stations are located throughout Frederick County. Nine refuse collection stations consist of hydraulic compactors with separable roll -off containers and collection facilities for recyclables, and three sites consist of front-end dumpsters only. The County converts dumpster sites to compactor stations when warranted by tonnage levels. Consolidation of sites during the conversion process is also desirable, when practical. Based on research by the Government 12 Student Learning project and staff, the concept of curbside pickup in the densely populated areas of Frederick County that are currently served by public water and sewer was endorsed by a resolution of the Board of Supervisors in August, 1998. The Board may elect to offer curbside refuse and recycling collection anytime after August, 2003. The Frederick County Landfill is a regional facility that receives refuse from Frederick and Clarke Counties and the City of Winchester. The landfill is operated by Frederick County as an enterprise fund and the landfill operation is fee sustaining. The management and planning of landfill operations are solely the responsibility of Frederick County, with input from an oversight committee comprised of representatives from Frederick and Clarke counties and the City of Winchester. Closure of the older section of the landfill, which opened in 1976, was completed in 1994 A new 160 -acre tract of adjacent land, purchased in 1986, was opened for landfilling during 1993. Frederick County 8 - 8 Comprehensive plan Community Facilities and Services Approximately 90 acres of this tract has been permitted for landfilling under the newly adopted Subtitle "D" Solid Waste Regulations. Both the closure of the old section and the construction of the new section have been carried out in accordance with new state regulations that require much more sophisticated environmental protection measures, including composite impermeable liners, a complete leachate collection system, leachate treatment facility, groundwater monitoring and gas monitoring. The current landfill was originally estimated to have adequate capacity for 25 years commencing in October of 1993. The development of a construction debris landfill should extend the life of the current sanitary landfill approximately eight years, resulting in a life of 33 years. A tract of land consisting of 109 wooded acres was purchased from Ryland Carper for the future development of a construction debris landfill. The permitting, design and construction of this new construction/debris landfill was completed in 1998. The County should reevaluate tonnage, revenue, and expenditure trends each year and set fees accordingly. The County should also continue to evaluate new technologies for waste reduction and recycling that would extend the life of the landfill. During the 1990's, the Countyplaced collection boxes for recyclable materials at each ofthe citizens' convenience areas located throughout the County. Through this effort, the County was able to meet the 1995 recycling mandate of 25 percent mandated by the Commonwealth of Virginia. Due to the rapid growth in the County, additional programs have been implemented to enable the County to maintain the 1995 recycling mandate of 25 percent. These programs include brush and yard waste mulching, composting, waste oil recycling, tire shredding, and household hazardous waste collections. New residential developments need to be provided with appropriate means of solid waste collection. Either private collection or new collection stations should be provided by developers. Sewer and Water Facilities The location of public sewer and water lines determines where urban development will occur. The Urban Development Area described by the Frederick County Comprehensive Plan is roughly the same as the service areas for public sewer and water. Because sewer and water facility location determines the location of urban development, great care is needed in planning where such facilities will be provided. The Frederick County Sanitation Authority has the responsibility for the treatment, transmission, and distribution of potable water and the collection and transmission of wastewater. Most of the sewer and water mains and laterals in the County are owned, operated, and maintained by the Sanitation Authority. Frederick County 8 - 9 Comprehensive Plan Community Facilities and Services Frederick County and the Sanitation Authority have executed a Facilities Planning Agreement which sets forth procedures for the planning of sewer and water mains in the County. The agreement includes provisions for adopting a water and sewer facilities plan as a part of the Comprehensive Plan, specifying the location of mains over eight inches in size, and includes provisions for review and update of the plan and for including sewer and water facilities projects in the Frederick County Capital Improvements Plan. The City of Winchester owns and maintains sewer and water lines in portions of the County adjacent to the City corporate limits. Such lines have been extended into the County following a previous agreement between the City and the County. The Frederick -Winchester Service Authority has the responsibility ofproviding wastewater treatment for the Sanitation Authority and the City of Winchester. The Service Authority currently owns the Opequon Water Reclamation Facility and the Parkins Mills Plant and contracts for their operation. The City operates the Opequon Facility and the Sanitation Authority operates Parkins Mills. Treatment of wastewater generated in the County is provided by two sewage treatment plants: the Opequon Water Reclamation Facility and the Parkins Mills Plant. The Opequon Plant serves the Abrams Creek drainage area and surrounding drainage areas east and north of Winchester, and provides sewage treatment for Winchester. The Parkins Mills plant serves the upper Opequon Creek, Wrights Run, and Stephens Run drainage areas. The Opequon Water Reclamation Facility has a hydraulic capacity of 8.4 millions gallons per day with a biological capacity of 18,000 pounds per day. The Opequou Water Reclamation Facility Capacity Needs Evaluation Report projects this capacity will meet demands through 2008. The Parkins Mills Plant serves the upper Stephens Run, Wrights Run, and Opequon drainage areas. The rated capacity of this plant is 2.0 million gallons per day. The current average daily flow of this plant is about 1.1 million gallons per day. Frederick County 8-10 Comprehensive Plan Frederick Cowety Department of Planning and Development. Winchester, VA November 2000F)% CILITY .LAN SEIVER & VANE . ,Community Facilities and Services Frederick County o° - 12 Comprehensive Plan Community Facilities and Services Figure 17 Total New Water and Sewer Connections 80c 700 M o` 600 w U N C C 500 0 U 400 300 200 100 0 91 92 93 94 95 96 97 98 99 100 Fiscal Year Frederick County 8-13 Comprehensive Plan Community Facilities and Services Figure 18: Opequon Treatment Plant; Sewer Flows Versus Capacity 2 El city Q FCSA Limit 91 92 93 94 95 96 97 98 99 '00 Fiscal Year Certain portions of the Urban Development Area, such as the Apple Pie Ridge area, may not be intended to be sewer and water service areas. Rural Community Centers that are outside of the Urban Development Area may be provided with some form of service, depending on the policies established for each particular center. The intention is that additional extensions of sewer and water service will reflect the boundaries of the Urban Development Area. The extension of mains into areas not included in sewer and water service areas described by the facilities plan will require an amendment to the Comprehensive Plan. In this way, the County will maintain an orderly process of development. All sewer and water mains extended should be publicly owned mains. Frederick County 8-14 Comprehensive Plan Community Facilities and Services Figure 19: Parkins Mill Treatment Plant; Flow Versus Capacity 2 Flow 1.6 mmn� Limit 1.6 1.4 6� 0.6 0.4 0.2 0- 92 93 94 95 96 97 98 99 '00 Fiscal Year Capital Improvements Plan The Capital Improvements Plan (CIP) is the community's plan for public facilities. It provides a list of projects planned for five years and is updated each year as projects are completed and new projects added. In general, projects on the Capital Improvements Plan are relatively expensive, fixed assets that require expenditures that do not recur annually and last for a relatively long time. Frederick County 8- 15 Comprehensive Plan Community Facilities and Services The first year in the Capital Improvements Plan should provide a capital budget for the upcoming fiscal year. The scheduling ofprojects needs to be coordinated with plans for development contained in the Comprehensive Plan. The Comprehensive Plan should be used as a tool to aid in determining priorities among projects, for estimating required funding, and for scheduling projects. The Capital Improvements Plan helps to guide development, to achieve the most efficient use of funds, and to maintain a stable financial program. The County's procedures for reviewing and adopting the CIP need to be improved. The CII' needs to have a direct link to available or projected funds. Projects need to be systematically reviewed against established standards in order to determine priorities. These standards need to be developed and reviewed on a regular basis. The County Finance Department should play an active role in the CIP development process. Facility Cost Impacts Rezoning requests should be evaluated to determine their potential impacts on community facilities. Costs to the County should be estimated in terms of what impact the development, which could result from the proposed rezoning, would have on facilities and infrastructure. These costs are estimated in terms of facility use per unit of development. The estimated facility use is determined through the use of established multipliers which use averages derived from existing development. These multipliers set out such factors as: expected numbers of vehicle trips, school children, gallons of sewer and water usage per dwelling unit, square footage of commercial use, or person. The demand on various facilities resulting from a proposed rezoning can then be estimated based on the projected number of units which could result. Actual cost estimates are then calculated using the costs of facilities listed in the Capital Improvements Plan. Initially, costs are estimated in terms of the actual costs of providing facilities to support the potential development. In 1991, an impact model was developed for Frederick County which has been utilized to project the fiscal impacts of rezonings on public schools, parks and recreation, and fire and rescue services for capital facilities costs. In 1998, a revised impact model was adopted by the Board of Supervisors. The revised model was designed to incorporate additional modules to project the fiscal impacts of rezonings on the sheriff's office, the public library system, county administration facilities, and miscellaneous public facilities, as well as the public agencies that were accounted for in the previous impact model. The impact model projects the gross potential costs of the facilities that would be needed to support a new development using the basic formula described above. Credit is given for the projected revenues that would be generated by the development. Potential revenues are subtracted from the projected gross costs resulting in an actual projected net fiscal impact of the development on the County. The impact model will need to be updated annually by county staff to ensure that the information used in the model is accurate. In general, negative fiscal impacts for capital facilities costs are realized from residential rezonings, while positive fiscal impacts are realized from commercial and industrial rezonings. Frederick County 8-16 Comprehensive Plan Communitv Facilities and Services No rezoning should be approved unless the net impacts on community facilities are positive, or if the negative impacts can be adequately addressed through proffers or some other means. A request for rezoning may be turned down even though all fiscal impacts appear to be addressed. If there are other impacts which are not addressed or if the request does not conform to this plan, a similar method should be developed for determining the impacts of proposed developments on transportation systems and other public facilities. Issues: There is a need to carefully monitor school enrollments and to plan for school capacity to deal with overcrowding, replacement of outdated facilities, and population growth in the County. There is a need to continue supporting fire and rescue squads and to develop policies to deal with growing emergency service demands. House number efforts should continue in association with improved emergency telephone systems. The County should support improvements at the Winchester Regional Airport as a part of the overall economic development efforts. The County should continue to monitor refuse collection sites and should make improvements or add sites as needed. The County should continue to monitor landfill recycling efforts should be supported. The County should maintain a process of careful Capital Improvements Planning coordinated with Comprehensive Planning. Frederick County and the Frederick County Sanitation Authority need to continue coordinated planning of sewer and water facilities following the procedures described by the Facilities Planning Agreement. Additional information is needed on the impacts of new development on community facilities. Frederick County and the City of Winchester need to maintain coordinated planning of sewer and water facilities in the County through the Sewer Agreements. Frederick County 8- 17 Comprehensive Plan Community Facilities and Services ► Together with the County and the City, the Frederick -Winchester Service Authority should carefully plan needed sewage treatment capacity based on trends in usage. The Service Authority needs to develop a capital improvements plan that is coordinated with City and County plans. ► Water and sewer service should be provided to service areas in the urban development areas through an orderly process following the Facilities Planning Agreement and using the Capital Improvements Plan. Community Facility and Service Policy GOAL Appropriate services and facilities shall be provided to serve planned land uses and development GOAL - Facilities and services should be carefully planned to meet projected needs Strate1 - Plan sufficient school capacity to meet projected enrollment trends and to meet appropriate facility standards. Strate2 -Recognize the changes occurring in demand for emergency services and develop policies for dealing with those changes. Strate 3 - Support expansion plans for the Winchester Regional. Airport. Strate 4 - Monitor refuse collection and landfill use and continue to develop plans for future improvements. Pursue recycling methods and other methods to extend the life of the landfill. Strate 5 - Carefully monitor sewer and water use and develop up-to-date improvement plans for sewer and water facilities. Strate 6 - Develop and maintain formal and regular relationships and procedures between the County and providers of facilities and services, including the Sanitation Authority, the City of Winchester, the Service Authority, the School Board, the Regional Airport Authority, and the Fire and Rescue Squads. Strate7 - Use the Capital Improvements Plan to carefully plan community facilities and to coordinate facilities planning with land use plans. Frederick Iounty 9- 19 Comprehensive Plan Communitv Facilities and Services Stratey 8 - Require that the impacts of new developments on facilities be described and require that the impacts are addressed through proffers and other means. Implementation Methods: 1. Carefully monitor school enrollments and plan facilities according to enrollment and development trends. Update the Capital Improvements Plan each year based on trends. 2. Continue to support fire and rescue squads and plan to increase support according to development in the various service areas.. 3. Develop plans for new emergency service facilities. 4. Continue to convert dumpster sites to compactor sites. Monitor usage. Plan for new refuse collection sites according to use and planned development patterns. 5. Monitor landfill use. Plan for additional landfill capacity on adjacent land. Explore alternative disposal methods. 6. Continue to plan for sewer and water main extensions according to the agreements established with the Sanitation Authority and the City of Winchester. Include planned extensions in the Capital Improvements Plan. 7. Provide for recycling at collection stations and support a regional materials recovery center. 8. Carefully monitor sewer and water use and develop a capital improvements plan to accommodate projected development. 9. Consider means to provide water service to Brucetown. 10. Consider alternative sources of water supply. 11. Minor extensions of sewer and water service to business and industrial uses beyond the service area may be considered if such uses conform with other County standards. Such extensions should be reviewed by the Planning Commission for conformance with the Plan. 12. Require that information be provided with rezoning proposals on the impacts of developmel-it on n cora unity acilities. impacts should be addressed through proffers and other means. No rezoning should be approved unless all impacts are adequately addressed. Frederick County 8- 19 Comprehensive Plan Community Facilities and Services t 13. Any sewer or water main six inches in diameter or larger, extended or existing within an area proposed for inclusion within the County's Sewer and Water Service Area or Urban Development Area, should be dedicated as a public line to be owned and maintained by the County Sanitation Authority or City of Winchester when appropriate. 14. Plans for new facilities should be based on demand projections as derived from population projections in the Comprehensive Plan. Frederick County 8-20 Comprehensive Plan AoS� Frederick County Depmbnent of Plmwng �� and Development Winchester,VA Cfll� "lLaunu Yacilfies aiRd Servxes December 2000 Parks and Recreation The purpose of this chapter is to outline the County's recreational policies and to identify implementation methods for accomplishing recreational facilities, programs, studies, and plans. It is not meant to be a detailed recreation plan, but rather it is a part of the County's continuing planning process and a guide to decision making. Facilities The County currently owns and operates two regional parks. Clearbrook Park, located five miles north of Winchester on Route 11, consists of approximately 55 acres and Sherando Park, located two miles east of Stephens City on Route 277, consists of approximately 330 acres. Both regional parks currently serve the County's population with both active and passive recreational programs and facilities. In addition to these regional parks, five neighborhood parks have been developed which serve a more specific group with more limited facilities than those in the regional parks. The neighborhood parks are located at: Reynolds Store Fire Company and Gainesboro Fire Company in the Gainesboro District, and Round Hill Fire Company in the Back Creek District, and at Frederick Heights subdivision in the Shawnee District. These neighborhood parks consist primarily of playground equipment for young children. The Parks and Recreation Department also maintains two tennis courts at Senseny Road Elementary School for community use. In 1987, master development plans were adopted for both Clearbrook and Sherando Parks. These master plans establish development goals for each park, identify unmet recreational needs, provide unified facility plans, and propose a development program for each park. The master plan for both Clearbrook and Sherando Parks reflect the recommendations of the County residents and national standards as outlined in the Virginia Outdoor Plan. These plans emphasize the development of a swimming pool complex and additional sports, picnic, maintenance, and other support facilities. Funding has been provided to update the Sherando Park Master Plan. The revisions are scheduled to be completed by June 30, 2001. Since the adoption of the master plans, the County has completed the construction of two outdoor swimming pool complexes, four soccer fields, a maintenance building, one shelter, two playground areas, two sand volleyball courts, and two fields of a four field softball complex. The County has also purchased an area to house the maintenance operation for Clearbrook Park. Additional recreational facilities currently provided are athletic fields, playground, and picnic areas with a variety of recreational opportunities such as horseshoes, fishing, paddleboats, and volleyball, open space areas and support facilities. Clearbrook Park, Sherando Park, neighborhood parks and all public school athletic fields and grounds are maintained by the Parks Division of the County Parks and Recreation Department. Asa result of a j oint operating agreement with the County School Board, the Parks and Recreation Department has use of the following Sherando High School facilities when they are not in use by the high school: lighted football field and track, baseball field, eight outdoor lighted tennis Frederick County 9- 1 Comprehensive Plan Parks and Recreation courts, and four outdoor lighted basketball courts. The Parks and Recreation Department's Community Center, which was built adjoined to Sherando High School, opened in September of 1993 and contains two racquetball courts, a weight room and a multipurpose room. The Residential Performance Zoning regulations require that open space be provided in most types of suburban development. In addition, recreational facilities are required in any residential development which contains lot sizes of less than 5,000 square feet. It is required that such open space and facilities be dedicated to homeowners associations. There is a need to examine recreational and park needs in suburban and urban areas, specifically, the development of a bikeway and trail system. One need that has been identified is the development of a bikeway and trail system. To date, the County has constructed a 2.40 mile bicycle facility to serve several residential areas east of Stephens City, The County has also committed to the construction of a.60 (3,2001.£) bicycle facility to serve residential areas on the northern perimeter of Sherando Park. These bicycle facilities will link those residential areas with Sherando Park and Sherando High School. Additional trails would provide residents the ability to travel safely from their homes to schools, stores, work or recreational areas without having to share the overcrowded arterial and collector roads with automobiles. Also, there is a need to examine Residential Performance Zoning regulations to determine whether the recreational needs of the single family homeowner are being met. Programs The Recreation Division of the Frederick County Parks and Recreation Department was created to provide a comprehensive and accessible program of recreational services and activities for the residents of Frederick County. A diverse range of recreational and enrichment programs are provided for all age groups. This broad base of activities includes, but is not limited to, instructional classes, outdoor recreation programs, sports and athletics, health and fitness programs, cultural and special events, and trips and excursions. Programming responsibilities are assigned within the Division's four interest sections --Community Recreation (Children's Programs, Cultural Arts, etc.); Senior Citizens; Aquatics; and Sports and Athletics. Staff members work together to identify, develop and implement those activities which most closely meet the interests and desires of the community. The Division typically implements programs along age group stratifications such as preschool, youth, teen, adult and senior adult; however, a shift in programming emphasis has resulted in the development of broader activities to appeal to family units. In particular, holiday events are planned to include parent and child in a variety of leisure opportunities. The majority of recreation programs offered by the Parks and Recreation Department are held within the 15 public schools in Frederick County and the Parks and Recreation Department's Community Center. Consequently, a wide variety of recreation offerings has maximized use of the county school Frederick County 9 - 2 Comprehensive Plan Parks and Recreation buildings. The joint efforts of the Frederick County School Board and the Parks and Recreation Commission/Department resulted in the inclusion of recreational facilities within Sherando High School. The Department's Community Center, which was built adjoined to Sherando High School, opened in September of 1993. On August 28, 2000, the Orchard View Community Center is scheduled to open. This facility, which is attached to the Orchard View Elementary School, will have a full-size gymnasium that will be programmed during non -school hours. Citizen Participation Citizen participation and input regarding recreation programs and park development have been actively solicited since the creation of the department in 1971. The Parks and Recreation Commission consists of seven members, including one from each magisterial district, appointed by the Board of Supervisors for four year terms and two at -large members recommended by the Commission and appointed by the Board to serve staggered four year terms. Future Demands To help plan for the future leisure service demands, the Parks and Recreation Department has completed master plans for the County's two regional parks, studied national standards provided in the Virginia Outdoor Plan, and gathered survey information relating to the provision of leisure services. Through the utilization of these and any other available resources, it is projected that the following areas must be addressed if we are to meet future leisure demands: I . Land acquisition to meet minimum standards 2. Facility development to meet minimum standards 3. Development of recreational centers 4. Increased programming for special populations 5. Increased programming for teens 6. Great diversity of programming so as to better meet the needs of the entire community. 7. Establishment of trail systems and bikeways Frederick County 9 - 3 Comprehensive Plan Parks and Recreation Area Standards As suggested by the 1996 Virginia Outdoor Plan, the area standard for local recreation and park sites in Virginia is ten acres of developed park land per thousand population. Frederick County has a population of approximately 57,000 (based on 1999 provisional estimate data provided by the University of Virginia Center for Public Services) and currently maintains 404 acres of park land. Of the 404 acres assigned to the parks, about 240 acres would be considered developed. By the year 2001, using the population projections provided by the Frederick County Planning Department, an additional 166 acres will be needed and by the year 2010, another 130 will be required if we are to keep pace with the recommended standard of the ten acres per thousand. It is estimated by the Department of Parks and Recreation that by the year 2020, Frederick County will need approximately 833 acres of developed park land to adequately serve the County's population. In meeting the ten -acre per thousand minimum standard for park land, it is recommended by the Virginia Outdoor Plan to consider the following types of park development: Frederick County 9 - 4 Comprehensive Plan Parks and Recreation NEIGHBORHOOD PARK Size: 5 - 20 acres Plan at 3 acres/ 1000 Population Service Area: Approximately 5 - 15 minutes walking distance or 1/2 mile to 1 '/2 miles Administrative Responsibility: Local Unit of Government or Homeowners Association Purpose: The primary function of the neighborhood park is to provide limited types of recreation for the entire family within easy walking distance. Facilities should be provided for all age groups. Character: Intensive use and easy access are characteristics of this classification. Ideally, the site would have areas that are level to gently rolling to accommodate the intensive use facilities, with shaded areas for passive recreation. Location: If possible, the neighborhood park should be located near a school and /or the neighborhood center and away from railroads, major streets and other hazardous barriers. Potential Facilities: *playground *badminton courts *ball diamond *swimming pool *basketball courts *volleyball courts *tennis courts *fishing pond *shuffleboard courts *recreation center *picnic facilities *walking trails *horseshoe courts *bikeway *football/soccer field Play fields usually serve a dual purpose is this type of facility. They provide an area for sports and running games and also serve as open space. Intensive use areas (the playground area and hard surfaced courts) are buffered from other activities by passive natural areas and pedestrian access corridors. Programmed activities such as organized athletics are often suitable in neighborhood parks. Although limited parking facilities are provided, site design should encourage pedestrian access to the greatest extent possible. Rural communities may want to consider deleting neighborhood parks and include their function in larger community parks which could better serve the needs of widely dispersed local population. From an economic standpoint, it would be more beneficial for a rural locality to have a few strategically located, well designed, larger facilities than to invest in several small sites and not have the funds to properly develop and maintain them. Frederick County 9 - 5 Comprehensive Plan Parks and Recreation COMMUNITY PARK Size: 20 -50 acres Plan at 3 acres/1000 Population Service Area: Approximately 15 minutes driving time Administrative Responsibility: Local Unit of Government Purpose: Community parks should primarily support active recreation activities and be capable of withstanding intensive use, while still containing a fair amount of open space. Character: The site usually varies from relatively flat open space to moderately sloping wooded area. Such a park should be adaptable to a wide variety of recreational activities. Access is gained by auto, bicycles, or walking. Location: Locate when possible near the center of the community with good access and serviced by a public transportation system. Potential Facilities: * playgrounds * tennis courts * horseshoe courts * ball diamonds * volleyball courts * beach\swimming area * picnic facilities * swimming pool * shuffleboard courts * basketball courts * parking area * football\soccer fields * trails: walking, hiking, biking, fitness * natural area * fishing lake or stream access * recreation center A multitude of activities must be provided by this intensive -use recreational facility. The recreation center is often the focal point of the park. Organized activities are grouped in the surrounding area. Their location is dependent upon the natural terrain, need for control, and vehicular access. Any existing natural qualities, such as topography, water features, and trees, should be preserved and utilized as natural buffers between activity areas as well as to protect the recreation environment from surrounding, incompatible influences. These natural elements should also be used to provide a space for more passive forms of recreation such as nature walks, picnicking, and fishing. In the rural setting, this park category may take the place of the neighborhood park. It can better serve a widely dispersed population than two or three smaller sites. Community parks, along with neighborhood parks (where applicable), usually meet most of the close -to -home recreation needs of most localities. Frederick County 9 - 6 Comprehensive Plan Parks and Recreation REGIONAL PARK Size: 50- 150 acres Plan at 4 acres/1000 Population Service Area: 15 - 25 minutes driving time 5 - 15 miles service radius Administrative Responsibility: Local Unit of Government Purpose: Regional Parks should serve the recreational needs of large portions of the local population. They should contain a wide variety of intensively developed areas for day use recreation while providing ample open space with generous buffers between activity areas. Character: The site could vary from flat open space to moderately to steeply sloping topography. It should be capable of supporting a wide variety of activities with ample buffer and natural areas. Sitting on a stream or lake is highly desirable. The regional park needs to be accessible by auto as well as pedestrians and bicycles. Location: When possible, locate the regional park so that it is near the center of the service area. It should be on or near an arterial or major collector road providing good access to the facility. In urban or suburban situations, easy access to mass transit is highly desirable. The site should also be accessible by pedestrians and bicyclists. Potential Facilities: *playgrounds *natural area *ball diamonds *parking areas *recreation centers *swimming pool and/or beach with swimming area *trails *tennis courts * fishing/boating *basketball courts *shuffleboard courts *golf *picnic facilities *lake or stream *horseshoe courts *volleyball courts *football/soccer fields Frederick County 9 - 7 Comprehensive Plan Parks and Recreation RECREATION CENTERS The recreation center may be found at the neighborhood, community, district, and regional parks. At the neighborhood level, the recreation center is usually constructed between 15, 000 and 20,000 square feet. It generally will include multipurpose rooms, an arts and crafts area, game room, kitchen, lounge and lobby, restrooms, and office. If a gymnasium is not available in a neighborhood school, the recreation center may also include a gymnasium and locker room facilities. The recreation center in a large park that serves a community will be considerably larger, from 50,000 -100,000 square feet, and will include several multipurpose rooms, gymnasium, indoor pool, shower and locker rooms, game room, arts and crafts area, an auditorium or areas for performing arts, class or club rooms, kitchen, large meeting room, restrooms, office, lounge or lobby, and some specialized areas such as a ceramics workshop or weight room. An important consideration in all recreation facilities is to provide adequate storage space. Frederick County 9 - 8 Comprehensive Plan Parks and Recreation EXISTING REGIONAL PARK FACILITIES Currently, the Parks and Recreation Department is responsible for operating and maintaining the following facilities: Clearbrook Park Clearbrook Park, covering 55 acres, is located approximately five miles north of Winchester, on Route 11. Clearbrook Park is open 365 days a year, from 8:00 a.m. to dark and includes: *four lighted athletic fields with concessions *paddleboats *playgrounds *outdoor swimming pool *maintenance complex Sherando Park *three -acre lake *horseshoe pits *vintage red caboose *passive areas *fishing *volleyball *tables & grills *picnic shelter Sherando Park is located on Route 277, approximately two miles east of I-81, near Stephens City. The park consists of 330 acres, approximately one-half of which is undeveloped. Sherando Park is open 365 days a year, from 8:00 a.m. to dark and includes: *five -acre lake *model radio airplane facility *seven lighted athletic fields with concessions *four outdoor lighted basketball courts *eighteen -hole disc golf course *outdoor swimming pool *fishing *four soccer fields *horseshoe pits *eight lighted tennis courts *hiking trails *community center facilities *paddleboats *passive areas *volleyball *playgrounds *picnic shelters *tables & grills Based on the demand standards established by the 1996 Virginia Outdoor Plan, Frederick County should use the following recommendations as a guide for future park development. Frederick County 9 - 9 Comprehensive Plan Parks and Recreation Table 15: Facility Needs Based on Minimum Standards Established in the 1996 Virginia Outdoor Plan _ }] 47 p■; 11■ [■ nTa l-1 ' k, NOOdsr ap aft do A iCP/t� +j�}y '. Needs Cap B2a9M, ars y{�:r/� p'1 t1} /y ;rpt a ia,Ul !Needs Gap 113a don y{y�,y l��1 /y. 02 $fl,$Q Archery Range 1/50,000 0 0 1 1 Baseball Diamond 1/6,000 *7 2 3 6 Basketball Court 1/5,000 5 5 7 11 Bicycle Trails 1 mile/1,000 2.4 miles 37.6 57.6 77.6 Soccer Fields 1/5,000 4 6 8 12 Horseshoes 1/10,000 8 -4 -2 0 Softball 1/3,000 **5 12 15 21 Swimming Pools *** 1/10,000 2 3 4 6 Tennis Courts 1/2,000 23 3 7 17 Park Land I Oac./1,000 404 -4 196 396 Ice Skating 1/30,000 0 1 2 2 Picnicking 10/1,000 400 0 200 400 Skateboard Park 1/80,000 0 0 0 1 In -Line Hockey 1/30,000 0 1 2 2 Amphitheater 1/40,000 0 1 1 2 Source: Frederick County Department of Parks and Recreation Because these facilities share time with softball, this figure has been adjusted according to percent of use. ** Because these facilities share time with baseball, this figure has been adjusted according to percent of use. *** Jr. Olympic Pool Frederick County 9-10 Comprehensive Plan Parks and Recreation Conclusions As the population of the Winchester -Frederick County area continues to increase, there will undoubtedly be greater emphasis placed on the County's Parks and Recreation Department. As indicated by the standards provided in the 1996 Virginia Outdoor Plan, (referred to in this chapter), there currently exists a need to concentrate on further facility development just to meet present minimum standards, and a greater need to establish a long range capital improvement program to insure the provision of the physical amenities required to meet future leisure demands. At this time, priority should be given to bring our park system up to the recommended minimum standard, but strong consideration should also be given to the acquisition of park land to meet future needs while desirable open space is still available at a reasonable cost. In addition to the facilities that are needed to meet current and future demands, in eastern Frederick County and western Frederick County, the Parks and Recreation Department will also need additional professional staff if the County is to accommodate an already increasing demand for recreational programs. Recreation Policy GOAL Contribute to the phjuical, mental. and cultural need: of the eornmunity, its economic and social wen tieing, and its sense of civics pride} and social re,spoisihility through a complete Program ofparks and recreation,. Strategy 1 - Insure that appropriate open space and facilities are provided with new development. Strategy 2 - Identify the recreational, parks, and open space needs of the County. Strategy 3 - Make available a wide range of year-round recreational opportunities. Strategy 4 - Seek alternative funding methods for the provision of existing and identified recreational needs. StrStrateg 5 - Encourage cooperative efforts with private, semi-public, and public providers of recreational opportunities. Frederick County 9- 11 Comprehensive Plan Parks and Recreation Implementation Methods: 1. Prepare a County -wide recreation plan which identifies recreational, park, and open space needs. 