Loading...
013-22 (Rezoning84Lumber) ORDINANCE W - SUN Action: PLANNING COMMISSION: July 20, 2022 Public Hearing Held, Recommended Approval BOARD OF SUPERVISORS: August 10,2022 Adopted ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING#04-22 84 LUMBER WHEREAS,REZONING#04-22 84 Lumber submitted to rezone 2.21-acres from B3 (Industrial Transition)District to the M 1 (Light Industrial)District with proffers,and$.69-acres from the B3 District to the M1 District with proffers,totaling 10.9-acres. These properties are located northwest of the intersection of Martinsburg Pike(Route 11)and Yardmaster Court and are identified by Property Identification Numbers 44-A-75F and 44-A-75G in the Stonewall Magisterial District; and WHEREAS,the Frederick County Planning Commission held a public hearing on this Rezoning on July 20,2022 and recommended approval; and WHEREAS, the Frederick County Board of Supervisors held a public hearing on this Rezoning during their regular meeting on August 10, 2022; and WHEREAS,the Frederick County Board of Supervisors finds the approval of this Rezoning to be in the best interest of the public health, safety, and welfare. NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors, that Chapter 165 of the Frederick County Code, Zoning, is amended to revise the Zoning District Map to rezone 2.21-acres from B3 (Industrial Transition) District to the M 1 (Light Industrial) District with proffers, and 5.69- acres from the B3 District to the M1 District with proffers, totaling 10.9-acres with amended proffer statement bearing signature date June 13,2022. The conditions voluntarily proffered in writing by the Applicant and the Property Owner are attached. This ordinance shall be in effect on the date of adoption.Passed this 101 day of August 2022 by the following recorded vote: Charles S. DeHaven,Jr., Chairman Aye Shawn L. Graber Aye J. Douglas McCarthy Aye Robert W. Wells Aye Josh E. Ludwig Aye Judith McCann-Slaughter Aye Blaine P. Dunn Aye A COPY ATTEST Michael L. Bollhoef Frederick County ninistrator Res No. 013-22 �1GK r COQ REZONING APPLICATION #04-22 84 LUMBER WINCHESTER w Staff Report for the Board of Supervisors ® � Prepared: July 29,2022 „Bwr Staff Contacts: M. Tyler Klein, AICP, Senior Planner 1738 Reviewed Action Planning Commission: 07/20/2022 Recommended Approval Board of Supervisors: 08/10/2022 Pending EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 08/10/22 BOARD OF SUPERVISOR MEETING: This is aproposal to rezone 2.21-acres from B3 (Industrial Transition)Districttothe MI (Light Industrial) District with proffers, and 8.69-acres from the B3 (Industrial Transition) District to the M1 (Light Industrial) District with proffers, totaling 10.9-acres. This rezoning application modifies approved land uses associated with Rezoning Application(REZ)902-05 and removes the requirement for a berm as part of the landscape buffer. The intended use of the proposed M 1 zoned parcels is a manufacturing facility(84 Lumber—truss plant expansion). This site is located within the Sewer and Water Service Area(SWSA) and is located within the limits of the Northeast Land Use Plan of the Comprehensive Plan. The Comprehensive Plan envisions this area of the County as"business."The proposed M 1 (Light Industrial)District is inconsistent with the future land use plan; however, the adjoining property (north) zoning designation is M1, and the proposed rezoning would accommodate expansion of the existing manufacturing operation by the owner/applicant. Following the required public hearing, a decision regarding this rezoning application by the Board o Supervisors would be aggro,2riate. The A,2,2licant should be prepared to adequately address all concerns raised by the Board ofSu,2ervisors. Rezoning 404-22—84 Lumber Winchester July 29,2022 Page 2 This report is prepared by the Frederick County Plannin'-Staff to provide information to the Planninz Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoninz matter. Unresolved issues concerninz this application are noted by staff where relevant throughout this staff report. PROPOSAL: This is a proposal to rezone 2.21-acres from B3 (Industrial Transition)District to the M1 (Light Industrial)District with proffers, and 8.69-acres from the B3 (Industrial Transition)District to the M1 (Light Industrial) District with proffers, totaling 10.9-acres. LOCATION: These properties are located northwest of the intersection of Martinsburg Pike(Route 11) and Yardmaster Court(public roadway)and are identified with Property Identification Numbers (PIN'S) 944-A-75F and 944-A-75G in the Stonewall Magisterial District. MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 44-A-75F & 44-A-75G PROPERTY ZONING: B3 (Industrial Transition) District PRESENT USE: Vacant/Unimproved ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: Single-Family Detached Residential South: B3 (Industrial Transition) Use: Heavy Equipment Sales (James River)/Vacant East: B2 (General Business) Use: Office/Outdoor Storage West: Ml (Light Industrial) Use: Manufacturing (84 Lumber) Rezoning 404-22—84 Lumber Winchester July 29,2022 Page 3 REVIEW EVALUATIONS: Planning & Zoning: 1) Site History The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle) depicts the zoning of the subject parcels as A2 (Agricultural General)District. The County's agricultural zoning districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. In 2004,the Board of Supervisors approved Rezoning Application(REZ)#11-04 which rezoned the properties to the B3 (Industrial Transition) District with proffers. REZ 902-05 (approved May 13,2005)revised the previously approved proffers for the subject properties to modify the proffered uses of the site. 2) Comprehensive Plan The Comprehensive Plan is the guide for the future growth of Frederick County. The Comprehensive Plan is an official public document that serves as the community's guide for making decisions regarding development, preservation, public facilities and other key components of community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans and Appendix I of the Comprehensive Plan are the primary implementation tools and will be instrumental to the future planning efforts of the County. Comprehensive Plan Land Use Compatibility The Northeast Frederick Land Use Plan of the Comprehensive Plan provides guidance on the future development of the property. The Plan identifies the subject properties with a"business" land use designation;the property is also within the limits of the Sewer and Water Service Area (SWSA). The existing B3 (Industrial Transition)zoning is generally consistent with the goals of the Comprehensive Plan. The proposed MI (Light Industrial) zoning on 10.9-acres is inconsistent with future land use map designation ("business"). However, the adjoining property (north) zoning designation is M1 and is also owned by the applicant.The applicant states in the application that the rezoning of 10.9-acres to M1 would enable expansion of the existing manufacturing operation. The intent of the M 1 District is to provide for a variety of light manufacturing, commercial office and heavy commercial uses in well-planned industrial settings. Uses are allowed which do not create noise, smoke, dust or other hazards. Uses are allowed which do not adversely affect nearby residential or business areas. Such industrial areas shall be provided with safe and sufficient access. Rezoning 404-22—84 Lumber Winchester July 29,2022 Page 4 3) Access & Transportation The site will have commercial access from Yardmaster Court(public roadway), as required by approved REZ#02-05 proffers;there will be no direct access from the subject parcels to Route 11. The Concept Drawing included with the application also depicts inter-parcel connectivity to adjoining PIN#44-A-75B, the existing 84 Lumber truss plant and storage yard. The traffic study included with application shows that the proposed manufacturing facility(84 Lumber)does not negatively impact the operations of the existing roadway network(Route 11 & Yardmaster Court). 4) Potential Impacts & Proffers The rezoning proposes a change in the land use of 10.9-acres to the M1 (Light Industrial) District and removes a requirement for earthen berm as part of the required landscape buffer (Proffer D—North Buffer). In lieu of a berm,the applicant has proffered to construct a six(6)- foot (FT) tall opaque fence. All the other proffers, including prohibited uses and site access, associated with the original REZ, #02-05, remain unchanged. Virginia Dept.of Transportation: The documentation within the application to rezone this property (44-A-75G/44-A-75F) from B3 to M1 appears to have little impact on Route 11 (Martinsburg Pike). This route is the VDOT roadway which has been considered as the access to the property referenced. VDOT is satisfied that the transportation proffers offered in the 84 Lumber Truss Plant rezoning application of date April 26, 2022 address transportation concerns associated with this request. Please see attached letter from VDOT dated May 31, 2022 addressed from Lloyd Ingram. Frederick Water: No comment. Please see attached letter from Eric Lawrence, Executive Director, dated May 26, 2022. Frederick County Fire Marshall: Plan approved. Please see attached letter from Adam Hounshell, Lieutenant/Assistant Fire Marshal dated May 19, 2022. Frederick Countv Public Works: We offer no additional comments at this time. Please see attached letter from Joe Wilder, Director of Public Works dated June 6, 2022. County of Frederick Attorney: Please see attached letter from Roderick B. Williams, County Attorney dated May 17, 2022. PLANNING COMMISSION SUMMARY AND ACTION FROM THE 07/20/22 MEETING: The Planning Commission held a public hearing on July 20, 2022. There were no speakers for this Rezoning 404-22—84 Lumber Winchester July 29,2022 Page 5 proposed rezoning application. The Planning Commission in their discussion noted the proposed zoning,MI,was inconsistent with the County's long-range land use plan.However,with the adjoining parcel was zoned M1 and because the proposed rezoning would expand the existing Ml use (manufacturing),the requested rezoning may be appropriate. The Planning Commission recommended approval of the rezoning 10-0-2 (Commissioners Thomas &Markert absent). Following the required public hearing, a decision regarding this rezoning ag,2lication by the Board o Supervisors would be aggro,2riate. The Agglicant should be prepared to adequately address all concerns raised by the Board of Supervisors. REZ # 04 - 22: 84 Lumber PINs: 44 - A - 75F, 44 - A - 75G Rezoning from B3 to M1 Zoning Map r ;*.* s �4u MIX d —.. ' < a' 11 REZ#04-22 m 2r � 4 Q .l �PRS f�7A f�KS Op ND s m 2 Stephenson Application sTFAy Parcels i �oa'� �Je�� 11 FNSONA Sewer and Water Service Area ° m B2(General Business District) B3(Industrial Transition District) N i M1 (Light Industrial District) 1 MH1(Mobile Home Community District) 7 \ N E ! j S Frederick County Planning&Development t _ 107 N Kent St Winchester,VA 22601 540-665-5651 0 125 250 500 Feet Map Created:June 23,2022 REZ # 04 - 22: 84 Lumber PINs: 44 - A - 75F, 44 - A - 75G Rezoning from B3 to M1 Location Map 4l' s. .. •, lid d MIX ♦ NKE 11 44 A 75G k 44 A 75F y� f3(S op - ' MORE�NO Stephenson p�;� o � Application N Parcels 1 Sewer and Water Service Area 7 \ N E ! j S Frederick County Planning&Development t _ 107 N Kent St Winchester,VA 22601 540-665-5651 0 125 250 500 Feet Map Created:June 23,2022 REZ # 04 - 22: 84 Lumber PINs: 44 - A - 75F, 44 - A - 75G Rezoning from B3 to M1 Long Range Land Use Map ,, MW� am ■ 4 / ,;, _ Gam+ MID M1 UM UM 40,116111,ft, u�ui t REZ#04-22 j REZ#04-22 J� m �I GA RoMPS��R NitP f3�3 Aftlif 4"i/ T WW ; UI{17.7 � l MORE�/// NOW Y gN/fq y <N C Q Pe Application Parcels ��� Sewer and Water Service Area ```, r,, 41' e Stephensonsr�AN Long Range Land Use o�`e � 71 NNSON 0 Business NO ® m Mixed Use Industrial/Office Industrial Rural Community Center 1 0 Sensitive Natural Areas ! \ wE ! I S Frederick County Planning&Development t _ 107 N Kent St Winchester,VA 22601 540-665-5651 0 125 250 500 Feet Map Created:June 23,2022 PROFFER STATEMENT REZONING: RZ # Industrial Transition District (133) with Proffers to Light Industrial District (M 1) with Proffers PROPERTY: Tax Parcel # 44-(A)-75F 2.21 acres & Tax Parcel # 44-(A)-75G 8.69 acres RECORD OWNER: Pierce Hardy Limited Partnership (both) APPLICANT: Pierce Hardy Limited Partnership ("Applicant") PROJECT NAME: 84 Lumber Truss Plant Expansion ORIGINAL DATE OF PROFFERS: April 26,2022 REVISED DATE May 17, 2022 REVISED DATE June 13, 2022 Preliminary Matters Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and the provisions of the Frederick County Zoning Ordinance with respect to conditional zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors of Frederick County, Virginia, shall approve Rezoning Application # for the rezoning of combined 10.90 ::L acres from the Industrial Transition (133) District with Proffers to the Light Industrial (M1) District with Proffers, development of the subject property shall be done in conformity with the terms and conditions set forth herein, except to the extent that such terms and conditions may be subsequently amended or revised by the Owner and such be approved by the Frederick County Board of Supervisors in accordance with the said Code and Zoning Ordinance. In the event that such rezoning is not granted, then these proffers shall be deemed withdrawn and will have no effect whatsoever. These proffers shall be binding upon this Owner and their legal successors, heirs, or assigns.Approval of this proffer statement does not eliminate previously approved proffers associated 44- (A)-75C, 44-(A)-75D, 44-(A)-75E and 44- (A)-75F; which were approved under the conditions set forth in RZ #02-05 approved by the Frederick County Board of Supervisors on April 13,2005. However,these proffers will alter the previously approved proffer for current Tax Map Parcels 44-(A)-75F $ 44- (A) 75G . The previous proffer will remain in force for the Property, to the extent that prior proffer is not inconsistent with the current proposed proffer. The subject properties, more particularly described as the lands owned by Pierce Hardy Limited Partnership, being all of Tax Map Parcel 44-(A)-75F & Tax Map Parcel 44- (A) 75 G and further described by Subdivision and Consolidation Plat prepared by Triad Engineering, Inc. dated December 29, 2021 (see attached Consolidation Plat). Page 1 of 4 A.) Generalized Development Plan The Owner hereby proffers to re-develop the combined 10. 