2. Continue to solicit public opinion in planning parks and recreation. 3. Continue to encourage the participation and financial support of civic groups, businesses, and other organizations and individuals for recreational needs. 4. Continue to utilize State and Federal grants and loans for financing and programming County recreational needs and especially for major capital projects. 5. Continue to expand our cooperative relationship with the Frederick County School Board jointly meeting identified County recreational needs. 6. Continue to cooperate with the private sector, the semi-public sector, and other public providers of recreation in meeting identified recreational needs. GOAL - cont nue to rl ve-1op the Couwy's rqdonal pgrk as a ingi lr sou ee of recreational ,facilities amWlivities. Strategy 1 - As finances are available, improvements to the Sherando and Clearbrook Parks should take place according to the adopted master plans. Implementation Methods: 1. Use the capital improvements planning process to provide improvements to the regional parks. 2. Seek alternative sources of funding for park improvements. Frederick County 9- 12 Comprehensive Plan Parks and Recreation GO -4L -Insure that appropriate open space and recreational facilities are provided in urban and rural areas. Strategy 1 - Insure that appropriate open space and recreational facilities are provided in association with new urban development. Strategv 2 - Provide for suitable recreational opportunities for all portions of the County. Strategy 3 - Provide for a trail system and bikeway plan. Implementation Methods: 1. Use a County -wide recreation plan to develop standards for open space and recreational facilities in new urban developments. 2. Use a County -wide recreation plan to identify the recreational needs of residents in all portions of the County. 3. Identify recreational needs associated with the Rural Community Centers. 4. Review land development regulations to insure that appropriate standards are provided for open space and recreational facilities in new developments. GOAL - Provide recreational programs and activities based on identified needs and available .f "ending. - Strategv I - Identify recreational program needs. Strategy 2 - Solicit public opinion on recreational programs to be provided. Strategy 3 - Coordinate with Frederick County School Board, the public sector, the semi-public sector, and private organizations for the provision of recreational program funds, services, and facilities. Frederick County 9-13 Comprehensive Plan Parks and Recreation Implementation Methods: 1. Prepare a County -wide recreation plan identifying program needs. 2. Develop and maintain citizen participation in the identification of recreational program and facility needs. 3. Actively solicit contributions for the provision of recreational programs and program facilities, from all segments of the community, both public and private. 4. Structure the provision of all program facilities, such as indoor community centers, to recognize land use decisions and policies. 5. Actively utilize public, semi-public, and private facilities for the provision of recreational programs. Frederick County 9-14 Comprehensive Plan FREDERICK COUNTY ADMINISTRATION COUNTY of FREDERICK Department of Public Works 540/665-5643 FAX: 540/678-0682 MEMORANDUM TO: Susan K, Eddy, Senior Planner, Department of Planning and Development FROM: Harvey E. Strawsnyder, Jr., P.E., Director of Public Works SUBJECT: Fiscal Year 2005-2006 Capital Improvements Plan for Publics W`` orks DATE: September 14, 2004 Attached is our proposed Capital Improvement Plan (C.I.P.) for Fiscal Year 2005-2006. Our proposed plan includes the following projects: New Animal Shelter, Expansion of the Greenwood Citizens' Convenience Area and a New Citizens' Convenience Site to replace the existing Back Creek/Gainesboro site. The animal shelter project has been included in our capital improvement plan for the past six (6) years. Funds have been allocated in this year's budget (2004/2005) for the design of the new facility which will be located adjacent to the existing regional jail. To that end, we are currently in the process of selecting an architect to complete the design. We anticipate completing the design on or before May, 2005, advertising by June 1, 2005, and awarding a contract after July 1, 2005. We intend to include funding for construction in the upcoming budget. The proposed expansion of the Greenwood site and the new replacement site for the Back Creek/Gainesboro facility are being included in the capital improvement plan even though a permanent site has not been located for the Back Creek/Gainesboro facility. These improvements have been included numerous times in past budgets. However, they were deleted because of budgetary constraints. We will continue to include these projects in our C.I.P. because of the need to provide a site which will safely acconurlodate an ever increasing traffic flow. The attached map has been revised to reflect the site of the new animal shelter. The Greenwood convenience site was previously located on this map. The proposed Back Creek/Gainesboro site has not been determined to date; however, the existing Back Creek/Gainesboro site is reflected on the map. HES/rls Attachment: as stated cc: file C:\Corel\V1'ordPerfect\Rhonda\C1P llocuinents\2011.-211(16('11'\plancipAlP,jNl.iuem 107 North Kent Street - Winchester, Virginia 22601-5000 2005-2006 FREDERICK COUNTY CAPITAL IMPROVEMENTS PLAN Departmental Request Prioritization Summary New and Carry Over Project Requests July 2, 2004 Department of Planning and Development 2005-2006 Departmental Request Prioritization Summary Not, and Carry Over (Modified and Unmodified)Project Requests Department: Public Works Approved By: Dept. Project FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TOTAL Priority Title Cost Cost Cost Cost Cost CIP Cost 2,501 I New Animal 2501 Shelter Greenwood 2 Citizens' 20 180 Convenience 200 Site Expansion 3 Gainesboro 40 180 Citizens' 220 Convenience Site 4 5 6 7 8 9 10 11 TOTAL 2561 360 2,921 The amounts listed above should be multiplied by 1,000. ILegend Frederick County Solid Waste Managment Facilities 0 1.5 3 6 9 12 Miles Frederick County Dept. of GIS 107 N. Kent St. Winchester, VA 22601 Draft September 9, 2004 • J • 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: New Frederick County Animal Shelter Date Prepared: August 9, 2004 Agency: Public Works Agency Contact Person: Harvey E. Strawsnyder, Jr., P.E. Phone Number: 540-665-5643 Location of Project: See Below Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This project will replace the existing Esther Boyd Animal Shelter which will be displaced by landfill development in the near future (approximately 3 years). The new shelter needs to be enlarged to accommodate an ever increasing population of dogs and cats. For estimate purposes, we have adopted a 12,000 square foot building with appropriate fencing and parking areas. This size of a structure would provide the necessary upgrades to accommodate the growth of the animal population and provide humane, state-of-the-art animal care. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. It is planned to construct the new animal shelter on a site adjacent to the regional jail which is located in the Fort Collier Industrial Park. The proposed location will allow the shelter to share parking and an access road with the new work release complex associated with the regional jail. We anticipate initiating and completing the design of the new shelter in FY 2005. The construction would follow the design with a completion in FY 2006. Coordination: If the project is dependent upon or is being planned in conjunction with any other ID project(s), identify it/them and indicate the relationship between the projects. This project will be constructed on property adjacent to the regional jail. This will allow sharing of access and parking. Utilities are also readily available at this site This combination would result in reduced site development costs. It is also anticipated that some part-time labor will be provided by the jail for site maintenance. 2005-2006 Capitalmprovements an ro�ect equests Page 1 Project Priority: 1 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element PTY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, 171 171 Surveying, & Design Land Acquisition Site Preparation 165 165 & Improvements Construction 2,100 2,100 Furniture and 65 65 Equipment Other (opening clay collection) TOTAL 171 2,330 2,501 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received X* "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) *Building cost was based on a unit rate of $175 per square foot. The amounts listed above should be multiplied by 1,000. 2005-2006 Capitalmprovements Plan PrQlect ReqUests Page 2 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2005 2006 2007 2008 2009 FY 2010 2,501 General 171 2,330 Fund Other Fund State Grants Bonds and Debts Other Fund- raising -71 2,501 TOTAL 171 2,330 Please describe the source of funding (i.e. type of grant): The amounts listed above should be multiplied by 1,000. 2005-2006 CapitalImprovements Plan PrQlect Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The animal shelter will serve the citizens of Frederick County. Please describe the need for this project. The project is necessary to replace and upgrade the existing facility to accommodate an ever increasing animal population and more stringent regulations imposed by the state veterinarian. Also, the future landfill development will eventually displace the existing animal shelter building. Please describe and justify the proposed location of the project. Refer to previous comments. 2005-2006 CapitalImprovements Plan PrQject Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The proposed project does provide a public service by providing humane treatment of unwanted animals. 2005-2006 Capitalmprovenimts Plaii Pro.ject Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The shelter fulfills a requirement to provide a "pound" for unwanted animals. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? M 2005-2006 Capitalmprovements Plan PrQlect ReqLiests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? IM Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The general public fully expects Frederick County to provide an animal shelter. We have received numerous amounts of unsolicited support for the new shelter. 2005-2006 Capitalmprovements Plan PrQlect Requests Page 7 C� • • 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: New Frederick County Convenience Site - Greenwood Road Date Prepared: August 12, 2004 Agency: Public Works Agency Contact Person: Harvey E. Strawsnyder, Jr., P.E. Phone Number: 540-665-5643 Location of Project: See Below Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This project will expand the existing trash drop-off on Greenwood Road which has become overburdened by residential growth in the area. The expansion would add another compactor and a separate entrance and exit to the facility for improved traffic flow, keeping traffic from backing out onto Greenwood Road during particularly busy times of the day. This project would require several months to complete and include fencing, paving and a buffer of trees. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. If the county is not planning on instituting curbside collection in the immediate future, then expansion is required to keep pace with growth. Project Priority: _ �® If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Estimate Cost (in 2004 dollars): 7200,000 2005-2006 Capital mprovements Plan Project Requests Page 1 PROPOSED EXPENDITURES Element VFY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, 20 20 Surveying, & Design Land Acquisition Site Preparation 120 120 & Improvements Construction 0 Furniture and 60 60 Equipment Other (opening day collection) TOTAL 0 20 180 1 1 1 200 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 2 N� Source of Funding: indicate the projected amount for each funding source. PROPOSED FITNDING gOtT-RCF.c Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2005 2006 2007 2008 2009 FY 2010 General 20 180 200 Fund Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 20 180 200 Please describe the source of funding (i.e. type of grant): The funding for the proposed Greenwood expansion would be derived from the general fund. A percentage of the capital will be reimbursed from Clarke County who's citizens currently utilize the site under a special agreement, currently 11 percent. The amounts listed above should be multiplied by 1,000. 2005-2006 Capitalnprovements Plan roject Requests Page 3 0 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. 6348 persons (2004 est.) For Frederick County residents. Please describe the need for this project. The project is necessary to provide adequate, safe trash disposal service for citizens living in the Greenwood Road area of Frederick County. This site is also shared with the citizens of Clarke County via a written agreement. Please describe and justify the proposed location of the project. Site is existing. Intent is to expand site and make it more user friendly. Adjacent developer of Channing Drive project has proferred to pay the Greenwood Fire Company for the lease of the property. 2005-2006 CapitalImprovements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: �® Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? It does meet our department's goals and objectives of providing a solid waste disposal site for household trash. The expansion is shown on the Comprehensive Plan. Public Health, Safety, or Welfare: �� s1� Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? It definitely affects health and safety by providing a safe means of disposing of household trash. apital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? M Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? No Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? No 2005-2006 Capital Improvements Plan Project equests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support_ The public would definitely support the expansion to eliminate the long waiting line to dispose of their trash. 2005-2006 Capitalimprovements Plan Project Requests Page 7 2005-2006 Capital Improvements Plan Project Requests Page 8 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: New Frederick County Convenience Site - Gainesboro Date Prepared: August 18, 2004 Agency: Public Works Agency Contact Person: Harvey E. Strawsnyder, Jr., P.E. Phone Number: 540-665-5643 Location of Project: See Below Magisterial District: Gainesboro Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The citizens convenience site will be relocated and expanded somewhere in the Gainesboro District to accommodate fencing and control illegal dumping at the site. This project would require several months to complete and include fencing, earthwork, retaining was, electric, paving and a buffer of trees. A site has not been located at this time. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. Project Priority, : If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project.- Estimate roject: Estimate Cost (in 2004 dollars): $220,000 PROPOSED EXPENDITURES 2005-2006 Capital Iniproverneiits an equests Page 1 Element VFY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006_ 2007 2008 2009 FY 2010 Planning, 20 20 Surveying, & Design Land 20 20 Acquisition Site Preparation 120 120 & Improvements Construction 0 Furniture and 60 60 Equipment Other (opening dny collection) TOTAL 0 40 1 180 1 1 1 220 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided_ X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g_ no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capitai Improvements Plan Project equests Page 2 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2005 2006 2007 2008 2009 FY 2010 General 40 180 220 Fund Other Fund State Grants Bonds and Debts Other Fund - raisin TOTAL 0 40 180 220 Please describe the source of funding (i.e. type of grant): General Fund The amounts listed above should be multiplied by 1,000. 200-2006 Capital Improvements Pixi Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. Approximately 2000 persons Please describe the need for this project. The project is necessary to provide adequate trash disposal service for citizens living in the Gainesboro area of Frederick County. Existing site is completely inadequately and cannot be expanded to provide for safe ingress and egress and fencing to prevent illegal dumping. Please describe and justify the proposed location of the project. Intent is to provide much -improved service for residents in the western end of the county. 200-2006 apitaImprovements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Current site is a safety hazard for those vehicles entering and leaving the site. It is also overrun by rodents and snakes due to its proximity to Back Creek._ It is the department's desire to provide 2005-2006 apita mprovements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? 2005-2006 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. 2005-2006 Uapital Improvements Man Project Requests Page 7 2005-2006 CapitalImprovements Plan Project Requests Page 8 HANDLEY REGIONAL LIBRARY �l j_:DLEY REWj' A Public Library Serving Winchester, Frederick and Clarke Counties 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Virginia Public Libraries Ranked by 2003 Holdings Per Capital Library Name Population FY2003 Data Grand Total Holdings FY2002 Data Population FY2001 Data FY2000 Data FY1999 Data Materials Per Capita Grand Total Holdings Population Grand Total Holdings Population Grand Total Holdings Population Grand Total Holdings Pearisburg Public Library 2,729 45,145 16.54 Materials Per Capita Materials Per Capita Materials Per Capita P Materials Per Capita Iris Brammer Library 2,111 33,637 15.93 2,729 43,615 15.98 2,729 40,135 14.71 2,618 40176 15.35 2,128 37,399 17.57 Mary Riley Styles Public Library 11,100 115,601 10.41 2,111 32,507 15.40 2,111 30,347 14.38 2,283 26852 11.76 2,083 26,306 12.63 Waynesboro Public Library 19,600 192,907 9.84 10,377 109,108 10.51 10,377 111,600 10.75 9,800 115509 11.79 9,800 113,346 11.57 Clifton Forge Public Library 4,300 36,463 8.48 19,520 188,548 9.66 19,520 185,133 9.48 19,200 198164 10.32 18,549 210,370 11.34 Bristol Public Library 17,300 132,748 7.67 4,289 41,438 9.66 4,289 41,604 9.70 4,300 38300 8.91 4,400 38,108 8.66 Staunton Public Library 23,500 173,879 7.40 17,367 128,967 7.43 17,367 123,909 7.13 17,200 118764 6.90 17,300 116,894 6.76 Highland County Public Library 2,500 16,007 6.40 23,853 173,112 7.26 23,853 171,639 7.20 24,300 171786 7.07 24,400 150,293 6.16 Lonesome Pine Regional Library 107,900 667,346 6.18 2,536 14,915 5.88 2,536 14,087 5.55 2,500 13088 5.24 2,525 11,818 4.68 Richmond Public Library 193,000 1,036,421 5.37 107,414 669,155 6.23 107,414 653,748 6.09 108,500 637576 5.88 107,200 632,914 5.90 Williamsburg Regional Library 64,400 337,086 5.23 197,790 1,046,894 5.29 197,790 1,024,556 5.18 191,300 986301 5.16 194,200 932,230 4.80 Richmond County Public Library 9,100 46,251 5.08 60,100 333,048 5.54 60,100 312,028 5.19 58,300 298491 5.12 53,900 282,347 5.24 Rockbridge Regional Library 39,100 194,127 4.96 8,809 47,910 5.44 8,809 29,037 3.30 8,700 27100 3.11 8,700 25,739 2.96 Radford Public Library 15,500 75,774 4.89 39,072 170,998 4.38 39,072 172,120 4.41 38,800 171138 4.41 38,000 162,403 4.27 Petersburg Public Library 32,200 156,421 4.86 15,859 74,773 4.71 15,859 73,921 4.66 16,100 74566 4.63 15,400 68,030 4.42 Buchanan County Public Library 25,900 118,144 4.56 33,740 154,035 4.57 33,740 152,990 4.53 34,000 150753 4.43 34,300 146,544 4.27 Salem Public Library 24,900 113,104 4.54 26,978 118,824 4.40 26,978 128,307 4.76 28,400 129190 4.55 29,500 114,712 3.89 Poquoson Public Library 11,600 51,684 4.46 24,747 113,145 4.57 24,747 113,860 4.60 24,400 106909 4.38 24,600 97,317 3.96 Orange County Public Library 27,100 119,806 4.42 11,566 50,755 4.39 11,566 47,338 4.09 11,400 42703 3.75 11,300 39,999 3.54 Middlesex County Public Library 9,800 42,692 4.36 25,881 108,332 4.19 25,881 101,901 3.94 25,300 94458 3.73 24,100 82,826 3.44 Roanoke County Public Library 87,700 373,790 4.26 9,932 39,040 3.93 9,932 35,711 3.60 9,600 30546 3.18 9,400 26,561 2.83 Colonial Heights Public Library 17,000 71,142 4.18 85,778 379,919 4.43 85,778 397,440 4.63 83,700 370393 4.43 82,000 342,896 4.18 Rappahannock County Library 7,000 28,715 4.10 16,897 69,259 4.10 16,897 64,319 3.81 16,600 60774 3.66 16,500 59,900 3.63 Alexandria Library 137,500 540,059 3.93 6,983 128,283 26,611 544,896 3.81 6,983 NA NA 7,600 25025 329 6,800 24,195 3.56 Roanoke City Public Library 94,600 360,771 3.81 4.25 128,283 480,329 3.74 119,900 430853 3.59 123,386 381,965 3.10 Mathews Memorial Library 9,300 34,903 3.75 94,911 354,711 3.74 94,911 348,132 3.67 93,800 356556 3.80 101,200 361,699 3.57 Lancaster County Public Library 11,400 41,137 3.61 9,207 31,991 3.47 9,207 39,634 4.30 9,200 38761 4.21 9,200 37,941 4.12 Botetourt County Library 30,600 109,591 3.58 11,567 44,585 3.85 11,567 43,342 3.75 11,300 42957 3.80 11,300 40,439 3.58 Halifax County -South Boston Reg, Librar 37,000 130,511 3.53 30,496 100,792 3.31 30,496 97,746 3.21 29,500 91155 3.09 29,500 83,209 2.82 Campbell County Public Library 50,800 178,173 3.51 37,355 126,721 3.39 37,355 123,136 3.30 37,100 123136 3.32 36,900 153,466 4.16 Pamunkey Regional Library 129,000 433,197 3.36 51,078 172,851 3.38 51,078 168,661 3.30 49,800 161820 3.25 49,900 154,922 3.10 Portsmouth Public Library 98,400 326,579 3.32 122,959 415,864 3.38 121,959 399,654 3.28 121,600 377919 3.11 112,200 379,458 3.38 Wythe -Grayson Regional Library 44,600 144,505 3.24 100,565 325,348 3.24 100,565 341,137 3.39 97,200 335468 3.45 97,700 298,054 3.05 Heritage PublicLibrary 21,100 67,449 3.20 45,516 140,589 3.09 45,516 135,898 2.99 43,600 132881 3.05 43,000 127,902 2.97 Blackwater Reg. Library (formerly Rawls) 75,400 240,738 3.19 20,388 65,264 3.20 20,388 62,461 3.06 20,300 60233 2.97 20,300 58,019 2.86 Norfolk Public Library 234,100 747,336 3.19 74,889 234,817 3.14 74,889 213,502 2.85 74,400 220666 2.97 74,400 220,717 2.97 Lewis Egerton Smoot Memorial Library 17,600 56,097 3.19 234,403 1,125,944 4.80 234,403 1,092,474 4.66 225,700 1064512 4.72 231,900 1,040,703 4.49 Charlotte County Library 12,700 40,377 3.18 16,803 57,171 3.40 16,803 55,014 3.27 17,000 55162 3.24 16,600 57,476 3.46 Smyth -Bland Regional Library 40,100 123,023 3.07 12,472 38,859 3.12 12,472 44,462 3.56 12,900 56660 4.39 12,700 55,100 4.34 Chesapeake Public Library 205,100 628,748 3.07 39,952 120,407 3.01 39,952 114,359 2.86 39,600 109922 2.78 39,600 119,127 3.01 Danville Public Libra Y 47,100 143,686 3.05 199,184 735,713 3.69 199,184 684,188 3.43 197,000 669073 3.40 193,700 685,683 3.54 Fauquier County Public Library 58,900 178,966 3.04 48,411 139,115 2.87 48,411 136,073 2.81 50,200 109444 2.18 50,700 135,780 2.68 Chesterfield County Public Library 270,700 800,903 2.96 55,139 157,937 2.86 55,139 148,591 2.69 53,500 154958 2.90 53,167 167,020 3.14 James L. Hamner Public Library 11,700 34,238 2.93 259,903 839,833 3.23 259,903 767,875 2.95 252,200 746045 2.96 248,300 671,798 2.71 Blue Ridge Regional Library 91,300 264,790 2.90 11,400 30,225 2.65 11,400 25,739 2.26 10,600 24271 2.29 10,000 24,271 2.43 Bedford Public Library System 67,800 194,881 2.87 92,753 295,146 3.18 92,753 254,011 2.74 89,900 268129 2.98 90,000 262,149 2.91 66,670 192,290 2.88. 66,670 247,860 3.72 63,900 225429 3.53 62,800 154,451 2.46 10/25/2004 1 of 2 10125/2004 2of2 Virginia Public Libraries Ranked by 2003 Holdings Per Capital Library Name FY2003 Data FY2002 Data FY2001 Data FY2000 Data FYI 999 Data Population Grand Total Holdings Population Grand Total Holdings Population Grand Total Holdings Population Grand Total Holdings Population Grand Total Holdings 47 Essex Public Library 10,000 Materials 28,645 Per Capita 2.86 Materials Per Capita Materials Per Capita Materials Per Capita Materials Per Capita 48 Southside Regional 45,400 129,176 2.85 9,989 26,936 2.70 9,989 22;956 2.30 9,300 21803 2.34 9,064 22,705 2.50 49 Washington County Public Library 51,200 140,578 2.75 45,526 93,953 2.06 45,526 89,615 1.97 43,400 90018 2.07 43,300 91,894 2.12 50 Arlington Dept. of Libraries 194,300 532,713 2.74 51,103 128,865 2.52 51,103 114,108 2.23 50,500 100058 1,98 49,400 92,264 1.87 51 Jefferson -Madison Regional Library 184,300 499,340 2.71 189,453 540,081 2.85 189,453 556,233 2.94 189,900 578104 3.04 180,600 590,416 3.27 52 Newport News Public Library System 179,300 481,628 2.69 179,601 533,124 2.97 179,601 511,719 2.85 173,500 528576 3.05 173,500 462,989 2.67 53 York County Public Library 58,800 156,933 2.67 180,150 465,332 2.58 180,150 451,532 2.51 179,900 445233 2.47 177,500 434,927 2.45 54 Fairfax County Public Library 1,028,700 2,715,110 2.64 56,297 148,124 2.63 57,500 122,076 2.12 57,500 109359 1.90 56,650 103,306 1.82 55 Samuels Public Library 32,500 84,945 2.61 991,247 2,630,510 2.65 1,003,099 2,576,546 2.57 962,800 2519780 2.62 949,800 2,333,436 2.46 56 Augusta County Library 66,300 172,832 2.61 31,584 85,097 2.69 31,584 84,747 2.68 29,600 82885 2.80 29,600 82,085 2.77 57 Meherrin Regional Library 35,600 92,313 2.59 65,615 187,528 2.86 65,615 177,170 2.70 62,400 193602 3.10 60,800 154,750 2.55 58 Prince William Public Library System 360,400 924,665 2.57 35,644 87,129 2.44 35,644 82,378 2.31 35,500 88668 2.50 33,900 91,099 2.69 59 J. Robert Jamerson Memorial Library 13,700 34,955 2.55 326,238 937,194 2.87 326,238 931,848 2.86 309,700 97995 0.32 318,748 814,978 2.56 60 Henrico County Public Library 271,700 691,121 2.54 13,705 35,042 2.56 13,705 34,210 2.50 13;400 32211 2.40 13,200 27,650 2.09 61 Northumberland Public Library 12,800 32,141 262,300 688,075 2.62 262,300 621,149 2.37 249;200 622046 2.50 254,194 644,667 2.54 62 Madison County Library, Inc. 12,900 2.51 12,259 32,814 2.68 12,259 31,385 2.56 11,700 29336 2.51 11,400 24,693 2.17 63 Shenandoah County Library 36,800 31,936 2.48 12,520 31,489 2.52 12,520 28,840 2.30 12,700 29256 2.30 12,500 28,027 2.24 64 Loudoun County Public Library 205,800 90,971 2.47 35,075 78,804 2.25 35,075 72,038 2.05 36,300 64905 1.79 35,600 35,245 0.99 65 Lynchburg Public Library 65,600 506,781 2.46 169,599 452,307 2.67 169,599 417,584 2.46 155,900 418716 2.69 156,374 374,998 2.40 66 Tazewell County Public Library 43,300 160,300 2.44 65,269 160,130 2.45 65,269 164,799 2.52 64,600 171387 2.65 65,600 154,460 2.35 67 Eastern Shore Public Library 51,500 99,872 117,900 2.31 2.29 44,598 96,521 2.16 44,598 125,320 2.81 45,900 129826 2.83 47,100 124,911 2.65 68 Charles P, Jones Memorial Lib+ary 23,000 52,640 2.29 51,398 120,804 2.35 51,398 119,827 2.33 45,700 115119 2.52 45,600 109,333 2.40 69 Virginia Beach Public Library 428,400 979,324 2.29 19,229 55,706 2.90 19,229 54,469 2.83 19,400 54752 2.82 19,600 56,185 2.87 70 Suffolk Public Library System 69,200 157,273 2.27 425,257 935,407 2.20 425,257 898,303 2.11 421,000 868584 2.06 419,200 844,684 2.01 71 Caroline Library, Inc. 22,200 49,291 2.22 63,677 160,932 2.53 63,677 142,617 2.24 63,500 131463 2.07 67,195 118,559 1.76 72 Galax -Carroll Regional Llbrary 36,300 78,158 2.15 22,121 46,639 2.11 22,121 45,813 2.07 21,700 43134 1.99 21,300 44,114 2.07 73 Appomattox Regional Library System 80,700 171,673 2.13 36,082 74,586 2.07 36,082 71,898 1.99 34,700 68567 1.98 34,800 65,646 1.89 74 Nottoway County Library 15,600 33,184 2.13 79,934 169,867 2.13 79,934 168,291 2.11 77,400 175023 2.26 72,814 171,728 2.36 75 Hampton Public Library 145,200 306,281 2.11 15,725 32,377 2.06 15,725 33,615 2.14 15,200 31510 2.07 15,100 31,510 2.09 76 Amherst County Public Library 31,700 65,774 2.07 146,437 294,305 2.01 146,437 303,369 2.07 136,200 294177 2.16 137,700 304,402 2.21 77 Handley Regional Library 100,300 203,971 2.03 31,894 53,319 1.67 31,894 50,065 1.57 30,400 46700 1.54 30,100 46,659 1.55 78 Gloucester Library 35,000 71,173 2.03 95,446 200,056 2.10 95,446 145,499 1.52 92,100 134600 1.46 92,100 134,046 1.46 79 Fluvanna County Public Library 22,300 44,705 2.00 34,780 67,891 1.95 34,780 62,892 1.81 34,500 58921 1.71 33,900 55,539 1.64 80 Culpeper County Library 35,900 71,736 2.00 20,047 45,274 2.26 20,047 44,739 2.23 19,600 52534 2.68 18,600 50,152 2.70 81 Central Rappahannock Regional Library 243,100 482,903 1.99 34,262 69,836 2.04 34,262 66,059 1.93 33,400 59712 1.79 32,700 55,546 1.70 82 Franklin County Public Library 48,700 95,690 1.96 218,838 453,164 2.07 218,838 471,982 2.16 214,500 458502 2.14 202,600 443,679 2.19 83 Montgomery -Floyd Regional Library 99,200 190,371 1.92 47,286 92,407 1.95 47,286 93,739 1.98 46,000 91719 1.99 47,000 92,471 1.97 84 Pulaski County Library System 34,800 63,684 1.83 97,503 196,696 2.02 97,503 196,053 2.01 91,700 164633 1.80 89,900 177,076 1.97 85 Cumberland County Public Library 9,200 16,731 1.82 35,127 68,847 1.96 35,127 68,155 1.94 34,700 71745 2.07 34,496 69,915 2.03 86 Pittsylvania County Public Library 62,100 112,810 1.82 9,017 16,303 1.81 9,017 15,399 1.71 8,400 14645 1.74 8,200 13,546 1.65 87 Russell County Public Library 29,600 48,226 1.63 61,745 107,077 1.73 61,745 96,942 1.57 59,000 92405 1.57 58,600 84,268 1.44 88 Massanutten Regional Library 134,700 217,597 1.62 30,308 47,192 1.56 30,308 2,555 0.08 28,900 39391 1.36 29,100 38,179 1.31 89 Central Virginia Regional Library 36,100 56,892 1.58 131,370 204,697 1.56 131,370 201,414 1.53 122,500 2500 0.02 119,637 173,520 1.45 90 Powhatan County Pudic Library 24,000 34,086 1.42 35,343 56,300 1.59 35,343 53,139 1.50 33,900 51490 1.52 32,400 49,019 1.51 22,377 29,086 1.30 22,377 25,173 1.12 22,300 20715 0.93 21,000 19,542 0.93 Totals/Statewide Average 1,353,940 6,333,811 4.68 1,340,749 6,252,667 4.66 1,339,749 6,067,501 4.53 1,314,301 5,887,187 4.48 1,210,671 5,336,246 4.41 10125/2004 2of2 C� • • 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Parking Lot and Sidewalk addition at Bowman Library Date Prepared: Oct.1, 2004 Agency: Handley Regional Library Agency Contact Person: Trish Ridgeway Phone Number: 662-9041, ext.14 Location of Project: Stephens City Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This project is the Library's top capital improvement priority. It is a safety issue for Bowman Library users. To provide a safe means for people to reach Bowman Library, Handley Regional Library proposes that a sidewalk be constructed to connect with existing sidewalks at the library. (See preliminary drawings that were previously submitted.) Additionally, more parking is needed to prevent individuals from parking on Tasker Road when the existing lot is full, a situation that is happening more and more frequently. The 4 -foot wide sidewalk will extend approximately 400-500 ft. (approximately 4,000 sq.ft.) beyond the sidewalk that now borders the parking lot. Two options are shown on the drawings. The Library had requested Painter -Lewis provide two alternatives, and both options are estimated to cost about the same. The Library has chosen Option 2. This option brings the sidewalk to a point on Lakeside Drive most likely to be used by residents, almost all of whom are coming from the east. It would require a culvert system that duplicates the one currently used on the corner of Lakeside and Tasker. The parking lot expansion would enlarge the lot from 101 spaces to 221 spaces (approximately 4,000 additional sq. yd.) and would relieve the overcrowding that forces individuals to park on Tasker Road during peak library use times. This work will not require additional storm drainage work but will necessitate moving shrubbery, planting trees and bushes, installing curbs and gutters, and installing parking -lot light fixtures to match the current down -light fixtures. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The project will take approximately 3-5 months. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This is the Number 1 on Handley Regional Library's list. The project awaits funding. Estimate Cost (in 2002 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 005 2006 2007 2008 2009 FY 20010 Planning, Surveying, & $11,500 $ 11,500 Design Land Completed Acquisition Site Preparation & 144,157 144,157 Improvements Construction 72,811 72,811 Furniture and Equipment N/A Other (opening day collection TOTAL $228,468 $228,468 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor The Library paid Painter/Lewis to provide the preliminary design. Shockey provided the estimate From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element Ist FY 2nd FY 3rd FY 4th FY 51h FY Beyond FY TOTAL 005 2006 2007 2008 2009 2010 General Fund $228,468 Other Fund State Grants Bonds and Debts Other Fund -raisin TOTAL 1$228,468 Please describe the source of funding (i.e. type ofgrant); 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The Mary Jane and James L. Bowman Library opened July 16, 2001. Year round an average of 10,000 individuals a month enter the Library. The Library serves all age groups from very young children to senior citizens and provides recreational and education materials for them. The library is a favorite location for families to visit together and serves many children and adults when they are working on school assignments or self- improvement. The library supplies computer access for word processing and other office applications and for Internet usage. Please describe the need for this project. Parking Lot: One children's program last fall attracted over 450 attendees. Library users park on Tasker Road or in the nearby town -house parking lot because the library lot is full. This usually occurs during elections, children's programs and the library's twice - annual book sales. Opening a car door or helping small children exit a car in the face of Tasker Road traffic is dangerous. The library has public seating space for 183. In addition, the meeting room holds 120 people and is available for area groups to use. Also, since the book processing staff, bookmobile staff, and unit supervisors operate out of Bowman Library, staff takes up 11 to 16 parking spaces during the business day and 7 to 8 spaces in the evenings. The Library is also a polling place for Frederick County. Library of Virginia standards call for 190 or more parking spaces for a public library building of Bowman's size. Frederick County standards require 100 spaces, and since money was tight for the project, Public Works decided to use the county standard. Sidewalk: The Bowman Library has proved very popular with children and families. Children from the Lakeside Drive side of the Library often bicycle or walk to the library. If they bicycle, they ride on Tasker Road where the traffic often goes faster than the 45 mph speed limit. If they walk, they can walk across the field between the library and Lakeside Drive, and many children jump the drainage ditch, rather than walk to the corner where it is easy to get across. Mothers, who want to walk, complain they have to use Tasker Road when they have children in strollers. Please describe and juste the proposed location of the project. The parking lot location is the area that was set aside for parking lot expansion. 2005-2006 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? Yes. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Safety is the primary reason for this request. It is very dangerous for bicyclists and walkers to be on Tasker Drive. More individuals would be comfortable coming on foot or by bicycle if there were a safer route. Likewise parking along the roadside at Tasker also is not safe. The Bowman Library is a polling place for Frederick County and parking ss a problem during elections. 2005-2006 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? No Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to apopulation group that is currently under served relative to other areas of the County? Public libraries in general serve segments of population who cannot afford to purchase many books for their own libraries as well as those that lack computers and Internet access. Through pooling of funds, public libraries make available to the public at large expensive printed works, books on tape, and computer databases that an individual or most companies could not afford. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would theproject improve the tax base, reduce operating expenses, produce revenue, or otherwise have apositive effect on the local economy? Realtors, firms relocating, and homebuyers see Public Libraries as a very positive local quality of life factor. Libraries provide information on business start-up, investing, and company management. 2005-2006 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessaryfor the successful completion of otherprojects? Is the project part of a larger project? No Public Support. Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. It is citizen's requests and complaints, both to Library staff and to members of the Board of Supervisors, that continue to push this proposal. 2005-2006 Capital Improvements Plan Project Requests Page 7 • J • 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Northern Frederick County Library Branch Date Prepared: Oct. 1, 2004 Agency: Handley Regional Library Agency Contact Person: Trish Ridgeway Phone Number: 662-9041, ext. 14 Location of Project: Near Cross Junction Magisterial District: Gainesboro Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Construction of a 7,000 sq.ft. branch library with expansion possible to 10,000 square feet. Initial parking should be for up to 35 vehicles. The proposed location would be on Rt. 522 in the Gainesboro district, but this could change depending on patterns of library use in the next 3 to 4 years and on whether donated land could be located. The acquisition of the land of 3 to 4 acres would be in fiscal year 2007/2008. The library itself would be constructed the following fiscal year. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Building program complete 2007/2008 Land acquisition 2007/2008 Hire architect 2007/2008 Hire general contractor 2008/2009 Begin construction 2008/2009 Complete construction 2008/2009 Furnish Library 2009/2010 Open Library 2009/2010 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. NIA Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This project continues to rank 2nd on Handley Regional Library's capital requests. Estimate Cost (in 2002 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 005 2006 2007 2008 2009 FY 2010 Planning, Surveying, & Design Land Acquisition $36,000- $36,000- 48,000 48,000 Site Preparation & Improvements Construction Furniture and Equipment Other TotalBldg. Costs.............................................................................................................................................. .... .. 945,000 ............................ ............ .........945,00.0 Books, etc. *60,000 60,000 TOTAL 1,0500,000 $190419000- 190539000 'The Bowman Library at Stephens City with architect's fees and furniture and equipment, but without books, cost approximately $145 per square foot. Since a site has not selected, it is difficult to estimate site costs. Books, books on tape, videos, CDs, and DVDs are calculated with a beginning collection of 30,000 items at a rough estimate of $20 each. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following Ifyou want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received ✓ "Preliminary" estimate, (e.g no other basis for estimate, guesstimate) On the land cost, we have talked to a landowner who had a contract in 2001 for a 5 - acre residential lot on route 522 at $11,980. See information on estimate cost above. Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element Ist FY 2005 2nd FY 2006 3rd FY 2007 4th FY 2008 5th FY 2009 Beyond FY 201t TOTAL General Fund $48,000 $48,000 Other Fund State Grants Bonds and Debts $945,000 Other Fund -raisin 60,000 TOTAL $48,097,05,000 $1,0539000 Please describe the source offending (i.e. type of grant): 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This branch would serve most of those who live in the Gainesboro district along with other citizens who travel in the area. In July 2001 the bookmobile began a twice -weekly stop at Redland Church on route 522. Approximately 725 items are checked out each month with the bookmobile there only eight hours per week. Please describe the need for this project. Now that the Bowman Library is completed, the residents of Gainesboro district comprise the largest population group that is the most distance from a library within the regional system. The Library will provide materials and programming for patrons from toddlers to senior citizens. It will provide recreational and educational materials. It will be a prime source for homework help since it will be open nights and on weekends when school libraries are closed. The library will supply computer access for word processing and other office applications and for Internet usage. There will be a meeting room of 425 square feet in which area groups can meet. Please describe and juste the proposed location of the project. The exact location is yet to be determined. Ideally, a public library should be easy to get to, be located on a major road, and be very visible from the road. Location criteria are similar to those for a retail establishment. If a location other than route 522 meets these criteria, it would also be acceptable. Beginning the search for a location now may facilitate the donation of land. 2005-2006 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? Yes. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Frederick County Citizens of all ages checked out 359,575 items in 2003-2004; over 240,000 items per year are borrowed from the Bowman Library. Many senior citizens utilize public libraries; for many of them, the library is their primary social outlet. They volunteer at the library; they visit it each daily or weekly because there is no cost and the staff is friendly. Our introductory computer classes that are offered twice yearly attract many senior citizens. Public libraries also serve an important recreational source for children. Our summer reading program this year registered 2,200 preschoolers and school-age children system wide. We distributed over 1,005 books (all donated) as reading incentives to program participants. 2005-2006 Capital Improvements Plan Project Requests Page 5 Legal Requirement. Is the project required in order to meet a State or Federal mandate or some other legal requirement? No Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the projectprovide equivalent services to a population group that is currently under served relative to other areas of the County? The Bowman Library, the Handley Library, and the Clarke County Library provide services to the residents of Frederick County. Other than the sparsely populated far southwest corner of the County, Gainesboro residents have the farthest drive to reach a library. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have apositive effect on the local economy? Realtors, firms relocating, and homebuyers see Public Libraries as a very positive local quality of life factor. Libraries provide information on business start-up, investing, and company management. 2005-2006 Capital improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? We have discussions with Frederick County School Superintendent William Dean about the possibility of collaboration when a new Gainesboro School is constructed, but are only in the general discussion stage. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Regular users of the bookmobile and residents of the community have anecdotally indicated strong support. 2005-2006 Capital Improvements Plan Project Requests Page 7 2005-2006 Departmental Request Summary Department: Handley Regional Library Approved By: Richard Stephenson, HRL Board Chairman Trish Ridgeway, Director Dept. Priority Project Title FY 2005 Cost FY 2006 Cost FY 2007 Cost FY 2008 Cost FY 2009 Cost TOTAL CIP Cost I Bowman Parking lot & Sidewalk Additions $228,468 $228,468 2 NW Library Land Acquisition & Site work $48,000 $1,005,000 $1,053,000 3 4 5 6 7 8 9 10 11 TOTAL $1,281,468 2005-2006 Capital Improvements Plan Project Requests Page 8 FREDERICK COUNTY PARKS AND RECREATION COUNTY of FREDERICK Parks and Recreation Department James M. Doran, Director 540-665-5678 FAX: 540-665-9687 www.co.frederick.va.us e-mail: fcprd@co.frederick.va.us MEMO To: Eric R. Lawrence, Director, Planning Department From: James M. Doran, Director, Parks and Recreation Department', . Subject: 2005-2006 CIP Requests 0 Date: October 1, 2004 Attached as requested is the Department's 2005-06 CIP requests as approved by the Parks and Recreation Commission at their September 21, 2004 meeting. JMD/sm 107 North Kent Street Winchester, VA 22601 Jim A110, FREDERICK COUNTY PARKS Frederick County Schools sz ® Elementary Schools p Middle Schools\, O High Schools Fire Stations Reynolds Store Fire Co. ,\ Urban Development Area Roads :. N Primary , \ Secondary Y r \ Tertiary \. Parks ;Parcels - \ F77 City / Town 2005-2006 Departmental Request Prioritization Summary Department: Parks and Recreation Department Approved by: 2005-2006 Departmental Request Prioritization Dept. Project FY 2006 FY 2007 FY 2008 FY FY 2010 TOTAL Priority Title Cost Cost Cost 2009 Cost CIP Cost Cost 1 Indoor 9,000,000 9,000,000 Pool 2 Playground 88,000 88,000 Sherando Park 3 Water 1,000,000 1,000,000 Slide/ Spray Ground Clearbrook Sherando Parks 4 Park Land 2,302,737 2,302,737 East FC 5 Park Land 1,409,549 1,409,549 West FC 6 Open Play 386,591 386,591 Areas - Clearbrook 7 Skateboard 490,752 490,752 Park/ln- line Hockey 8 Lake/Trails/ 858,001 858,001 Parking (708,925) with 2 multi- purpose fields irrigated (130,000) 9 Softball 514,922 514,922 Complex Sherando 2005-2006 Departmental Request Prioritization Summary Department: Parks and Recreation Department ADDroved bv: Dept. Project FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 TOTAL Priority Title Cost Cost Cost Cost Cost CIP Cost 10 Baseball 1,056,741 1,056,741 Complex Renovation Sherando 11 Soccer 1,178,435 1,178,435 Complex 12 Tennis/ 403,887 403,887 Basketball Complex Clearbrook 13 Tennis/ 649,882 649,882 Picnic Areas Sherando 14 Shelter/ 401,254 401,254 Stage - Clearbrook 15 Mainten- 205,725 205,725 ance Compound Sherando 16 Access Road 829,781 829,781 with Parking and Trails 17 Field 7,040,000 7,040,000 House TOTAL 10,0888,000 5,447,630 2,750,098 2,490,529 7,040,000 27,816,257 PARKS AND RECREATION SECTION - FREDERICK COUNTY COMPREHENSIVE PLAN The purpose of this chapter is to outline the County's recreational policies and to identify implementation methods for accomplishing recreational facilities, programs, studies, and plans. It is not meant to be a detailed recreation plan, but rather it is a part of the County's continuing planning process and a guide to decision making. Facilities The County currently owns and operates two regional parks. Clearbrook Park, located five miles north of Winchester on Route 11, consists of approximately 55 acres and Sherando Park, located two miles east of Stephens City on Route 277, consists of approximately 330 acres. Both regional parks currently serve the County's population with both active and passive recreational programs and facilities. In addition to these regional parks, five neighborhood parks have been developed which serve a more specific group with more limited facilities than those in the regional parks. The neighborhood parks are located at: Reynolds Store Fire Company and Gainesboro Fire Company in the Gainesboro District, and Round Hill Fire Company in the Back Creek District, and at Frederick Heights subdivision in the Shawnee District. These neighborhood parks consists primarily of playground equipment for young children. The Parks and Recreation Department also maintains two tennis courts at Senseny Road Elementary School for community use. In 1987, master development plans were adopted for both Clearbrook and Sherando Parks. These master plans establish development goals for each park, identify unmet recreational needs, provide unified facility plans, and propose a development program for each park. The Master Plans for both Clearbrook and Sherando Parks reflect the recommendations of the County residents and national standards as outlined in the Virginia Outdoor Plan. These plans emphasize the development of a swimming pool complex and additional sports, picnic, maintenance, and other support facilities. In 2001, the Sherando Park Master Plan was revised and adopted. Since the adoption of the Master Plans, the County has completed the construction of: two outdoor swimming pool complexes, four soccer fields, a maintenance building, two shelters, two playground areas, two sand volleyball courts and two fields of a four field softball complex. The County has also purchased an area to house the maintenance operation for Clearbrook Park. Additional recreational facilities currently provided are athletic fields, playground, and picnic areas with a variety of recreational opportunities such as horseshoes, fishing, paddle boats, and volleyball, open space areas and support facilities. Clearbrook Park, Sherando Park, neighborhood parks and all public school are maintained by the Parks Division of the County Parks and Recreation Department. As the result of a joint operating agreement with the County School Board, the Parks and Recreation Department has use of the following: Sherando High School facilities when they are not in use by the high school: lighted football fields and track, baseball fields, 24 outdoor lighted tennis courts, and four outdoor lighted basketball courts. The Parks and Recreation Department's Community Center, which was built adjoined to 1 Sherando High School, opened in September of 1993 and contains two racquetball courts, a weight room and a multipurpose room. The Residential Performance zoning regulations require that open space be provided in most types of suburban development. In addition, recreational facilities are required in any residential development which contains lot sizes of less than 5,000 square feet. It is required that such open space and facilities be dedicated to homeowners associations. There is a need to examine recreational and park needs in suburban and urban areas, specifically, the development of a bikeway and trail system. To date, the County has constructed a 2.40 mile bicycle facility to serve several residential areas east of Stephens City. The County has also committed to the construction of a .60 of a mile (3,200 l.f.) bicycle facility to serve residential areas on the northern perimeter of Sherando Park. These bicycle facilities will link those residential areas with Sherando Park Sherando High School. Additional trails would provide residents the ability to travel safely from their homes to schools, stores, work or recreation areas without having to share the overcrowded arterial and collector roads with automobiles. Also, there is a need to examine Residential Performance Zoning regulations to determine whether the recreational needs of a single family homeowner are being met. Programs The Recreation Division of the Frederick County Parks and Recreation Department was created to provide a comprehensive and accessible program of recreational services and activities for the residents of Frederick County. A diverse range of recreational and enrichment programs was provided for all age groups. This broad base of activities includes, but is not limited to, instructional classes, outdoor recreational programs, sports and athletics, health and fitness programs, cultural and special events, and trips and excursions. Programming responsibilities are assigned within the Division's four interest sections, Community Recreation (Children's Programs, Cultural Arts, etc), Senior Citizens, Aquatics, Lifetime Leisure and Fitness and Sports and Athletics. Staff members work together to identify, develop and implement those activities which most closely meet the interests and desires of the community. The Division typically implements programs along age group stratifications such as preschool, youth, teen, adult and senior adult; however, a shift in programming emphasis has resulted in the development of broader activities to appeal to family units. In particular, holiday events are planned to include parent and child in a variety of leisure opportunities. The majority of recreation programs offered by the Parks and Recreation Department are held within the 16 public schools in Frederick County and the Parks and Recreation Department's Community Center. Consequently, a wide variety of recreation offerings has maximized use of county school buildings. The joint efforts of the Frederick County School Board and the Parks and Recreation Commission/Department resulted in the inclusion of recreational facilities within Sherando High School. The Department's Community Center, which was built adjoined to Sherando High School, opened in September of 1993. The Orchard View Community Center, which is attached to Orchard View Elementary School opened in August 2000 and has a full-size gymnasium available for recreational activities during non -school hours. 2 Citizen Participation Citizen participation and input regarding recreation programs and park development have been actively solicited since the creation of the department in 1971. The Parks and Recreation Commission consists of eight members, including one from each magisterial district, appointed by the Board of Supervisors for four year terms and two at -large members recommended by the Commission and appointed by the Board to serve staggered four year terms. Future Demands To help plan for future leisure service demands, the Parks and Recreation Department has completed Master Plans for the County's two Regional Parks, studies national standards provided in the Virginia outdoor Plan, and gathered survey information relating to the provision of leisure services. Through the utilization of these and any other available resources, it is projected that the following areas must be addressed if we are to meet future leisure demands. 1. Land acquisition to meet minimum standards 2. Facility development to meet minimum standards 3. Development of recreation centers 4. Increased programming for special populations 5. Increased programming for teens 6. Greater diversity of programming so as to better meet the needs of the entire community. 7. Expansion of trail systems and bikeways. Area Standards As suggested by the 2002 Virginia outdoor Plan, the area standard for local recreation and park sites in Virginia is ten acres of developed park land per thousand population. Frederick County has a population of approximately 61,219 (based on estimates provided by the Frederick County Planning Department) and currently maintains 396 acres of park land. Of the 396 acres assigned to the parks, about 220 acres would be considered developed. Using the population projections provided by the Frederick County Planning Department, an additional 216 acres are needed to meet the current demand; another 68 acres by 2010 and 60 acres by 2015 will be required if we are to keep pace with the recommended standard of the ten acres per thousand population. It is estimated by the Parks and Recreation Department that by the year 2020, Frederick County will need approximately 800 acres of developed park land to adequately serve the County's population. In meeting the ten -acre per thousand minimum standard for park land, it is recommended by the Virginia Outdoor Plan to consider the following types of park development: 3 NEIGHBORHOOD PARK + Size 5-20 acres Plan at 3 acres/1000 Population + Service Area Approximately 5 - 15 minutes walking distance or 'A mile to 1 V2 miles + Administrative Responsibility Local Unit of Government. + Purpose The primary function of the neighborhood park is to provide limited types of recreation for the entire family within easy walking distance. Facilities should be provided for all age groups. + Character Intensive use and easy access are characteristics of this classification. Ideally, the site would have areas that are level to gently rolling to accommodate the intensive use facilities, with shaded areas for passive recreation. + Location If possible, the neighborhood park should be located near a school and/or the neighborhood center and away from railroads, major streets and other hazardous barriers. + Potential Facilities o playground o volleyball courts o picnic facilities o badminton courts o tennis courts o walking trails o ball diamond o fishing pond o horseshoe pits o swine-dng pool o shuffleboard courts o bikeway o basketball courts o recreation center o football/soccer field Play fields usually serve a dual purpose in this type of facility. They provide an area for sports and running games and also serve as open space. Intensive use areas (the playground area and hard surfaced courts) are buffered from other activities by passive natural areas and pedestrian access corridors. Programmed activities such as organized athletics are often 4 suitable in neighborhood parks. Although limited parking facilities are provided, site encourage pedestrian access to the greatest extent possible. Rural communities may want to consider deleting neighborhood parks and include their fun community parks which could better serve the needs of widely dispersed local population. standpoint, it would be more beneficial for a rural locality to have a few strategically designed, larger facilities than to invest in several small sites and not have the funds and maintain them. COMMUNITY PARK + Size 20-50 acres Plan at 3 acres/1000 population + Service Area Approximately 15 minutes driving time + Administrative Responsibility Local Unit of Government + Purpose Community parks should primarily support active recreation activities and be capable of intensive use, while still containing a fair amount of open space. + Character The site usually varies from relatively flat open space to moderately sloping wooded are should be adaptable to a wide variety of recreational activities. Access is gained by a walking. + Location Locate when possible near the center of the community with good access and serviced by a transportation system. 9 + Potential Facilities o playgrounds o football/soccer fields o picnic facilities o trails: walking, hiking, o tennis courts biking, fitness o ball diamonds o natural areas o horseshoe pits o fishing lake or stream access o shuffleboard courts o beach and swimming area o basketball courts o swimming pool o volleyball courts o parking area o recreation center A multitude of activities must be provided by this intensive -use recreational facility. The recreation center is often the focal point of the park. Organized activities are grouped in the surrounding area. Their location is dependent upon the natural terrain, need for control, and vehicular access. Any existing natural qualities, topography, water features, trees, etc., should be preserved and utilized as natural buffers between activity areas as well as to protect the recreation environment from surrounding, incompatible influences. These natural elements should also be used to provide a space for more passive forms of recreation such as nature walks, picnicking and fishing. In the rural setting, this park category may take the place of the neighborhood park. It can better serve a widely disbursed population than two or three smaller sites. Community parks, along with neighborhood parks (where applicable), usually meet most of the close -to -home recreation needs of most localities. REGIONAL PARK + Size 150-300 acres Plan at 4 acres/1000 population + Service Area 15-25 minutes driving time 5-15 miles service radius + Administrative Responsibilitv Local Unit of Government + Purpose Regional Parks should serve the recreational needs of large portions of the 11 local population. They should contain a wide variety of intensively developed areas for day use recreation while providing ample open space with generous buffers between activity areas. + Character The site could vary from flat open space to moderately to steeply sloping topography. It should be capable of supporting a wide variety of activities with ample buffer and natural areas. Sitting on a stream or lake is highly desirable. The regional park needs to be accessible by auto as well as pedestrians and bicycles. + Location When possible, locate the regional park so that it is near the center of the service area. It should be on or near an arterial or major road providing good access to the facility. In urban or suburban situations, easy access to mass transit is highly desirable. The site should also be accessible by pedestrians and bicyclists. + Potential Faciliti o playgrounds o picnic facilities o tennis courts o ball diamonds o horseshoe courts o basketball courts o volleyball courts o shuffleboard courts o football/soccer fields +Size o trails o natural area o lake or stream o fishing/boating o parking areas o golf (on larger sites with ample land) o recreation centers o swimming pool and/or beach with a swimming area GREENWAY Any length, preferably longer than one mile Typically 75-100 feet or wider +Service area Depends upon the location, size and significance of the corridor +Administrative Responsibility Federal, state, local or public/private partnership +Purpose Greenways are established to protect, preserve, and maintain existing natural and cultural corridors; to link population centers with recreational, educational and business areas and other population centers; and to provide recreational and non -motorized transportation opportunities along these corridors by using natural features (ridge -lines, steep slopes), utility rights-of-way, and watercourses (streams, rivers, canals, etc.). +Character 7 Depending on the location, it can range from rugged terrain with scenic views and extensive vegetation to open level meadows. The greenway can be a separate entity or a portion of any of the other park categories. +Potential facilities o Camping o fishing o Picnic facilities o access points o trails (all types) o canoeing o natural area o parking areas o winter sports o boating and facilities o historic sites RECREATION CENTERS The recreation center may be found at the neighborhood, community, district and regional parks. At the neighborhood level, the recreation center is usually constructed between 15,000 and 20,000 square feet. It generally will include multipurpose rooms, an arts and crafts area, game room, kitchen, lounge and lobby, restrooms and office. If a gymnasium is not available in a neighborhood school, the recreation center may also include a gymnasium and locker room facilities. The recreation center in a large park that serves a community will be considerably larger, from 50,000-100,000 square feet, and will include several multipurpose rooms, gymnasium, indoor pool, shower and locker rooms, game room, arts and crafts area, an auditorium or areas for performing arts, class or club rooms, kitchen, large meeting room, restrooms, office, lounge or lobby, and some specialized areas such as a ceramics workshop or weight room. An important consideration in all recreation facilities is to provide adequate storage space. EXISTING REGIONAL PARK FACILITIES Currently, the Parks and Recreation Department is responsible for operating and maintaining the following facilities: Clearbrook Park Clearbrook Park, covering 55 acres, is located approximately 5 miles north of Winchester, on Route 11. Clearbrook Park is open 365 days a year, from 8:00 a.m. to dark and includes: C . Four -lighted baseball/softball fields with concessions and restrooms Three -acre lake Fishing Paddle boats . Picnic shelters, tables and grills . Horseshoe pits . Playgrounds . Vintage red caboose . Volleyball • Swimming Pool with concessions . Passive areas . Maintenance complex • Comfort stations Sherando Park Sherando Park is located on Route 277, 1.8 miles east of 2-81, near Stephens City. The Park consists of 335 acres, approximately one-half of which is undeveloped. Sherando Park is open 365 days a year, from 8:00 a.m. to dark and includes: . 