90 f acre property in substantial conformance with the attached Geometric Layout and Utility plan for an expansion of the existing adjacent 84 Lumber Truss Plant B.) Vehicle Per Day (VPD) and Land l]se Restrictions l.) Conditional Rezoning Application # Trip generation for the existing and proposed land uses were determined based upon the 11th Edition of the Institute of Transportation Engineers' ("ITE")Trip Generation Report.Accordingly, ITE Land Use Code 812 (Building and Lumber Store & small office buildings) was used to calculate the trips associated with the by- right 84 Lumber and ITE Land Use Code was used to calculate the trips associated with the proposed truss manufacturing plant.The Applicant hereby proffers to restrict development of the combined 10.90 acre property to an amount not to exceed a maximum of 570 VPD. 2.) The Owner hereby proffers to prohibit the following M-1 District land uses within the combined 10.90± acre property: ■ Local and suburban transit and interurban highway passenger transportation. �+ Business associations; membership organizations; and labor unions ■ Motor freight transportation, excluding warehousing and storage ■ Transportation by air ■ Transportation services ■ Truck stops C.) Transportation 1.) Access to Martinsburg Pike (US Route 11) Direct access to Martinsburg Pike (US Route 11) is provided through Yardmaster Court to provide ingress and egress for the c o m b i n e d 10.9 f acre property. All other access will be prohibited Page 2 of 4 2.) Signalization Reference is made to Proffer C4 in 2005 proffers on this property. Owner acknowledges that it will bear a pro rata share of the cost of signalization, should a signal ever be needed. D.) North BuFFer The Owner hereby proffers to construct a six foot high o p a q u e fence as the opaque element within the one-hundred foot wide Category "C" full screen adjacent to tax parcels 44-(A)-76A, 44-(A)- 76B, 44-(A)-76C, &44(A)-76D . E.) Monetary Contribution to Offset Impact of Development The undersigned owner of the above-described property hereby voluntarily proffers that in the event rezoning application # is approved, the undersigned will pay to the Treasurer of Frederick County, Virginia the following amount: $ .015/ building square foot, based upon any additional square footage added for the redeveloped site. This payment is intended to offset the additional cost to Frederick County, and more specifically Frederick County Fire and Rescue, due to an increased demand on public services. The proffer increments will be paid prior to issuance of the building occupancy permits. F.) Signatures The conditions proffered above shall be binding upon the heirs, executors, administrators, assigns and successors in the interest of the Applicant and owner. In the event the Frederick County Board of Supervisors grants this rezoning and accepts the conditions,the proffered conditions shall apply to the land rezoned in addition to other requirements set forth in the Frederick County Code. Page 3 of 4 Respectfully Submitted: WITNESS: A� ' Ji-rrt Zaunick, �y —Vice President Pierce Hardy Limited Partnership COMMONWEALTH OF PENNSYLVANIA SS COUNTY OF WASHINGTON On this, the lyh day offu.& 2022, before me, Tamara Demarino, the undersigned officer, personally appeared Jim Zaunick, who acknowledged h i m self to be the Vice President of Pierce Hardy Limited Partnership, a Pennsylvania Limited Partnership, and that he, as such Vice President, being authorized to do so, executed the foregoing instrument for the purposes therein contained by signing the name of the limited partnership by herself as Assistant Vice President. In witness whereof, I hereunto set my hand and official seal. Notar Public Commonwealth of Pennsylvania-Notary Seal Tamara R.DeMarino,Notary public Washington County My commission expires November 3,2022 Commission number 1225445 Member,Pennsylvania Assobat on of Notaries Page 4 of 4 N 7,136,000 p RAILROAD SITE �Ns�o N Q\��P m M m ���JQo�m m M w N 7,132,000 VICINITY MAP SCALE I"=2000' OWNER'S CERTIFICATE THE ABOVE AND FOREGOING CONSOLIDATION OF THE LAND OF PIERCE HARDY LIMITED PARTNERSHIP AS SHOWN ON THIS PLAT,AND IS WITH THE FREE CONSENT AND IN ACCORDANCE WITH THE DESIRES OF THE UNDERSIGNED OWNERS,PROPRIETORS AND TRUSTEES, IF ANY. NAME,TITLE NAME,TITLE COMMONWEALTH OF VIRGINIA CITY/COUNTY OF: TO WIT: THE FORGOING OWNERS CERTIFICATE WAS ACKNOWLEDGED BEFORE ME THIS DAY OF 12022 BY NOTARY PUBLIC 3 MY COMMISION EXPIRES: APPROVALS: N r O FREDERICK COUNTY SUBDIVISION ADMINISTRATOR DATE U N SURVEYOR'S CERTIFICATE I, MARK CAMPBELL,A DULY LICENSED LAND SURVEYOR IN THE COMMONWEALTH OF VIRGINIA,DO HEREBY CERTIFY THAT THE o PROPERTIES SHOWN HEREON ARE NOW IN THE NAME OF PIERCE HARDY LIMITED PARTNERSHIP AS RECORDED IN INSTRUMENT L 210009828, INSTRUMENT 210010908,AND INSTRUMENT 120013224 a AMONG THE LAND RECORDS OF FREDERICK COUNTY,VIRGINIA. .m FINAL SUBDIVISION AND CONSOLIDATION PLAT 'DDIRAFT E FOR THE PROPERTIES OF co NOT FOR PIERCE HARDY LIMITED PARTNERSHIP INSTRUMENT 210009828 N RECORDATION INSTRUMENT 210010908 INSTRUMENT 120013224 0 CADD FILE: E N 07-21-0657 BLA.dwg CRIAD E of DRNNNBY: CHECKEDBY: STONEWALL MAGISTERIAL DISTRICT TRIAD ENGINEERING,INC. 3I MAC MAC FREDERICK COUNTY,VIRGINIA www.triadeng.com DATE: SCALE: 200 AVIATION DRIVE o=' 12/29/2021 AS SHOWN I JOB NO: 07-21-0657 SHEET 1 OF 6 WINCHESTER,VA d T GENERAL NOTES 1. THE PROPERTIES SHOWN HEREON ARE LOCATED ON FREDERICK COUNTY TAX ASSESSMENT MAPS AND ARE IDENTIFIED AS TAX MAP 44-A-75G,TAX MAP 44-A-75F,AND TAX MAP 44-A-75B. 2. THE PROPERTIES SHOWN HEREON ARE NOW IN THE NAME OF THOSE LISTED BELOW AS FOUND AMONG THE LAND RECORDS OF FREDERICK COUNTY,VIRGINIA. PIERCE HARDY LIMITED PARTNERSHIP 1019 ROUTE 519 EIGHTY FOUR,PA 15330-2813 INSTRUMENT 210009828(TAX MAP 44-A-75G) INSTRUMENT 210010908(TAX MAP 44-A-75F) INSTRUMENT 120013224(TAX MAP 44-A-75B) 3. BOUNDARY INFORMATION SHOWN HEREON IS BASED ON EXISTING LAND RECORDS OF FREDERICK COUNTY,VIRGINIA AND A FIELD RUN SURVEY PERFORMED BY TRIAD ENGINEERING, INC. 4. NORTH MERIDIAN INFORMATION SHOWN HEREON IS BASED A FIELD RUN SURVEY PERFORMED BY TRIAD ENGINEERING, INC.AND IS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983(NAD83). 5. THE SURVEYED PROPERTIES SHOWN HEREON LIE WITHIN ZONE'X',AN AREA OF MINIMAL FLOOD HAZARD AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP FOR FREDERICK COUNTY,VIRGINIA,COMMUNITY-PANEL NUMBER 51069CO250E DATED JANUARY 29,2021. 6. EXISTING 20'GREEN STRIP RECORDED INSTRUMENT 090008802 NOTED AS BEING ESTABLISHED"PER PARAGRAPH G OF PROFFER STATEMENT DATED FEBRUARY 18,2005 ON FILE WITH FREDERICK COUNTY DEPARTMENT OF PLANNING AND DEVELOPMENT". 7. THE PROPERTIES AS SHOWN HEREON ARE SUBJECT TO ALL COVENANTS AND RESTRICTIONS OF RECORD AND THOSE RECORDED HEREWITH. THE SURVEYOR HAS NOT BEEN PROVIDED A CURRENT TITLE REPORT AND THEREFORE CANNOT ATTEST TO ALL SERVITUDES, RESTRICTIONS,COVENANTS AND CONDITIONS THAT ENCUMBER THE PROPERTY. 8. SETBACK LINES IDENTIFIED WITH A DEED REFERENCE MAY NOT REFLECT THE SETBACK DISTANCES REQUIRED BY CURRENT ZONING ORDINANCES AT THE TIME OF THIS SURVEY. a 0 N r O U N N N to C O N C N L Q N N FINAL SUBDIVISION AND CONSOLIDATION PLAT DIRAFT E FOR THE PROPERTIES OF co NOT FOR PIERCE HARDY LIMITED PARTNERSHIP INSTRUMENT 210009828 N RECORDATION INSTRUMENT 210010908 INSTRUMENT 120013224 0 CADD FILE: E N 07-21-0657 BLA.dwg CRIAD E of DRAWN BY: CHECKED BY: STONEWALL MAGISTERIAL DISTRICT TRIAD ENGINEERING,INC. 3I MAC MAC FREDERICK COUNTY,VIRGINIA www.triadeng.com DATE: SCALE: 200 AVIATION DRIVE 6=' 12/29/2021 AS SHOWN JOB NO: 07-21-0657 SHEET 2 OF 6 WINCHESTER,VA d T ZONING INFORMATION 133 INDUSTRIAL TRANSITION DISTRICT(PART 604) DIMENSIONAL AND INTENSITY REQUIREMENTS(PER 165-601.02) FRONT YARD SETBACK ON PRIMARY OR ARTERIAL HIGHWAYS(FEET) - 50' FRONT YARD SETBACK ON COLLECTOR OR MINOR STREETS(FEET) - 35' SIDE YARD SETBACKS(FEET) - 15' REAR YARD SETBACKS(FEET) - 15' FLOOR AREA TO LOT AREA RATIO(FAR) - 1.0 MINIMUM LANDSCAPED AREA(PERCENTAGE OF LOT AREA) - 25% MAXIMUM HEIGHT(FEET) - 35' M1 LIGHT INDUSTRIAL DISTRICT(PART 606) DIMENSIONAL AND INTENSITY REQUIREMENTS(PER 165-601.02) FRONT YARD SETBACK ON PRIMARY OR ARTERIAL HIGHWAYS(FEET) - 75' FRONT YARD SETBACK ON COLLECTOR OR MINOR STREETS(FEET) - 75' SIDE YARD SETBACKS(FEET) - 25' REAR YARD SETBACKS(FEET) - 25' FLOOR AREA TO LOT AREA RATIO(FAR) - 1.0 MINIMUM LANDSCAPED AREA(PERCENTAGE OF LOT AREA) - 25% MAXIMUM HEIGHT(FEET) - 60' AREA TABLUATION TAX MAP 44-A-75G 378,378 S.F. 8.6864 AC. TAX MAP 44-A-75F 96,175 S.F. 2.2079 AC. TAX MAP 44-A-75B 435,597 S.F. 9.9999 AC. CONSOLIDATED AREA 910,150 S.F. 20.8942 AC. a 0 N r O U N N N to C O N C N L Q N N FINAL SUBDIVISION AND CONSOLIDATION PLAT DIRAFT E FOR THE PROPERTIES OF co NOT FOR PIERCE HARDY LIMITED PARTNERSHIP INSTRUMENT 210009828 N RECORDATION INSTRUMENT 210010908 INSTRUMENT 120013224 0 CADD FILE: E N 07-21-0657 BLA.dwg CRIAD E of DRNNNBY: CHECKEDBY: STONEWALL MAGISTERIAL DISTRICT TRIAD ENGINEERING,INC. 3I MAC MAC FREDERICK COUNTY,VIRGINIA www.triadeng.com DATE: SCALE: 200 AVIATION DRIVE o=' 12/29/2021 AS SHOWN I JOB NO: 07-21-0657 SHEET 3 OF 6 WINCHESTER,VA d T EASEMENTLEGEND ---1 EX. 10'POTOMAC EDISON EASEMENT E1 INSTRUMENT 060006159 (APPROXIMATE LOCATION) GS 1 EX. 20'GREEN STRIP -- INSTRUMENT 090008802 (SEE NOTE 6) SS 1 EX. 25'x20'SANITARY SEWER EASEMENT -- INSTRUMENT 0500 1 75 12 SS2 EX. 20'SANITARY SEWER EASEMENT -- INSTRUMENT 090008802 ST 11, EX 20'STORM SEWER EASEMENT -- INSTRUMENT 060019998 ST2 EX 20'STORM SEWER EASEMENT -- INSTRUMENT 0500 1 75 12 (APPROXIMATE LOCATION) W9 1 EX. VARIABLE WIDTH WATERLINE EASEMENT -- INSTRUMENT 0500 1 75 12 --- EX. 15'WATERLINEEASEMENT -W2J' INSTRUMENT 060019998 ---1 EX. 15'WATERLINEEASEMENT -W3J' INSTRUMENT 090008802 --- EX 15'PERMANENT FREDERICK WATER UTILITY EASEMENT -W4J' INSTRUMENT 190005880 WS 11, EX 30'W4 TER AND SEWER EASEMENT -- INSTRUMENT 020014910 OWNERSHIP LEGEND LEGEND IRF IRON ROD FOUND OSUBJECT PROPERTY LABEL WC WITNESS CORNER SEE SHEET 5 ADJOINING PROPERTYLABEL SEE SHEET 5 a CURVE TABLE o CURVE RADIUS I LENGTH CHORDBEARING1 CHORD I DELTA TANGENT N Cl 1 275.00' 1 221.39' 1 S 85°49'15"W 1 215.46' 46°07'35.00" 117.09' 0 C2 225.00' 1 213.21' 1 S89-54'17"W 205.32' 54°17'39.00" 115.37' a LINE TABLE LINE BEARING DISTANCE L1 S 14°55'47"W 182.63' L2 S 63°50'17"W 49.54' N L3 S 62°45'27"W 135.31' 0 c N t a N N FINAL SUBDIVISION AND CONSOLIDATION PLAT D 11R,A F T E FOR THE PROPERTIES OF co NOT FOR PIERCE HARDY LIMITED PARTNERSHIP INSTRUMENT 210009828 N RECORDATION INSTRUMENT 210010908 INSTRUMENT 120013224 0 CADD FILE: EN 07-21-0657 BLA.dwg CRIAD E of DRAWN BY: CHECKED BY: STONEWALL MAGISTERIAL DISTRICT TRIAD ENGINEERING,INC. 3I MAC MAC FREDERICK COUNTY,VIRGINIA www.triadeng.com DATE: SCALE: 200 AVIATION DRIVE o=' 12/29/2021 AS SHOWN JOB NO: 07-21-0657 SHEET 4 OF 6 WINCHESTER,VA d T TAX MAP 44-A-75G TAX MAP 44-A-77 PIERCE HARDY LIMITED KENILWORTH O PARTNERSHIP PROPERTIES, LLC ZONE: B3 INSTRUMENT210000698 378,378 S.F. ZONE:RA 8.6864 AC. TAX MAP 44-A-75F PIERCE HARDY LIMITED TAX MAP44-A-76A O PARTNERSHIP DEBORAHA. MULLINS ZONE: B3 DEED BOOK647AT PAGE 310 96,175 S.F. ZONE:RA 2.2079 AC. TAX MAP 44-A-7513 PIERCE HARDY LIMITED TAX MAP44-A-76B O PARTNERSHIP FLORENCE H. CONARD ZONE:MI DEED BOOK 415 AT PAGE 490 435,597 S.F. ZONE:RA 9.9999 AC. JRE WINCHES I ER LLC TAX MAP 44-A-76C INSTRUMENT 060002887 ANN H. WILDER TAX MAP 44-A-75D DEED BOOK 415 AT PAGE 443 ZONE:B3 ZONE:RA NO TAX MAP NUMBER ASSIGNED TAX MAP 44-A-76D WINCHESTER AND EDWARD M. MAYAND WESTERN RAILROAD CO. JUANITA A. MAY Jr DEED BOOK207AT PAGE 676 �2 INSTRUMENT 050012634 (CITY OF WINCHESTER) ZONE:RA ZONE:NOT ASSIGNED TAX MAP 44-A-75H FREDERICK COUNTY 3 SAN/TA TION AUTHORI TY INSTRUMENT 190001260 ZONE:RA 0 N TAX MAP 44-A-75A ❑ KENILWORTH PROPERTIES, LLC 7 INSTRUMENT 180000092 ZONE:RA a 0 c N t a N N FINAL SUBDIVISION AND CONSOLIDATION PLAT DIRAFT E FOR THE PROPERTIES OF co NOT FOR NOT HARDY LIMITED PARTNERSHIP INSTRUMENT 210009828 N RECORDATION INSTRUMENT 210010908 INSTRUMENT 120013224 0 CADD FILE: N 07-21-0657 BLA.dwg CRIAD E of DRAWN BY: CHECKED BY: STONEWALL MAGISTERIAL DISTRICT TRIAD ENGINEERING,INC. 3I MAC MAC FREDERICK COUNTY,VIRGINIA www.triadeng.com DATE: SCALE: 200 AVIATION DRIVE o=' 12/29/2021 AS SHOWN JOB NO: 07-21-0657 SHEET 5 OF 6 WINCHESTER,VA d T IR (wc) w ti4-;,- ❑❑ 0910 ZONE o 25 \°4 N F 6 �9 �RIp, N 25' 2s, 04' �sg3 ZSETBACK *SFTB\ IRF NN - �WS1l rn SS 1}, � 3 N w U O cn o co Q N cn cn N h m O M N W CONSOLIDATED AREA m m m I 910,150S.F �m Z r� 20.8942 AC. (31 w 50.0' J IRF T) -- 25' (BENW1-i ZONE:M1 IRF SETBACK IRF PROPERTYLINE ZONE- B3 L1 W2-,IR E1 ZONE:B3 IRF 2 vo< vb STI J, C2 �T�� PFt%gel IRF(BENT) W L W2_ IRF SS21 Cl \ E1 7 35'BRL INSTRUMENT 050017512 IRF N �O o m wz 15'BRL INSTRUMENT 050017512 c A0 W n m z . C c)A o 30'BRL INSTRUMENT 050017512 m A i z l cWii N z2r -1 II Go N� 100'MINIMUM„-CA TAGORYC (z) ZONING DISTRICT BUFFER o 4 n II n I INSTRUMENT 050017512 2 II J N z ry �] I W3- C 100'MINIMUM -CATAGORY C a ZONING DISTRICT BUFFER 50' s INSTRUMENT 090008802 62.0' SETBACK El 0 100 200 400 LW4- �GS1_ J _ j /RF IRF _ — IRF o IRF `2 S 18-4731"W 378.13' MARTINSBURG PIKE- U.S. ROUTE 11 (VARIABLE WIDTH PUBLIC RIGHT OF WAY) N DEED BOOK 171 AT PAGE 295 INSTRUMENT 050017512 FINAL SUBDIVISION AND CONSOLIDATION PLAT DITRAFT E FOR THE PROPERTIES OF co NOT FOR PIERCE HARDY LIMITED PARTNERSHIP INSTRUMENT 210009828 N RECORDATION INSTRUMENT 210010908 INSTRUMENT 120013224 0 CADD FILE: N 07-21-0657 BLA.dwg CRIAD E of DRAWN BY: CHECKED BY: STONEWALL MAGISTERIAL DISTRICT TRIAD ENGINEERING,INC. 3I MAC MAC FREDERICK COUNTY,VIRGINIA www.triadeng.com DATE: SCALE: 200 AVIATION DRIVE o= 12/29/2021 1"=200' JOB NO: 07-21-0657 SHEET 6 OF 6 WINCHESTER,VA d T LUMBER COMPANY April 26,2022 Revised May 17, 2022 Department of Planning and Development Frederick County, VA 107 North Kent Street Winchester, VA 22601 Re: Impact Analysis Statement 84 Lumber - Yardmaster Court A.Site Sustainability The property is undeveloped and lightly vegetated with overgrowth and smaller tree saplings.The property is not within the 100-yr flood plain and there are no wetlands. The property is within zone"x"panel number 51069CO250E dated 1/29/21.The only steep slopes(<0.1 ac)are located at the southwest portion of the property abutting the existing 84 Lumber development.There are no known mature woodlands or prime agricultural soils. A geo tech report was performed for the site—although bedrock was encountered in certain locations,rock excavation can still be performed using hoe-ram or splitting techniques,as was performed in construction of the existing 84 Lumber facility. B. Surrounding Properties The property is located on the northeastern corner of the Yardmaster Court Subdivision.The property is bounded to the west by our current 84 Lumber facility,to the north by residential land and to the south by vacant warehouse land of the Yardmaster Court subdivision.The property is bounded to the east by Martinsburg Pike/US Route 11. Distance from the northerly property line to the adjacent residential dwellings is as follows 1) Parcel 76 D approx. 17 feet 2) Parcel 76 C approx;64 feet 3) Parcel 76B approx..47 feet 4)Parcel 76 A approx..45 feet Since any manufacturing or assembly operations for the truss plant facility will be within the enclosed building,any impacts to surrounding properties associated with dust,nose,glare,pollution, and odor would be minimal. C.Traffic Yardmaster Court is a two-lane undivided roadway with an auxiliary right turn lane, listed as a Local Road on VDOT's Functional Classification Map. It has an east-west alignment with a statutory speed limit of 25 mph. Martinsville Pike(State Route 11) is a two-lane undivided roadway with auxiliary turning lanes, listed as a Major Collector on VDOT's Functional Classification Map. It has a north-south alignment with a posted speed limit of 45 mph.This intersection is currently a four-legged unsignalized intersection where Yardmaster Court/Private Driveway has an east-west alignment and Martinsburg Pike has a north-south alignment The eastbound approach consists of one shared left turn/through lane and one exclusive right turn lane. The westbound approach consists of one shared left turn/through/right turn lane.The northbound approach consists of one exclusive left turn lane and one shared through/right turn lane.The southbound approach consists of one exclusive left turn lane,one through lane,and one exclusive right turn lane. The Institute of Transportation Engineers(ITE)Trip Generation Manual, 11th Edition was used to determine the number of trips generated by the proposed land use. . As indicated in the Traffic Impact Analysis,prepared by Bowman Consulting Group&dated April 201 2022,the project will not affect Yardmaster Court. 