4.5 acre lake Paddle boats Fishing . Six lighted baseball/softball fields with concessions . Picnic shelters, tables and grills . Eighteen -hole disc golf course . Hiking trails . Horseshoe pits . Playgrounds . Volleyball . Swimming pool with concessions Radio airplane facility . Passive areas • Maintenance complex • Comfort stations . Bike trails Based on the demand standards established by the 1996 and 2002 Virginia Outdoor Plan, Frederick County should use the following recommendations as a guide for future park development. L•] Facility Needs Based on Minimum Standards Established in the 2002 Virginia Outdoor Plan Facility Units/1000 Population Existing Number of Facilities Needs gap based on current population 61,219 Needs gap based on 2010 population 68,000 Needs gap based on 2015 population 74,000 Needs gap based upon 2020 population 80,000 Amphitheater 1./40,000 0 1 1 1 2 Baseball (Youth)* 1/5,000 15 _3 -1 0 1 Basketball 1/5,000 5 7 8 10 ll Bicycle Trails 1 mile/1,000 3.0 miles 58 miles 65 miles 71 miles 77 miles Horseshoes 1/10,000 8 _2 _1 _1 0 Ice Skating 1/30,000 0 2 2 2 2 In -Line Hockey 1/30,000 0 2 2 2 2 Park Land 10 acre/1,000 396 216 284 344 404 Picnicking 10/1,000 400 212 280 340 400 Recreation Center - Indoor Pool 1/60,000 0 1 1 1 1 Skateboard Park 1/60,000 0 1 1 1 1 Soccer Fields 1/5,000 8 4 6 7 8 Softball(Adult)** 1/5,000 5 7 9 10 11 Swimming Pools*** 1/10,000 2 4 5 5 6 Tennis Courts 1/2,000 14 17 20 23 26 Volleyball 115,000 3 9 10 11 13 * Facilities shared with softball, figure adjusted according to percent of use and includes 4 public little league fields on Passage Road in Stephens City. * * Facilities shared with baseball, figure adjusted according to percent of use. * * * Jr. Olympic Pool CONCLUSIONS As the population of the Winchester -Frederick County area continues to increase, there will undoubtedly be greater emphasis placed on the County's Parks and Recreation Department. As indicated by the standards provided in the 2002 Virginia Outdoor Plan, (referred to in this chapter), there currently exists a need to concentrate on further facility development just to meet present minimum standards, and a greater need to establish a long range capital improvement program to insure the provision of the physical amenities required to meet future leisure demands. At this time, priority should be given to bring our park system up to the recommended minimum standard, but strong consideration should also be given to the acquisition of park land to meet future needs while desirable open space is still available at a reasonable cost. In addition to the facilities that are needed to meet current and future demands, in eastern Frederick County and western Frederick County, the Parks and Recreation Department will also need additional professional staff if the County is to accommodate an already increasing demand for recreational programs. Recreation Policy Goal - Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. Strategy 1 - Insure that appropriate open space and facilities are provided with new development. Strategv._2 - Identify the recreational, parks, and open space needs of the County. Strategy 3 - Make available a wide range of year-round recreational opportunities. Strategy 4 - Seek alternative funding methods for the provision of existing and identified recreational needs. Strategy 5 - Encourage cooperative efforts with private, semi-public, and public providers of recreational opportunities. Implementation Methods: 1. Prepare a County -wide recreation plan which identifies recreational, park, and open space needs. 2. Continue to solicit public opinion in planning parks and recreation. 3. Continue to encourage the participation and financial support of 11 civic groups businesses, and other organizations and individuals for recreational needs. 4. Continue to utilize State and Federal grants and loans for financing and programming County recreational needs and especially for major capital projects. 5. Continue to expand our cooperative relationship with the Frederick County School Board in jointly meeting identified County recreational needs. 6. Continue to cooperate with the private sector, the semi-public sector and other public providers of recreation in meeting identified recreational needs. Goal - Continue to develop the County's regional parks as the major source of recreational facilities and activities. Stratecry 1 - As finances are available, improvements to the Sherando and Clearbrook Parks should take place according to the adopted master plans. Implementation Methods: 1. Use the capital improvements planning process to provide improvements to the regional parks. 2. Seek alternative sources of funding for park improvements. Goal - Insure that appropriate recreational facilities are provided in urban and rural areas. Strateav 1 - Insure that appropriate open space and recreational facilities are provided in association with new urban development. Strategy 2 - Provide for suitable recreational opportunities for all portions of the County. Strateav 3 - Provide for a trail system and bikeway plan. Implementation Methods: 1. Use a County -wide recreation plan to develop standards for open space and recreational facilities in new urban development. 2. Use a County -wide recreation plan to identify the recreation needs of residents in all portions of the County. 3. Identify recreation needs associated with the Rural Community Centers. 4. Review land development regulations to insure that appropriate standards are provided for open space recreational facilities in 12 new developments. Goal - Provide recreational programs and activities based on identified needs and available funding. Strategy 1 - Identify recreational program needs. Strategy 2 - Solicit public opinion on recreational programs to be provided. Strategy 3 - Coordinate with the Frederick County School Board, the public sector, the semi-public sector, and private organizations for the provision of recreational program funds, services, and facilities. Implementation Methods: 1. Prepare a County -wide recreation plan identifying program needs. 2. Develop and maintain citizen participation in the identification of recreational program and program facility needs. 3. Actively solicit contributions for the provision of recreational programs and program facility needs, from all segments of the community, both private and public. 4. Structure the provision of all program facilities, such as indoor community centers, to recognize land use decisions and policies. 5. Actively utilize public, semi-public, and private facilities for the provision of recreational programs. 13 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department cf Planning cnd Development Frederic,< County, Virginia Project Name: Tnrlonr Qwimmina Pool Date Prepared: 09011n4 Agency: Park -sand Recreation Agency Contact Person: Tames M T)nran Phone Number: 665-56,78 Location of Project: Tn RP Deferminerd Magisterial District: Tn Re DPterminerl Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This facility would house a leisure and competitive lap swimming pool with an office, storage and locker rooms. This facility should be located on property owned or proffered to the County and would utilize approximately 10-12 acres with parking. Facility to be designed to accommodate the addition of Field House amenities listed in project number 17 of this report. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2006-07 fiscal year. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. 2005-2006 Capital Improvements Plan Projects Requests Page I This project is planned with the construction of the Field House Project. The Indoor Swimming Pool facility would be constructed to allow for the addition of the Field House. When both are completed, they will share the same property and parking. Project Priority: 1 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #I - Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd 3rd FY 4th FY 5th FY Beyond Total 2006 FY 2008 2009 2010 FY 2011 2007 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction 9,000,000 9,000,000 Furniture and Equipment Other (opening day collection) TOTAL MMI, 9,000,000 0 0 0 0 0 9,000,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor 2005-2006 Capital Improvements Plan Projects Requests Page 2 From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 9,000,000 0 0 0 0 1 0 9,000,000 Please describe the source of funding (i.e. type of grant): Presently, there are no federal or state grant monies available for this project. As a result, this project would need to be funded through the County Capital Improvement Fund, through donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Projects Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. Since its inception, the Parks and Recreation Department has relied solely on the use of the county public schools to house our programs. This arrangement was adequate when the department first started out, but now the department offers over 750 programs annually and at this same time, space within the schools is more difficult to secure. This has created a situation where the department can no longer meet the programming and facility needs of the county residents. Additionally, there are no indoor pools in Frederick County. By constructing the indoor pool, it would permit the department to meet citizen programming demands, provide an instructional facility, as well as provide the area with a facility that would attract new businesses to the community. This facility would be available to all area residents. Please describe the need for this project. As stated above the Department and the community have outgrown the use of school facilities for programming. In the past four years, the Department has experienced a fifty-four percent increase in program offerings. The construction of this project will provide a facility the Department will be able to offer year round recreational programming to the residents of Frederick County. Please describe and justify the proposed location of the project. The Indoor Pool facility should be located in an area convenient to the major transportation corridors of the county on a county proffered site. However, as an alternative one of the two county regional parks could be used to house the facility, since these locations are already identified as centers for recreation programs and activities. Additionally, locating the facility on property already owned by the county would reduce development costs. 2005-2006 Capital Improvements Plan Projects Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Indoor Pool project meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Continues to develop the County's regional parks as a major source of recreational facilities and activities. • Supports a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, and programs, as well as supporting economic development in the County through the support of businesses and the travel and tourism industry. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Indoor Pool project addresses the need for an indoor recreational facility in Frederick County. The construction of this facility will provide the community with a public facility that could be used for not only recreational pursuits, but rehabilitation and wellness programs. In addition, the development of this project would assist in reducing overcrowding in the school facilities and provide a new outlet to expand the existing scholastic activities programs within the schools. 2005-2006 Capital Improvements Plan Projects Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? In initial stages of planning, the Indoor Pool project is projected to potentially serve over 150 community organizations and groups. This assistance would be provided in either facility or programming provisions within the facility. There is currently no other similar facility located within the County. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2005-2006 Capital Improvements Plan Projects Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Indoor Pool project is not dependent upon another project. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The Indoor Pool project has been identified by the Recreation Commission and the County's Capital Improvements Plan. A Parks and Recreation Commission sub -committee has been formed to determine the final size and content of the facility. In addition, the Commission has prepared a user survey to solicit input from community organizations who would benefit from the facility. 2005-2006 Capital Improvements Plan Projects Requests Page 7 2005-2006 Capital Improvements Plan Projects Requests Page 8 • • �7 2005-2006 CAPITAL IMPROVEMENTS PLAN NDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Depar'7ment of Planning and Development Frederick County, Virginia Project Name: Date Prepared: 09121„104. Ag=r • Parks and Recreation Agency Contact Person: Iamec M Doran Phone Number: 665-5679 Location of Project: Rheranrin Park Magisterial District: npf-.q»nn Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Playground - Multi-component accessible play structure for age groups from 5-12 years of age. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park which was completed in 2001. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2005-06 fiscal year. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. None Project Priority: 2 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: New Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES 2005-2006 Capital Improvements Plan Project Requests Page 2 Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design Land Acquisition Site Preparation Improvements Construction 88,000 88,000 Furniture and Equipment Other (opening day collection) TOTAL 88,000 0 0 0 0 Oil 88,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. 2005-2006 Capital Improvements Plan Project Requests Page 3 PROPOSED FUNDING SOURCES Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 88,000 88,000 Other Fund State Grants Bondsand Debts Other Fund- raising TOTAL 88,000 0 0 0 0 0 88,000 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. To provide recreational opportunities for the Sherando Park service area. Please describe the need for this project. To reduce the gap between the number of existing passive recreational areas and the number which is needed to meet the minimum standards for our service area. To replace outdated play equipment and play equipment which no longer meets CPSC guidelines. Please describe and justify the proposed location of the project. The project location would be at Sherando Park which is currently owned by Frederick County. Presently, Sherando Park has two designated play areas. 2005-2006 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The playground meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The playground will provide a Sherando Park with an accessible multi-component play structure to meet the demands of the service area. 2005-2006 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 2001. w Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would provide a facility to meet the demands of the growing youth population in the service area. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. w 0 Coordination with other projects: 2005-2006 Capital Improvements Plan Project Requests Page 7 Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The project is not dependent upon any other planned projects. It is one element of the adopted Master Development Plan for Sherando Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park completed in 2001 to satisfy existing recreational demands and needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 8 2005-2006 Capital Improvements Plan Project Requests Page 9 2005-2006 CAPITAL IMPROVEMENTS PLAN NDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Date Prepared: - ()9/?d /(i4 Agyo`r Park -, and Rerreation Agency Contact Person: Tama-, M Doran Phone Number: 665-liOR Location of Project: C'learhrnnk/ChPranrdn Parkc Magisterial District: _ Stonewall/(boon Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Upgrade the outdoor swimming pools and both Clearbrook and Sherando Parks. Upgrade would involve the removal of the diving boards and the installation of one 50' water slide and one 75' water slide at each pool. The upgrade would also include the addition of a spray ground with 10- 12 features at each pool. r� Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project will take approximately 8 months to complete. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2005-06 fiscal year. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project. Project Priority: 3 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: New Estimate Cost (ln 220-04 dollars): PROPOSED EXPENDITURES 2005-2006 Capital Improvements Plan Project Requests Page 2 Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design Land Acquisition Site Preparation Improvements Construction 1,000,000 1,000,000 Furniture and Equipment Other (opening day collection) TOTAL 1,000,000 0 0 0 0 0 1,000,000 ■ Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES 2005-2006 Capital Improvements Plan Project Requests Page 3 Element 1st FY 2nd 3rd FY 4th FY 5th FY Beyond TOTAL 2006 FY 2008 2009 2010 FY 2011 2007 General 1,000,000 1,000,000 Fund Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 1,000,000 0 0 0 0 0 1,000,000 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. To provide recreational opportunities for the Clearbrook Park and Sherando Park service area. Please describe the need for this project. Currently, we have two outdoor swimming pools at the County's regional parks. These facilities are 15 years old and were constructed with two diving boards as the main feature for each pool. Over the, past 5 years, swimming pool attendance has been flat and users are requesting that we add different water features. The addition of two water slides and a spray ground to each pool facility will increase pool attendance by an estimated 30% and with the increase in fees to comparable facilities, the County could realize an additional 65,000 in revenue annually. Please describe and justify the proposed location of the project. Clearbrook and Sherando Parks, currently owned by Frederick County offers the best site and location for the development of this facility. With the upgrade to the existing swimming pool facilities, the County would not have to incur costs for property acquisition or infrastructure development. 2005-2006 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The upgrading of the swimming pool facilities meets the County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 2001. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The upgrading of the swimming pool facilities will mean more active participation options for all swimming pool users, especially school aged participants. 2005-2006 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would upgrade the existing swimming pool facilities and would be available to all citizens of Frederick County. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: 2005-2006 Capital Improvements Plan Project Requests Page 7 Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This project, at both Clearbrook and Sherando Parks is not dependent upon any other planned project. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvement Plan. The swimming pool facilities have been identified as part of the Master Development Plan for both Clearbrook and Sherando Parks. 2005-2006 Capital Improvements Plan Project Requests Page 8 2005-2006 Capital Improvements Plan Project Requests Page 9 Page 2005-2006 CAPITAL IMPROVEMENTS PLAN NDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Deve�opment Frederick County, Virginia Project Name: -- Parkland in Eastern Frederick Crnmty Date Prepared: 09/? 1 /04 Agency- Parks and Recreatinn Agency Contact Person: Tames M T)nran Phone Number: 665-5679 Location of Project: Fastern Frederick Crninty Magisterial District: Eastern Fred Ca Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Acquisition of Parkland; 150-200 acres Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commission is requesting that this project be funded and completed in FY 2005-06. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. Project Priority: 4 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #2. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design Land 2,302,737 2,302,737 Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL 7 0 2,302,737 0 0 0 0 2,302,737 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment 2005-2006 Capital Improvements Plan Project Requests Page 2 From cost estimate provided by an engineer, architect, or vendor From bids received X "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006 2007 2008 2009 2010 FY 2011 General Fund 2,302,737 2,302,737 Other Fund State Grants Bondsand Debts Other Fund- raising TOTAL 0 2,302,737 01 0 1 0 0 2,302,737 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available they will be actively pursued by this department. Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This project would be located in the primary growth center of Frederick County, within the 2005-2006 Capital Improvements Plan Project Requests Page 3 existing urban development area and the approved Southern Frederick Land Use Plan, which consists of 1,200 acres of new residences. The project could be used by the entire Frederick County area, but the principal users would be from the eastern Frederick County area. The location of this project in eastern Frederick County will also serve to reduce the traffic burden in other areas by providing facilities and services in closer proximity to the residents. Please describe the need for this project. To reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for our service area, as recommended by the Virginia Outdoors Plan. Please describe and justify the proposed location of the project. Potential acreage for parkland would be located in the eastern portion of Frederick County. The location of this project would provide parkland which could be developed to create more accessible recreational facilities and opportunities to the residents of eastern Frederick County. 2005-2006 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Parkland acquisition in eastern Frederick County meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Identify and protect important natural resources. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, insuring that adequate and appropriate open space and recreational facilities are provided, as well as supporting economic development and the travel and tourism industry in the county. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The acquisition of Parkland in eastern Frederick County ensures the adequate provision of open space, and will provide the citizens of the county with an area that will contribute to their physical and mental well being, as well as improving the quality of life in Frederick County. 2005-2006 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The acquisition of parkland in eastern Frederick County would service the needs of the citizens of the entire county, but the residents in the urban development area would be provided services that only exist at Clearbrook and Sherando Parks. ■ Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2005-2006 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The acquisition of Parkland in eastern Frederick County is not dependent upon another project. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The acquisition of Parkland in eastern Frederick County has been identified by the Parks and Recreation Commission. 2005-2006 Capital Improvements Plan Project Requests Page 7 2005-2006 Capital Improvements Plan Project Requests Page 8 0 0 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Parkland in Wastern Frederick C onnty Date Prepared: 0901104 Agency- Park-, and Recreation Agency Contact Person: Tnme-, M Dnrnn Phone Number: 665-5679 Location of Project: We -,tern Frederick Crn,n4 Magisterial District: We -,t Fred Co Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Acquisition of Parkland; 150-200 acres Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commissions is requesting that this project be funded and completed in FY 2005-06. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. Project Priority: 5 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #3. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyon Total 2006 2007 2008 2009 2010 FY 201 Planning, Surveying, & Design Land Acquisition 1,409,549 1,409,549 Site Preparation Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL 1,409,549 0 0 0 1,409,549 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed informa.ti.on on the estimate, please do so in the space provided. 2005-2006 Capital Improvements Plan Project Requests Page 2 Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received X "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyon FY 201 TOTAL General Fund 1,409,549 1,409,549 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 1,409,549 0 0 0 1,409,549 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This project would be used by the entire Frederick County area. Please describe the need for this project. To reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for our service area, as recommended by the Virginia Outdoors Plan. Please describe and justify the proposed location of the project. Potential acreage for parkland would be located in the western portion of Frederick County. The location of this project would provide parkland which could be developed to create more accessible recreational facilities and opportunities to the residents of western Frederick Count 2005-2006 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Parkland acquisition in Western Frederick County project meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. + Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Identify and protect important natural resources. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, insuring that adequate and appropriate open space and recreational facilities are provided, as well as supporting economic development and the travel and tourism industry in the county. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The acquisition of Parkland in Western Frederick County ensures the adequate provision of open space, and will provide the citizens of the county with an area that will contribute to their physical and mental well being, as well as improving the quality of life in Frederick County. 2005-2006 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The acquisition of parkland in western Frederick County would service the needs of the citizens of the entire county, but directly the Back Creek and Gainesboro Districts, who currently have to drive to either Clearbrook or Sherando Parks. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2005-2006 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The acquisition of Parkland in Western Frederick County is not dependent upon another project. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The acquisition of Parkland in Western Frederick County has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, in 1996 public hearings were held to discuss the project and the acquisition of property. 2005-2006 Capital Improvements Plan Project Requests Page 7 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Open Play Area - Clenrhrnnk Date Prepared: 09/21 /04 Agenrv• Park- and RPrreatinn Agency Contact Person: Tame- M Moran Phone Number: 665-567R Location of Project: Clearhrnnk Park Magisterial District: Stonewall Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Open Play Areas on South side of Lake: Parking - 64 spaces; asphalt paved with curbed islands and concrete wheel stops; line markings and 4 security lights. Existing Shelters (5) - Repair, cleaning, painting, and restroom rehab. One signage refurbish, 5 picnic shelters, 1 restroom. Landscaping - 11 shade trees; 8 evergreens. Peripheral Work - General turf (2 acres): miscellaneous signage: (Cont'd) Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Clearbrook Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2005-2006 fiscal year. Open Play Area - Clearbrook (cont'd) 2005-2006 Capital Improvements Plan Project Requests Page 1 Open play at water tower: Parking - 73 spaces; asphalt paved with curbed islands and concrete wheel stops; line markings and 6 security lights. Picnic shelter - 30'x 55'; 18 tables, wood deck floor; wood frame and asphalt shingles. Horseshoe pits (6) - sand base; 12 steel bars; 8" x 8" timber edge. Croquet - turf surface Shuffleboard - concrete base, regulation court, tournament style. Volleyball court (1) - 50' x 80' sand court. Existing concession - cleaning, repair, refurbish, rehab., paint. Landscaping - 14 shade trees Peripheral work - general turf (1.4 acres); miscellaneous signage. 2005-2006 Capital Improvements Plan Project Requests Page 2 ■ Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Clearbrook Park to satisfy existing recreational needs. Project Priority: 6 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #7. Estimate Cost (in 2004 dollars): PROPOSED FXPFND1TITRFC Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design 30,515 30,515 Land Acquisition Site Preparation Improvements 183,011 183,011 Construction 173,065 173,065 Furniture and Equipment Other (opening day collection) TOTAL 0 386,591 0 0 0 0 386,591 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed info�nination on the estimate, please do so in the space provided. 2005-2006 Capital Improvements Plan Project Requests Page 3 Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 386,591 386,591 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 386,591 0 0 0 7 0 386,591 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. To provide recreational opportunities for the Clearbrook Park service area. Please describe the need for this project. To reduce the gap between the number of existing passive recreational areas and the number which is needed to meet the minimum standards for our service area. Please describe and justify the proposed location of the project. Clearbrook Park, currently owned by Frederick County, offers the best location for this development. With the county already having ownership of the property, one aspect of the cost of this project has already been completed. This project, being located at Clearbrook Park, is necessary to meet the needs of our service area. 2005-2006 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The development of the Open Play Area at Clearbrook Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Clearbrook Park which was completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? development of the Open Play Area at Clearbrook Park will provide the facility with additional parking, provide paved pathways and renovate existing structures to improve the accessibility and appearance of the park. Legal Requirement: 2005-2006 Capital Improvements Plan Project Requests Page 6 Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would relieve some of the existing pressure on the facility, as well as provide additional outlets for recreational opportunities. The project is being developed in accordance to the Master Plan for Clearbrook Park which was completed in 1987. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a 2005-2006 Capital Improvements Plan Project Requests Page 7 larger project? The Open Play Area project at Clearbrook Park is not dependent upon any other planned project. It is one element of the adopted Master Plan for Clearbrook Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Clearbrook Park since 1987 to satisfy existing recreational needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 8 1-uuD-1-uub capital improvements Plan Project Requests Page 9 Page • C-: • 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Date Prepared: 0901 /04 ARP,nw• Parks anrd Recreation Agency Contact Person: Tames M Doran Phane Number: 665-5679 Location of Project: gheranda Park Magisterial District: 012cquan Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. 1 Bowl, 1 half pipe and open skate area 2 In -Line Hockey Rinks (90'x 180') with sideboards and panels Parking - 40 spaces; asphalt paved with curb islands, wheel stops; line markings and security lights Access road Fencing Landscaping/access paths Signage Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2006-07 fiscal year. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other planned project. This project was identified in the Master Development Plan for the County's regional parks completed in 2001. The project has been included at the request of the citizenry of Frederick County. Project Priority: 7 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as 48. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design 11,389 11,389 Land Acquisition Site Preparation Improvements 366,621 366,621 Construction 112,742 112,742 Furniture and Equipment Other (opening day collection) TOTAL 0 490,752 0 0 0 0 490,752 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment 2005-2006 Capital Improvements Plan Project Requests Page 2 From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDTNf 4 nMTRCFc Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 490,752 490,752 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 490,752 0 0 0 490,752 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. To provide recreational opportunities to the citizens of Frederick County. Please describe the need for this project. Requested by the community to provide additional recreational facilities for the youth of Frederick County at Sherando Park. This project is not mandated by state or federal requirements, but it is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the 2001 Master Development Plan for Sherando Park. Please describe and justify the proposed location of the project. The location of this project would be at Sherando Park in the open field area at the intersection of Lake View Drive and Splash Ave. This location has been identified in the 2001 Master Development Plan for Sherando Park. 2005-2006 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Skateboard Park/In-Line Hockey Rink project meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Skateboard Park/In-Line Hockey Rink will provide a facility dedicated to the safety of the participants. It will provide participants with a facility where they can pursue this recreational avenue, without interfering with vehicular or pedestrian traffic on public and private properties. 