1019 Route 519 • Eighty Four, PA 15330 724-228-8820 r � 1 LUMBER COMPANY D. Sewage Conveyance and Treatment The projected sewage flow for the project(one phase,max build out) is based on a total of 25 employees at 10 gpd/employee for a total of 250 gpd. Sewage flows will be collected by a public gravity sanitary sewer main along Yardmaster Court.The existing 8"sewer main is approximately 200 feet from the proposed buildings with restrooms. Min capacity for the existing sewer,with 1%slope, is 2.4 MGD E. Water Supply Domestic water demand will be approximately 250 gal/day Fire flow demand will be approximately 1500 gal./min for the largest building(20,000 sf).A fire flow test on the existing hydrants will be performed to verify existing water capacity-since he existing water main currently services the existing 84 Lumber truss plant facility,adequate supply is expected. The existing water main is approximately 200 feet from the proposed buildings requiring water service. F. Drainage An existing stormwater management easement is located at the southwest corner of the property.This easement serves as stormwater management for the existing 84 Lumber Truss facility to the west.This easement will be abandoned,and a new stormwater management facility will be constructed at the easterly edge of the property.The new stormwater facility will provide stormwater quality and quantity control for both the existing 84 Lumber truss plant as well as the proposed truss plant expansion. G.Solid Waste Disposal Facilities Based on the proposed operation, the expected sold waste from this facility will be less than 20 tons/year H. Historic Sites and Structures The land being rezoned is vacant and undeveloped,containing no historical structures. The adjoining properties also have no historic structures. I. Impact on Community Facilities The existing adjacent 84 Lumber truss facility generated approximately 35 million dollars in sales in 2021. This proposed expansion can be expected to generate an additional 20-30 million in sales within the first five years.As a result of the development,payment in the amount of$.015//building square foot is offered to offset additional costs to Frederick County,more specifically Fire and Rescue. J.Other Impacts The proposed office space shall consist of 2,000 total square feet,well below the maximum of 24,750 in a zoned M-1 Property. Residential density will not apply Silk ' James A Zaunick, P.E. 1019 Route 519 • Eighty Four, PA 15330 • 724-228-8820 Rezoning Comments Virginia Department of Transportation Mail to- Hand deliver to: Virginia Department of Transportation Virginia Department of Transportation Attn: Resident Engineer Attn: Resident Engineer 14031 Old Valley Pike 2275 Northwestern Pike Edinburg,Virginia 22824 Winchester, Virginia 22603 (540)984-5600 Applicant: Please fill out the information as accurately as possible in order to assist the Virginia Department of Transportation with their review. Attach three copies of your application form, location ntsp,,prW er,g#;!k=ikatjq"ct analysis,and any Appiicanfs Name.- Pierce Hardy Limited Partnership Telephone: 724-228-8820 Ext,1350 Mailing Address: 1019 Route 519 Eighty Four PA 15330 I oc:ation of property: 210009820(Tax Map 44-A-75G)1210010908(Tax Map 44-A-75F)-- Yardmaster Ct. Winchester.VA 22603 Current zoning: B3 Zoning requested: MI Acreage: 10.9 Virginia Department of Transportation Comments- The documentation within the application to rezone this property(44-A-75G/44-A-75F)from B3 to M1 Effipe-a—rs ro-Nave TiWe-impar t-on—TCo--ure--"-bra?tin—sUdr§Pike)-This ri-o-06 is ffl-e-VUU-7 frb-aUw—ay which has been considered as the access to the property referenced. VDOT is satisfied that the transportation A- pim"Ilters offe-Ired In the 8-At Lumber T russ Hant rezoning appliCat, V, 4V44-CIUUI--- transportation concerns associated with this request. VDOT appreciates the opportunity to provide input on this potential rezoning. Please feel free to contact me at 540-534-3214 if you have an gij_qsCj9n§_gEcerns. r� _p�L ------ VDOT Signature& Date: M A V -2 A Notice to VDOT-Please Return Form to Applicant 21 Rezoning Comments Frederick Water Nlail to: Hand deliver to: Frederick Water Frederick Water Attn: Engineer Attn: Engineer P.O. Box 1877 315 Tasker Road Winchester, Virginia 22604 Stephens City,Virginia (540)868-1061 Applicant: Please fill out the infortin�aoiion' Its a1ccultrakfieh, a"' l)"ossible in order to assist the agetic�y,with their revievv. Attack a copy of your wt�apf'XlkI#k 46L -ilop hwas, locattott stap, proftr sfttewhapatt p, and any other pertinent informi Applicant's Name: Pierce Hardy Limited Partnership Telephone: 724-228-8820 Ext.1350 Mailing Address: -1019 Route 519 Eighty F-our,_PA 15330 Location of property: 210009828(Tax Map 44-A-75G)1210010908(Tax Map 44-A-75F) Yardmaster Ct. Winchester,VA 22603 Current B3 zoning: C, Zoning requested: MI Acreage: 10,9 Frederick Water Comments: ca-vi 1%^C-4 f---,g Frederick Water Signature& Date: Notice to Frederick Water Please Return This Fo�rm to the Applicant Rezoning Comments Frederick County Fire Prl!arshal Mail to: Hand deliver to: Frederick County Fire Marshal Frederick County Fire& Rescue Dept. 1080 Coverstone Drive Attn: Fire Marshal Winchester, Virginia 22602 Public Safety Building (540)665-6350 1050 Coverstone Drive Winchester,Virginia Applicant: Please fill out the information as accurately as possible in order to assist the Frederick County Fire Marshal with his review. A' eh a copy of your application fam location map, proffer ' statern ent impact analysis,and ony rather pertiueut informaCm. Applicant's Name: Pierce Hardy Umited Partnership '"l elephone: 724-228-8820 Ext.MO Mailing Address: 1019 Route 519 Eighty Pour,Ptd 15330 Location of property: 210009828(Tax Map aa-A-Iso)�210010908 Drax Map -A-75r) Yardmaster fit. Winchester,VA 22603 Current zoning: B3 _ _ Zoning requested: MI Acreage: i0.9 Fire Marshal's Comments: Fire Marshals Signature& Date: ___.._ _...�.._......._._��_. ;I Notice to Fire Marshal - Please Return This Foran to time Applicant �C EIV 1 � 23 AY 13 20"212 Frederick County Fire and Rescue Department Office of the Fire Marshal 9084 Coverstone Drive Winchester,VA 22602 Phone: 540-665-6350 Fax: 540-678-4739 fmo@fcva.us Plan Review Rezoning Status, Approved Business 84 Lumber 240 Yardmaster Ct Stephenson,Virginia 22656 Other. Printed Elate:05/99/2022 Pierce Hardy Limited Partnership Information Received Date: 05/9312022 Occupancy Type: Manufacturing Review Begin Date: 05/19/2022 Property Use: Manufacturing Review End Date: 05/99/2022 Activity Number: 1059065 Hours: 9.0000 Review Cause: Application Activilty Details Project Name Truss Plant Expansion Comments: Possible typo on Page 3 letter F.)on Proffer Statement., $,015/building square foot Adam Hounshell Lieutenant/Assistant Fire Marshal Page I of 9 F Rezoning Comments � Frederick County Department-went of Public Works �3 Mail to., Hand deDiver Lz r� Frederick Cou rl Dept-of Public:Works Frederick County Dept. of Public storks Attn. Director of Engineering Attn: Director of Engineering 107 North gent Street 107 North lent Street Winchester,Virginia 22601 Suite 200 (5413) 65-5643 Winchester, Virginia A�pplf t: 'ease l os:t the it foirrr anon a ac Patel as s i�ie r or es to assist the Department of Applicant's?tame: Pierce Hardy Limited Partnership Telephone. 724-22"820 Ext 1350 aiIing Address: 1919 Route 519 VVinct�5tar,V�22" 3 Location of property- 24 9828(Tax Map 44-R-75G);21001,09-08'Tax leap 44-A-75F) Yardmaster Ct. win tJA 22-60-3 Current zoning: Zoning r quested, NA A.cteage: 10,9__ Department of Public Works Comments: 10 e f:5'_ �. Public Works Signature& Date: Notice to Dept. of P Works- Please Return This Form to the Applicant ¢ 22 COUNTY OF FREDERICK Roderick B.10v'ifliams County Attorney 540/722-8383 —----- Fax 540/667-0370 E-mail rwillia@fcva.us May 17, 2022 VIA EMAIL Mr. Guy A. Flament, Jr. Permit&Project Coordinator 84 Lumber Company 1019 Route 519, Building 4 Eighty Four,PA 15330 Re: Rezoning Application–Pierce Hardy Limited Partnership Tax Parcel Numbers 44-A-75F and 44-A-75G, 10.90±Acres (the "Property") Proposed Proffer Statement(the "Proffer Statement") Dear Mr. Flament: You have submitted to Frederick County for review the Proffer Statement, for the proposed rezoning of the Property, 10.90±acres in the Stonewall Magisterial District, from the B3 (Industrial Transition) District,with proffers, to the Ml (Light Industrial)District, with proffers, by Pierce Hardy Limited Partnership (the "Owner"), I have now reviewed the Proffer Statement and it is my opinion that the Proffer Statement would be in a form to meet the requirements of the Frederick County Zoning Ordinance and the Code of Virginia, and would be legally sufficient as a proffer statement, subject to the following comments. • Preliminary Matters, I"paragraph–To avoid any ambiguity, the references to "Applicant" in this paragraph should be to "Owner". • Preliminary Matters, 2nd paragraph–This paragraph refers to a boundary survey plat dated April 30, 2021. The materials you sent included a draft consolidation plat, but not the referenced item. It may be appropriate to change the reference to the eventual consolidation plat and to parcels I and 2 as shown thereon. • Proffer A–The proffer refers to an attached site plan,but no site plan accompanied the materials I received. Mr.Guy A.Flament,Jr. May 17,2022 Page 2 • Proffer C I —At the time of approval of the original 2005 proffers, dedication of Yardmaster Court as a public road had not taken place. It appears that the reference in Proffer C1 to"a single shared commercial entrance"is, however,to what is now known as Yardmaster Court. Therefore, to avoid any ambiguity, it appears that the reference to 41a single shared commercial entrance"should be changed to"Yardmaster Court". • Proffer C2—The proffer indicates that Proffer C2 from the 2005 proffers is complete,but it appears that Proffer C3 (additional right-of-way dedication along Route 11) from the 2005 proffers is also complete, so it may be most appropriate either to reference Proffer C3 from the 2005 proffers as complete as well or not to refer to either of the 2005 proffers. • Proffer E—The proffer states the monetary contribution rate as $0.015 per square foot, the same as the 2005 proffers state, but the impact analysis letter dated April 26, 2002 indicates $0.15 per square foot. If the intent is for the rate to be $0.15 per square foot, a correction would be in order. I have not reviewed the substance of the proffers as to whether the proffers are suitable and appropriate for this specific development, as my understanding is that review will be done by staff and the Planning Commission. Sincerely, Roderick B. Williams County Attorney cc: Wyatt Pearson, Director,Planning&Development, Frederick County (via email) John Bishop, Assistant Director, Planning& Development, Frederick County (via email) Tyler Klein, Senior Planner, Planning&Development, Frederick County(via email) To be completed by Planning Staff Fee Amount Paid Zoning Amendment Number Anticipated PC Hearing Date.,-- Date ate. __Date Received Anticipated BOS Hearing Date REZONING APPLICATION FREDERICK COUNTY,VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Pierce Hardy Limited Partnership Specific Contact Person if Other than Above: Guy Flament Address: 1019 Route 519 Eighty Four, PA 15330 724-228-8820 ext. 1350 n,.,, f�nrv,„n+�Q��. ,v,h^r Telephone: Email: . . Name: Specific Contact Person if Other than Above: Jim Zaunick Address: 1019 Route 519 Eighty Four, PA 15330 Telephone: 724-228-8820 ext. 1380 Email: 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name: Specific Contact Person if Other than Above: Address: Telephone: Email: 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Bowman Specific Contact Person at Finn: Jerry Dove, PE, LEED AP Address: 101 South Street, SE Leesburg VA 20175 Telephone: 703-443-2400 Email J Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. Page 12 4. Project Name (if any): 84 Lumber Winchester Truss Expansion 5. Property Information: a. Property Identification Number(s): 44-A-75F 44-A-75G b. Total acreage of the parcel(s): 10.9 Total Acres c. Total acreage of parcel(s)to be rezoned(if other than whole parcel(s) is being rezoned): All 10.9 Total Acres d. Current zoning designation(s) and acreage(s) in each designation: 44-A-75F 2.21 Acres B3 and 44-A-75G 8.69 Acres B3 e. Proposed zoning designation(s) and acreage(s) in each designation: 44-A-75F 2.21 Acres M1 and 44-A-75G 8.69 Acres M1 f. Magisterial District(s): Stonewall g. Location-the property is located at(give street address(es) if assigned or otherwise exact location based on nearest road and distance from nearest intersection, using road names and route numbers): Both parcels are north of Yardmaster Court, VA 22656. Parcels are northwest of the intersection of Martinsburg Pike (US 11) and Yardmaster Ct. h. Adjoining Properties: Parcel ID Number Use Zoning See Attached See Attached See Attached Please attach additional page(s) if necessary. Property identification numbers, magisterial districts, and deed book and page numbers/ instrument numbers may be obtained from the Office of the Commissioner of the Revenue, Real Estate Division, 107 North Kent Street, Winchester, VA 22601. Page 13 6. Disclosure of real parties in interest. Virginia Code § 15.2-2289 provides that localities may by ordinance require any applicant for a zoning amendment to make complete disclosure of the equitable ownership of the real estate to be affected including, in the case of corporate ownership, the name of stockholders, officers, and directors, and in any case the names and addresses of all real parties of interest. Frederick County has, by County Code § 165-101.09, adopted such an ordinance. For each business entity that is an owner or contract purchaser of the property, please list the name and address of each person owning an interest in, or who is an officer or director of, any entity that is an owner or contract purchaser of the property (you need not indicate the amount or extent of the ownership interest). Please note that this requirement does not apply to a corporation whose stock is traded on a national or local stock exchange and having more than 500 shareholders. See Attached Articles of Organization Please attach additional page(s) if necessary. 7. Checklist. Please check that the following items have been included with this application: Z Location Map ✓[� Plat Depicting Metes/Bounds of Proposed Zoning Impact Analysis Statement 21 Proffer Statement(if any) 0 Agency Comments [✓ Fee 0 Copies of Deed(s) to Property(ies) ZTax Payment Verification 0 Digital copies (pdf s) of all submitted items Page 14 7. Signature(s): I (we),the undersigned, do hereby respectfully make application and petition the Frederick County Board of Supervisors to amend the zoning ordinance to change the zoning map of Frederick County,Virginia. I(we) authorize Frederick County officials to enter the property for site inspection purposes. I (we)understand that the sign issued when this application is submitted must be placed at the front property line at least seven days prior to the Planning Commission public hearing and the Board of Supervisors public hearing and maintained so as to be visible from the road right-of-way until the hearing. I (we) hereby certify that this application and its accompanying materials are true and accurate to the best of my(our)knowledge. SIS— Owner: Date ZZ signing on behalf of an entity, please state name of entity and your title: ' �c74 e Owner: Date If signing on behalf of an entity, please state name of entity and your title: Other Applicant Party(if any): Date If signing on behalf lo --6n entity, pleas tate nalme of entity and your title: P1/ L 0 , /47 j LhQ�' Cii�h r If additional signature lines are necessary, such as if more than two persons are owners, please use additional copies of this page. Page 15 ADJOINING PROPERTY OWNERS Owners of property adjoining the land will be notified of the Planning Commission and the Board of Supervisors meetings. F'r the purpose of this application, adjoining property IS any property abutting the requested property on the side or rear or any property directly across a public right-of-way, a private right-of-way, or a watercourse from the requested property. The applicant is required to obtain the following information on each adjoining property including the parcel identification number which may be obtained from the office of the Commissioner of Revenue. The Commissioner of the Revenue is located on the 2nd floor of the Frederick County Administrative Building, 107 North Kent Street. Name and Property Identification Number I Address NameDeborah Mullins P.O. Box 243 Property#44-A-76A Stephenson, VA 22656 NameFlorence Conard P.O. Box 202 Property#44-A-76B Stephenson, VA 22656 NameAnn Wilder P.O. Box 251 Property#44-A-76C Stephenson, VA 22656 NameEdward May 2851 Martinsburg Pike Property#44-A-76D Stephenson, VA 22656 NameAPAC Virginia, Inc. P.O. Box 339 Property#44-A-89 