2005-2006 Capital hnprovements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Currently, there are no facilities within Frederick County to accommodate skateboarding or outdoor in-line hockey. This project is needed to provide a safe facility to meet the recreational demands of the community. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: 2005-2006 Capital Improvements Plan Project Requests Page 6 Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This project is not dependent upon any other planned project. This project has been included on the 2001 Master Plan Development for Sherando Park. The project has been included at the request of the citizens of Frederick County. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Requested by the community to provide a dedicated public recreational facility, this project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. 2005-2006 Capital Improvements Plan Project Requests Page 7 2005-2006 CAPITAL IMPROVEMENTS PLAN NDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Date Prepared: 09/21 /04 Agency Pnrkc and Recreation Agency Contact Person: Tames M Doran Phone Number: 665-5679 Location of Project: Sherando Park Magisterial District: Opeg„on Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. 1. Development of a 12 acre lake on the north side of Rt. 277 in Sherando Park. 2. 1.5 Mile trail system around the lake. 3. 800 L.F. of access roadway. 4. Parking lot/lighted with 125 spaces. 5. Development of two irrigated 70 x 120 yd. multi-purpose fields. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the master development plan for Sherando Park, which was completed in 2001. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2006-2007 fiscal year. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon or is being planned in conjunction with any other project. This project is planned as one element of the master development plan for Sherando Park. Project Priority: 8 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as # 13. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES 2005-2006 Capital Improvements Plan Project Requests Page 2 Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & 52,209 52,209 Design Land Acquisition Site Preparation Improvements Construction 805,792 805,792 Furniture and Equipment Other (opening day collection) TOTAL 0 858,0010 0 0 0 858,001 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES 2005-2006 Capital Improvements Plan Project Requests Page 3 Element 1st FY 2006 2nd FY 2007 3rd F6 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 858,001 858,001 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 858,001 0 0 0 0 858,001 Please describe the source of funding (i.e. type of grant): We are currently utilizing the TEA -21 grant program for the trail facilities. In addition, recreation access grant monies through the Virginia Department of Transportation may be available for entrance and access roadways. If these grant programs are not funded, this project would need to be funded through the county capital improvements program, by donations, or by funds generated through the collection of proffers. 2005-2006 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility would provide recreational opportunities for the Sherando Park service area and the entire Frederick County community. Please describe the need for this project. To reduce the needs gap between the number of existing passive recreational areas and the number needed to meet the minimum standards required for our service area. This project will provide trails with walking and jogging opportunities which ranks as #1 in the 2002 Virginia Outdoors Plan survey. This project will also provide multi -use playfields for adult and youth programs. Please describe and justify the proposed location of the project. Sherando Park, currently owned by Frederick County, offers the best location for this development. With the County currently having ownership of the property, one aspect of the cost of this project has already been completed. This project, being located at Sherando Park, is necessary to meet the needs of our service area. 2005-2006 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The development of the lake with trails and parking and two multi-purpose fields at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 2001. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The development of the lake with trails and parking will provide recreational opportunities in an undeveloped portion of Sherando Park which is adjacent to adjoining housing subdivisions. 2005-2006 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 2001. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? This project would provide passive recreational services in the County's urban development area and is being developed in accordance with the Sherando Park Master Plan which was completed in 2001. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: 2005-2006 Capital Improvements Plan Project Requests Page 7 Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The lake with trails and parking and two multi-purpose fields is not dependent upon any other planned project. It is one element of the adopted master development plan for Sherando Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park completed in 2001 to satisfy existing recreational demands and needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 8 2005-2006 Capital Improvements Plan Project Requests Page 9 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Departmert of Planning and Development Frederick County, Virginia Date Prepared: 09/? 1 /04 Agen"- Pgrk-sand Recreation Agency Contact Person: _ Tnmec"lVT Doran Phone Number: 665-5678 Location of Project: Cberanrin Park-_ Magisterial District: Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Softball fields (2) - 300' radius, fully fenced, backstop, four 50 person bleachers per field, lighted concrete poles 50/30 FC, concrete deck. Access Road - 500 LF. Parking - 153 spaces, asphalt paved with curbed islands and drop off; line markings and 6 security lights. Landscaping - 100 shade trees; pine screen. Peripheral Work - General seeding - 1 acre; miscellaneous signage. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park and a site development plan has also been completed for these facilities. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2007-08 fiscal year. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Projects Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. Once this project has been completed, we will be able to retrofit the existing baseball/softball complex at Sherando Park for youth baseball use. Project Priority: 9 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #4. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design Land Acquisition Site 402,619 402,619 Preparation & Improvements Construction 109,870 109,870 Furniture and 2,433 2,433 Equipment Other (opening day collection) TOTAL 0 0 514,922 0 0 0 514,922 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment 2005-2006 Capital Improvements Plan Projects Requests Page 2 X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006 2007 2008 2009 2010 FY 2011 General Fund 514,922 514,922 Other Fund State Grants Bonds and Debts Other Fund- raising ■ TOTAL 0 0 514,922 0 0 01[1 514,922 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. 2005-2006 Capital Improvements Plan Projects Requests Page 3 This facility would provide recreational opportunities for the entire Frederick County area. In addition to its use as a recreational facility, it will be used by the Frederick County school system. ■ Please describe the need for this project. Presently, there are ten softball/baseball fields within the county's regional park system. Eight of ten existing fields must serve a dual purpose of facilitating youth baseball as well as youth and adult softball programs. With the increased usage of these fields, it has become more difficult to facilitate these programs. This project is needed in order for the Parks and Recreation Department to accommodate the existing demand of youth baseball and adult softball programs. ■ Please describe and justify the proposed location of the project. Sherando Park, currently owned by Frederick County, represents the very best site for softball field development. The fact that the County will not have to acquire property for this facility means that the most costly aspect of this development has already been completed. Sherando Park also provides a location that is situated in the fastest growing area of the county and is adjacent to Sherando High School. Joint use of facilities between the park and school system has been approved, and, as a result, these fields will facilitate school activities as well as recreation programs. Conformance to the Comprehensive Pian: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The completed development of the Softball Complex at Sherando Park meets the following 2005-2006 Capital Improvements Plan Projects Requests Page 4 County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Softball Complex at Sherando Park will provide a safe facility to meet the needs of the county's growing softball program for both adults and youth. 2005-2006 Capital Improvements Plan Projects Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would relieve some of the existing pressure on the Sherando Park with the continual demand for field space in southern Frederick County. The facility could also be used by the Frederick County school system. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: 2005-2006 Capital Improvements Plan Projects Requests Page 6 Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Softball Complex at Sherando Park project is not dependent upon any other planned project, however, once completed it will allow the existing baseball/softball complex at Sherando Park to be retrofitted for youth baseball use. The project is one element of the adopted Master Plan for Sherando Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park to satisfy existing recreational demands and needs of the residents. 2005-2006 Capital Improvements Plan Projects Requests Page 7 2005-2006 CAPITAL. IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Racehall Complex Renovation - Sherando Date Prepared: 09/21 /04 Agnncv• Park -, and Recreation Agency Contact Person: Tames M Doran Phone Number: F(5-Sh7R Location of Project: Sherando Park Magisterial District: 012eq„on Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Renovate existing ball fields (4) - Grading, seeding, infield renovation; partial fencing and new backstops; new lighting (required by Little League, Inc.); drainage control and upgrade support facilities. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2007-08 fiscal year. m®wwr any Coordination: If the project is dependent upon or is being planned in conjunction with 2005-2006 Capital Improvements Plan Project Requests Page l other project(s), identify it/them and indicate the relationship between the projects. Renovation of this facility cannot be completed until the softball complex on the north side of Rt. 277 has been completed. Project Priority: 10 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #5. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design Land Acquisition Site Preparation 702,177 702,177 Improvements Construction 345,410 345,410 Furniture and 9,154 9,154 Equipment Other (opening day collection) TOTAL 0 0 1,056,741 0 01:0 0 it 1,056,741 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. 2005-2006 Capital Improvements Plan Project Requests Page 2 Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 1,056,741 1,056,741 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 1,056,741 7�o 0J 1,056,741 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility, presently serving as both youth baseball and adult softball fields, would be used by the "Little League" programs within the Sherando Park service area. In addition to its use as a recreational facility, the athletic complex will also be used by the Frederick County school system. Please describe the need for this project. In its present design, the four field complex does not provide adequate diamond configuration or grading scheme to facilitate youth baseball programs. The renovation of this complex would correct these problems and bring those fields up to the recommended standards. Please describe and justify the proposed location of the project. The project location would be at Sherando Park which is currently owned by Frederick County. Presently, Sherando Park has six baseball/softball fields. This project would involve the renovation of the existing ball field complex. With the site of the new county high school being adjacent to Sherando Park, there will be a joint use of these facilities and with the renovation of the fields, athletic programs can be more effectively facilitated. 2005-2006 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The renovation of the Baseball Complex at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The renovation of the Baseball Complex at Sherando Park will provide a safe facility to meet the demands of the county's growing baseball program. 2005-2006 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 1987. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would correct original design problems for the facility and provide a facility to meet the demands of the growing youth baseball program in the County. Additionally, the renovation of the facility will permit more efficient use of the site. The facility would also be used by the school system. M -� Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: 2005-2006 Capital Improvements Plan Project Requests Page 6 Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The renovation of the Baseball Complex at Sherando Park cannot be completed until the softball complex on the north side of Route 277 has been completed. The project is part of the adopted Master Plan for Sherando Park completed in 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park completed in 1987 to satisfy existing recreational demands and needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 7 2005-2006 Capital Improvements Plan Project Requests Page 8 0 0 0 2005-2006 CAPITAL IMPROVEMENTS PLAN NDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Casser ComnlPx - 4herandn Date Prepared: 09/1? 1 /04 Agency- Parks anal Recreatinn Agency Contact Person: James M T)nran Location of Project: Chemndn Park Phone Number: 665-W9 Magisterial District: npen„nn Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Soccer field (2) - 450'x 450' pad plus goals Access paths - 1500 LF; 10' wide; asphalt paved. Restroom/concession - 820 SF; masonry with concrete roof deck; full concession hookup Plaza - 22,000 SF; 50% paved/50% planted; kiosk. Picnic shelters (1) - 24'x 24': 6 picnic tables each; concrete pad; wood frame structure; asphalt shingles. 12 sets of bleachers. Landscaping - 90 shade trees. Lighting - 5 fields. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2007-08 fiscal year. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Sherando Park to satisfy existing recreational needs. Project Priority: 11 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #6 Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design 66,472 66,472 Land Acquisition Site Preparation Improvements 634,460 634,460 Construction 477,503 477,503 Furniture and Equipment Other (opening day collection) TOTAL 0 0 11,178,435 1 01 0 Oil 1,178,435 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment 2005-2006 Capital Improvements Plan Project Requests Page 2 X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006 2007 2008 2009 2010 FY 2011 General Fund 1,178,435 1,178,435 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 01 0 1,178,4350 0 0 1,178,435 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility would be used by the entire Frederick County area. In addition to its use as a recreational facility, the soccer complex will also be used by the Frederick County school system. Please describe the need for this project. To reduce the gap between the number of existing soccer fields and the number of fields which are needed to meet the minimum standard for our service area. Please describe and justify the proposed location of the project Sherando Park, currently owned by Frederick County, represents the very best location for soccer field development. The fact that the county will not have to acquire property for this facility means that the most costly aspect of this development has already been completed. Sherando Park also provides a location that is situated in the fastest growing area of the county and is adjacent to the new county high school. With joint use of facilities between the park and school system, the construction of additional soccer fields will benefit both agencies. 2005-2006 Capital Improvements Plan Project Requests Page 4 w Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Soccer Complex at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Soccer Complex at Sherando Park will provide a safe facility to meet the demands of the county's growing youth and adult soccer programs. 2005-2006 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 1987. rr� Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would be used by the entire Frederick County area to meet the demands for additional soccer fields for the growing youth and adult soccer programs within the County. The fields will not only serve the recreational needs of the community, but will also be used by the Frederick County school system. 1 11 Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: 2005-2006 Capital Improvements Plan Project Requests Page 6 Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Soccer Complex at Sherando Park is not dependent upon any other planned project. The project is one element of the Master Plan for Sherando Park completed in 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park completed in 1987 to satisfy existing recreational demands and needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 7 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Date Prepared: Agency- Parlrc anrd Rerrention Agency Contact Person: Tames M Duran- Phone Number: 665-567R Location of Project: Clearhrnnk Park Magisterial District: gtonPwald Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Tennis courts (4) - 2 sets of 2 courts each; fully fenced, chain link vinyl clad, lighted, 30 FC. Basketball courts (2) - 85'x 65' asphalt with color coating; 2 backboards each court; player benches, lighted, concrete poles, 30 FC. Shelter deck (1) - 30'x 30' octagonal shelter concrete pad, wood frame, cedar shingles, 6 picnic tables. Parking - 25 spaces; asphalt paved with curbed islands and concrete wheel stops; line markings and 2 security lights. Landscaping - 39 shade trees. Peripheral work - general turf (8 acres); miscellaneous signage. Access paths - 1000 LF; 10' wide, asphalt paved. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Clearbrook Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2008-09 fiscal year. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Clearbrook to satisfy existing recreational needs. Project Priority: 12 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #10. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design 34,305 34,305 Land Acquisition Site Preparation & Improvements 253,107 253,107 Construction 125,554 125,554 Furniture and Equipment Other (opening day collection) TOTAL 0 0 0 403,887 0 403,887 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. 2005-2006 Capital Improvements Plan Project Requests Page 2 Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 403,887 403,887 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 0 403,887 0 403,887 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of 2005-2006 Capital Improvements Plan Project Requests Page 3 service to be provided by the project. Because Clearbrook Park is a regional facility, these facilities will be available to all county residents. Currently, there are no tennis, racquetball, or basketball courts in the Clearbrook Park area and, with over 150,000 park visitors annually, these facilities are needed. Please describe the need for this project. Presently, there are no tennis, racquetball, or basketball courts located in the Clearbrook Park area and, with park visitation over 150,000 annually, these facilities are needed. This project will reduce the gap between the number of existing tennis, racquetball, and basketball courts and the number of courts needed to meet the minimum standards for our service area. Development of this project will also provide this department with facilities for recreational programs. i Please describe and justify the proposed location of the project. Clearbrook Park, currently owned by Frederick County, provides the very best location for tennis and basketball court development. Since the county will not have to acquire property for this facility, the most costly aspect of this development has already been completed. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the ComprehensivePiaci? Is the project consistent with established policies? 2005-2006 Capital Improvements Plan Project Requests Page 4 The development of the Tennis/Basketball Complex at Clearbrook Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Clearbrook Park which was completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The development of the Tennis/Basketball Complex at Clearbrook Park will provide the citizens with a facility to improve their physical and mental well being. Additionally, the project will provide Clearbrook Park with additional parking, provide paved pathways and renovate existing structures to improve the accessibility and appearance of the park. Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the 2005-2006 Capital Improvements Plan Project Requests Page 5 adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? There are currently no tennis, basketball or racquetball courts in the Clearbrook area. The development of the Tennis/Basketball Complex at Clearbrook Park will provide the residents of northern Frederick County with facilities similar to those found at Sherando Park. The project is being developed in accordance to the Master Plan for Clearbrook Park which was completed in 1987. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Tennis/Basketball Complex project at Clearbrook Park is not dependent upon any other planned project. It is one element of the adopted Master Plan for Clearbrook Park completed in 2005-2006 Capital Improvements Plan Project Requests Page 6 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Clearbrook Park since 1987 to satisfy existing recreational needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 7 2005-2006 CAPITAL IMPROVEMENTS PLAN NDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Tennia/Picnic Area - Cheranrin Date Prepared: nA/)I 104 Agency Park- and Rer.reatinn Agency Contact Person: .Tame- M Imran Phone Number: 665-5678 Location of Project: Sherando Park Magisterial District: 012apon Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Tennis courts (3) - 1 set of courts ea.; asphalt, color coated; fully fenced, vinyl clad chain link; lighted 30 FC. Restroom/concession - 625 SF masonry and wood with asphalt shingles; limited concession hookup; 1500 SF plaza. Picnic shelter (4) with plaza - 24'x 24'; 6 picnic tables each; concrete pad, wood frame structure; cedar shingles, skylights, stain, electric and water outlets. Playground area. Access paths - 1000 LF; 10' wide; asphalt paved. Access road - 50 LF; 24' wide (Cont'd) Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2008-09 fiscal year. Tennis/Picnic Area - Sherando Park (cont'd) 2005-2006 Capital Improvements Plan Project Requests Page 1 Parking - 94 spaces; asphalt paved with curbed islands and concrete wheel stops; line markings and 4 security lights. Landscaping - 15 shade trees. Peripheral work - general turf (3 acres); miscellaneous signage. 2005-2006 Capital Improvements Plan Project Requests Page 2 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Sherando Park to satisfy existing recreational needs. Project Priority: 13 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #11. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design 45,142 45,142 Land Acquisition Site Preparation Improvements 354,092 354,092 Construction 250,648 250,648 Furniture and Equipment Other (opening day collection) TOTAL 0 0 0 0 649,882 0 649,882 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. 2005-2006 Capital Improvements Plan Project Requests Page 3 Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 649,882 649,882 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 0 0 649,882 0 649,882 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. These facilities would be used by the Sherando Park service area and the southwestern part of Frederick County. Although tennis courts have been included at Sherando High School, the Commission feels that it is important to include three tennis courts on park property for general use while the school courts are being used for school activities. Please describe the need for this project. Presently, there are no tennis courts and only five picnic areas within Sherando Park. This development is needed to reduce the gap between the number of existing facilities and the minimum standards for the Sherando Park service area and southwestern Frederick County. s� Please describe and justify the proposed location of the project. Sherando Park represents the best location for tennis court and picnic area development. Since Sherando Park is owned by Frederick County and the acquisition of property will not be necessary, the most costly aspect of this development has been completed. Sherando Park also provides a site which is situated in the fastest growing area of the county. 2005-2006 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Tennis/Picnic Area project at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The development of the Tennis/Picnic Area project will provide the citizens with a facility to improve their physical and mental well being. Additionally, the project will provide Sherando Park with additional parking, provide paved pathways and additional facilities to improve the accessibility and availability of recreational opportunities within the park. Legal Requirement: 2005-2006 Capital Improvements Plan Project Requests Page 6 Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 1987. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? These facilities will provide Sherando Park with public tennis courts available for general use only. In addition, the project will provide much needed facility development within the park to meet the recreational demands of the citizens of Sherando Park service area. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a 2005-2006 Capital Improvements Plan Project Requests Page 7 larger project? The project is not dependent upon any other planned project. It is one element of the Master Plan for Sherando Park completed in 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project is part of the Master Plan for Sherando Park completed in 1987 to satisfy existing recreational demands and needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 8 J • • 2005-2006 CAPITAL IMPROVEMENTS PLAN NDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Date Prepared: 1• 14 .-. ... .. Agency Contact Person: TamPc M Doran Phone Number: 665-5679 Location of Project: Clearbrook Park Magisterial District: Stonewall Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Existing restrooms - clean, repair, paint and refurbish, signage. Access paths - 1000 LF; 10' wide; asphalt paved. Shelter/Stage - sound stage; sound system; lighting; 6300 SF; wood decking, stairs and miscellaneous site development. Peripheral work - general turf (1 acre); miscellaneous signage. Lake Renovation Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Clearbrook Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during fiscal year 2008-09. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page I other proj ect(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Clearbrook Park to satisfy existing recreational needs. Project Priority: 14 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as 412. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design 24,038 24,038 Land Acquisition Site Preparation Improvements 74,177 74,177 Construction 303,039 303,039 Furniture and Equipment Other (opening day collection) TOTAL 7M�o 0 0 401,254 0 1 01 r7254J Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment 2005-2006 Capital Improvements Plan Project Requests Page 2 X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 401,254 401,254 Other Fund State Grants Bonds and Debts Other Fund- raising 0 401,254 0 0401,254 TOTAL 0 0 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility would be used by the entire Winchester -Frederick County area. Please describe the need for this project. Presently, there are no facilities to accommodate cultural programs within the county's park system. This project is needed to provide a facility for cultural activities. Please describe and justify the proposed location of the project. Clearbrook Park, currently owned by Frederick County, represents the very best location for facilitating cultural events. The fact that the county will not have to acquire property for this project means that a significant cost has already been completed. Clearbrook Park, with its existing park characteristics and cultural features also provides the best location for our service area. 2005-2006 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Shelter/Stage Seating project at Clearbrook Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Clearbrook Park which was completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The project provides facilities to enhance the physical and mental well being of the citizens of Frederick County. In addition, the project renovates existing facilities and improves the accessibility and appearance of the park. Legal Requirement: 2005-2006 Capital Improvements Plan Project Requests Page 5 Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. In addition, the project is part of the Master Plan for Clearbrook Park which was completed in 1987. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Currently, there are no facilities to accommodate cultural programming within the county's park system. This project is needed to provide a facility for development of cultural arts programming to meet the recreational demands of the community. In addition, the project is being developed in accordance to the Master Plan for Clearbrook Park which was completed in 1987. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a 2005-2006 Capital Improvements Plan Project Requests Page 6 larger project? This project not dependent upon any other planned project. It is one element of the adopted Master Plan for Clearbrook Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Clearbrook Park since 1987 to satisfy existing recreational needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 7 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Manning and Development Frederick County, Virginia Project Name: Maintenance Compound and Offir.P - gheranrdn Date Prepared: 09/?1 /04 Aaenrv• Parksand Rerreation Agency Contact Person: Tames M Doran Phone Number: 66 5-5679 Location of Project: Qheranrin Park Magisterial District: 013ennnn Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Office - 1200 SF. Storage Sheds - 4000 SF. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during fiscal year 2008-09. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Sherando Park to satisfy existing recreational needs. Project Priority: 15 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #13. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design 12,962 12,962 Land Acquisition Site Preparation Improvements 14,259 14,259 Construction 174,616 174,616 Furniture and Equipment 3,888 3,888 Other (opening day collection) TOTAL 0 0 0 205,725 Irm 205,725 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment 2005-2006 Capital Improvements Plan Project Requests Page 2 X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING S01TRC F.S Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 205,725 205,725 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0' 0 0 205,725 0 205,725 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility will enable the county to maintain its equipment and facilities in a more responsible and effective manner. 2005-2006 Capital Improvements Plan Project Requests Page 3 Please describe the need for this project. To provide an adequate maintenance facility to maintain county equipment and facilities in a responsible and effective manner. Also, with the additional responsibility of maintaining all outdoor facilities at the new Sherando High School, there is a need for more storage, maintenance and office space. Please describe and justify the proposed location of the project. Sherando Park, currently owned by Frederick County, will provide the best location for the development of this maintenance facility. Since the maintenance equipment, staff and facility is needed to serve as a maintenance function for Sherando Park's grounds and facilities, this project should be located at Sherando Park. 2005-2006 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Maintenance Compound and Office development at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The project will provide the park with a facility to enable the County to maintain its equipment and facilities in a safe, efficient and responsible manner. 