Stephenson, VA 22656 NameFranklin LF & Sons P.O. Box 339 Property#44-A-89A Stephenson, VA 22656 NameJRE Winchester LLC 1104 Leadbetter Road Property#44-A-75 Ashland, VA 23005 NameJRE Winchester LLC 11047 Leadbetter Road Property#44-A-75D Ashland, VA 23005 Name Property# 16 PIERCE HARDY LIMITED:PARTNERSHIP .Unanimous Written Consent of the General.Partn r in Lieu of an Annual Meeting Sf The undersigned, being the: sole general partner (the:"General Partner") of Pierce Hardy Limited Partnership, a Pennsylvania limited partnership(the"Partnership."),does hereby consent in writing,pursuant to all applicable provisions of the Pennsylvania Uniform Limited Partnership Act of 2016; :as amended, and the Amended and Restated Agreement of Limited Partnership dated January 1, 20161 as arriended, to the:adoption of the following resolutions and to the Partnership actions hereinafter set forth and direct that they shall,in all respects.,be deemed as valid Partnership actions as though such actions and resolutions had been duly approved and authorized at an annual meeting of the:General Partner of the Partnership,held as of the date aboveset forth: I. Election of Officers RESOLVED, that the following persons are hereby unanimously elected to serve in the respective offices set forth beside theirname until;the next annual meeting of the General Partner and until their successor(s)are duly elected:and qualified: Margaret Hardy. Knox — President Prank Cicero — Chief.Operating Officer Paul J. Lentz -- Assistant Vice President Bethany L. Cypher -- Assistant Vice:President Jim Zaunick --- Vice President Ed Baer — Assistant.Vice President 2. Ratification of Actions RESOLVED,that all other actions of the officers of the Partnership taken ny such persons on behalf of the Partnership since the last annual meeting of the General Partner be,and hereby are,ratified and approved as valid Partnership actions. The undersigned directs that this written consent shall,in all.respects, be deemed to be in lieu of an annual meeting of the General Partner of the Partnership, and all notice requirements in connection herewith,whether by'statute or:otherwise,hereby are waived. (o[245450:1 I IN WITNESS: WHEREOF, the mdersigued has duly executed this written consent, to be effective as of the,date first above,:written. GENERAL PARTNER: Peter Jon Co. By: L!far ar tF"ay V ox MPresident Special Limited Power of Attorney Q County of Frederick, Virginia Frederick Planning Website: www.fcva.us Department of Planning& Development, County of Frederick,Virginia 107 North Kent Street,Winchester,Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents That: Pierce Hardy Limited Partnership Name of Property Owner/Applicant Please note: if the property owner/applicant is an entity,the name of the entity should appear above. If multiple persons own the property or are applicants,an executed power of attorney from each owner will be needed. 1019 RQl Ite-51�l,Eighty Four PA 153W 724-228-8820 Mailing Address of Property Owner/Applicant Telephone Number as owner of,or applicant with respect to,the tract(s)or parcel(s)of land in Frederick County, Virginia,identified by following property identification numbers: 21QQQ9828 (Tax Map 44-A-75G) / 21001,Q908 (Tax Mao 44-A-75E) do hereby make,constitute, and appoint: Jim Zaunick and/or Guy Flament and/or their designee Name of Attorney-In-Fact 1019 Route 519, Eighty Four PA 15330 724-228-8820 _ Mailing Address of Attomey-In-Fact Telephone Number to act as my true and lawful attorney-in-fact for and in my name,place,and stead,with the same full power and authority I would have if acting personally,to file and act on my behalf with respect to application with Frederick County,Virginia for the follow in ,for the above identified property: Q Rezoning Subdivision Conditional Use Permit x Site Plan Master Development Plan(prelim. or final) Variance or Zoning Appeal and,further,my attorney-in-fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: This appointment shall expire one year from the day that it is signed,or at such sooner time as I otherwise rescind or niodifv it. Signature vAIN,r- �L Titlesi gan behalf of an entity) State of_Pey)R S4Iyan l C!s_ , County) •)- A C(SV)i r�Cj�VI_ To wit: I,�IffiaVf 17Q,�'rr� ,{ , a Notary Public in and for the jurisdiction aforesaid, certify that the person who signed the foregoing instrument personally appeared before me and has acknowledged the Sam before me in the jurisdiction aforesaid this day of ,2112 !! My Commission Expires: q� YVlI7�1� •i a Neta P blit Registration Number: 1,2.�5` 145- Commonwealth of Pennsylvania-Notarryy Seal Tamara R.DeMarino.NotaryPublle Washington County My commisslon expires November 3,2022 Gemmossien number i 225445 Momber,PenneylvanlaAssociation of Notaries 0 W Prepared by: McCarthy&Akers, P.L.C. J. Douglas McCarthy,Esq.,VSB No. 65713 Return to: McCarthy&Akers,P.L.C. 302 W. Boscawen Street Winchester,Virginia 22601 Grantees' address: ((,)C G R WtC519 �yr4 fir- 04 152 Consideration: $300,000.00 Assessment: $291,000.00 Parcel ID: 44-A-75F Title Insurer: Fidelity National Title Insurance Company THIS DEED,made and dated this I Nday of J uh^Q , 2021,by and between EVANLYNN L.L.C.,a Virginia limited liability company,hereinafter called the Grantor, and PIERCE HARDY LIMITED PARTNERSHIP, a Pennsylvania limited partnership, hereinafter called the Grantee. WITNESSETH: That for and in consideration of the sum of One Dollar and other good and valuable consideration, the receipt of which is hereby acknowledged, the Grantor does hereby grant and convey, with General Warranty and English covenants of title unto the Grantee, in fee simple, all of the following described realty, to-wit: All of that certain lot or parcel of land together with all improvements thereon and appurtenances thereunto belonging, containing 2.2078 acres, situate in Stonewall Magisterial District, Frederick County, Virginia, as shown on the plat and survey of Richard A. Edens, L.S., dated June 26, 2006 and recorded with Deed as Instrument No. 060019998, among the land records of Frederick County, Virginia. AND BEING the same real estate conveyed to Evanlynn L.L.C.,a Virginia limited liability company, by deed from The Adams Development Group, Inc., a West Virginia corporation, dated October 24, 2006, and recorded October 24, 2004 in the Clerk's Office Circuit Court, Frederick County, Virginia as Instrument No. 060019998. Prepared by: McCarthy&Akers,P.L.C. Affmuyd and Cowu&n at Law 1 302 West Bosrawen Street Winchester,VA 22601 c-7 W C� Reference is hereby made to the aforesaid instruments and the references therein a contained for more particular descriptions of the property herein conveyed. This conveyance is made subject to all easements, rights of way and restrictions of record, affecting the subject property. WITNESS the following signatures and seals: Evanlynn L.L.C., a Virgini;1,* ited liability compan Grantor By ��`�l� JJ(SEAL) Adam E. Smith, Member/Manager COMMONWEALTH OF VIRYIN�A; CITY/COUNTY OF L)f v�Cr- , to-wit: The foregoing instrument was acknowledged before me this 10.( day of JPVti� , 2021 by Adam E. Smith as Member/Manager of Evanlynn, L.L.C., a Virginia limited liability company. My commission expires: My commission number: ,,h111111/1I1/III pp,UL p Jp. ...,, FTS•% 1- . ••NOTARY'' , ,A PUBLIC %(P NbTARY PUBLIC REG 8 7902083 ;Z MY COMMISSION: O EXPIRES 'VIRGINIA' 10/31/2024 '•• . • c`: ►�RVMRIN COHb l�SCI •."NALTH ��. I�bi�iI10r1 ►�1mit(�fWOingwas prAdaCodt-oMom .11 �'I•I11111 -`R AC)W at andwithcertificat acknowlcdgemcnfiRr 0annexed wasadmittedtorocord. Faxlmposedbyser,.a$.1 1Q2ot and SS-1-801 have been paid,ifassessable. Prepared by: McCarthy&Akers,P.L.C. Aff mwj,and C.,.A rat Law `-' l.l�r� 302 West Boarawen Street Winchester,VA 22601 ' V1 v 0 0 -W 0 0 0 if 0 OD OD 0 0 00 0 0 0 0 0 C14 OD 00 0 00 0 0 0 0 0 CN 00 N m C; O C; 0 cli OD N a% C; C; C; W 1-1 V)-0) C) V 00 OD OD %D 1-411-Ch 0 q:r CD OD 00 0) Ln in,m ci Ln OD OD 00 cll Ln iii-m cv Ln OD OD OD W 134 %D 0 v W 10 r-I Ln OD r-i �- C4 0 r-I Ln rp 00 0 4-1 41 =W- if)- V)-V)-vl-i* irk 4) a] Ea #1: EQ 4-1 41 VI- 4/�-AL?VI-V). if)- 9 -,-1 0 4-) E-, ;j 'd >,4.) '0 CU EO En 4# w u 4-) M (d 04 U -Y Q)-H 0 V E-i :3 rd >,4-)T; Q) ri 0 Q) 4 4J rJ)-H -r-i 4 —1 —1 (d 0 �4 a) Q -,4 L) V 4J M (d P4 U 0 (U -) W ;J N (d 44.AV* -;:.Cll. U .-•,i -G.-d-Q 0 H (d a) k a) U SaoLn , ...mW 4J 4-) uu L 0 iL4 Ln F-.1 P4 0 : 0 m JA: H"Ln V ij44 EQ .............. . .... cq ..........w. .......... ..... ... 44 Ix CII O C,4 0 d CN ........... CV .. . ........ P4 fx ...... .... ........... N r4 >4 P4 ii Cx C, Ei ka Hx F:) C4 N., . ..... .... ... P4 C14 ........... P4 134 ...... ....... ...... H N ... ... ....:.rw t5 .... ........ .. ........... 9 -.----.-- . �H 0 U) C,4 >1 0 rn C%4 W E 4 0 clq 0 N 0 n 0 Q E-1 00 E-4 OD Ix 0 0 Ln ril OD 4 pq OD E-1 > 0 0N U2 00 > C,4 P4 En C,4 N W 00 E--1 Pi pq cl P4 La C%j �l PI 04 w 0 w �4 14 W 0 W U H m E-1 Ixrl) H x P N E- H 0 0 U) M U PP4� CE-n H 0 0 U) M M P4 4 m w Ix 1-4 r4 pq H z P4 4 m r4 P4 w 4 z X r4 1-4 m F:4 X 9 W 0 cq 134 - - Z F-I ON Cd > 01H 4 F4 0 Z NN r, W Oz E-4 N U 134 P4 - H C:) . (d > Cr% F-I C,4 Cq DI C,4 F4 N U N �: Cq C,4 �4 W C%J �3: ED I H r-I r-1 N N 00 N O N r-I N r-I r-1 O O r-I 0 O N O M M 0 0 m O O N O M M O O M O m �Ewom U) N Ln Ln N ONN Ln N Ln N \ 00 O N In Ln Ln Ln O\H W 0 r-I H ri r I .-I I l0 M\O W d� r I r�� ao0o Ln \ p' o O 0 ,� rH °° l Fj O O N � 4J al th vi 4*if)- yr J-1 yJ i/} V}Vk vi-0). in- Erl k 0-rH G 4� H � rd �+4J FO (U r-I 14 74 N-rNi fNti' 1l F '� 'd 74.1.1 rd (U r-I U it bl (d Ra U O N -H 1.) Ul• 1 � N U 4-1 bl (d a U O W •r1 J} Ul• 1 :J N .H (d N �4 N U •ri U ..,:Jd:r{..W.:-M..Q O ri (d N �A N U •ri U ::;Id:r-I-N:.:(d,0 0 F A W F A aC : i~`::;'.:[ :etk::i-W.:::.:;.N:.... H A IX H A W. art a 4J 4J Uo btwil4.) 0a QJ O .-1:W: x P4 PQ x E rHi '. N .. fu O w. ul _ ow r-I so CN M. ri rt . L'1 to 0 ; a to FC •• � . cli W N _ - w C.N �'U E W N U• N A c> H W fn a: a w FC SAM W FzAz o zZN W HAz 3 H O H Wri u oo �n uFi m £ a > U a N cn ar-I w CN W OON W o AN a x N W w W W � H W N Ix Ul l0 WE uHx H � a FCF W U x H baa P [� a0M W aF< HxW 040p09 W a � WP04 >4 FC W SO Z CVw Gi � NZ FC WW 30 Z N0 %D Wo (q H W Ua g NCO ,a UNC H wua 3 NOD a ariW ■ ■ � r Traffic Impact Analysis i t 84 Lumber Truss Plant Martinsburg Pike and Yardmaster Court Frederick County, Virginia Prepared for: 84 Lumber April 20th, 2022 Traffic Impact Analysis 84 Lumber Truss Plant Martinsburg Pike and Yardmaster Court Frederick County, Virginia Prepared April 20th, 2022 Prepared for: 84 Lumber Prepared by: Bowman Bowman Consulting Group, Ltd. � �1�� Z �� UC7 MICHAELYOUNG Y Lie.No. 0402060103 SSIONAL O Traffic Project Manager: Michael Young, P.E. Bowman Job # 130155-01-003 ii bow manconsulti❑g.com Table of Contents ExecutiveSummary........................................................................................................................................................v Introduction.......................................................................................................................................................................1 BackgroundInformation..............................................................................................................................................1 Scopeof Work.............................................................................................................................................................2 ExistingRoadway Network..........................................................................................................................................3 ExistingIntersection Configuration..........................................................................................................................3 DataCollection.................................................................................................................................................................4 TurningMovement Counts....................................................................................................................................4 ProgrammedImprovements..................................................................................................................................4 Traffic Forecast and Background Traffic.................................................................................................................5 ProposedDevelopment................................................................................................................................................5 TripGeneration and Trip Distribution.....................................................................................................................5 CapacityAnalysis.............................................................................................................................................................6 Capacity Analysis of Existing Conditions (Year 2022)...................................................................................7 Capacity Analysis Comparison — No Build vs. Build Conditions (Year 2023).......................................8 Summary......................................................................................................................................................................... 11 Conclusion...................................................................................................................................................................... 11 List of Figures Figure1. Site Location..................................................................................................................................................1 Figure2. Conceptual Plan...........................................................................................................................................2 Figure 3. Aerial of Martinsburg Pike and Yardmaster Court/Private Driveway Intersection.............4 List of Tables Table1. Site Trip Generation......................................................................................................................................5 Table 2. HCM Level of Service Criteria....................................................................................................................6 Table 3. 2022 Existing Conditions Capacity Analysis— Martinsburg Pike and Yardmaster Court/ PrivateDwy........................................................................................................................................................................7 Table 4. 2023 AM Peak Hour Capacity Analysis— Martinsburg Pike and Yardmaster Court/ Private Dwy.......................................................................................................................................................................................8 Table 5. 2023 PM Peak Hour Capacity Analysis— Martinsburg Pike and Yardmaster Court/ Private Dwy.......................................................................................................................................................................................9 Table 6. 2023 AM Peak Hour Capacity Analysis—Yardmaster Court and Site Dwy........................... 10 Table 7. 