2005-2006 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project will permit the park to continually comply to OSHA requirements for the provision of a safe work environment. In addition, it is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 1987. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would provide support facilities for not only the maintenance of Sherando Park, but Sherando High School as well. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2005-2006 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The project is not dependent upon any other planned project. It is one element of the Master Plan for Sherando Park completed in 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project is part of the Master Plan for Sherando Park completed in 1987 to satisfy existing recreational demands and needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 7 2005-2006 Capital Improvements Plan Project Requests Page 8 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development rrederick County, Virginia Project Name: Date Prepared: Agency Pnrkc nnrd Recreatinn Agency Contact Person: JamPc M T)nran Phone Number: 665-5679 Location of Project: !�herandn Park Magisterial District: Opt-quan Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Access Road/Parking and Trails at Sherando Park north side of Rt. 277 and Wrights Run. 1. Entrance and access road (1,800 L.F.) off of Warrior Drive 2. Parking - 100 spaces 3. Trails - 2.8 Miles Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the master development plan for Sherando Park, which was completed in 2001. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2008-2009 fiscal year. Coordination: If the project is dependent upon or is being planned in conjunction with any 2005-2006 Capital Improvements Plan Project Requests Page 1 other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon or is being planned in conjunction with any other project. This project is planned as one element of the master development plan for Sherando Park. Project Priority: 16 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #14. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES 2005-2006 Capital Improvements Plan Project Requests Page 2 Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & 52,429 52,429 Design Land Acquisition Site Preparation Improvements Construction 777,352 777,352 Furniture and Equipment Other (opening day collection) TOTAL 0 () 0829,781 0 0 829,781 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 0 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES 2005-2006 Capital Improvements Plan Project Requests Page 3 Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 829,781 829,781 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 0 829,781 0 0 829,781 Please describe the source of funding (i.e. type of grant): We are currently utilizing the TEA -21 grant program for the trail facilities. In addition, recreation access grant monies through the Virginia Department of Transportation may be available for entrance and access roadways. If these grant programs are not funded, this project would need to be funded through the county capital improvements program, by donations, or by funds generated through the collection of proffers. 2005-2006 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility would provide recreational opportunities for the Sherando Park service area and the entire Frederick County community. Please describe the need for this project. To reduce the needs gap between the number of existing passive recreational areas and the number needed to meet the minimum standards required for our service area. This project will provide trails with walking and jogging opportunities which ranks as #1 in the 2002 Virginia Outdoors Plan survey for all outdoor recreational activities. Please describe and justify the proposed location of the project. Sherando Park, currently owned by Frederick County, offers the best location for this development. With the County currently having ownership of the property, one aspect of the cost of this project has already been completed. This project, being located at Sherando Park, is necessary to meet the needs of our service area. 2005-2006 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The development of an entrance off of Warrior Drive and an access road with parking and trails at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 2001. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The development of an entrance and access road with parking and trails will provide recreational opportunities in an undeveloped portion of Sherando Park which is adjacent to adjoining housing subdivisions. 2005-2006 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 2001. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? This project would provide passive recreational services in the County's urban development area and is being developed in accordance with the Sherando Park Master Plan which was completed in 2001. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2005-2006 Capital Improvements Plan Project Requests Page 7 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The entrance and access road with parking and trails is not dependent upon any other planned project. It is one element of the adopted master development plan for Sherando Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park completed in 2001 to satisfy existing recreational demands and needs of the residents. 2005-2006 Capital Improvements Plan Project Requests Page 8 2005-2006 Capital Improvements Plan Project Requests Page 9 0 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development rederick County, Virginia Project Name: Date Prepared: 09/21 /04 Agency: Parka and Recreation Agency Contact Person: Tames M Doran Phnne Number: 66L5679 Location of Project: Tn RP D Magisterial District: To Re Determiner) Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The Field House project would be approximately 44,000 square feet and include an indoor area large enough to accommodate a 1/16 mile meter track and a minimum of two basketball courts. This court area would also be designed for utilization by indoor soccer, baseball, softball, wrestling, volleyball, tennis and badminton with the installation of in -floor sleeves and drop curtains or partitions. This area could also be used for special events such as dances, proms, music festivals, garden and home, outdoor, craft, antique, quilt, or boat shows, thus providing a flexible facility for a multitude of activities to take place at one time. The facility would also house a fitness center, multipurpose rooms, office, storage, and locker rooms. This facility would be attached to the Indoor Swimming Pool. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2009-10 fiscal year. This project is planned with the construction of the Indoor Swimming Pool project. The Field House would attach to the Indoor Swimming Pool facility and would share the same exterior amenities (i.e., parking),. 2005-2006 Capital Improvements Plan Projects Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. In previous years, the Field House and Indoor Swimming Pool were two separate projects, but citizen input and cost analysis has lead the Parks and Recreation Commission to recommend the two projects be combined into one. Project Priority: 17 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #1 and has been separated from the Indoor Swimming Pool Project. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006 2007 2008 2009 2010 FY 2011 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction 7,040,000 Furniture and Equipment Other (opening day collection) TOTAL 0 0 0 0 7,040,000 011 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor 2005-2006 Capital Improvements Plan Projects Requests Page 2 From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2006 2nd FY 2007 3rd FY 2008 4th FY 2009 5th FY 2010 Beyond FY 2011 TOTAL General Fund 7,040,000 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 7 0 0 7,040,000 0 0 Please describe the source of funding (i.e, type of grant): Presently, there are no federal or state grant monies available for this project. As a result, this project would need to be funded through the County Capital Improvement Fund, through donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2005-2006 Capital Improvements Plan Projects Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. Since its inception, the Parks and Recreation Department has relied solely on the use of the county public schools to house our programs. This arrangement was adequate when the department first started out, but now the department offers over 750 programs annually and at this same time, space within the schools is more difficult to secure. This has created a situation where the department can no longer meet the programming and facility needs of the county residents. By constructing the Field House facility, it would permit the department to meet citizen programming demands, provide an instructional facility, as well as provide the area with a facility that would attract new businesses to the community. This facility would be available to all area residents. Please describe the need for this project. As stated above the Department and the community have outgrown the use of school facilities for programming. In the past four years, the Department has experienced a fifty-four percent increase in program offerings. The construction of this project will provide a facility the Department will be able to offer year round recreational programming to the residents of Frederick County. ■ Please describe and justify the proposed location of the project. The Field House facility should be located in an area convenient to the major transportation corridors of the county on a county proffered site. However, as an alternative one of the two county regional parks could be used to house the facility, since these locations are already identified as centers for recreation programs and activities. Additionally, locating the facility on property already owned by the county would reduce development costs. 2005-2006 Capital Improvements Plan Projects Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Field House project meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Continues to develop the County's regional parks as a major source of recreational facilities and activities. • Supports a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, and programs, as well as supporting economic development in the County through the support of businesses and the travel and tourism industry. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Field House project addresses the need for an indoor recreational facility in Frederick County. The construction of this facility will provide the community with a public facility that could be used for not only recreational pursuits, also wellness programs. In addition, the development of this project would assist in reducing overcrowding in the school facilities and provide a new outlet to expand the existing scholastic activities programs within the schools. 2005-2006 Capital Improvements Plan Projects Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? In initial stages of planning, the Field House project is projected to potentially serve over 150 community organizations and groups. This assistance would be provided in either facility or programming provisions within the facility. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. Coordination with other projects: 2005-2006 Capital Improvements Plan Projects Requests page 6 Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Field House project is not dependent upon another project. However, when this facility is constructed adjoining the indoor pool facility, development and construction costs would be reduced. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The Field House project has been identified by the Recreation Commission and the County's Capital Improvements Plan. A Parks and Recreation Commission sub -committee has been formed to determine the final size and content of the facility. In addition, the Commission has prepared a user survey to solicit input from community organizations who would benefit from the facility. 2005-2006 Capital Improvements Plan Projects Requests Page 7 2005-2006 Capital Improvements Plan Projects Requests Page 8 FREDERICK COUNTY PUBLIC SCHOOLS Administrative Assistant to the Superintendent dente �"o LTJj�j� S� BeF Ci D U E p PSIC 'b SEP 2004 01 Frederick County Public Schools Visit us at www.frederick.k1Zva.us September 3, 2004 Susan K. Eddy, Senior Planner Department of Planning and Development 107 North Kent Street Winchester, VA 22601. Dear Ms. Eddy: 11CK COUNTY & DEVELOPM e-mail: kapocsis@ftederickk12-va.us Please find enclosed an administrative draft of the 2005-2006 Capital Improvements Plan requests for Frederick County Public Schools. The Frederick County School Board will adopt their revised Capital Improvements Plan no later than its November 16, 2004, school board meeting by official action. Should the school board make any changes, a copy will be forwarded to your office immediately. Also, enclosed is a map of Frederick County showing the public schools' current locations and the generalized area where future schools and school facilities may be located. Should you have any questions or need additional information, please feel free to contact my office at 662-3889, ext. 112. Respectfully yours, Stephen M. Kapocs Administrative Assistant to the Superintendent UI► Enclosure 540-662-3889 Ext 112 1413 Amherst Street, Post Office Box 3508, Winchester, VA 22604-2546 FAX 540-662-3890 DRAFT 2005-2006 FREDERICK COUNTY CAPITAL IMPROVEMENTS PLAN Departmental Requests Individual Description and Justification Forms For New and Carry Over Project Requests July 2, 2004 Department of Planning and Development 2005-2006 FREDERICK COUNTY CAPITAL IMPROVEMENTS PLAN Departmental Request Prioritization Summary New and Carry Over Project Requests July 2, 2004 Department of Planning and Development D AT 2005-2006 Departmental Request Prioritization Summary New and Carry Over (Modified and Unmodified) Project Requests Department: Frederick County Public Schools Approved By: Dept. Project Title FY 2005 FY 2006 FY 2007 FY FY 2009 TOTAL Priority Cost Cost Cost 2008 Cost CIP Cost Cost 1 l ltn Elementary 5.9m 5.9m School Total cost Construction of project 12.9m 2 Transportation 750,000 750,000 Facility Land Acquisition 3 Transportation TBD Facility Construction 4 Administration TBD Building Renovation and Addition 5 Replace Lom 5.5m 5.9m 12.4m Gainesboro Elementary School 6 Robert E. TBD Aylor Middle School Renovation 7 James Wood TBD High School Renovation 8 9 10 I1 TOTAL 7,650,000 5,500,000 5,900,000 19,050,000 Frederick County School Facilities 01 Admiral Richard E. Byrd Middle 02 Apple Pie Ridge Elem. 03 Armel Elem. 04 Bass -Hoover Elem, 05 Gainesboro Elem. 06 Indian Hollow Elem. 07 Middletown Elem. 08 Millbrook HS 09 Orchard View Elem. 10 Redbud Run Elem. I l Sensory Road Elem. 12 Stonewall Elem, 13 Frederick County Middle 14 James Wood Middle 15 R.E. Aylor Middle 16 James Wood HS 17 Sherando HS 18 Dowell J Howard Center 19 Northwestern Reg. Ed. Program A i 1's Elementary School Site B Transportation Facility (future) C Gainesboro Elem. Sch. (Replacement site) fit _ AFT V� ttayr�+� i S� 4�41) N W S M3 . 'R Frederick County Public Schools 2004 Frederick County School Board Capital Improvements Plan Draft 10/28/04 2004 —2009 Borrowed Department . . " 7/1104- . 7/1/05- 711/06- 7/1107- 7/1108- '> Estimated . Protect Title Prior to Estimated Estimated . Priority 6/30/04 6/30105 $/30106 :. 611/07 6/1%08 611/09 . , Project Interest Debt 11 ` Elementary Open Cost Service 1 School $1.8m $7.7m $3.4m Fall $12.9m $6.6m $19.Sm Construction 2006 2 Transportation Open Facility $2.0m $6.4m December $8.4m $4.1m $12.5m 2007 Admin. Bldg. 3 Renovation & Addition TBD TBD TBD Replace $5.2m $17.6m 4 Gainesboro Elementary $1.Om $S.Sm $5.9m O I2007a11 $12.4m School Robert E. Aylor 5 Middle School Renovation TBD TBD TBD James Wood 6 High School Renovation TBD TBD TBD New High 7 School Land Acquisition TBD TBD TBD New Middle 8 School Land Acquisition TBD TBD TBD Apple Pie Ridge Elementary School TBD TBD TBD Renovation Bass Hoover 10 Elementary School TBD TBD TBD Renovation Total $8,7m $10.9m $12.3m: $33.7m ' $15.9m $4.9,6m Kapocs i/04-05/ 102004 d raftC IPEvaIS u mS heet 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: New Elementary School #11 Date Prepared: 8/28/04 Agency Contact Person: Steve Kapocsi Location of Project: Off Rt.522 South of Winc Agency: Frederick County Public School Phone Number: (540) 662-3889 Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This is a single story elementary school with a floor area of approximately 81,000 square feet. The school will be located on 25 acres next to Admiral Richard E. Byrd Middle School. The facility will be designed to accommodate a student membership of 644. The outdoor facilities will include three pods of grade -level appropriate playground equipment, one asphalt play area, one softball field, and one physical education field. This facility will meet or exceed all Virginia Department of Education new construction requirements for K-5 Elementary Schools. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Property for the l lth elementary school is located off Rt. 522 South of Winchester next to the Admiral Richard E. Byrd Middle School. Prior to the purchase of property an architectural & engineering review was conducted that included a boundary survey, topographical survey, traffic study, traffic signal study, environmental study, wetlands study and delineation, and geotechnical testing. Architectural & Engineering design has begun in August 2004, and bid documents are scheduled to begin in late January/February 2005. A fall 2006 opening is scheduled 2005-2046 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: 1 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: going. The new elementary school is listed as number 1 on the priority fist. Project is on PROPOSED EXPENDITURES Element 1s` FY 2nd 3rd FY 4th FY 5th FY Beyond Total 2005 FY 2007 2008 2009 FY 2010 2006 Planning, Surveying, & 50,000 50,000 Design Land Acquisition Site Preparation & Improvements Construction 4.15m 4.15m Furniture and 1.6m 1.6m Equipment Other (opening 100,000 100,000 day collection) 5.9m TOTAL 5.9m 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2005 2nd FY 2006 3rd FY 2007 4th FY 2008 5th FY 2009 Beyond FY 2010 TOTAL General Fund Other Fund State Grants Bonds and Debts 5.9m 5.9m Other Fund-raising TOTAL 5.9m 5.9m Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The facility will serve 644 students. Please describe the need for this project. Senseny Road Elementary School is currently over capacity with housing growth in this area projected to continue. Redbud Run Elementary School and Armel Elementary School are both near their program capacity. Please describe and justify the proposed location of the project. This school will be located between Senseny Road Elementary School and Armel Elementary School to relieve current overcrowding and to accommodate the projected new housing development in the areas served by these elementary school attendance zones. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk Completion of this project will decrease the level of overcrowding at Senseny Road Elementary School, Armel Elementary School and Redbud Run Elementary School. This school will also assist in accommodating new students that reside in the high growth areas of Frederick County. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No! 2005-2006 Capital Improvements Plan Project Requests Page 5 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support_ Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Transportation Facility Land Acquisition Date Prepared: 8/29/04 Agency: Frederick County Public Schools Agency Contact Person: Steve Kapocsi Location of Project: TBA Phone Number: (540) 662-3889 Magisterial District: TBA Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Preliminary design work and land acquisition of approx. 20 acres for the construction of a transportation facility. Project will provide needed data to establish a more detailed cost of construction. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Purchase of property, property assessment, and planning, should take approximately six months to a year. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. It has been the policy of the school board to support Frederick County Government departments and agencies, where and whenever possible, as long as there are no negative impacts on the operations or services of the school division. The project is not dependent upon any other project, however, communication will need to occur with the county administrator's office to ensure the best interest of both the school board and the board of supervisors are considered. 2005-2006 Capital Improvements Plan Project Requests Page 1 Project Priority: 2 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The transportation facility land acquisition project is number two on the project priority Iist. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1s` FY 2nd 3rd FY 4th FY 5th FY Beyond Total 2005 FY 2007 2008 2009 FIT 2010 2006 Planning, Surveying, & Design Land Acquisition 750,000 750,000 Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL 750,000 11750,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received `'Preliminary`' estimate, (e.g, no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 2 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2005 2nd FY 2006 3rd FY 2007 4th FY 2008 5th FY 2009 Beyond FY 2010 TOTAL General Fund Other Fund State Grants Bonds and Debts 750,000 750,000 Other Fund-raising TOTAL 750,000 750,000 Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to- be provided by the project. The project will lead to the construction of a transportation department which provides a student transportation system to support a division membership of over 11,600 students and over 2,000 full and part-time employees. The transportation department also supports other county agencies such as the Parks & Recreation Department, the Sheriff's Department, etc. 2005-2006 Capital Improvements Plan Project Requests Page 3 Please describe the need for this project. Due to rising land prices and the current critical need for a new transportation facility that will accommodate the out grown current facilities that does not have sufficient area to expand. Please describe and justify the proposed location of the project. The location of this facility has not yet been determined. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive PIan? Is the project consistent with established policies? The current facility does not have sufficient area to expand due to the increase of student population and buses. The future construction of the facility will be relocated, expanded and modernized. The location will conform to the Frederick County Comprehensive Policy Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The land acquisition project which will lead to the proposed transportation facility project will directly impact the transportation department's ability to operate and maintain the school division's school bus fleet, the vehicle fleet, and the direct transportation support of other county agencies and departments. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? This project will lead to assisting the transportation department in its ability to maintain compliance with Federal and State laws and regulations that govern the transportation of students. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? With the increase of student population the project will ensure that student transportation is provided to all eligible residents of Frederick County. Students that have a verified special need for special services transportation are provided those services. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This project is necessary for the successful completion of the construction of a new transportation facility to replace the outgrown current facility. This project is the first phase of a project to replace the current transportation department. 2005-2006 Capital Improvements Plan Project Requests Page 5 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Transportation Facility Construction Date Prepared: 8/29/04 Agency Contact Person: Steve Kapocsi Location of Project: TBA 4 Lka I iWL N -Ma Agency: Frederick County Public Schools Phone Number: (540) 662-3889 Magisterial District: TBA Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. A transportation facility that will accommodate administrative offices, support staff offices, driver training areas, driver and staff meeting area, mechanical service and repair bays, inspection bay, wash bay, and fueling bays. The location of the facility should be close to major transportation arteries and as close to the largest number of schools as possible. The facility will also need secure parking for the bus and vehicle fleet, as well as adequate parking for staff and drivers. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Planning, design, and construction should take approximately 24 months once started. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. It has been the policy of the school board to support Frederick County Government departments and agencies, where and whenever possible, as long as there are no negative impacts on the operations or services of the school division. The project is not dependent upon any other project, however, communication will need to occur with the county administrator's office to ensure the best interest of both the school board and the board of supervisors are considered. 20U5-2UU6 Capital improvements Plan Project Requests Page 1 Project Priority: 3 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The transportation facility construction would be listed as number three. Estimate Cost (in 2004 dollars): PROPOSED EXPENDTI'URES Element 1g` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL TBD ■ Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 2 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2005 2nd FY 2006 3rd FY 2007 4th FY 2008 5th FY 2009 Beyond FY 2010 TOTAL General Fund Other Fund State Grants Bonds and Debts Other Fund-raising TOTAL TBD Please describe the source of funding (Le. type of grant): Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The transportation department provides a student transportation system to support a division membership of over 11,600 students and over 2,000 full and part-time employees. The transportation department also supports other county agencies such as the Parks & Recreation Department, the Sheriffs Department, etc. Please describe the need for this project. The transportation department has outgrown the current facilities and there is not sufficient area to expand those facilities. The increase in student membership, coupled with the stringent laws and regulations that govern the operation and maintenance of school transportation vehicles, requires a much larger and upgraded transportation facility. 2005-2006 Capital Improvements Plan Project Requests Page 3 Please describe and justify the proposed location of the project. The location of this facility has not yet been determined. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This is an existing facility that will be relocated, expanded and modernized. The location will conform to the Frederick County Comprehensive Policy Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This proposed project will directly impact the transportation department's ability to operate and maintain the school division's school bus fleet, the vehicle fleet, and the direct transportation support of other county agencies and departments. Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? This proposed project will assist the transportation department in its ability to maintain compliance with Federal and State laws and regulations that govern the transportation of students. Equitable Distribution of Services: 2005-2006 Capital Improvements Plan Project Requests Page 4 Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Student transportation is provided to all eligible residents of Frederick County. Students that have a verified special need for special services transportation are provided those services. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No! Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support_ Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 5 C] FT nw Z- m u A- 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Administration Building Renovation & Addition Date Prepared: 8/29/04 Agency: Frederick County Public Schools Agency Contact Person: Steve Kapocsi Phone Number: (540) 662-3889 Location of Project: 1415 Amherst Street Magisterial District: Winchester, City Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This project would renovate the current administration building to an upgraded electrical service and distribution system, removal of asbestos floor covering, replacement windows and window coverings, upgraded restroom facilities, and upgraded mechanical systems. The project would include an addition for a public records storage and office space. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. It is estimated that this project may be completed in one year. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. No! 2005-2006 Capital Improvements Plan Project Requests Page 1 Project Priority: 4 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: With the completion of Admiral Richard E. Byrd Middle School project the administration building renovation and addition will be number four on the project priority list. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1S` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL TBD Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 2 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2005 2nd FY 2006 3rd FY 2007 4th FY 2008 5th FY 2009 Beyond FY 2010 TOTAL General Fund Other Fund State Grants Bonds and Debts Other Fund-raising TOTAL TBD Please describe the source of funding (i.e. type of grant).- TBD rant):TBD Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The administration building houses approximately 100 administrative, instructional, and support personnel. Please describe the need for this project. All available building space is being utilized to its fullest potential. In addition to the use of closets and part of the original coal bin and boiler room for office space, a modular office provides space for human resources new employee processing. Renovation and additional space is needed to provide a safe and adequate work place for employees. 2005-2006 Capital Improvements Plan Project Requests Page 3 Please describe and justify the proposed location of the project. Improvements and expansion would occur at the current building location. Until an architectural study has been conducted, this site appears to be the most economical location. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This project will address ADA inadequacies, relieve overcrowding, and plan for future expansion. Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? This project would assist in maintaining compliance with building code and fire regulations. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A 2005-2006 Capital Improvements Plan Project Requests Page 4 Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. It takes adequate facilities and well-managed programs to maintain quality public schools. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No! Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 5 'RAFT 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Gainesboro Elementary School Date Prepared: 8/28/04 Agency Contact Person: Steve Kapocsi Location of Project: On the East side of 522, North of Winchester, and immediately North of the intersection of Route 681 & Route 522 Agency: Frederick County Public School Phone Number: (540) 662-3889 Magisterial District: Gainesboro Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This is a single story elementary school with a floor area of approximately 81,000 square feet. The facility will be designed to accommodate a student membership of 644. The outdoor facilities will include three pods of grade level appropriate playground equipment, one asphalt play area, one softball field, and one physical education field. This facility will meet or exceed all Virginia Department of Education new construction requirements for K-5 Elementary Schools. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Planning, design, property assessment, and construction should take approximately 24 months. 2005-2006 Capital Improvements Plan Project Requests Page I Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: 5 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The replacement of Gainesboro Elementary School was listed as number sig. With the completion of Admiral Richard E. Byrd Middle School, the replacement of Gainesboro Elementary School will move up to number five. Estimated Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1s` FY 2nd FY 3rd FY 4th 5th FY Beyond Total 2005 2006 2007 FY 2009 FY 2010 2008 Planning, 470,000 Surveying, & 400,000 50,000 20,000 Design Land Acquisition Site Preparation 600,000 400,000 1,000,000 & Improvements Construction 5,050,000 4,200,000 9,250,000 Furniture and 1,600,000 1,600,000 Equipment Other (opening 80,000 80,000 day collection) TOTAL 1.Om 5.5m 5.9m 1112.4m 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2005 2nd FY 2006 3rd FY 2007 4th FY 2008 5th FY 2009 Beyond FY 2010 TOTAL General Fund Other Fund State Grants Bonds and Debts Lom 5.5m 5.9m 12.4m Other Fund-raising FTOTAL 1.0m 5.5m 5.9m 12.4m Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. 