2023 PM Peak Hour Capacity Analysis—Yardmaster Court and Site Dwy............................ 10 bore manconsulti ng.com Appendices Appendix A: Conceptual Plan Appendix B: Turning Movement Counts Appendix C: Traffic Volume and Traffic Distribution Exhibits Appendix D: Existing (2022) Capacity Analysis Appendix E: No Build (2023) Capacity Analysis Appendix F: Build (2023) Capacity Analysis iv bore manconsulti ng.com Executive Summary This report summarizes the findings of the Traffic Impact Analysis (TIA) performed by Bowman for the proposed 84 Lumber Truss Plant development located in Frederick County, VA. The purpose of this analysis is to determine the potential impact (if any) to the existing traffic operations of the surrounding roadway network caused by the proposed development. Description of Proposed Development The proposed development is to be located at the northwest corner of the intersection of Martinsburg Pike (US 11) and Yardmaster Court in Frederick County, VA. The proposed site will consist of a Truss Plant including 31,750 S.F. of assembly and storage buildings, as well as a 2,000 S.F. small office building. The proposed development is an expansion of an existing 84 Lumber Facility, and will be located directly to the east of the existing facility. Access to the proposed site will be provided via three (3) full-access driveways connecting to Yardmaster Court: one (1) proposed truck driveway, one (1) proposed customer/employee driveway, and one (1) existing employee driveway. To provide a conservative analysis of the driveway operations for the site, the access to the proposed site will be evaluated as one site driveway connecting to Yardmaster Court. Scope of Work The scope of work for this analysis was prepared per VDOT Traffic Impact Analysis Guidelines. To examine the projected impact of the proposed development's site traffic on the existing roadway network, the following study intersections were analyzed in this report: • Martinsburg Pike (US 11) and Yardmaster Court/Private Driveway (Unsignalized) • Yardmaster Court and Proposed Site Driveway (Unsignalized) For the purposes of this analysis, it is anticipated that the proposed development will be constructed and fully operational by the year 2023. Therefore, the following scenarios were evaluated as part of this study: • Existing Conditions (2022) • Future Conditions (2023) without the proposed development (No Build) • Future Conditions (2023) with the proposed development (Build) v bore manconsulti ng.com Programmed Improvements It is Bowman's understanding that there are no programmed roadway improvements within the project vicinity. Trip Generation Trip generation for the proposed development was calculated based on the calculations and formulae contained in the Institute of Transportation Engineers (ITE) Trip Generation Monuof, I Yh Edition. The proposed 84 Lumber Truss Plant Development is expected to generate 53 total trips (33 in and 20 out) during the morning peak hour, 75 total trips (33 in and 42 out) during the evening peak hour, and 570 total trips (284 in and 286 out) during an average weekday. Capacity Analysis Results To evaluate the traffic operations with the proposed development in place, capacity analyses were completed at the two (2) study intersections included in this report. The purpose for this analysis was to compare the results of the No Build and Build Conditions to identify areas impacted by the proposed development. The results of the capacity analysis indicate that there are no projected changes to levels of service at the study intersections from No Build to Build Conditions. Conclusion Based on the results of the analysis contained in this report, the addition of the site traffic associated with the proposed development is not expected to adversely impact the operations of the existing roadway network. vi bore manconsulti ng.com Introduction This report summarizes the findings of the Traffic Impact Analysis (TIA) performed by Bowman for the proposed 84 Lumber Truss Plant development located in Frederick County, VA. The purpose of this analysis is to determine the potential impact (if any) to the existing traffic operations of the surrounding roadway network caused by the proposed development. Background Information The proposed development is to be located at the northwest corner of the intersection of Martinsburg Pike (US 11) and Yardmaster Court in Frederick County, VA. Figure 1 depicts the site location. c A F , �r�I ir Jur ' K T Figure 1. Site Location The Applicant is proposing to develop the site with a Truss Plant consisting of 31,750 S.F. of assembly and storage buildings, as well as a 2,000 S.F. small office building. The proposed development is an expansion of an existing 84 Lumber Facility, and will be located directly to the east of the existing facility. The conceptual plan for the proposed site is depicted on Figure 2 and included in Appendix A. 1 bore manconsulti ng.com -- --- .. x 1 ' 1 Proposer!Truck Dwy Proposed customer! Existing Employee Dwy Employee Dwy Figure 2. Conceptual Plan As shown in Figure 2, access to the proposed site will be provided via three (3) full-access driveways connecting to Yardmaster Court: one (1) proposed truck driveway, one (1) proposed customer/employee driveway, and one (1) existing employee driveway. To provide a conservative analysis of the driveway operations for the site, the access to the proposed site will be evaluated as one site driveway connecting to Yardmaster Court. Scope of Work The scope of work for this analysis was prepared per VDOT Traffic Impact Analysis Guidelines. In accordance with VDOT requirements, the following items were analyzed in this report: • Trip generation calculations for the proposed development • Traffic assignment (trip distribution) for the proposed development • Capacity and queuing analyses For the purposes of this analysis, it is anticipated that the proposed development will be constructed and fully operational by the year 2023. Therefore, the following scenarios were evaluated as part of this study: Study Periods • Existing Conditions (2022) • Future Conditions (2023) without the proposed development (No Build) • Future Conditions (2023) with the proposed development (Build) 2 bore manconsulti ng.com Intersections Evaluated • Martinsburg Pike and Yardmaster Court/Private Driveway (US 11) (Unsignalized) • Yardmaster Court and Proposed Site Driveway (Unsignalized) Programmed Improvements • It is Bowman's understanding that there are no proposed roadway improvements within the Project vicinity. Background Growth Rate • Historical traffic volumes along Martinsburg Pike published by VDOT for the previous five (5) years indicate that there has been a decrease in background traffic from 7,800 daily vehicles in 2015 to 7,600 daily vehicles in 2019. • Therefore, in order to provide a conservative amount of background traffic growth, a background growth rate of 2.0% per year will be used in the study. Existing Roadway Network Mortinsbura Pike (US 11) within the identified study area is a two-lane undivided roadway with auxiliary turning lanes, listed as a Major Collector on VDOT's Functional Classification Map. It has a north-south alignment with a posted speed limit of 45 mph. YordmosterCourtwithin the identified study area is a two-lane undivided roadway with an auxiliary right turn lane, listed as a Local Road on VDOT's Functional Classification Map. It has an east-west alignment with a statutory speed limit of 25 mph. Existing Intersection Configuration Intersection of Martinsburg Pike and Yardmaster Court/Private Driveway This intersection is currently a four-legged unsignalized intersection where Yardmaster Court/Private Driveway has an east-west alignment and Martinsburg Pike has a north-south alignment as shown on Figure 3. 3 bore manconsulti ng.com ' r .4 Figure 3. Aerial of Martinsburg Pike and Yardmaster Court/Private Driveway Intersection The eastbound approach consists of one shared left turn/through lane and one exclusive right turn lane. The westbound approach consists of one shared left turn/through/right turn lane. The northbound approach consists of one exclusive left turn lane and one shared through/right turn lane.The southbound approach consists of one exclusive left turn lane, one through lane, and one exclusive right turn lane. Data Collection Turning Movement Counts Turning movement counts were collected at the Martinsburg Pike and Yardmaster Court/Private Driveway intersection during the morning (7:00 AM — 9:00 AM) and evening (4:00 PM — 6:00 PM) peak periods. The turning movement counts were collected on Wednesday, March 23rd, 2022. The roadway network AM peak hour was determined to be from 8:00 AM — 9:00 AM, and the PM peak hour was determined to be from 4:15 PM —5:15 PM. A copy of the turning movement counts is included in Appendix B. Programmed Improvements It is Bowman's understanding that there are no proposed roadway improvements within the project vicinity. 4 bow manconsulti❑g.com Traffic Forecast and Background Traffic For the purposes of this analysis, it is anticipated that the 84 Lumber Truss Plant Development will be constructed and fully operational by the year 2023. The following scenarios were evaluated as part of this study: • Existing Conditions (2022) • Future Conditions (2023) without the proposed development (No Build) • Future Conditions (2023) with the proposed development (Build) The 2022 Existing Peak Hour Traffic Volumes are depicted on Exhibit 1 in Appendix C. As previously mentioned, a background growth rate factor of 2.0% per year was applied to the traffic counts to grow the existing volumes to Future Conditions. This growth rate factor was applied to project the 2022 Existing Traffic Volumes one (1) year to develop the 2023 No Build Peak Hour Traffic Volumes, which are depicted on Exhibit 2 in Appendix C. Proposed Development The Applicant is proposing to develop the site with a Truss Plant consisting of 31,750 S.F. of assembly and storage buildings, as well as a 2,000 S.F. small office building. The proposed development is an expansion of an existing 84 Lumber Facility, and will be located directly to the east of the existing facility. Trip Generation and Trip Distribution The Institute of Transportation Engineers (ITE) Trip Generation Monuof, 11' Edition was used to determine the number of trips generated by the proposed land use. Table 1 displays the trip generation for the proposed development. Table 1. Site Trip Generation Weekday AM Peak Four Weekday PM Peak Hour Average Weekday Develtrpmentlu Land Use Side Units In out Total In Out Total In Out IotaI Building Materials and Lumber Store 812 31,750 S.F. 31 19 50 32 39 71 270 271 Small Office Buildings 712 2,000 S.F. 2 1 3 1 3 4 14 15 29 Total 33 20 53 33 42 P, 284 2Fn sf (1)based OR the tnstinge of Tr pxwvon f Vnren Tip Grnewbw Momj&.11th fd�r-c As shown in Table 1, the proposed 84 Lumber Truss Plant Development is expected to generate 53 total trips (33 in and 20 out) during the morning peak hour, 75 total trips (33 in and 42 out) during the evening peak hour, and 570 total trips(284 in and 286 out) during an average weekday. 5 bow manconsulti❑g.com These traffic volumes were then distributed to the roadway network in accordance with a site traffic distribution pattern developed from the 2022 traffic counts. The site trip distribution is depicted on Exhibit 3 in Appendix C, and the site-generated trips are depicted on Exhibit 4 in Appendix C. The projected site trips were then added to the 2023 No Build Traffic Volumes to create the 2023 Build Peak Hour Traffic Volumes, which are depicted on Exhibit 5 in Appendix C. Capacity Anal The study intersections were analyzed for each scenario using the 6th Edition of the Highway Capacity Manual (HCM) methodologies using the computer software package Synchro 10 with SimTraffic. The analysis uses capacity, Level of Service (LOS), control delay, and queuing as the criteria for the performance of the intersections. The analysis models were developed per the standards and requirements included in VDOT's Traffic Operations and Safety Analysis Manual (TOSAM) —Version 2.0. Capacity, as defined by the HCM, is a measure of the maximum number of vehicles in an hour that can travel through an intersection or section of roadway under typical conditions. Level of Service (LOS) is a marker of the driving conditions and perception of drivers while traveling during the given time period. LOS ranges from LOS "A", which represents free-flow conditions, to LOS "F", which represents breakdown conditions. Table 2 shows the LOS for intersections as defined by the HCM. Table 2. HCM Level of Service Criteria Unsignalized Intersections Level of Service Average Control Delay (sec/veh) A 510 B >10-15 C X15-25 D >25-35 E >35-50 >50 Control delay is a measure of the total amount of delay experienced by an individual vehicle and includes delay related to deceleration, queue delay, stopped delay, and acceleration. Table 2 shows the amount of control delay (in seconds per vehicle) that corresponds to the LOS for signalized and unsignalized intersections. The reported queues, or linear distance of delayed vehicles, for the intersections in this study are the 95th percentile queues reported by SimTraffic after 10 runs of 60 minutes each with a 15- minute seeding time. They are reported to ensure that the storage lengths of lanes at 6 bow manconsulting.corn intersections are of adequate length and that queued vehicles will not interfere with free flow vehicles or adjacent intersections. Capacity analyses were completed for the following scenarios during the morning and evening peak hours: • Existing Conditions (2022) • Future Conditions (2023) without the proposed development (No Build) • Future Conditions (2023) with the proposed development (Build) Capacity Analysis of Existing Conditions (Year 2022) A capacity analysis under the Existing Year 2022 Conditions was conducted for the study intersection previously described in this report. The Existing Conditions capacity analysis results are included in Appendix D. Intersection of Mortinsbura Pike (US 11) and Yardmaster Court/Private Drivewoy Based on the results of the capacity analysis under Existing Conditions, the intersection of Martinsburg Pike and Yardmaster Court/Private Driveway currently operates at an acceptable overall level of service "A" during both the morning and evening peak hours. All turning movements and approaches currently operate at a LOS C or better during both the morning and evening peak hours. The queue results from SimTraffic do not appear to exceed the available storage for the auxiliary lanes. The capacity analysis results are summarized in Table 3. Table 3. 2022 Existing Conditions Capacity Analysis— Martinsburg Pike and Yardmaster Court/ Private Dwy AM Peak Hour PM Peak Hour 0tT1:RSECTIOH Conditions Conditions DELAY(S) LOS MaxihDELAY[S) LOS Maximum Vlovenent Storage(ft) i' )' LT 535 176 C 62 181 C 32 EB R 290 11.5 8 59 101 B 53 Approach - 15.1 C -- 123 B VB Approach - 192 C 46 217 C 24 istemectton#I, L 90 9.1 A 42 8 1 A 20 Motitsburg Pike and TR 280 0 0 A 0 0 0 A 0 Yardmaster CounFrivate Dwy NB RWExhting Condkkms} Approach -- 0.5 A 02 A L 175 00 A 4 00 A 0 SB T 1 +1.000 00 1 A 0 0.0 A 0 R 275 0.0 A 0 00 A 0 Approach 0.0 A -- 0,0 A OVERALL 1.0 A 0.9 A 'Extracted from SimTraff ic simulation software 7 bow manconsulti❑g.com Capacity Analysis Comparison - No Build vs. Build Conditions (Year 2023) Capacity analyses were conducted for the No Build and Build Conditions for the proposed year 2023. The primary purpose for this approach was to compare the results in order to identify areas impacted by the proposed development. The capacity analysis results are included in Appendices E and F. Intersection of Mortinsbura Pike (US 11) and Yardmaster Court/Private Drivewo� Morning Peak Hour Based on the results of the capacity analysis during the morning peak hour, the intersection of Martinsburg Pike and Yardmaster Court/Private Driveway is projected to operate at an acceptable overall level of service "A" during both the No Build and Build Conditions,with an increase in delay of 0.6 seconds. There are no projected changes in levels of service from No Build to Build Conditions. The mainline (Martinsburg Pike) turning movements and approaches are all projected to operate at a LOS A during both the No Build and Build Conditions. The side-street (Yardmaster Court) turning movements and approaches are all projected to operate at a LOS C or better during both the No Build and Build Conditions. The queue results from SimTraffic do not appear to exceed the available storage for the auxiliary lanes. The capacity analysis results are summarized in Table 4. Table 4. 2023 AM Peak Hour Capacity Analysis— Martinsburg Pike and Yardmaster Court/ Private Dwy AM Peak(No Build) AM Peak(Build) INTERSECTION Conditions Conditions DELAY(S) LOS Maximum DELAY(S) LOS Maximum Approach Nkr+vement Stora aft Queue(It)' queue(ttr LT 535 16.3 C 62 17.7 C 69 EB R 290 112 B 52 113 B 61 ,Approach -- 142 B -- 147 B ._ Ve Approach -- 17's C 45 194 C 47 Enierseciion#1: Martins burg Pike and L 90 9.0 A 44 9.1 A 66 Yardmaster CourtIPrivaie Dwy NB TR 280 0.0 A 0 0,0 A 12 (2023 No Build Conditions Approach 0.4 A 1.4 A vs,2023Build Condrtions) L 175 0.0 A 0 0.0 A 0 T +1.000 0.0 A 0 0.0 A I8 sa R 275 0.0 A 0 0.0 A 0 Approach -- 0.0 A -- 0.0 A OVERALL 0.9 A -- 1.5 A 'Extracted from SimTraffic simulation software 8 bow manconsulti❑g.com Evening Peak Hour Based on the results of the capacity analysis during the evening peak hour, the intersection of Martinsburg Pike and Yardmaster Court/Private Driveway is projected to operate at an acceptable overall level of service "A" during both the No Build and Build Conditions,with an increase in delay of 0.7 seconds. There are no projected changes to levels of service from No Build to Build Conditions. The mainline (Martinsburg Pike) turning movements and approaches are all projected to operate at a LOS A during both the No Build and Build Conditions. The side-street (Yardmaster Court/Private Driveway) turning movements and approaches are all projected to operate at a LOS C or better during both the No Build and Build Conditions. The queue results from SimTraffic do not appear to exceed the available storage for the auxiliary lanes. The capacity analysis results are summarized in Table S. Table S. 2023 PM Peak Hour Capacity Analysis— Martinsburg Pike and Yardmaster Court/ Private Dw PM Poak(No Build) PM Peak(Build) KTERSECTIO>f'! Conditions Conditions DELAY(S) LOS Maexi LF},DELAY(S) LOS tmaxk um Approach Movement Storage ft LT 535 185 C 32 20.9 C 51 EB R 290 102 B 53 104 B G' Approach -- 125 B 14.1 B -- VAB Approach -- 221 C 24 24.9 C 15 Mtersectiart it1 Marlins bury Pike and L 90 8.1 A 22 82 A 45 Yardntasser CourtINivate Dwy NB TR 280 0.0 A 0 0.0 A 0 (2023 No Wild Condh ions Approach -- 0.2 A 04 A vs.2023 Build Conditions) L 175 00 A a 0.0 A 56 T +1.000 00 A 0 0,0 A 0 R 275 0.0 A 0 0.0 A 0 Approach 00 A -- 00 A OVERALL 0.9 A 1.6 A 'Extracted from SlmTraff is simulab on software Intersection of Yardmaster Court and Proposed Site Drivewo-y Morning Peak Hour Based on the results of the capacity analysis during the morning peak hour, the southbound approach at the intersection of Yardmaster Court and the Proposed Site Driveway is projected to operate at a LOS A under Build Conditions. All other movements are free-flowing, and therefore do not produce delay. 9 bow manconsulti❑g.com The queue results from SimTraffic do not appear to exceed the available storage for the auxiliary lanes. The capacity analysis results are summarized in Table 6. Table 6. 2023 AM Peak Hour Capacity Analysis—Yardmaster Court and Site Dwy AM Peak(No Build) AM Peak(Build) INTERSECTION Conditions Conditions DELAY(5) LOS Maximum DELAY l S) LOS Maximum Ent'-Ft -tktn 02, Approach Movement Stora aft Queue ilt)' Queue(IT)' Yzwdmaster Court and Site Dwy (2023 No Build Conditions $B Approach — 9 0 A vs.2023 Buil!Conditions) "Extracted from SimTraffic simulation software Evening Peak Hour Based on the results of the capacity analysis during the evening peak hour, the southbound approach at the intersection of Yardmaster Court and the Proposed Site Driveway is projected to operate at a LOS A under Build Conditions. All other movements are free-flowing, and therefore do not produce delay. The queue results from SimTraffic do not appear to exceed the available storage for the auxiliary lanes. The capacity analysis results are summarized in Table 7. Table 7. 2023 PM Peak Hour Capacity Analysis—Yardmaster Court and Site Dwy PtAPlak(No Build) PIN Peak(Bulld) INTERSECTION Conditions Coadltlons DB_AY LOS Maximum LOS Maxhrrum DELAY � n ersectioA1- Approach Movement Storage ( Queue(ft)' (S) Queue(ft)' Yardmaster Court and Site[fay (2023 No Build Ccsnditicns SB Approach — 92 A 55 VS.2023 Build Conditions) 'Extracted from SimTraffic simulation software As previously discussed and to provide a conservative analysis of the driveway operations for the site, the access to the proposed site was evaluated as one site driveway connecting to Yardmaster Court. The capacity analysis results above indicate that the proposed driveway approach analyzed is projected to operate at an acceptable LOS A during both the morning and evening peak hours. Therefore, because the traffic anlayzed at this location would be divided among the three (3) proposed site driveways, it is anticipated that the 3 driveways will also operate at a LOS A during both the morning and evening peak hours. 10 bow manconsulti❑g.com Summary The Applicant is proposing to develop the site with a Truss Plant consisting of 31,750 S.F. of assembly and storage buildings, as well as a 2,000 S.F. small office building. The proposed development is expected to generate 53 total trips (33 in and 20 out) during the morning peak hour, 75 total trips (33 in and 42 out) during the evening peak hour, and 570 total trips (284 in and 286 out) during an average weekday. To evaluate the traffic operations with the proposed development in place, capacity analyses were completed at the two (2) study intersections included in this report. The purpose for this analysis was to compare the results of the No Build and Build Conditions to identify areas impacted by the proposed development. The results of the capacity analysis indicate that there are no projected changes to levels of service at the study intersections from No Build to Build Conditions. Conclusion Based on the results of the analysis contained in this report, the addition of the site traffic associated with the proposed development is not expected to adversely impact the operations of the existing roadway network. 11 bore manconsulti ng.com Bowman �C 0 N S U L T I N G 1441 � Appendix A Conceptual Plan bowin�.1icon5U1tiilg.00111 LSOdND 1 no rx�ous mn aux mx...nrf........� 41'7— /Tj� 0 so so mm2„_o i/T//� —.._.._.._..—._.._.._..—..—.. �aus`s za oao rio-111'1. -- __� o�Eo „o o�Eo �onEa II E.no Eo opo re .� .,uw a lAl— POND a� PANEi q9 n I( n r e. \ F I r� /f TRUSS PLANT EXPANSION sc �a 000=Eo 11E1r1 IAI - - B4 LU FREDERICK COUNTY nzai z Bowman �C 0 N S U L T I N G 1441 � Appendix 6 Turning Movement Counts bowmanconsulting.com Type of peak hour being reported:Intersection Peal< Method for determining peak hour:Total Entering Volume LOCATION: Martinsburg Pike--Yardmaster Ct/Private Dwy QC_' "f 15746201 CITY/STATE: Frederick,VA DATE:Wed, Mar 23 2022 353 250 Peak-Hour:8:00 AM--9:00 AM 11.3 11.6 a * Peak 15-Min:8:45 AM--9:00 AM + + s 348 o 21011.z o r 4 1 r i L L 21 « 8 s t 0 s 5 3&1. 25 ,/ t 0 n 20 8 . 0.79 r 3 37.5 y. r 0 27 . 11 z r 2 . 9 33.3 4 36.4 r 50 . 33.3 e Fs 242 * � �5 3.8 112 361 256 uaL S}. Counts 12.2 13.3 e 0 0 0 J l 1 L 0 0 0 1 0 0 . 0 o z r o h f r 0 � —1 ' 0 0 0 +A * L +A ~ L N/A N/A N/A yr i r N/A r s /A * N/A r 15-Min Count Martinsburg Pike Martinsburg Pike Yardmaster Ct/Private Dwy Yardmaster Ct/Private Dwy Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Hourly Beginning At Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 7:00 AM 6 55 0 0 0 70 5 0 0 0 0 0 0 0 0 0 136 7:15 AM 1 49 0 0 0 87 2 0 0 0 4 0 0 0 0 0 143 7:30 AM 4 53 1 0 0 88 4 0 1 0 1 0 0 1 0 0 153 7:45 AM 2 72 0 0 0 89 1 0 2 2 2 0 0 1 0 0 171 603 8:00 AM 5 57 0 0 0 68 0 0 3 4 1 0 0 1 0 0 139 606 8:15 AM 2 53 0 0 0 76 1 0 4 2 1 0 0 2 0 0 141 604 8:30 AM 3 52 1 0 0 94 0 0 0 2 6 0 0 0 0 0 158 609 8:45 AM 3 80 0 0 0 110 4 0 1 0 3 0 2 0 0 0 203 1 641 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 12 320 0 0 0 440 16 0 4 0 12 0 8 0 0 0 812 Heavy Trucks 8 32 0 0 64 4 0 0 4 4 0 0 116 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 3/28/2022 3:27 PM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 1 of 1 Type of peak hour being reported:Intersection Peal< Method for determining peak hour:Total Entering Volume LOCATION: Martinsburg Pike--Yardmaster Ct/Private Dwy QC_' "f 15746202 CITY/STATE: Frederick,VA DATE:Wed, Mar 23 2022 291 541 Peak-Hour:4:15 PM—5:15 PM 2.4 3 * Peak 15-Min:4:30 PM--4:45 PM + 5 2% 0 L I 20 2.1 0 L r + 1 1 + + 16 « 15 s t 0 « 1 1&8. 0 ,t t 0 « 0 0 . r 0 0 y « 0 54 . 39 '+ r 1 . 0 3.7 . 5.1-1 r 0 . 0 ' F- -11 s1 526 * +yI }. f��y �+y ;2 3 326 5.37 u aL i 4. Counts t t 25 3.4 VATA 17i1tT[7R ffS COMMUMMES I 0 0 0 - L l 0 t t 0 0 0 0 . 5 ., r 0 0 0 � f r 0 -10 0 0 N/A L L N/A y . t N/A N/A-1 r N/A 15-Min Count Martinsburg Pike Martinsburg Pike Yardmaster Ct/Private Dwy Yardmaster Ct/Private Dwy Period (Northbound) (Southbound) (Eastbound) (Westbound) Total Hourly Beginning At Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U Totals 4:00 PM 4 134 0 0 0 73 4 0 1 0 5 0 0 0 0 0 221 4:15 PM 7 135 0 0 0 66 2 0 0 0 4 0 0 0 0 0 214 4:30 PM 1 127 0 0 0 73 2 0 10 0 23 0 0 0 0 0 236 4:45 PM 1 132 0 0 0 64 0 0 0 0 1 0 0 0 0 0 198 869 5:00 PM 2 132 0 0 0 83 1 0 5 0 11 0 1 0 0 0 235 883 5:15 PM 0 97 0 0 0 62 0 0 3 0 8 0 2 0 0 0 172 841 5:30 PM 0 118 0 0 0 79 3 0 3 0 10 0 0 0 0 0 213 818 5:45 PM 1 78 0 0 0 63 2 0 0 0 6 0 0 0 0 0 150 770 Peak 15-Min Northbound Southbound Eastbound Westbound Total Flowrates Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 4 508 0 0 0 292 8 0 40 0 92 0 0 0 0 0 944 Heavy Trucks 4 16 0 0 8 0 0 0 4 0 0 0 32 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Report generated on 3/28/2022 3:27 PM SOURCE:Quality Counts,LLC(http://www.qualitycounts.net)1-877-580-2212 Page 1 of 1 Bowman �C 0 N S U L T I N G 1441 � Appendix C Traffic Volume and Traffic Distribution Exhibits bowmanconsulting.com a Y 'a rn c r m (5) (286) (0) "L 0 (0) 5 348 0 F 3 (0) < y L> 2 (1) Private Dwy Yardmaster Court (15) 8 T (0) 8 13 242 1 (39) 11 (11) (526) (0) d Y 'a rn c `m NOT TO SCALE Legend EXHIBIT 2022 Existing 123 -AM Peak Hour Traffic Volumes ������ Peak Hour Traffic Volumes 1 (123) -PM Peak Hour Traffic Volumes 84 Lumber Truss Plant TIA PROJECT NO. Frederick County,VA 130155-01-003 a Y 'a rn c r m (5) (292) (0) "L 0 (0) 5 355 0 F 3 (0) <J y L> 2 (1) Private Dwy Yardmaster Court (15) 8 T (0) 8 13 247 1 (39) 11 (11) (537) (0) d Y 'a rn c `m A� NOT TO SCALE Legend 2023 No Build EXHIBIT 123 -AM Peak Hour Traffic Volumes ������ Peak Hour Traffic Volumes 2 (123) -PM Peak Hour Traffic Volumes 84 Lumber Truss Plant TIA PROJECT NO. Frederick County,VA 130155-01-003 a Y 'a rn c D � w (l00%) 4,— loo 45% F <j L> L> Private Dwy Yardmaster Court (45%) T > 55% (55%) d Y 'a rn c `m NOT TO SCALE Legend EXHIBIT 123 -AMPeakHourTrafficVolumes Trip Distribution 3 (123) -PM Peak Hour Traffic Volumes Bowman 84 Lumber Truss Plant TIA PROJECT NO. Frederick County,VA 130155-01-003 a Y 'a rn c D � w (42) (15) "L 20 41— 33 (33) 15 F <y L> F <j Y L> Private Dwy Yardmaster Court 9) 9 <1T P. > 18 (23) 11 7. (18) d Y 'a rn c `m NOT TO SCALE Legend EXHIBIT 123 -AM Peak Hour Traffic Volumes Site Trips (123) -PM Peak Hour Traffic Volumes Bowman 84 Lumber Truss Plant TIA PROJECT NO. Frederick County,VA 130155-01-003 a Y 'a rn c D � w (0) (42) (20) (292) (0) "L 0 (0) 0 20 41— 33 (33) 20 355 0 F 3 (0) 4 L> F 21 (16) E1 `Y L> 2 (1) Private Dwy (0) 0 Yardmaster Court (34) 17 <1 T P. (54) 27 (0) 8 31 247 1 (62) 22 (29) (537) (0) d Y 'a rn c `m A� NOT TO SCALE Legend 2023 Build EXHIBIT 123 -AM Peak Hour Traffic Volumes ������ Peak Hour Traffic Volumes 5 (123) -PM Peak Hour Traffic Volumes 84 Lumber Truss Plant TIA PROJECT NO. Frederick County,VA 130155-01-003 Bow n C d N S U L T I N G Appendix D Existing (2022) Capacity Analysis bowin�.1icon5U1ting.com Lanes, Volumes, Timings 2022 Existing AM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 1I04/18/2022 --1. .4--- t i Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +' r 1� Vii + r Traffic Volume(vph) 8 8 11 2 3 0 13 242 1 0 348 5 Future Volume(vph) 8 8 11 2 3 0 13 242 1 0 348 5 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width(ft) 11 11 11 12 12 12 11 11 11 11 11 13 Grade(%) -2% 2% 1% -1% Storage Length (ft) 0 290 0 0 90 0 175 275 Storage Lanes 0 1 0 0 1 0 1 1 Taper Length(ft) 25 25 0 0 Link Speed(mph) 25 25 45 45 Link Distance(ft) 733 347 793 874 Travel Time(s) 20.0 9.5 12.0 13.2 Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 Heavy Vehicles(%) 25% 38% 36% 50% 0% 0% 54% 11% 0% 0% 11% 20% Shared Lane Traffic(%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.0% ICU Level of Service A Analysis Period(min) 15 2022 Existing AM Synchro 10 Report MJY Page 1 HCM 6th TWSC 2022 Existing AM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 04/18/2022 Intersection Int Delay,s/veh 1 Movement EBL EBBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurationsi Traffic Vol,veh/h 8 8 11 2 3 0 13 242 1 0 348 5 Future Vol,veh/h 8 8 11 2 3 0 13 242 1 0 348 5 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None - Storage Length 290 - 90 - 175 275 Veh in Median Storage,# 0 - 0 0 0 - Grade, % -2 - 2 1 -1 - Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79 Heavy Vehicles, % 25 38 36 50 0 0 54 11 0 0 11 20 Mvmt Flow 10 10 14 3 4 0 16 306 1 0 441 6 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 782 780 441 795 786 307 447 0 0 307 0 0 Stage 1 441 441 - 339 339 - - - - - - - Stage 2 341 339 - 456 447 - - - Critical Hdwy 6.95 6.48 6.36 8 6.9 6.4 4.64 4.1 Critical Hdwy Stg 1 5.95 5.48 - 7 5.9 - - - Critical Hdwy Stg 2 5.95 5.48 - 7 5.9 - - - Follow-up Hdwy 3.725 4.342 3.624 3.95 4 3.3 2.686 2.2 Pot Cap-1 Maneuver 311 314 564 233 299 725 886 1265 _ Stage 1 581 546 - 565 620 - - - Stage 2 653 603 - 477 549 - - - _ Platoon blocked, % Mov Cap-1 Maneuver 304 308 564 219 294 725 886 1265 _ Mov Cap-2 Maneuver 304 308 - 219 294 - - - Stage 1 571 546 555 609 _ Stage 2 637 592 457 549 Approach EB WB NB SB _ HCM Control Delay,s 15.1 19.2 0.5 0 _ HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity(veh/h) 886 306 564 259 1265 - HCM Lane V/C Ratio 0.019 0.066 0.025 0.024 - HCM Control Delay(s) 9.1 17.6 11.5 19.2 0 - HCM Lane LOS A C B C A HCM 95th%tile Q(veh) 0.1 0.2 0.1 0.1 0 2022 Existing AM Synchro 10 Report MJY Page 2 SimTraffic Simulation Summary 2022 Existing AM 04/18/2022 Summary of All Intervals Run Number 1 10 2 3 4 5 6 Start Time 7:45 7:45 7:45 7:45 7:45 7:45 7:45 End Time 9:00 9:00 9:00 9:00 9:00 9:00 9:00 Total Time(min) 75 75 75 75 75 75 75 Time Recorded(min) 60 60 60 60 60 60 60 #of Intervals 5 5 5 5 5 5 5 #of Recorded Intervals 4 4 4 4 4 4 4 Vehs Entered 672 621 653 657 583 612 616 Vehs Exited 676 623 647 655 586 616 616 Starting Vehs 5 6 5 5 7 9 5 Ending Vehs 1 4 11 7 4 5 5 Travel Distance(mi) 210 194 203 204 182 192 192 Travel Time(hr) 5.4 4.8 5.1 5.1 4.5 4.8 4.7 Total Delay(hr) 0.4 0.3 0.3 0.3 0.3 0.3 0.2 Total Stops 47 35 34 41 35 36 32 Fuel Used(gal) 6.2 5.6 6.1 5.9 5.2 5.7 5.6 Summary of All Intervals Run Number 7 8 9 Avg Start Time 7:45 7:45 7:45 7:45 End Time 9:00 9:00 9:00 9:00 Total Time(min) 75 75 75 75 Time Recorded(min) 60 60 60 60 #of Intervals 5 5 5 5 #of Recorded Intervals 4 4 4 4 Vehs Entered 661 645 633 637 Vehs Exited 665 647 633 636 Starting Vehs 7 6 3 5 Ending Vehs 3 4 3 5 Travel Distance(mi) 207 201 198 198 Travel Time(hr) 5.2 5.0 5.0 5.0 Total Delay(hr) 0.3 0.3 0.3 0.3 Total Stops 43 35 37 39 Fuel Used(gal) 6.0 5.8 5.8 5.8 Interval #0 Information Seeding Start Time 7:45 End Time 8:00 Total Time(min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. - 2022 Existing AM SimTraffic Report MJY Page 1 SimTraffic Simulation Summary 2022 Existing AM 04/18/2022 Interval #1 Information 1 Start Time 8:00 End Time 8:15 Total Time(min) 15 _ Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 150 141 133 147 139 146 119 Vehs Exited 148 138 132 147 143 152 123 Starting Vehs 5 6 5 5 7 9 5 Ending Vehs 7 9 6 5 3 3 1 Travel Distance(mi) 46 43 41 45 44 47 38 Travel Time(hr) 1.2 1.1 1.0 1.2 1.1 1.2 0.9 Total Delay(hr) 0.1 0.0 0.1 0.1 0.1 0.1 0.0 Total Stops 11 4 10 14 8 9 7 Fuel Used(gal) 1.4 1.2 1.3 1.3 1.2 1.4 1.1 Interval #1 Information 1 Start Time 8:00 End Time 8:15 Total Time(min) 15 166" Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 165 140 153 144 Vehs Exited 167 141 149 144 AL- ANW Starting Vehs 7 6 3 5 Ending Vehs 5 5 7 5 Travel Distance(mi) 52 43 47 45 Travel Time(hr) 1.3 1.1 1.2 1.1 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ' 9 10 8 10 Fuel Used(gal) 1.5 1.3 1.4 1.3 2022 Existing AM