2005-2006 Capital Improvements Plan Project Requests Page 3 The facility will serve 644 students. Please describe the need for this project. The current site is too limited to justify renovating the facility to meet the building standards of today. The building Iacks air conditioning, an adequate Iibrary, physical education facilities, and support special education facilities. There are other health and safety concerns that are inherent in the age and design of the building. Please describe and justify the proposed location of the project. The school board owns property within 3 miles of the current site in the Gainesboro Elementary School attendance zone. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk This school will assist the school division and county government in meeting the community needs for the citizens and elementary students in the Gainesboro District. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No! 2005-2006 Capital Improvements Plan Project Requests Page 5 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support_ Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name- Robert E. Aylor Middle School Renovation Date Prepared: 8/29/04 Agency: Frederick County Public Schools Agency Contact Person.- Steve Kapocsi Phone Number: (540) 662-3889 Location of Project: 901 Aylor Road Magisterial District: Opequon Stephens City, VA Project Description: Give a brief (1-2) paragraph description of what the project includes_ Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Robert E. Aylor Middle School is located at 901 Aylor Road Stephens City VA and opened for students in 1969 and has served as a middle school since that time. The school contains 113,643 square feet and has a program capacity of 850 students. Currently the building serves grades 6, 7, and 8. The building is in good condition however, several major areas need to be addressed in a renovation. Major areas to be included in this renovation project are additional classroom space; a complete replacement of fire alarm, and communication systems; upgrade of electrical and plumbing; and complete replacement of mechanical systems. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning - An architectural/engineering study will need to be conducted to determine the scope of work to be undertaken and provide preliminary cost estimates for the project. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 1 Project Priority: 6 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The renovation of Robert E. Aylor is number six on the project priority list. This project moves up due to the Admiral Richard E. Byrd Middle School project being completed. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1s` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL TBD Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 2 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2005 2006 2007 2008 2009 FY 2010 General Fund Other Fund State Grants Bonds and Debts Other Fund-raising TOTAL TBD Please describe the source of funding (i.e. type of grant): TBD Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The renovation of Robert E. Aylor Middle School will serve 850 students in grades 6, 7, & 8. Please describe the need for this project. Robert E. Aylor Middle School is soon to be 36 years of age and renovations are needed to a number of areas to insure the economical and efficient operation of the school for the years to come. 2005-2006 Capital Improvements Plan Project Requests Page 3 Please describe and justify the proposed location of the project. N/A Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This project will assist the school division and county government in meeting the community needs for the citizens and middle school students in the Robert & Aylor Middle School attendance zone. Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodation students and staff with disabilities. 2005-2006 Capital Improvements Plan Project Requests Page 4 Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age populations of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 5 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: James Wood High School Renovation Date Prepared: 9/29/04 Agency: Frederick County Public School Agency Contact Person: Steve Kapocsi Phone Number: (540)-662-3889 Location of Project. 161 Apple Pie Ridge Rd Magisterial District: Gainesboro Winchester, VA Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. James Wood High School located at 161 Apple Pie Ridge Rd Winchester VA opened for students in 1980 school year and has served as a high school since that time. The school contains 234,095 square feet and has a program capacity of 1400 students. Currently the building serves grades 9 —12. The building is in good condition however, several major areas need to be addressed in a renovation. Major areas to be included in this renovation project include increased electrical service and distribution to support technology; technology cabling, hardware, and its installation; upgrade of plumbing and mechanical systems; and modification of instructional areas to support instructional delivery. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. An architecture (engineering study will need to be conducted to determine the scope of work to be undertaken and provide preliminary cost estimates for the project. 2005-2006 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: 7 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The renovation of James Wood High School is an addition to the project priority list as number 7. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1s` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL II I I I I I I i T BD 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2005 2nd FY 2006 3rd FY 2007 4th FY 2008 5th FY 2009 Beyond FY 2010 TOTAL General Fund Other Fund State Grants Bondsand Debts Other Fund-raising TOTAL TBD Please describe the source of funding (i.e. type of grant): f 11 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The renovation of James Wood High School will serve 1400 students in grades 9 —12. Please describe the need for this project_ James Wood High School is soon to be 25 years of age and renovations are needed to a number of areas to insure the economical and efficient operation of the school for the years to come. Please describe and justify the proposed location of the project. N/A Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This project will assist the school division and county government in meeting the community needs for the citizens and high school students in the James Wood High School attendance zone. 2005-2006 Capital Improvements Plan Project Requests rage 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodation students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age populations of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No 2005-2006 Capital Improvements Plan Project Requests Page 5 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 WINCHESTER REGIONAL AIRPORT Winchester Regional Airport Through coordinated efforts between the Counties of Frederick, Clarke, Shenandoah and Warren, and the City of Winchester, it was determined major capital improvements would be needed in order to develop Winchester Municipal Airport into a modern first class airport. The Winchester Regional Airport Authority was formed on July 1, 1987 by the Virginia General Assembly and consists of representatives from the Counties of Frederick, Clarke, Shenandoah and Warren and the City of Winchester Since its formation, the Winchester Regional Airport Authority embarked on an extensive airport capital improvement program in order to comply with Federal Aviation Administration safety and design standards to accommodate business/corporate aircraft. The Winchester Regional Airport is now a 376 -acre, all weather, 24-hour general aviation airport with a 5,500 foot asphalt runway. It is conveniently located southeast of Interstate 81, Exit 313 and lies between State Routes 50 east and 522 south. Completed construction projects include a 1,100 -foot runway extension, pavement resurfacing of the entire runway, relocation of the taxiway and the creation of safety areas at each end of the runway. New buildings constructed under this program include a modern general aviation terminal, a 12,000 square foot clear span hangar, a 9,000 square foot aviation maintenance hangar office complex, and 61T -hangar units. Other improvements include airfield lighting upgrade, installation of a 41,000 gallon above ground fuel storage facility, security fencing of the Airport perimeter, the installation of a precision instrument approach system that provides all weather access to the Airport, and the relocation of Airport Road State Route 645 to meet FAA standards which will also allow room for future expansion to accommodate additional corporate hangars. Private and business aircraft based at Winchester total over 100, and range in size from small single engine aircraft to large cabin class business aircraft and business jets. Numerous aviation business located at the airport provide airframe and engine maintenance, flight schools, aircraft rentals, parts brokering, aircraft rides, air ambulance service, and aircraft charter services. Collaborating with Frederick County and the Virginia Department of Transportation, the Authority has also made improvements to primary access roads to the airport. Water and sewer service was also established within the Route 522 South area affording the opportunity to many Frederick County residents to access this needed utility. To date, more than $19 million dollars have been invested in Airport capital improvements, equipment, and promotions through funding received from the Federal Aviation Administration, Virginia Department of Aviation, the Virginia Department of Transportation and the supporting local jurisdictions. Important amenities include 24-hour U.S. Customs and Border Protection (formerly 2005-2006 Capital Improvements Plan Project Requests Page 46 U.S. Customs and Immigrations), 24-hour on call line service, air cargo handling, automated weather observation system (AWOS III), computerized weather and flight planning equipment, full instrument landing system and rental car/limousine services. In December 1993, the Winchester Regional Airport Authority updated its 1987 Twenty - Year Master Plan which is near completion with only a few projects remaining. They include the relocation of Airport Road to remove a section of the road that infringes on regulated airspace, land acquisition along the northern side of Bufflick Road for noise abatement and a modified master development plan for the north side of the runway. Land to accommodate the road relocation project was acquired by the Airport over two years ago and the design phase is complete. In working with the Virginia Department of Aviation and the Federal Aviation Administration, approximately three parcels a year along Bufflick Road will be processed for acquisition in accordance with the current Master Plan. Due to the limitations on space on the south side, the Airport Authority is in the process of creating a development plan for the north side of the runway. With continuing increased air space restrictions within the Dulles/Washington area, the Winchester Airport has experienced a steady increase in business traffic. In addition to increased operations, the sizes of aircraft used for business travel have become larger and with the growing demand in air cargo service the airport has seen the introduction of DC -9 air freight service. Requests by owners of larger aircraft to lease land to build hangars currently cannot be met due to limited available building space. This is a loss of potential revenue by the Airport in lease fees along with the loss of tax revenue by Frederick County. A modified master plan for development on the north side will be completed in the fiscal year 2005. While details are not yet completed it is known that a parallel taxiway with a minimum 400 foot separation from the centerline of the runway will have to be constructed. This setoff distance will safely accommodate the larger aircraft and will also provide a means to access ramps and hangars on the north side. Members of the Federal Aviation Administration and the Virginia Department of Aviation often use the Winchester Regional Airport as a role model airport for planning and development. This recognition was achieved through the solidarity of the Winchester Regional Airport Authority. Through the continued support and dedication of its member jurisdictions, the Winchester Regional Airport will enhance its role as a vital economic development asset in the attraction of new commercial and industrial businesses to this region while serving the needs of existing businesses. 2005-2006 Capital Improvements Plan Project Requests Page 47 2005-2006 Departmental Request Prioritization Summar New and Carry Over (Modified and Unmodified) Project Requests Department: Approved By: Dept. Project FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TOTAL Priority Title Cost Cost Cost Cost Cost CIP Cost 1 Land Parcel 31, $700,000 $165,000 $865,000 36,53 2 Terminal Bldg $50,000 $500,000 $550,000 Renovation 3 Land Parcel 47, $65,000 $800,000 $865,000 47A, 48 4 Upgrade Airfield $50,000 $150,000 $200,000 Lights 5 Land Parcel 50, $50,000 $300,000 $350,000 51,52 6 Airfield Maint Bldg $300,000 $300,000 7 8 9 10 11 TOTAL $865,000 $1,615,000 $350,000 $300,000 $3,130,000 2005-2006 Capital Improvements Plan Project Requests Page 2 2005-2006 FREDERICK COUNTY CAPITAL IMPROVEMENTS PLAN Departmental Requests Individual Description and Justification Forms For New and Carry Over Project Requests July 2, 2004 Department of Planning and Development 2005-2006 Capital Improvements Plan Project Requests Page 1 t•(I Y I MODIFICATION TO STANDARDS 1491 uLnMATE EYE ORADIFM DN AI !'ri�N NNE'b �N� NAYE.y ee ° DESCRIPTION rnxniMx E FpOpO°IN°mN nxa,An PROP09ED MRIOATION AIRPORT DATA pgOP09E0 PNT TTP. b E%ISTNO MPROACN CN9URFACE3 RUNWAY LNWnNU ,0" Oe 'TE- �� ?ane D• .e RW/fW SEPMARON aar A00 BOO REMMN MOOIFlCATION IO NOT USED NRPORT ELEVATION -MEL ):C ti. GAME S T-11MOM9 (M UNITS) its FT MSL N OPEN SERA XMMR ib FT MSL wp 8 w� n. " e• a• $ •w w• °,• ^o PMI PRECISION APPgOALX PAIN INDICATOR PPgDYFp HV FM AP Rll i NBI iZ FIEID MANYIENMCE BUILDING TE2 FT MSL ae• MIPORT REFENENCE POINT (MPI LaIO •m wm °le BAMF ._ OPEN BPM HMOM TST FT M8L U ROTATING NRPoM BEMAN i.2. FT MSL -ELECTRICAL E%19TIN6 AVIO.AiION EASEMENT MIRl9 MEDIUM INiEN9RY RUNWAY LIOMT9 MEAN MMIMUM DNLY TEMP. HB• 8ME NIRL9 N4H WTENSRY RUNWAY UGHT9 1 NOT USED 8 T -HANGARS M UNITS) ' el • 0.r •OMa ��°� F°° B°NTB LAND EC0Y1B ELECTRONIO NAVAIDS YOR/LOWLIZER/0. SWE•O's - REMOVED PHASE 1 TB PT MSL O AWOS TJ2 IT MSL ODAI OMNI DIRECTIONAL APPROACH LMlMING O OPEN BPM NMGAR TN FT M8L AIRPORT REFERENCE CODE C -II SAME 2-3 . • vv °w e „3 •• wwlm8 v mg V19UAL AV)9 BEACON SME SERVICE LEVEL CIA TRANS— SAME N DOAV SERVICE ROLE OA PESIONAL (OFD SANE ° T ; • v A � I B i 4 °er'H6E 3 S5b Fy . 6E B g6 N` ,� •• f " �//1% na taNA V _ _ 13 RUNWAY DATA I RUNWAY Exl9twG 1491 uLnMATE EYE ORADIFM DN AI M ----SAME PNT eTRENOTN BE61 yanp BlHwnq°aA B PNT TTP. b GAME E MPROACN CN9URFACE3 RUNWAY LNWnNU _ASPM / So MIDI 9AMF ..�n. RJNWAT ¢MFdTMPNI ALL WEATHER V414DROSE KNwAv ¢MPH RMPN IFR WINDROSE - -_ E A E. ER PORT E«m E. DDDEb TL mPaRT � 1°x.N nN�n �L W-Y.LLr:Y y ECauvla c ^ - _. ,uq awn. IRAN v,Aw vwmun -- 7;1 �� doNaDHMEnn t �N- -� _ f W---- -- ---- - iR ----------- i ____ __ I nmua�w ____ ° E I AAAA. r - --e. ,..: _ — — F N —=—� = — HDARPGR -ALL IATINOEE AND LONGITUDE. ME TAKEN FROM NN,- -- r—� PHASE 1 DEVELOPNIENT - YEMB ROTA RUNWAY .-CT FREE AREA FACILITIES -- +tlAm TELT xaxx '- m.� WNqur. tOP OF WGDIxO E Xwa. +.LY 1 T TERM—Bl b ---------'-'-- PHASE 111 DEVELOPMENT )N20 YEARS RPZ TBIHWAY PROTECTION iDNE E%19TING BUILOIN09 REIT RUNWAY END IDENTIFIER LIGM9 •.._ .... AAAA - :: — m - R� OIL D C lE - 1 fF i1\ T _. '�'r• L,f ''i� l -' .. _T°w'riAl 9L -. - - \iNlwe� D�iw`vrma:�.vdi, Nm .t , - - �. GxAAeI/nIASAFAEq•.... _ -. x�n �axNm°ALY.E �- 1� ep.TL FUTmIe : w „„°"�°ma` ,w�"t'a'"",S¢ LEGEND ABBflEV1AT10N9 "''1 - �' '� - ATa"TN sxagr`°A:rsir, -lam - -- - j - }' _ _ ` i r—� PHASE 1 DEVELOPNIENT - YEMB ROTA RUNWAY .-CT FREE AREA FACILITIES INDEX DATE FAcllm Na DESCRIPTION a. PNDOlIH tOP OF WGDIxO I� II DOPMENT 8.0 YEARS RBA RUNWAY T TERM—Bl pE9ERiPTONPHASE BOPEN BPM NMOM EIAYA-IL F26 FT MSL ---------'-'-- PHASE 111 DEVELOPMENT )N20 YEARS RPZ TBIHWAY PROTECTION iDNE E%19TING BUILOIN09 REIT RUNWAY END IDENTIFIER LIGM9 2 OPEN BPM NMOM ]N FT MSL IO NOT USED PROPOSED SUILOIN09 CoNNON-DIRlCTN)RAl BEACON S T-11MOM9 (M UNITS) its FT MSL N OPEN SERA XMMR ib FT MSL - - - - - - AIRPORT PROPERTY LINE PMI PRECISION APPgOALX PAIN INDICATOR A OPEN BPM NMOM TSO FT MSL iZ FIEID MANYIENMCE BUILDING TE2 FT MSL — - - — - - — PROP. AIRPORT PROPERTY UNE AWOB AUTOMATED WEATHER OBSERVING STATION OPEN BPM HMOM TST FT M8L U ROTATING NRPoM BEMAN i.2. FT MSL -ELECTRICAL E%19TIN6 AVIO.AiION EASEMENT MIRl9 MEDIUM INiEN9RY RUNWAY LIOMT9 8 OPEN BPM HMOM TA2 FT MSL VAULT T88 FT MEL NIRL9 N4H WTENSRY RUNWAY UGHT9 1 NOT USED 8 T -HANGARS M UNITS) 13 ABOYE GROUND FUEL TMKe T20 FT MSL ��°� F°° B°NTB LAND EC0Y1B MITLS MEDIUM BZIEN." TMIWAY UOMS AIN— PETER— PoIM - REMOVED PHASE 1 TB PT MSL O AWOS TJ2 IT MSL ODAI OMNI DIRECTIONAL APPROACH LMlMING O OPEN BPM NMGAR TN FT M8L O ROTATING BEACON MALSR MEDIUM WIFN8IIY APPROACH LIGMMING SYSTE APPROVED ------- AY ElY MEA WC/SC WIND CONE Mp 6EOMEMED CIRCLE - - - - - RUNWAY OBJECT FREE MEA FURIRE A-- PROTECTION ZONE "I- RUNWAY PROTECTION ZONE - COMPASS Amu FEDERAL AVMTION ADMINISTRAMN MMAOER YIRGWM..—ENT OF AVMITON DATE DIRECTOR WINCHEBfE)i REOIONN. AIRPORT AVMORIT/ DATE CHNRIMN DATE Oxvi.lPOl.i 6' CONTOUR INTERVAL 11 AIRPORT LAYOUT PLAN WINCHESTER REGIONAL AIRPOR' WINCHESTER, VIRGINIA EL TA 9NEE1 AW PCFMI(/LTIM; bµ4 AABL iX 1 M¢I°Ba AC MNI•(Vp PA n PJomµ.y YA OF DRAWN BY: SCAIE xTS _ _ S ------- AY ElY MEA WC/SC WIND CONE Mp 6EOMEMED CIRCLE - - - - - RUNWAY OBJECT FREE MEA FURIRE A-- PROTECTION ZONE "I- RUNWAY PROTECTION ZONE - COMPASS Amu CONSTRUCT A NEW A LANE NOTES 1: THE VWWNM DEPARTMENT OF TRANSPORTATION OMATION IS OFF ME END gOMWAY APPROXIMATELY U1p0 FEET TO 2000 FEEF OFF THE END OF RUNWAY µ THE PROP09Al WILL REWIRE THE RELEASE OF APPROXIMATELY U ACRES OF E%ISTINO NRPoM PROPE.."O L LAND RELEASE IS IDENTIFIED AS PARCEL ES ON THE NRPORT PROPERTY MAP. 2: THERE ME NO KNOWN THRESHOLD BRING SURFACE OBJECT PENETRATIONS OHECKED BY: JCL/A DA}E JAUUART ZOOl NO. REVISIONS BY/DATE FM/DATE DOAV/DATE WRM/I i EXISTING AIRPORT LAYOUT PLAN WINCHESTER REGIONAL AIRPORT APPROVALS EXHIBIT 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Land Acquisition — Preliminary Phase Parcels 31, 46 & 53 Date Prepared: October 7, 2004 Agency: Winchester Regional Airport Agency Contact Person: Serena R. Manuel Phone Number: (540) 662-5786 Location of Project: Bufflick Road Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Preliminary work to acquire three parcels along Bufflick Road identified on the Airport Property Map as parcels 31, 46 & 53 was completed in FY 2005 and funding for fee simple acquisition is budgeted in FY 2005. Actual acquisition of properties will carry over into FY 2006. Property is included in the current Twenty -Year Master Plan and is to be acquired for noise abatement. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. FY 2003 — 2004 Preliminary Costs (Surveys, appraisals, EDDA, etc.) Completed FY 2005 FY 2004 — 2006 Actual land acquisition costs may carry over with an increase into FY 2006 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 17 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Phase I of this project is in included in the CIP and is rated as four under the County Priority system. Funding grant through the Virginia Department of Aviation was awarded August 2004. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1St FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, Surveying, & Design Land Acquisition $700,000 $165,000 $865,000 Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL $700,000 $165,000 $865,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate_.) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 18 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd 4th FY 5th FY Beyond TOTAL 2005 2006 FY 2008 2009 FY 2010 2007 General Fund $14,000 $3.300 $17,300 Other Fund Federal Grant $665,000 $156,750 $821,750 State Grants $21,000 $4,950 $25,950 Bonds and Debts Other Fund-raising TOTAL 11 $700,000 $165,000 $8651000 Please describe the source of funding (i.e. type of grant): FY 2004 Local Share State Grant — Virginia Department of Aviation Federal Grant — Federal Aviation Administration FY 2005 Local Share State Grant — Virginia Department of Aviation Federal Grant — Federal Aviation Administration FY 2006 Local Share State Grant — Virginia Department of Aviation Federal Grant — Federal Aviation Administration $1,000(2%) $4,000(8%) $45,000 (90%) $14,000 (2%) $21,000 (3%) $665,000 (95%) $3,300(2%) $4,950(3%) $156,750 (95%) In FY 2006, funding reimbursement from the Federal Aviation Administration is anticipated to be received for expenditures in FY 2005 and FY 2006 resulting :n refunds to the County for monies advanced on this project. 2005-2006 Capital Improvements Plan Project Requests Page 19 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. For several years, development requiring land acquisition at the Winchester Regional Airport has focused on the Runway 32 (southwest) end. With that land acquisition project complete, several parcels within the Runway 14 (northeast) end also need to be acquired. Acquisition is necessary because many of the identified parcels are located within the Airport's FAR Part 77 primary surface and/or approach surface. In addition, several of the residential parcels are located in side the FAA's projected DNL 65 noise contour. The FAA considers residential use within the noise contour non -compatible with airport operations and encourages airport to resolve the non - compatibility through acquisition fee simple where feasible. Please describe and justify the proposed location of the project. N/A 2005-2006 Capital Improvements Plan Project Requests Page 20 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project is within the Airport's Twenty Year Master Development Plan and is within the Airport Support Area identified on Frederick County's Comprehensive Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Parcels 31 and 46 are located adjacent to Runway 14-32. Parcel 31 is located within the FAR Part 77 primary surface. In addition, terrain and other features on both parcels are obstructions the to FAR Part 77 transitional surface. Parcel 53 is located under the western corner of the Runway 14 Runway Protection Zone (RPZ). It is the recommendation of the FAA and the Airport's desire to own in fee simple all land within their RPZ's. These acquisitions will help to clear the approach surfaces for Runway 14 and structures, trees, etc. will be removed as part of this project. 2005-2006 Capital Improvements Plan Project Requests Paue 21 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Yes, under the federal Aviation Administration's Part 77 Surface Requirements, the Airport is required to own fee simple property within the Primary Surface. This requirement is also include in the Code of Virginia 15.2. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Safe and efficient approach systems into the airport are essential in attracting business traffic into this region especially during adverse weather conditions that could produce more revenue for the regional and additional operating revenue for the airport to help the airport be more self- sustaining. 2005-2006 Capital Improvements Plan Project Requests Page 22 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? Project is within the Airport's Twenty Year Master Plan. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Residents living along the northern side of Bufflick Road that have property identified for acquisition were immediately notified upon completion of the Master Plan Update in 1993. They were each provided a copy of an estimated timetable outlining when acquisition proceedings would proceed. Each property owner involved seems to e supportive of the project. Prior to beginning any actual proceedings, each owner involved will be fully advised and met with individually in accordance with Federal Land Acquisition Regulations. 2005-2006 Capital Improvements Plan Project Requests Page 23 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Terminal Building Renovations, Phase H Date Prepared: October 7, 2004 Agency: Winchester Regional Airport Agency Contact Person: Serena R. Manuel Phone Number: (540) 662-5786 Location of Project: Winchester Regional Airport Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The General Aviation Terminal building was constructed in 1992. Over the past 12 years, new and existing companies, State, Federal and local agencies, and the public have used the terminal building extensively. The building is beginning to show several areas of wear that need to be addressed including the delaminating of the exterior surface and leaking of the roof. In addition, the existing HVAC system is approaching the end of its useful life and needs to be replaced. There are places within the public lobby of the terminal building that leak rather badly and several areas of the ceiling have actually fallen down after becoming soaked with rainwater. Ceiling tiles are constantly being replaced within the office areas. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. An evaluation of the facility is being conducted in FY 2005. A qualified architect will determine the condition of all components of the building and a priority schedule for addressing renovations along with cost estimates and recommendations on what renovation efforts would be most beneficial. Realizing that such renovations are relatively expensive, the project will likely have to be completed over time once the evaluation and recommendations are completed. FY 2005 — Evaluation of Facility FY 2006 — Renovation of Facility 2005-2006 Capital Improvements Plan Project Requests Page 38 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. An evaluation of the terminal building and its components, is funded in FY 2005 budget and a State grant has been received for $40,000 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: 2005-2006 Capital Improvements Plan Project Requests Page 39 Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element V FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, Surveying, & $50,000 $50,000 Design Land Acquisition Site Preparation & Improvements Construction $500,000 $500,000 Furniture and Equipment Other (opening day collection) TOTAL $50,000 $500,000 1$550,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 40 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2005 2006 2007 2008 2009 FY 2010 General $10,000 $100,000 $110,000 Fund Other Fund State Grants $40,000 $400,000 $440,000 Bonds and Debts Other Fund- raising TOTAL $50,000 $500,000 $550,000 Please describe the source of funding (i.e. type of grant): FY 2005 Local Share — Local Jurisdictions State Grant — Virginia Department of Aviation FY 2006 Local Share — Local Jurisdictions State Grant — Virginia Department of Aviation $10,000 (20%) $40,000 (80%) $100,000 (20%) $400,000 (80%) 2005-2006 Capital Improvements Plan Project Requests Page 41 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. The terminal building is over twelve years old and is in need of renovation in order to prevent further deterioration and to protect the local jurisdictions and the State's investment. The flat roof needs to be repaired in order to prevent the interior of this building from further damage. Funds to construct the terminal building were received by the State Department of Aviation in 1989 and it is the responsibility to maintain and preserve this facility under conditions of the original grant. Please describe and justify the proposed location of the project. N/A 2005-2006 Capital Improvements Plan Project Requests Page 42 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? N/A Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? There are several areas within the building that sections of tile or drywall from the ceiling have fallen when wet. Leaks are repeatedly fixed however, it has been determined that there are also structural improvements that must be made in order to prevent further damage and deterioration. 2005-2006 Capital Improvements Plan Project Requests Page 43 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? As a condition to receiving funding from a State Grant, there is an obligation to maintain the facility constructed with State funds. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? The terminal building serves as the front door to this community with a positive impression made on businesses and travelers arriving at the Winchester Regional Airport. It is a valuable asset used to promote this region to enhance economic development and tourism. 2005-2006 Capital Improvements Plan Project Requests Page 44 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? Phase I for an evaluation to determine the scope of the renovation is in the FY 2005 budget. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. N/A 2005-2006 Capital Improvements Plan Project Requests Page 45 C�. • 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Land Acquisition — Preliminary Phase Parcels 47, 47A & 48 Date Prepared: October 7, 2004 Agency: Winchester Regional Airport Agency Contact Person: Serena R. Manuel Phone Number: (540) 662-5786 Location of Project: Bufflick Road Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Preliminary work to acquire three parcels along Bufflick Road identified on the Airport Property Map as parcels 47, 47A & 48. Property is included in the current Twenty -Year Master Plan and must be acquired to meet noise abatement requirements. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. FY 2004 — 2005 Preliminary Costs (Surveys, appraisals, EDDA, etc.) FY 2005 — 2006 Actual land acquisition costs Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. W&AI 2005-2006 Capital Improvements Plan Project Requests Page 24 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This project was rated as number 6 in the County CTP. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1s` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, $65,000 $65,000 Surveying, & Design Land $800,000 $800,000 Acquisition Site Preparation Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL $65,000 $800,000 $865,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "I relizxanary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 25 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2005 2nd FY 2006 3rd FY 2007 4th FY 2008 5th FY 2009 Beyond FY 2010 TOTAL General Fund $13,000 $160,000 ($155,700) $17,300 Other Fund Federal Grant State Grants $52,000 $640,000 $821,750 ($666,050) $821,750 $25,950 Bonds and Debts Other Fund-raising TOTAL $65,000 $800,000 $-0- $865,000 Please describe the source of funding (i.e. type of grant): FY 2005 Local Share $52,000 (20%) State Grant — Virginia Department of Aviation $13,000 (80%) FY 2006 Local Share $160,000 (20%) State Grant — Virginia Department of Aviation $640,000 (80%) In FY 2007 funding reimbursement from the Federal Aviation Administration is anticipated to be received for expenditures in FY 2005 & FY 2006 resulting in the local share being reduced from (20%) to (2%) with a refund due to the County on the local share in the amount of $155,700 2005-2006 Capital Improvements Plan Project Requests Page 26 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. For several years, development requiring land acquisition at the Winchester Regional Airport has focused on the Runway 32 (southwest) end. With that land acquisition project complete, several parcels within the Runway 14 (northeast) end also need to be acquired. Acquisition is necessary because many of the identified parcels are located within the Airport's FAR Part 77 primary surface and/or approach surface. In addition, several of the residential parcels are located in side the FAA's projected DNL 65 noise contour. The FAA considers residential use within the noise contour non -compatible with airport operations and encourages airport to resolve the non - compatibility through acquisition fee simple where feasible. Please describe and justify the proposed location of the project. N/A 2005-2006 Capital Improvements Plan Project Requests Yage 27 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project is within the Airport's Twenty Year Master Development Plan and is within the Airport Support Area identified on Frederick County's Comprehensive Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Parcels 47, 47A and 48 are located adjacent to Runway 14-32 within the FAR Part 77 primary surface. In addition, terrain and other features on both parcels are obstructions to the FAR Part 77 transitional surface. It is the recommendation of the FAA and the Airport's desire to own in fee simple all land within their RPZ's and primary surfaces. These acquisitions will help to clear the approach surfaces for Runway 14 and structures, trees, etc. will be removed as part of this project. 2005-2006 Capital Improvements Plan Project Requests Page 28 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Yes, under the federal Aviation Administration's Part 77 Surface Requirements, the Airport is required to own fee simple property within the Primary Surface. This requirement is also include in the Code of Virginia 15.2. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Safe and efficient approach systems into the airport are essential in attracting business traffic into this region especially during adverse weather conditions that could produce more revenue for the regional and additional operating revenue for the airport to help the airport be more self- sustaining. 2005-2006 Capital Improvements Plan Project Requests Page 29 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? Project is within the Airport's Twenty Year Master Plan. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Residents living along the northern side of Bufflick Road that have property identified for acquisition were immediately notified upon completion of the Master Plan Update in 1993. They were each provided a copy of an estimated timetable outlining when acquisition proceedings would proceed. Each property owner involved seems to be supportive of the project. Prior to beginning any actual proceedings, each owner involved will be fully advised and met with individually in accordance with Federal Land Acquisition Regulations. 2005-2006 Capital Improvements Plan Project Requests Pabe 30 • • J 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Upgrade Airfield Lighting Date Prepared: October 7, 2004 Agency Contact Person: Serena R. Manuel Agency: Winchester Regiorial Airport Phone Number: (540) 662-5786 Location of Project: Winchester Regional Airport Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes.Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Upgrade Medium Intensity Runway Lighting (MIRL) to High Intensity Runway Lighting (HIRL) and upgrade 2 -Box Precision Approach Path Indicator (PAPI) to 4 -Box PAPL Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The design phase is scheduled for FY 2005 with the construction phase scheduled for FY 2006 depending upon available State/Federal funding. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This project is included in the current CIP rated as number 3 under the County Priority System. This project will be delayed until Federal funding becomes available. Estimate Cost (in 2003 dollars): PROPOSED EXPENDITURES Element 1s` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, $50,000 $50,000 Surveying, & Design Land Acquisition Site Preparation & Improvements Construction $150,000 $150,000 Furniture and Equipment Other (opening day collection) TOTAL $50,000 $150,000 $200,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 4 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd 4th FY 5th FY Beyond TOTAL 2005 2006 FY 2008 2009 FY 2010 2007 General Fund $1,000 $3,000 $4,000 Other Fund Federal Grants $45,000 $135,000 $180,000 State Grants $4,000 $12,000 $16,000 Bonds and Debts Other Fund-raising TOTAL $509000 $150,000 $200,000 Please describe the source of funding (i.e. type of grant): Local Share — Local Jurisdictions State Grant — Virginia Department of Aviation Federal Grant — Federal Aviation Administration $4,000(2%) $16,000 (8%) $180,000 (90%) 2005-2006 Capital Improvements Plan Project Requests Page 5 �-oma Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. Recent improvements at the airport have enhanced all-weather and nighttime operations capability. Included in these improvements was the recent installation and commissioning of the airport's precision instrument landing system that has increased use of the airport by jet aircraft. FAA in Advisory Circular No. 150/5340-24 recommends that runways with precision approaches have high intensity runway edge lights (HIRLs) installed and that a 4 -Box visual approach aid be installed on runways with jet operations. Please describe and justify the proposed location of the project. N/A 2005-2006 Capital Improvements Plan Project Requests Page 6 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project is within the Airport's Twenty -Year Master Development Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Upgrade of the airfield lighting system will enhance the approach system into the Winchester Regional Airport providing pilots with faster traveling aircraft the ability to see the airport from a further distance out. 2005-2006 Capital Improvements Plan Project Requests Page 7 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Although not mandated, this project will meet the FAA's design standards and recommendation for airport with the type of precision instrument landing system in place at Winchester Regional Airport. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Approach systems at an airport that are safe and efficient could attract more business traffic to this region especially during adverse weather or nighttime operations. An increase in traffic could also produce more operating revenue for the airport. 2005-2006 Capital Improvements Plan Project Requests Page 8 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This project will complete the entire precision instrument land system already installed. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. N/A 2005-2006 Capital Improvements Plan Project Requests Page 9 C C� • 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Land Acquisition — Preliminary Phase Parcels 50, 51 & 52 Date Prepared: October 7, 2004 Agency Contact Person: Serena R. Manuel Location of Project: Bufflick Road Agency: Winchester Regional Airport Phone Number: (540) 662-5786 Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Preliminary work to acquire three parcels along Bufflick Road identified on the Airport Property Map as parcels 50, 51 & 52. Property is included in the current Twenty -Year Master Plan and is to be acquired to meet noise abatement requirements. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. FY 2006 — 2007 Preliminary Costs (Surveys, appraisals, EDDA, etc.) FY 2007 — 2008 Actual land acquisition costs Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 31 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This project was rated as number 7 in the County's CIP. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element I" FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 $50,000 Planning, $50,000 Surveying, & Design $300,000 $300,000 Land Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening clay collection) $50,000 $300,000 $350,000 TOTAL Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 32 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2005 2nd FY 2006 3rd FY 2007 4th FY 2008 5th FY 2009 Beyond FY 2010 TOTAL General Fund $10,000 $60,000 ($63,000) $7,000 Other Fund Federal Grant State Grants $40,000 $240,000 $332,500 ($269,500) $332,500 $10,500 Bonds and Debts Other Fund-raising TOTAL $50,000 $300,000 $-0- $350,000 Please describe the source of funding (i.e. type of grant): FY 2007 Local Share $10,000 (20%) State Grant — Virginia Department of Aviation $40,000 (80%) FY 2008 Local Share $60,000 (20%) State Grant — Virginia Department of Aviation $240,000 (80%) In FY 2009 funding reimbursement from the Federal Aviation Administration is anticipated to be received for expenditures in FY 2006 & FY 2007 resulting in the local share being reduced from (20%) to (2%) with a refund due on the local share of $63,000 2005-2006 Capital Improvements Plan Project Requests Page 33 i Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. For several years, development requiring land acquisition at the Winchester Regional Airport has focused on the Runway 32 (southwest) end. With that land acquisition project complete, several parcels within the Runway 14 (northeast) end also need to be acquired. Acquisition is necessary because many of the identified parcels are located within the Airport's FAR Part 77 primary surface and/or approach surface. In addition, several of the residential parcels are located in side the FAA's projected DNL 65 noise contour. The FAA considers residential use within the noise contour non -compatible with airport operations and encourages airport to resolve the non - compatibility through acquisition fee simple where feasible. Please describe and justify the proposed location of the project. N/A 2005-2006 Capital Improvements Plan Project Requests Page 34 Conformance to the Comprehensive flan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project is within the Airport's Twenty Year Master Development Plan and is within the Airport Support Area identified on Frederick County's Comprehensive Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Parcels 50, 51 and 52 are located adjacent to Runway 14-32 and are located within the FAR Part 77 primary surface. In addition, terrain and other features on both parcels are obstructions the to FAR Part 77 transitional surface. These parcels are located under the western corner of the Runway 14 Runway Protection Zone (RPZ). It is the recommendation of the FAA and the Airport's desire to own in fee simple all land within their RPZ's. These acquisitions will help to clear the approach surfaces for Runway 14 and structures, trees, etc. will be removed as part of this project. 2005-2006 Capital Improvements Plan Project Requests Page 35 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Yes, under the federal Aviation Administration's Part 77 Surface Requirements, the Airport is required to own fee simple property within the Primary Surface. This requirement is also include in the Code of Virginia 15.2. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Safe and efficient approach systems into the airport are essential in attracting business traffic into this region especially during adverse weather conditions could produce more revenue for the regional and additional operating revenue for the airport to help the airport be more self- sustaining. 2005-2006 Capital Improvements Plan Project Requests Page 36 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? Project is within the Airport's Twenty Year Master Plan. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Residents living along the northern side of Bufflick Road that have property identified for acquisition were immediately notified upon completion of the Master Plan Update in 1993. They were each provided a copy of an estimated timetable outlining when acquisition proceedings would proceed. Each property owner involved seems to be supportive of the project. Prior to beginning any actual proceedings, each owner involved will be fully advised and met with individually in accordance with Federal Land Acquisition Regulations. 2005-2006 Capital Improvements Plan Project Requests Page 37 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Airfield Maintenance Building — Design & Construction Date Prepared: October 7, 2004 Agency: Winchester Regional Airport Agency Contact Person: Serena R. Manuel Phone Number: (540) 662-5786 Location of Project: Winchester Regional Airport Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This project includes demolition of an old and undersized wooden structure formerly used to house maintenance equipment and the design and construction of a new facility. It will be large enough to accommodate the airport's maintenance equipment and designed to allow staff to perform preventive maintenance work. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project should be started and completed within the same fiscal year provided that State funding is available. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 10 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This project was rated as number 5 on the County Priority system. Estimate Cost (in 2004 dollars). PROPOSED EXPENDITURES Element V FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, $50,000 $50,000 Surveying, & Design Land Acquisition Site Preparation & Improvements Construction $250,000 $250,000 Furniture and Equipment Other (opening day collection) TOTAL $300,000 $300,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page I I Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2005 2006 2007 2008 2009 FY 2010 General $210,000 $210,000 Fund Other Fund State Grants $90,000 $90,000 Bonds and Debts Other Fund- raising TOTAL $300,000 $300,000 Please describe the source of funding (i.e. type of grant): State Grant — Virginia Department of Aviation — Design Only $40,000 (80%) Local Share — Local Jurisdictions $10,000 (20%) State Grant — VDOA construction (at this time only 1,250sf is eligible for reimbursement based on an estimated $50sf) $50,000 Local Share — Local Jurisdictions $200,000 2005-2006 Capital Improvements Plan Project Requests Page 12 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. Continuing expansion and improvements to the airport increased the demand to provide larger and more reliable maintenance equipment in order to properly maintain the airport. The airport owns various pieces of equipment and vehicles to handle aircraft towing, deicing equipment, cutting grass, snow removal operations, airfield and building maintenance. Room to store and maintain vehicles and equipment is inadequate resulting in the airport having to use two aircraft t -hangars that could be generating over $6,000 annually in revenue. In an effort to streamline operations and reduce operating costs, two staff position were created to perform light to medium maintenance on all airport owned buildings and equipment. One hangar is used as a temporary shop and does not provide adequate electrical service, heat and water/sewer facilities. The wooden structure previously used as a storage facility is undersized and was not constructed for the purpose of maintaining the types of equipment used by the airport nor does it have any utilities. Please describe and justify the proposed location of the project. N/A 2005-2006 Capital Improvements Plan Project Requests Page 13 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project is within the Airport's Twenty-year Master Development Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This facility will provide a safe, appropriate and efficient working environment for airport maintenance technicians to service and maintain airport equipment. VV-Lvvo k.apitat improvements Plan Project Requests Page 14 Page Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? N/A Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? An airfield maintenance/storage facility will allow the airport to generate additional revenue by leasing the hangar space to aircraft owners. The facility will allow for airport owned equipment to be properly and securely stored out of the weather which should help reduce maintenance costs and extend the life of the equipment that is maintained and purchased from operating revenues. 2005-2006 Capital Improvements Plan Project Requests Page 15 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? M Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. N/A 2uu5-2006 Capital Improvements Plan Project Requests Page 16 CLARK-EAUQUIER- ERE ERICK-WINCHESTER REGIONAL JAIL C F F W CLARKE e FAUQUIER o FREDERICK t, WINCHESTER REGIONAL ADULT DETENTION CENTER Fred D. Hildebrand Main Facility — 141 Fort Collier Road u Winchester, VA 22603 Superintendent Work Release Facility — 143 Fort Collier Road • Winchester, VA 22603 (540)665-6374 Bruce R. Conover FAX: (504) 665-1615 Assistant Superintendent Records FAX: (540) 665-5691 Work Release FAX: (540) 678-1339 MEMORAMBUM TO: Susan K. Eddy, Senior Planner Frederick County Department of Planning & Development FROM: Fred D. Hildebrand, Supenntendenq,,',)A&J DATE: September 1, 2004 SUBJECT: 2005-2006 CIP Attached is our draft project request. Also attached is a copy of our Community Based Corrections Plan (needs assessment). With all of the committees, boards and regulatory entities involved in our project, I have exhausted my supply of Planning Studies, however, will send you a copy within the next couple of weeks. After you review our request, please let me know how many copies of the Planning Study and Community Based Corrections Plan you will require, so I can order them from the architect. Thank you for your assistance. �C EIWE, SEF 7 2004 FREDERICK COUNTY PLANNING & DEVELOPMENT 2005-2006 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: CFFW Community Corrections Center (CCC) Date Prepared: August 27, 2004 Agency: CFFW Regional Jail Agency Contact Person: Fred D. Hildebrand Phone Number: 540-665-6374 Location of Project: Fort Collier Industrial Park Magisterial District: Stonewall Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The Clarke-Fauquier-Frederick-Winchester Regional Jail Board proposes the construction of a 44,000 square foot, 204 -bed Community Corrections Center on an 11.4 -acre parcel of land adjacent to the eastern boundary of its property located at 141 Fort Collier Road in Frederick County. The facility will be developed, constructed and financed in accordance with a Comprehensive Agreement between the City of Winchester and Howard Shockey & Sons, Inc., submitted and accepted under the Public -Private Education Facilities and Infrastructure Act of 2002. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project will be complete in 2004. Job Summary 1. Unsolicited PPEA Proposal Submitted 2. 45 day Advertisement 3. Community Based Corrections Plan 4. Planning Study 5. Construction Moratorium Waiver from General Assembly 6. Approval of Comprehensive Agreement 7. Design Development 8. Value Engineering 9. Construction Drawings Substantial Completion July 2003 September 15, 2003 March 2004 March 2004 April 2004 August 2004 October 15, 2004 October 15, 2004 November 5, 2004 2004-2005 Capital Improvements Plan Project Requests Page 1 10. Planning Study Approval November 2004 11. Treasury Department Approval November 2004 12. Contractor's Final Pricing December 3, 2004 13. Owner's Review & Acceptance of Cost January 14, 2005 14. Site & Building Permit Review February 4, 2005 15. General Assembly Reimbursement Approval April 2005 16. Construction August 19, 2005 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon another project. Frederick County Public Works Department plans to construct and operate an animal shelter on the southeast corner of the 11 acre parcel. General maintenance and cleaning will be provided by the Regional Jail inmates. Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This project was presented in the 2004-2005 CIP. It is the only existing project. Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 1S` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2005 2006 2007 2008 2009 FY 2010 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (Contingency) 2004-2005 Capital Improvements Plan Project Requests Page 2 TOTAL Total Cost $56,600 $113,200 $113,200 1 $113,200 $1,867,800 $2,264,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) The figures are a preliminary estimates provided by Shockey. Updated figures will be provided to the participating jurisdictions at 35, 65 and 100% design completion. TOTAL $7,650,000.00 The Comprehensive Agreement provides financing by the contractor, Howard Shockey & Sons, Inc., as follows. Bond Insurance Total Cost Planning, Survey & Design $612,000.00 Land Acquisition $338,400.00 Site Preparation & Improvements $250,000.00 Construction $5,418,000.00 F,F & E $527,600.00 Other (Contingency & Construction 135,195 Management)) $504,000.00 TOTAL $7,650,000.00 The Comprehensive Agreement provides financing by the contractor, Howard Shockey & Sons, Inc., as follows. Bond Insurance $ 150,221 Debt Service Reserve Fund $ 696,920 Capitalized Interest $ 431,878 Project Construction $7,650,000 Cost of Issuance $ 135,195 Rounding Amount $ 786 Total Financed $9,065,000 2004-2005 Capital Improvements Plan Project Requests Page 3 The participating political subdivisions are the Counties of Clarke, Fauquier and Frederick, and the City of Winchester. By agreement between all jurisdictions, the City of Winchester will serve as fiscal agent for this capital project and will represent the interests of all parties. The Community Corrections Center is being financed through a Comprehensive Agreement resulting from an unsolicited proposal submitted in accordance with the Public -Private Education Facilities and Infrastructure Act of 2002. The Design/Builder will finance (only the locality's share of the project) and construct the facility, with payments made by the Owner in equal installments over a 20- year period. Installments will commence the month construction is complete and the facility is accepted by the owner. There will be a one-year construction period with capitalized interest during construction. There will be a procurement of bond insurance from a AAA rated national provider. Bonds will be secured by a lease agreement. Debt Service will be divided by the participating political subdivisions based on the average prisoners per day for each parry for the preceding three fiscal years, divided by the total average prisoner per day of all the parties for the same period of time. The current percentages are as follows: Clarke 6.57% Fauquier 22.29% Frederick 32.57% Winchester 38.57% The portion to be reimbursed by the Commonwealth will initially be financed by borrowing from a local bank using a short-term debt instrument (bond anticipation note/grant) and will be satisfied when reimbursement is received. Frederick County's annual share of the lease/purchase debt service, without state reimbursement will by $695,120 x 32.57% _ $226,400. Until we receive reimbursement figures from the State, (for the sake of simplicity) we will assume a 50% reimbursement from the Commonwealth and reduce the financed amount to $113,200. As an alternative, the Comprehensive Agreement allows the owner to finance the project. Therefore, it is possible for Winchester or one of the other participating political subdivisions to issue a debt instrument or otherwise fund the owners portion of debt, thus, eliminating some of the costs associated with contractor financing. 2004-2005 Capital Improvements Plan Project Requests Page 4 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2005 2006 2007 2008 2009 FY 2010 General $56,600 $113,200 $113,200 $113,200 $1,867,800 $2,264,000 Fund Other Fund $117,180 $234,360 $234,360 $234,360 $3,866,940 $4,687,200 State Grants $3,825,000 $3,825,000 Bonds and Debts Other Fund- raising TOTAL $3,998,780 $347,560 $347,560 $347,560 $5,734,120 $10,776,200 Please describe the source of funding (i.e. type of grant): §§ 53.1-80 through 53.1-82.3, Code of Virginia, regulate the methods for state reimbursement of correctional construction for Virginia localities. In summary, localities operating regional jails may submit to the Treasury on or before July 1 biennially in odd numbered years the anticipated capital costs and the Governor may submit his recommendations for funding such projects as part of the budget bill on or before December 20 of the year immediately prior to the beginning of each regular session held in an even -numbered year of the General Assembly. Requests for appropriations of such funds shall be considered by the General Assembly only in even - numbered years. We submitted budget amendment language during the 2004 Session of the General Assembly that allowed us to submit our reimbursement request one year earlier than currently allowed by law. We anticipate that 50 % capital reimbursement will be included in the Governor's Budget for FY 2006 to be approved by the General Assembly during its 2005 Session. Capital costs include, but are not limited to, actual construction costs, costs of land acquisition, if the land purchased is used exclusively for the jail facility, architectural and engineering fees, and fixed equipment. Capital costs do not include administrative costs nor a financial advisor, an investment banker, or attorney fees incurred by local governments. Reimbursement may be "lump sum" or over a period of time specified by contract. 2004-2005 Capital Improvements Plan Project Requests Page 5 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The Regional Adult Detention Center has a designed capacity of 265 inmates. The current population exceeds 470 during the week and reaches nearly 500 on the weekends. The proposed Community Corrections Center will be designed to house approximately 204 low-risk prisoners including work release, community inmate workforce and additions treatment participants. The current work release center will be converted to house 72 medium custody prisoners. This will increase the cumulative operating capacity to 480 (204 in the main facility, 72 in Annex A and 204 in the CCC). Please describe the need for this project. (A formal needs assessment has been developed and is attached. § 53.1-82.3, Code of Virginia, requires localities to submit a Community Based Corrections Plan and Planning Study prior to capital reimbursement requests.) During the first 8 years of operation, the average daily inmate population at the Regional Jail increased by approximately 3 % per year. In FY 99 the ADP was 13 % below the operating capacity of 265. In FY 2000 the Regional Jail exceeded its operating capacity with an average daily inmate population of 275. In just a little over 3 years the population has increased by 200, now 79 % over rated capacity. Average Daily Population 500 450 354 388 400 350 275 280 300 250 200 150 FY00 FY02 Current In response, the Regional Jail Board has adopted overcrowding policies and an Overcrowding Planof Action. Initiatives include moving prisoners to other jails, double bunking, jail alternative programs, creating a cooperative classification agreement with the Department of Corrections, and jail expansion. Our localities currently operate nearly every jail alternative allowed by `Jiiginia statute. We have maximized the use of each of these programs. In addition, many of the cells which were designed for single occupancy have been double bunked. Inmates are currently housed on the 2004-2005 Capital Improvements Plan Project Requests Page 6 floors of housing unit day rooms, multipurpose/recreation rooms, and classrooms. Overcrowding has deleteriously impacted operations and created an extremely dangerous environment for both staff and inmates. Jail expansion is the only remaining remedy available. Community Based Corrections Plan The Community Based Corrections Plan was developed by Powell Consulting Services of Richmond, Virginia. It has been submitted to the Virginia Department of Corrections and will be considered by the Virginia Board of Corrections, either in September or November of 2004. Approval is required for state reimbursement of jail construction. To summarize, the report indicates that our jail population will increase to 599 in 2007 and 977 by 2017. The report recommends that the Jail Board expand its facilities to meet the future need identified above and concludes that expansion qualifies for 50% reimbursement from the state. Immediate expansion includes the 204 -bed Community Corrections Center and a 96 -bed expansion to the existing detention center. Planning Study The Planning Study was prepared by Hayes, Seah, Mattern & Mattern, Inc., of Virginia Beach. Using the projections in the Community Based Corrections Plan, this document recommends a Phase I plan that provides for 300 new beds, the 204 -bed Community Corrections Center and a 96 -bed expansion to the existing facilities (3`d Pod). The 3`d Pod would be a 32,990 square foot, direct supervision housing unit and is estimated to cost $8,818,283. It recognizes the need to plan for the 2017 projections (Phase II) and defers such planning until 2007-2008. 2004-2005 Capital Improvements Plan Project Requests Page 7 Please describe and justify the proposed location of the project. The existing detention facilities are located on a 22 -acre parcel in Fort Collier Industrial Park. The only unencumbered space available large enough for a 44,000 square foot building is designated for expansion of the secure detention facility. That expansion remains an integral component of the Jail Board's plan to meet future needs. Adjacent to the detention facilities is an 11.4 -acre lot that is owned by James L. McIlvaine. Mr. McIlvaine has given the Regional Jail Board an option to purchase the property at $30,000 per acre, well below market value. Co -locating correctional facilities creates a tremendous amount of operational efficiency and cost savings. Coordinating inmate transports, food service operations, maintenance, medical services, and security staff scheduling are some of the components affected by co -location. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? Future detention facilities are not currently included in the Comprehensive Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Health and safety will improve dramatically. Inmates are currently assigned to mattresses on the 2004-2005 Capital Improvements Plan Project Requests Page 8 floor in areas not designed for housing. Lavatory and shower facilities are insufficient for the population. The inability to secure prisoners creates an extremely dangerous environment for staff. Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The current facilities do not meet occupancy ordinances or correctional standards related to occupancy. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? M Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? The project would increase operating expenses. There is potential for generating additional revenue by housing additional federal & state pre-release prisoners in the CCC. Approximately 28 new jobs are created. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This is not part of another project. There is potential for sharing the property with other government agencies. For example, the Sheriff s Department could operate satellite facilities at this location. The Frederick County Public Works Department in planning to build and operate an animal shelter on the same site. 2004-2005 Capital Improvements Plan Project Requests page 9 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Local media has reported overcrowding and jail expansion regularly for approximately three years. The only public response has been strong opposition to locating a correctional facility in downtown Winchester. Establishment of a correctional facility normally involves a volatile mix of public controversy and technical and financial considerations that are found in no other public facility with the possible exception of landfills. However, since facilities already exist on this site, no public opposition is anticipated. 2004-2005 Capital Improvements Plan Project Requests Page 10 Clarke-Fauquier-Frederick-Winchester Regional Adult Detention Center In addition to describing existing facilities and related programs, this section outlines the Jail Board's plan of action for overcrowding and delineates future needs of correctional programming. Facilities Since March 1999 the Clarke-Fauquier-Frederick-Winchester Regional Jail Board has operated a 192 bed direct supervision adult detention center and a 73 -bed work release center, both located on a 22 -acre parcel of land in Fort Collier Industrial Park, just northeast of the City of Winchester, Virginia. The property is owned jointly by the Counties of Clarke, Frederick and the City of Winchester. These facilities were designed to serve the comprehensive adult detention needs of the Counties of Clarke and Frederick, and the City of Winchester. While operating a local jail in Warrenton, Virginia, Fauquier County is a parry to the Regional Jail Agreement, using the facilities primarily to house sentenced inmates. Co -located on the site, is a 32 -bed juvenile detention center that is owned and operated by the Northwestern Regional Juvenile Detention Commission and serves the Counties of Page, Shenandoah, Warren, Clarke, Frederick and the City of Winchester. The existing facilities house all inmates sentenced or awaiting trial in the three founding jurisdictions and the sentenced inmates from Fauquier County. In addition, approximately 20 federal prisoners are held by contract to generate additional revenue for the participating political subdivisions. Population By. Jurisd�cior� During the first 8 years of operation, the inmate population at the detention center increased at a marginal and predictable rate, approximately 3% per year. The jail first reached its operating capacity in 2000, with an average daily population of 275. Since then, population has grown by 200 inmates, now exceeding capacity by 79 Bio. 2004-2005 Capital Improvements Plan Project Requests Page 11 Clarke-Fauquier-Frederick-Winchester Regional Adult Detention Center In August 2002 the Jail Board adopted a plan of action that included the following components. 1. Increase Staff 2. Participate in State -Responsible Inmate Classification 3. Double Bunk Cells 4. Implement Weekend Confinement Work Program 5. Create a Transitional Jail Sentence Program 6. Maximize Use of Pre -Trial Services Program 7. Create Community Corrections Facility 8. Relocate Work Release 9. Construct 96 -Bed Secure Bed Pod Addition The first six initiatives have been implemented. Jail alternative programs operated by the participating jurisdiction include, community corrections, community service, pretrial services, alcohol safety action program, home electronic incarceration, and a public inebriate center. The cumulative average daily number of participants is 330. The use of all diversion and alternative programs has been maximized. Current and Future Capital Needs The Regional Jail is currently 79 % over its rated capacity and the population is continuing to increase at an alarming rate. A comprehensive plan of action has been implemented that includes capital expansion. In addition to the current request for construction of a community corrections center, the Jail Board plans to build a 96 -bed expansion to the secure detention center in FY 2007. With both new projects complete, the operating capacity of the jail will be 565. 2004-2005 Capital Improvements Plan Project Requests Page 12 Clarke-Fauguier-Frederick-Winchester Regional Adult Detention Center SECURE DETENTION EXPANSION Size: 32,990 sq. ft. 96 bed facility Administrative Responsibility: CFFW Regional Jail Board Purpose: The purpose of this project is to accommodate projected growth in inmate population. Location: This project will be connected to the existing secure detention center. The core facilities were designed to support the expansion and land was acquired during initial construction. Function: The expansion will be partially designed for direct supervision housing. It will also include a segregation unit, classification and negative air flow facilities. Both indoor and outdoor recreation facilities will be attached to the housing unit. It will be nearly identical in design to existing units within the detention center, but will provide some additional program space to be used for the entire detention population. Estimated Cost in 2004 Figures: $8,818,283 2UU4-2UU5 Capital Improvements Plan Project Requests Page 13 ITEM #3 Rural Areas Study Continuation of Policy Formulation Stage Discussion of the second phase of public consultation.