SimTraffic Report MJY Page 2 SimTraffic Simulation Summary 2022 Existing AM 04/18/2022 Interval #2 Information 2 Start Time 8:15 End Time 8:30 Total Time(min) 15 MqW Volumes adjusted by PHF, Growth Factors. Run Number 1 10 2 3 4 5 Vehs Entered 214 186 200 197 183 220 200 Vehs Exited 215 188 201 197 184 212 196 Starting Vehs 7 9 6 5 3 3 1 Ending Vehs 6 7 5 5 2 11 5 Travel Distance(mi) 68 58 63 61 58 68 62 Travel Time(hr) 1.8 1.5 1.6 1.6 1.4 1.7 1.5 Total Delay(hr) 0.2 0.1 0.1 0.1 0.1 0.1 0.1 Total Stops 17 12 6 15 5 10 13 Fuel Used(gal) 2.0 1.7 1.9 1.8 1.6 2.0 1.8 Interval #2 Information 2 Start Time 8:15 End Time 8:30 Total Time(min) 15 Volumes adjusted by PHF, Growth Factors. Run Number 8 9 Avg Vehs Entered 218 203 194 203 Vehs Exited 214 201 197 200 Starting Vehs 5 5 7 5 Ending Vehs 9 7 4 5 Travel Distance(mi) 67 62 61 63 Travel Time(hr) 1.7 1.6 1.6 1.6 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops 17 11 16 14 Fuel Used(gal) 2.0 1.8 1.8 1.9 2022 Existing AM SimTraffic Report MJY Page 3 SimTraffic Simulation Summary 2022 Existing AM 04/18/2022 Interval #3 Information 3 Start Time 8:30 End Time 8:45 Total Time(min) 15 _ Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 142 139 148 152 130 112 140 Vehs Exited 146 138 150 152 125 123 141 Starting Vehs 6 7 5 5 2 11 5 Ending Vehs 2 8 3 5 7 0 4 Travel Distance(mi) 45 43 46 48 40 36 44 Travel Time(hr) 1.1 1.1 1.1 1.2 1.0 0.9 1.1 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.0 0.0 Total Stops 11 10 5 4 10 7 5 Fuel Used(gal) 1.4 1.3 1.3 1.3 1.2 1.1 1.3 Interval #3 Information 3 Start Time 8:30 End Time 8:45 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 136 153 128 138 Vehs Exited 140 159 129 141 Starting Vehs 9 7 4 5 Ending Vehs 5 1 3 4 Travel Distance(mi) 43 49 40 43 Travel Time(hr) 1.1 1.2 1.0 1.1 Total Delay(hr) 0.1 0.1 0.0 0.1 Total Stops ■ 6 6 5 7 Fuel Used(gal) 1.2 1.4 1.1 1.3 2022 Existing AM SimTraffic Report MJY Page 4 SimTraffic Simulation Summary 2022 Existing AM 04/18/2022 Interval #4 Information 4 Start Time 8:45 End Time 9:00 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 166 155 172 161 131 134 157 Vehs Exited 167 159 164 159 134 129 156 Starting Vehs 2 8 3 5 7 0 4 Ending Vehs 1 4 11 7 4 5 5 Travel Distance(mi) 52 49 53 50 41 41 49 Travel Time(hr) 1.3 1.2 1.4 1.2 1.0 1.0 1.2 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.1 0.0 Total Stops 8 9 13 8 12 10 7 Fuel Used(gal) 1.5 1.4 1.6 1.4 1.2 1.2 1.4 Interval #4 Information 4 Start Time 8:45 End Time 9:00 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 142 149 158 152 Vehs Exited 144 146 158 150 - Starting Vehs 5 1 3 4 Ending Vehs 3 4 3 5 Travel Distance(mi) 45 46 50 48 Travel Time(hr) 1.1 1.1 1.2 1.2 Total Delay(hr) 0.0 0.0 0.1 0.1 Total Stops ■ 11 8 8 8 Fuel Used(gal) 1.3 1.3 1.5 1.4 2022 Existing AM SimTraffic Report MJY Page 5 Queuing and Blocking Report 2022 Existing AM 04/18/2022 Intersection: 1: Martinsburg Pike & Yardmaster Ct/Private Dwy Movement EB EB WB NB Directions Served LT R LTR L Maximum Queue(ft) 62 59 48 42 Average Queue(ft) 15 11 6 4 95th Queue(ft) 47 40 31 23 Link Distance(ft) 687 312 Upstream Blk Time(%) Queuing Penalty(veh) Storage Bay Dist(ft) 290 90 Storage Blk Time(%) Queuing Penalty(veh) Network Summary Network wide Queuing Penalty:0 2022 Existing AM SimTraffic Report MJY Page 6 Lanes, Volumes, Timings 2022 Existing PM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 1I04/18/2022 --1. .4--- t i Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +' r 1� Vii + r Traffic Volume(vph) 15 0 39 1 0 0 11 526 0 0 286 5 Future Volume(vph) 15 0 39 1 0 0 11 526 0 0 286 5 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width(ft) 11 11 11 12 12 12 11 11 11 11 11 13 Grade(%) -2% 2% 1% -1% Storage Length (ft) 0 290 0 0 90 0 175 275 Storage Lanes 0 1 0 0 1 0 1 1 Taper Length(ft) 25 25 0 0 Link Speed(mph) 25 25 45 45 Link Distance(ft) 810 347 793 874 Travel Time(s) 22.1 9.5 12.0 13.2 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles(%) 2% 0% 5% 0% 0% 0% 18% 3% 0% 0% 2% 20% Shared Lane Traffic(%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.7% ICU Level of Service A Analysis Period(min) 15 2022 Existing PM Synchro 10 Report MJY Page 1 HCM 6th TWSC 2022 Existing PM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 04/18/2022 Intersection Int Delay,s/veh 0.9 Movement EBL EBBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurationsi Traffic Vol,veh/h 15 0 39 1 0 0 11 526 0 0 286 5 Future Vol,veh/h 15 0 39 1 0 0 11 526 0 0 286 5 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None - Storage Length 290 - 90 - 175 275 Veh in Median Storage,# 0 - 0 0 0 - Grade, % -2 - 2 1 -1 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, % 2 0 5 0 0 0 18 3 0 0 2 20 Mvmt Flow 16 0 41 1 0 0 12 560 0 0 304 5 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 888 888 304 911 893 560 309 0 0 560 0 0 Stage 1 304 304 - 584 584 - - - - - - - Stage 2 584 584 - 327 309 - - - Critical Hdwy 6.72 6.1 6.05 7.5 6.9 6.4 4.28 4.1 Critical Hdwy Stg 1 5.72 5.1 - 6.5 5.9 - - - Critical Hdwy Stg 2 5.72 5.1 - 6.5 5.9 - - - Follow-up Hdwy 3.518 4 3.345 3.5 4 3.3 2.362 2.2 Pot Cap-1 Maneuver 292 314 741 232 256 515 1166 1021 _ Stage 1 730 689 - 470 470 - - - Stage 2 531 535 - 665 641 - - - _ Platoon blocked, % Mov Cap-1 Maneuver 290 311 741 217 253 515 1166 1021 _ Mov Cap-2 Maneuver 290 311 - 217 253 - - - Stage 1 723 689 465 465 _ Stage 2 526 530 628 641 Approach EB WB NB SB _ HCM Control Delay,s 12.3 21.7 0.2 0 _ HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity(veh/h) 1166 290 741 217 1021 - HCM Lane V/C Ratio 0.01 0.055 0.056 0.005 - HCM Control Delay(s) 8.1 18.1 10.1 21.7 0 - HCM Lane LOS A C B C A HCM 95th%tile Q(veh) 0 0.2 0.2 0 0 2022 Existing PM Synchro 10 Report MJY Page 2 SimTraffic Simulation Summary 2022 Existing PM 04/18/2022 Summary of All Intervals Run Number 1 10 2 3 4 5 6 Start Time 4:00 4:00 4:00 4:00 4:00 4:00 4:00 End Time 5:15 5:15 5:15 5:15 5:15 5:15 5:15 Total Time(min) 75 75 75 75 75 75 75 Time Recorded(min) 60 60 60 60 60 60 60 #of Intervals 5 5 5 5 5 5 5 #of Recorded Intervals 4 4 4 4 4 4 4 Vehs Entered 908 822 891 882 892 900 851 Vehs Exited 903 826 893 889 889 907 852 Starting Vehs 5 7 9 9 8 12 7 Ending Vehs 10 3 7 2 11 5 6 Travel Distance(mi) 285 260 281 279 281 285 269 Travel Time(hr) 7.2 6.6 7.1 7.0 7.1 7.2 6.7 Total Delay(hr) 0.5 0.4 0.5 0.5 0.5 0.5 0.4 Total Stops 61 60 60 56 54 63 45 Fuel Used(gal) 8.4 7.5 8.1 8.0 8.0 8.3 7.7 Summary of All Intervals Run Number 7 8 9 Avg Start Time 4:00 4:00 4:00 4:00 End Time 5:15 5:15 5:15 5:15 Total Time(min) 75 75 75 75 Time Recorded(min) 60 60 60 60 - #of Intervals 5 5 5 5 #of Recorded Intervals 4 4 4 4 Vehs Entered 831 897 905 878 Vehs Exited 832 900 903 880 Starting Vehs 7 10 3 7 Ending Vehs 6 7 5 6 Travel Distance(mi) 262 283 285 277 Travel Time(hr) 6.6 7.1 7.2 7.0 Total Delay(hr) 0.4 0.5 0.5 0.5 Total Stops 47 59 55 55 Fuel Used(gal) 7.5 8.3 8.1 8.0 Interval #0 Information Seeding Start Time 4:00 - End Time 4:15 Total Time(min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. - 2022 Existing PM SimTraffic Report MJY Page 1 SimTraffic Simulation Summary 2022 Existing PM 04/18/2022 Interval #1 Information 1 Start Time 4:15 End Time 4:30 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 227 193 221 232 196 191 189 Vehs Exited 228 195 222 232 199 195 188 Starting Vehs 5 7 9 9 8 12 7 Ending Vehs 4 5 8 9 5 8 8 Travel Distance(mi) 71 61 70 72 62 61 60 Travel Time(hr) 1.8 1.6 1.7 1.8 1.5 1.6 1.5 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Total Stops 12 15 14 17 13 14 14 Fuel Used(gal) 2.0 1.7 2.0 2.1 1.8 1.8 1.7 Interval #1 Information 1 Start Time 4:15 End Time 4:30 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 206 221 214 210 Vehs Exited 208 221 210 210 - Starting Vehs 7 10 3 7 Ending Vehs 5 10 7 7 Travel Distance(mi) 66 69 67 66 Travel Time(hr) 1.6 1.8 1.7 1.7 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ■ 12 15 11 13 Fuel Used(gal) 1.9 2.0 1.8 1.9 2022 Existing PM SimTraffic Report MJY Page 2 SimTraffic Simulation Summary 2022 Existing PM 04/18/2022 Interval #2 Information 2 Start Time 4:30 End Time 4:45 Total Time(min) 15 MqW Volumes adjusted by PHF, Growth Factors. Run Number 1 10 2 3 4 5 Vehs Entered 258 205 222 223 240 277 250 Vehs Exited 258 205 221 226 242 275 246 Starting Vehs 4 5 8 9 5 8 8 Ending Vehs 4 5 9 6 3 10 12 Travel Distance(mi) 81 65 70 71 76 87 79 Travel Time(hr) 2.0 1.6 1.8 1.8 1.9 2.3 2.0 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.2 0.1 Total Stops 15 13 21 13 13 24 15 Fuel Used(gal) 2.4 1.9 2.1 2.0 2.1 2.6 2.3 Interval #2 Information 2 Start Time 4:30 End Time 4:45 Total Time(min) 15 Volumes adjusted by PHF, Growth Factors. Run Number 8 9 Avg Vehs Entered 245 227 240 239 Vehs Exited 230 240 239 Starting Vehs 5 10 7 7 Ending Vehs 11 1 7 7 7 Travel Distance(mi) 76 72 75 75 Travel Time(hr) 1.9 1.8 1.9 1.9 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops 15 1 14 16 16 Fuel Used(gal) 2.2 2.1 2.1 2.2 2022 Existing PM SimTraffic Report MJY Page 3 SimTraffic Simulation Summary 2022 Existing PM 04/18/2022 Interval #3 Information 3 Start Time 4:45 End Time 5:00 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 217 196 218 224 226 211 207 Vehs Exited 216 196 220 224 219 215 210 Starting Vehs 4 5 9 6 3 10 12 Ending Vehs 5 5 7 6 10 6 9 Travel Distance(mi) 69 62 70 71 70 67 65 Travel Time(hr) 1.7 1.6 1.8 1.7 1.7 1.6 1.6 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Total Stops 15 15 14 13 9 12 10 Fuel Used(gal) 2.0 1.8 2.0 2.1 2.0 1.9 1.9 Interval #3 Information 3 Start Time 4:45 End Time 5:00 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 190 191 228 212 Vehs Exited 197 192 227 212 - Starting Vehs 11 7 7 7 Ending Vehs 4 6 8 7 Travel Distance(mi) 61 61 72 67 Travel Time(hr) 1.5 1.5 1.8 1.7 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ■ 6 14 15 12 Fuel Used(gal) 1.7 1.8 2.1 1.9 2022 Existing PM SimTraffic Report MJY Page 4 SimTraffic Simulation Summary 2022 Existing PM 04/18/2022 Interval #4 Information 4 Start Time 5:00 End Time 5:15 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 206 228 230 203 230 221 205 Vehs Exited 201 230 230 207 229 222 208 Starting Vehs 5 5 7 6 10 6 9 Ending Vehs 10 3 7 2 11 5 6 Travel Distance(mi) 64 72 72 64 72 69 65 Travel Time(hr) 1.6 1.8 1.8 1.6 1.9 1.7 1.6 Total Delay(hr) 0.1 0.1 0.1 0.1 0.2 0.1 0.1 Total Stops 19 17 11 13 19 13 6 Fuel Used(gal) 1.9 2.1 2.0 1.9 2.1 2.0 1.8 Interval #4 Information 4 Start Time 5:00 End Time 5:15 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 7 8 9 Avg Vehs Entered 190 258 223 220 Vehs Exited 188 257 226 220 _ Starting Vehs 4 6 8 7 Ending Vehs 6 7 5 6 Travel Distance(mi) 59 81 71 69 Travel Time(hr) 1.5 2.0 1.8 1.7 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ■ 14 16 13 14 Fuel Used(gal) 1.7 2.4 2.1 2.0 2022 Existing PM SimTraffic Report MJY Page 5 Queuing and Blocking Report 2022 Existing PM 04/18/2022 Intersection: 1: Martinsburg Pike & Yardmaster Ct/Private Dwy Movement EB EB WB NB Directions Served LT R LTR L Maximum Queue(ft) 32 53 24 20 Average Queue(ft) 10 19 1 2 95th Queue(ft) 31 43 10 12 Link Distance(ft) 764 312 Upstream Blk Time(%) Queuing Penalty(veh) Storage Bay Dist(ft) 290 90 Storage Blk Time(%) Queuing Penalty(veh) Network Summary Network wide Queuing Penalty:0 2022 Existing PM SimTraffic Report MJY Page 6 Bow n C d N S U L T I N G Appendix E No Build (2023) Capacity Analysis bowin�.1icon5U1ting.com Lanes, Volumes, Timings 2023 No Build AM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 1I04/18/2022 --1. .4--- t i Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +' r 1� Vii + r Traffic Volume(vph) 8 8 11 2 3 0 13 247 1 0 355 5 Future Volume(vph) 8 8 11 2 3 0 13 247 1 0 355 5 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width(ft) 11 11 11 12 12 12 11 11 11 11 11 13 Grade(%) -2% 2% 1% -1% Storage Length (ft) 0 290 0 0 90 0 175 275 Storage Lanes 0 1 0 0 1 0 1 1 Taper Length(ft) 25 25 0 0 Link Speed(mph) 25 25 45 45 Link Distance(ft) 898 347 793 874 Travel Time(s) 24.5 9.5 12.0 13.2 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles(%) 25% 38% 36% 50% 0% 0% 54% 11% 0% 0% 11% 20% Shared Lane Traffic(%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.4% ICU Level of Service A Analysis Period(min) 15 2023 No Build AM Synchro 10 Report MJY Page 1 HCM 6th TWSC 2023 No Build AM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 04/18/2022 Intersection Int Delay,s/veh 0.9 Movement EBL EBBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurationsi Traffic Vol,veh/h 8 8 11 2 3 0 13 247 1 0 355 5 Future Vol,veh/h 8 8 11 2 3 0 13 247 1 0 355 5 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None - Storage Length 290 - 90 - 175 275 Veh in Median Storage,# 0 - 0 0 0 - Grade, % -2 - 2 1 -1 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 Heavy Vehicles, % 25 38 36 50 0 0 54 11 0 0 11 20 Mvmt Flow 9 9 13 2 3 0 15 281 1 0 403 6 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 716 715 403 729 721 282 409 0 0 282 0 0 Stage 1 403 403 - 312 312 - - - - - - - Stage 2 313 312 - 417 409 - - - Critical Hdwy 6.95 6.48 6.36 8 6.9 6.4 4.64 4.1 Critical Hdwy Stg 1 5.95 5.48 - 7 5.9 - - - Critical Hdwy Stg 2 5.95 5.48 - 7 5.9 - - - Follow-up Hdwy 3.725 4.342 3.624 3.95 4 3.3 2.686 2.2 Pot Cap-1 Maneuver 343 342 593 262 328 750 918 1292 _ Stage 1 607 567 - 587 639 - - - Stage 2 674 619 - 505 573 - - - _ Platoon blocked, % Mov Cap-1 Maneuver 336 337 593 248 323 750 918 1292 _ Mov Cap-2 Maneuver 336 337 - 248 323 - - - Stage 1 597 567 578 629 _ Stage 2 659 609 486 573 Approach EB WB NB SB _ HCM Control Delay,s 14.2 17.8 0.4 0 _ HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity(veh/h) 918 336 593 288 1292 - HCM Lane V/C Ratio 0.016 0.054 0.021 0.02 - HCM Control Delay(s) 9 16.3 11.2 17.8 0 - HCM Lane LOS A C B C A HCM 95th%tile Q(veh) 0 0.2 0.1 0.1 0 2023 No Build AM Synchro 10 Report MJY Page 2 SimTraffic Simulation Summary 2023 No Build AM 04/18/2022 Summary of All Intervals Run Number 1 10 2 3 4 5 6 Start Time 7:45 7:45 7:45 7:45 7:45 7:45 7:45 End Time 9:00 9:00 9:00 9:00 9:00 9:00 9:00 Total Time(min) 75 75 75 75 75 75 75 Time Recorded(min) 60 60 60 60 60 60 60 #of Intervals 5 5 5 5 5 5 5 #of Recorded Intervals 4 4 4 4 4 4 4 Vehs Entered 688 653 673 666 587 623 631 Vehs Exited 688 656 668 664 589 627 631 Starting Vehs 5 7 5 5 7 9 5 Ending Vehs 5 4 10 7 5 5 5 Travel Distance(mi) 216 206 211 209 184 197 198 Travel Time(hr) 5.5 5.2 5.3 5.2 4.6 5.0 4.9 Total Delay(hr) 0.4 0.3 0.3 0.3 0.2 0.3 0.2 Total Stops 51 32 41 38 34 38 28 Fuel Used(gal) 6.4 6.0 6.2 6.0 5.3 5.8 5.7 Summary of All Intervals Run Number 7 8 9 Avg Start Time 7:45 7:45 7:45 7:45 End Time 9:00 9:00 9:00 9:00 Total Time(min) 75 75 75 75 Time Recorded(min) 60 60 60 60 #of Intervals 5 5 5 5 #of Recorded Intervals 4 4 4 4 Vehs Entered 655 670 640 648 Vehs Exited 659 669 638 649 Starting Vehs 7 6 3 5 Ending Vehs 3 7 5 5 Travel Distance(mi) 207 210 201 204 Travel Time(hr) 5.1 5.2 5.1 5.1 Total Delay(hr) 0.3 0.3 0.3 0.3 Total Stops 35 40 32 36 Fuel Used(gal) 6.0 6.1 5.8 5.9 Interval #0 Information Seeding Start Time 7:45 End Time 8:00 Total Time(min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. - 2023 No Build AM SimTraffic Report MJY Page 1 SimTraffic Simulation Summary 2023 No Build AM 04/18/2022 Interval #1 Information 1 Start Time 8:00 End Time 8:15 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 166 145 149 163 143 151 138 Vehs Exited 163 144 144 162 147 156 140 Starting Vehs 5 7 5 5 7 9 5 Ending Vehs 8 8 10 6 3 4 3 Travel Distance(mi) 52 45 46 51 45 49 44 Travel Time(hr) 1.3 1.1 1.2 1.3 1.1 1.2 1.1 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Total Stops 10 8 10 12 10 9 6 Fuel Used(gal) 1.5 1.3 1.4 1.5 1.3 1.5 1.3 Interval #1 Information 1 Start Time 8:00 End Time 8:15 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 170 148 169 155 Vehs Exited 149 165 153 - Starting Vehs 7 6 3 5 Ending Vehs 5 7 5 Travel Distance(mi) 53 46 53 48 Travel Time(hr) 1.2 1.3 1.2 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops 10 6 9 Fuel Used(gal) 1.5 1.4 1.5 1.4 2023 No Build AM SimTraffic Report MJY Page 2 SimTraffic Simulation Summary 2023 No Build AM 04/18/2022 Interval #2 Information 2 Start Time 8:15 End Time 8:30 Total Time(min) 15 Volumes adjusted by PHF, Growth Factors. Run Number 1 10 2 3 4 5 6 Vehs Entered 202 182 188 178 153 200 188 Vehs Exited 204 183 192 181 153 198 184 Starting Vehs 8 8 10 6 3 4 3 Ending Vehs 6 7 6 3 3 6 7 Travel Distance(mi) 64 58 60 56 49 63 59 Travel Time(hr) 1.7 1.4 1.5 1.4 1.2 1.6 1.4 Total Delay(hr) 0.2 0.1 0.1 0.1 0.1 0.1 0.1 Total Stops 17 6 8 10 3 14 10 Fuel Used(gal) 1.9 1.7 1.7 1.6 1.3 1.9 1.7 Interval #2 Information 2 Start Time 8:15 End Time 8:30 Total Time(min) 15 Volumes adjusted by PHF, Growth Factors. Run Number 7 8 9 Avg Vehs Entered 190 190 171 184 Vehs Exited 187 187 177 185 Starting Vehs 6 5 7 5 Ending Vehs 9 8 1 5 Travel Distance(mi) 59 59 55 58 Travel Time(hr) 1.5 1.5 1.5 1.5 - Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ■ 11 11 13 11 Fuel Used(gal) 1.8 1.7 1.7 1.7 2023 No Build AM SimTraffic Report MJY Page 3 SimTraffic Simulation Summary 2023 No Build AM 04/18/2022 Interval #3 Information 3 Start Time 8:30 End Time 8:45 Total Time(min) 15 _ Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 150 151 156 164 139 122 148 Vehs Exited 154 149 159 157 134 125 147 Starting Vehs 6 7 6 3 3 6 7 Ending Vehs 2 9 3 10 8 3 8 Travel Distance(mi) 48 47 49 51 43 39 46 Travel Time(hr) 1.2 1.2 1.2 1.3 1.1 0.9 1.1 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.0 0.0 Total Stops 10 10 9 6 8 5 4 Fuel Used(gal) 1.4 1.4 1.4 1.4 1.2 1.1 1.4 Interval #3 Information 3 Start Time 8:30 End Time 8:45 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 144 170 132 148 Vehs Exited 148 176 130 148 Starting Vehs 9 8 1 5 Ending Vehs 5 2 3 5 Travel Distance(mi) 46 55 41 46 Travel Time(hr) 1.1 1.3 1.0 1.2 Total Delay(hr) 0.1 0.1 0.0 0.1 Total Stops ■ 4 6 6 8 Fuel Used(gal) 1.3 1.6 1.1 1.3 2023 No Build AM SimTraffic Report MJY Page 4 SimTraffic Simulation Summary 2023 No Build AM 04/18/2022 Interval #4 Information 4 Start Time 8:45 End Time 9:00 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 170 175 180 161 152 150 157 Vehs Exited 167 180 173 164 155 148 160 Starting Vehs 2 9 3 10 8 3 8 Ending Vehs 5 4 10 7 5 5 5 Travel Distance(mi) 53 56 56 51 48 47 50 Travel Time(hr) 1.3 1.4 1.4 1.2 1.2 1.2 1.2 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.1 0.0 Total Stops 14 8 14 10 13 10 8 Fuel Used(gal) 1.6 1.6 1.7 1.5 1.4 1.3 1.4 Interval #4 Information 4 Start Time 8:45 End Time 9:00 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 151 162 168 161 Vehs Exited 153 157 166 162 - Starting Vehs 5 2 3 5 Ending Vehs 3 7 5 5 Travel Distance(mi) 48 50 53 51 Travel Time(hr) 1.2 1.3 1.3 1.3 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ■ 12 13 7 10 Fuel Used(gal) 1.4 1.5 1.5 1.5 2023 No Build AM SimTraffic Report MJY Page 5 Queuing and Blocking Report 2023 No Build AM 04/18/2022 Intersection: 1: Martinsburg Pike & Yardmaster Ct/Private Dwy Movement EB EB WB NB Directions Served LT R LTR L Maximum Queue(ft) 62 52 45 44 Average Queue(ft) 14 11 6 3 95th Queue(ft) 43 39 27 21 Link Distance(ft) 852 312 Upstream Blk Time(%) Queuing Penalty(veh) Storage Bay Dist(ft) 290 90 Storage Blk Time(%) Queuing Penalty(veh) Network Summary Network wide Queuing Penalty:0 2023 No Build AM SimTraffic Report MJY Page 6 Lanes, Volumes, Timings 2023 No Build PM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 1I04/18/2022 --1. .4--- t i Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +' r 1� Vii + r Traffic Volume(vph) 15 0 39 1 0 0 11 537 0 0 292 5 Future Volume(vph) 15 0 39 1 0 0 11 537 0 0 292 5 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width(ft) 11 11 11 12 12 12 11 11 11 11 11 13 Grade(%) -2% 2% 1% -1% Storage Length (ft) 0 290 0 0 90 0 175 275 Storage Lanes 0 1 0 0 1 0 1 1 Taper Length(ft) 25 25 0 0 Link Speed(mph) 25 25 45 45 Link Distance(ft) 889 347 793 874 Travel Time(s) 24.2 9.5 12.0 13.2 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles(%) 2% 0% 5% 0% 0% 0% 18% 3% 0% 0% 2% 20% Shared Lane Traffic(%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 38.3% ICU Level of Service A Analysis Period(min) 15 2023 No Build PM Synchro 10 Report MJY Page 1 HCM 6th TWSC 2023 No Build PM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 04/18/2022 Intersection Int Delay,s/veh 0.9 Movement EBL EBBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurationsi Traffic Vol,veh/h 15 0 39 1 0 0 11 537 0 0 292 5 Future Vol,veh/h 15 0 39 1 0 0 11 537 0 0 292 5 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None ' Storage Length 290 90 175 275 Veh in Median Storage,# 0 - 0 - 0 - 0 - _ Grade, % -2 - 2 - 1 - -1 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 _ Heavy Vehicles, % 2 0 5 0 0 0 18 3 0 0 2 20 Mvmt Flow 16 0 41 1 0 0 12 571 0 0 311 5 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 906 906 311 929 911 571 316 0 0 571 0 0 Stage 1 311 311 - 595 595 - - - - - - - Stage 2 595 595 - 334 316 - - - Critical Hdwy 6.72 6.1 6.05 7.5 6.9 6.4 4.28 4.1 Critical Hdwy Stg 1 5.72 5.1 - 6.5 5.9 - - - Critical Hdwy Stg 2 5.72 5.1 - 6.5 5.9 - - - Follow-up Hdwy 3.518 4 3.345 3.5 4 3.3 2.362 2.2 Pot Cap-1 Maneuver 284 308 735 226 250 508 1159 1012 Stage 1 724 685 - 463 464 - - - Stage 2 524 529 - 659 636 - - - _ Platoon blocked, % Mov Cap-1 Maneuver 282 305 735 212 248 508 1159 1012 _ Mov Cap-2 Maneuver 282 305 - 212 248 - - - Stage 1 717 685 458 459 _ Stage 2 519 524 622 636 Approach EB WB NB SB _ HCM Control Delay,s 12.5 22.1 0.2 0 _ HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity(veh/h) 1159 282 735 212 1012 - HCM Lane V/C Ratio 0.01 0.057 0.056 0.005 - HCM Control Delay(s) 8.1 18.5 10.2 22.1 0 - HCM Lane LOS A C B C A HCM 95th%tile Q(veh) 0 0.2 0.2 0 0 2023 No Build PM Synchro 10 Report MJY Page 2 SimTraffic Simulation Summary 2023 No Build PM 04/18/2022 Summary of All Intervals Run Number 1 10 2 3 4 5 6 Start Time 4:00 4:00 4:00 4:00 4:00 4:00 4:00 End Time 5:15 5:15 5:15 5:15 5:15 5:15 5:15 Total Time(min) 75 75 75 75 75 75 75 Time Recorded(min) 60 60 60 60 60 60 60 #of Intervals 5 5 5 5 5 5 5 #of Recorded Intervals 4 4 4 4 4 4 4 Vehs Entered 922 829 891 889 906 900 893 Vehs Exited 917 832 893 892 903 907 895 Starting Vehs 5 7 9 9 8 12 8 Ending Vehs 10 4 7 6 11 5 6 Travel Distance(mi) 291 263 282 281 286 286 283 Travel Time(hr) 7.4 6.7 7.2 7.1 7.2 7.2 7.1 Total Delay(hr) 0.5 0.4 0.5 0.5 0.5 0.5 0.4 Total Stops 60 55 58 56 54 59 44 Fuel Used(gal) 8.5 7.5 8.1 8.1 8.2 8.2 8.1 Summary of All Intervals Run Number 7 8 9 Avg Start Time 4:00 4:00 4:00 4:00 End Time 5:15 5:15 5:15 5:15 Total Time(min) 75 75 75 75 Time Recorded(min) 60 60 60 60 - #of Intervals 5 5 5 5 #of Recorded Intervals 4 4 4 4 Vehs Entered 849 918 912 891 Vehs Exited 849 921 911 892 Starting Vehs 7 10 3 7 Ending Vehs 7 7 4 7 Travel Distance(mi) 269 290 288 282 Travel Time(hr) 6.8 7.3 7.3 7.1 Total Delay(hr) 0.4 0.5 0.5 0.5 Total Stops 48 59 52 54 Fuel Used(gal) 7.7 8.5 8.2 8.1 Interval #0 Information Seeding Start Time 4:00 - End Time 4:15 Total Time(min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. - 2023 No Build PM SimTraffic Report MJY Page 1 SimTraffic Simulation Summary 2023 No Build PM 04/18/2022 Interval #1 Information 1 Start Time 4:15 End Time 4:30 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 234 193 221 232 203 191 210 Vehs Exited 235 195 222 232 207 195 210 Starting Vehs 5 7 9 9 8 12 8 Ending Vehs 4 5 8 9 4 8 8 Travel Distance(mi) 74 61 70 73 65 61 67 Travel Time(hr) 1.9 1.6 1.7 1.8 1.6 1.6 1.7 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Total Stops 12 16 14 17 15 12 14 Fuel Used(gal) 2.1 1.7 2.0 2.1 1.9 1.7 1.9 Interval #1 Information 1 Start Time 4:15 End Time 4:30 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 206 228 214 214 Vehs Exited 208 228 210 214 Starting Vehs 7 10 3 7 Ending Vehs 5 10 7 7 Travel Distance(mi) 66 72 67 68 Travel Time(hr) 1.6 1.8 1.7 1.7 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ■ 12 17 10 13 Fuel Used(gal) 1.9 2.1 1.9 1.9 2023 No Build PM SimTraffic Report MJY Page 2 SimTraffic Simulation Summary 2023 No Build PM 04/18/2022 Interval #2 Information 2 Start Time 4:30 End Time 4:45 Total Time(min) 15 _ Volumes adjusted by PHF, Growth Factors. Run Number 1 10 2 3 4 5 Vehs Entered 258 205 222 223 247 277 257 Vehs Exited 258 205 222 226 249 275 259 Starting Vehs 4 5 8 9 4 8 8 Ending Vehs 4 5 8 6 2 10 6 Travel Distance(mi) 82 65 70 71 78 88 82 Travel Time(hr) 2.0 1.6 1.8 1.8 2.0 2.3 2.1 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.2 0.1 Total Stops 15 13 20 13 12 24 12 Fuel Used(gal) 2.4 1.9 2.1 2.0 2.2 2.6 2.4 Interval #2 Information 2 Start Time 4:30 End Time 4:45 Total Time(min) 15 Volumes adjusted by PHF, Growth Factors. Run Number 8 9 Avg Vehs Entered 245 234 240 241 Vehs Exited 237 240 241 Starting Vehs 5 10 7 7 Ending Vehs 8 1 7 7 6 1 Travel Distance(mi) 77 74 76 76 Travel Time(hr) 1.9 1.8 2.0 1.9 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops 14 1 14 16 16 Fuel Used(gal) 2.2 2.1 2.2 2.2 2023 No Build PM SimTraffic Report MJY Page 3 SimTraffic Simulation Summary 2023 No Build PM 04/18/2022 Interval #3 Information 3 Start Time 4:45 End Time 5:00 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 224 203 218 227 226 211 214 Vehs Exited 223 203 219 224 218 215 210 Starting Vehs 4 5 8 6 2 10 6 Ending Vehs 5 5 7 9 10 6 10 Travel Distance(mi) 71 64 70 71 71 67 67 Travel Time(hr) 1.8 1.6 1.8 1.7 1.7 1.6 1.7 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Total Stops 14 8 13 13 8 10 10 Fuel Used(gal) 2.0 1.8 2.0 2.0 1.9 1.9 1.9 Interval #3 Information 3 Start Time 4:45 End Time 5:00 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 205 198 228 215 Vehs Exited 208 198 227 214 Starting Vehs 8 7 7 6 Ending Vehs 5 7 8 7 Travel Distance(mi) 65 63 72 68 Travel Time(hr) 1.6 1.6 1.8 1.7 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ■ 9 14 13 11 Fuel Used(gal) 1.9 1.9 2.1 2.0 2023 No Build PM SimTraffic Report MJY Page 4 SimTraffic Simulation Summary 2023 No Build PM 04/18/2022 Interval #4 Information 4 Start Time 5:00 End Time 5:15 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 206 228 230 207 230 221 212 Vehs Exited 201 229 230 210 229 222 216 Starting Vehs 5 5 7 9 10 6 10 Ending Vehs 10 4 7 6 11 5 6 Travel Distance(mi) 64 72 72 65 72 70 67 Travel Time(hr) 1.7 1.8 1.8 1.7 1.9 1.7 1.6 Total Delay(hr) 0.1 0.1 0.1 0.1 0.2 0.1 0.1 Total Stops 19 18 11 13 19 13 8 Fuel Used(gal) 1.9 2.1 2.0 1.9 2.1 2.0 1.9 Interval #4 Information 4 Start Time 5:00 End Time 5:15 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 193 258 230 222 Vehs Exited 191 258 234 221 Starting Vehs 5 7 8 7 Ending Vehs 7 7 4 7 Travel Distance(mi) 61 81 73 70 Travel Time(hr) 1.5 2.0 1.8 1.8 Total Delay(hr) 0.1 0.2 0.1 0.1 Total Stops ■ 13 14 13 14 Fuel Used(gal) 1.8 2.4 2.1 2.0 2023 No Build PM SimTraffic Report MJY Page 5 Queuing and Blocking Report 2023 No Build PM 04/18/2022 Intersection: 1: Martinsburg Pike & Yardmaster Ct/Private Dwy Movement EB EB WB NB Directions Served LT R LTR L Maximum Queue(ft) 32 53 24 22 Average Queue(ft) 10 19 1 2 95th Queue(ft) 31 42 10 13 Link Distance(ft) 843 312 Upstream Blk Time(%) Queuing Penalty(veh) Storage Bay Dist(ft) 290 90 Storage Blk Time(%) Queuing Penalty(veh) Network Summary Network wide Queuing Penalty:0 2023 No Build PM SimTraffic Report MJY Page 6 Bowman �C 0 N S U L T I N G 1441 � Appendix F Build (2023) Capacity Analysis bowmanconsulting.com Lanes, Volumes, Timings 2023 Build AM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 1I04/18/2022 --1. .4--- t i Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +' r 1� Vii + r Traffic Volume(vph) 17 8 22 2 3 0 31 247 1 0 355 20 Future Volume(vph) 17 8 22 2 3 0 31 247 1 0 355 20 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width(ft) 11 11 11 12 12 12 11 11 11 11 11 13 Grade(%) -2% 2% 1% -1% Storage Length (ft) 0 290 0 0 90 0 175 275 Storage Lanes 0 1 0 0 1 0 1 1 Taper Length(ft) 25 25 0 0 Link Speed(mph) 25 25 45 45 Link Distance(ft) 535 347 793 874 Travel Time(s) 14.6 9.5 12.0 13.2 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles(%) 25% 38% 36% 50% 0% 0% 54% 11% 0% 0% 11% 20% Shared Lane Traffic(%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.4% ICU Level of Service A Analysis Period(min) 15 2023 Build AM Synchro 10 Report MJY Page 1 HCM 6th TWSC 2023 Build AM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 04/18/2022 Intersection Int Delay,s/veh 1.5 Movement EBKEBBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurationsi Traffic Vol,veh/h 17 8 22 2 3 0 31 247 1 0 355 20 _ Future Vol,veh/h 17 8 22 2 3 0 31 247 1 0 355 20 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None _ Storage Length 290 90 175 275 Veh in Median Storage,# 0 - 0 - 0 - 0 - _ Grade, % -2 - 2 - 1 - -1 - Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88 _ Heavy Vehicles, % 25 38 36 50 0 0 54 11 0 0 11 20 Mvmt Flow 19 9 25 2 3 0 35 281 1 0 403 23 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 756 755 403 784 778 282 426 0 0 282 0 0 Stage 1 403 403 - 352 352 - - - - - - - Stage 2 353 352 - 432 426 - - - Critical Hdwy 6.95 6.48 6.36 8 6.9 6.4 4.64 4.1 Critical Hdwy Stg 1 5.95 5.48 - 7 5.9 - - - Critical Hdwy Stg 2 5.95 5.48 - 7 5.9 - - - Follow-up Hdwy 3.725 4.342 3.624 3.95 4 3.3 2.686 2.2 Pot Cap-1 Maneuver 324 325 593 238 303 750 904 1292 Stage 1 607 567 - 554 611 - - - Stage 2 644 595 - 494 562 - - - _ Platoon blocked, % Mov Cap-1 Maneuver 312 312 593 216 291 750 904 1292 _ Mov Cap-2 Maneuver 312 312 - 216 291 - - - Stage 1 583 567 532 587 _ Stage 2 615 572 466 562 Approach EB WB NB SB _ HCM Control Delay,s 14.7 19.4 1 0 _ HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity(veh/h) 904 312 593 256 1292 - HCM Lane V/C Ratio 0.039 0.091 0.042 0.022 - HCM Control Delay(s) 9.1 17.7 11.3 19.4 0 - HCM Lane LOS A C B C A HCM 95th%tile Q(veh) 0.1 0.3 0.1 0.1 0 2023 Build AM Synchro 10 Report MJY Page 2 Lanes, Volumes, Timings 2023 Build AM 2: Yardmaster Ct & Site Dwy 04/18/2022 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume(vph) 0 27 21 33 20 0 Future Volume(vph) 0 27 21 33 20 0 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Grade(%) -2% 2% 0% Link Speed(mph) 25 25 25 Link Distance(ft) 451 535 256 Travel Time(s) 12.3 14.6 7.0 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles(%) 2% 33% 38% 2% 2% 2% Shared Lane Traffic(%) Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period(min) 15 2023 Build AM Synchro 10 Report MJY Page 3 HCM 6th TWSC 2023 Build AM 2: Yardmaster Ct & Site Dwy 04/18/2022 Intersection Int Delay,s/veh 1.8 Movement EBL EBT WBT WBR SBL SBR Lane Configurations + 1� Traffic Vol,veh/h 0 27 21 33 20 0 Future Vol,veh/h 0 27 21 33 20 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None - None Storage Length - 0 Veh in Median Storage,# 0 0 0 Grade, % -2 2 0 Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 2 33 38 2 2 2 Mvmt Flow 0 31 24 38 23 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 74 43 Stage 1 - - 43 - Stage 2 31 - Critical Hdwy 6.42 6.22 Critical Hdwy Stg 1 5.42 - Critical Hdwy Stg 2 5.42 - Follow-up Hdwy 3.518 3.318 Pot Cap-1 Maneuver 0 930 1027 Stage 1 0 979 - Stage 2 0 992 - Platoon blocked, % Mov Cap-1 Maneuver - 930 1027 _ Mov Cap-2 Maneuver 930 - Stage 1 979 _ Stage 2 992 Approach EB WB SB _ HCM Control Delay,s 0 0 9 HCM LOS A Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 930 HCM Lane V/C Ratio 0.024 HCM Control Delay(s) 9 _ HCM Lane LOS A HCM 95th%tile Q(veh) 0.1 2023 Build AM Synchro 10 Report MJY Page 4 SimTraffic Simulation Summary 2023 Build AM 04/18/2022 Summary of All Intervals Run Number 1 10 2 3 4 5 6 Start Time 7:45 7:45 7:45 7:45 7:45 7:45 7:45 End Time 9:00 9:00 9:00 9:00 9:00 9:00 9:00 Total Time(min) 75 75 75 75 75 75 75 Time Recorded(min) 60 60 60 60 60 60 60 #of Intervals 5 5 5 5 5 5 5 #of Recorded Intervals 4 4 4 4 4 4 4 Vehs Entered 771 725 747 682 715 696 737 Vehs Exited 768 724 744 684 716 696 741 Starting Vehs 6 4 4 6 7 5 7 Ending Vehs 9 5 7 4 6 5 3 Travel Distance(mi) 235 221 228 210 219 212 227 Travel Time(hr) 6.3 5.9 6.1 5.7 6.0 5.7 6.0 Total Delay(hr) 0.5 0.4 0.5 0.4 0.5 0.4 0.5 Total Stops 87 85 87 94 79 79 84 Fuel Used(gal) 7.3 6.9 7.0 6.6 6.7 6.6 7.0 Summary of All Intervals Run Number 7 8 9 Avg Start Time 7:45 7:45 7:45 7:45 End Time 9:00 9:00 9:00 9:00 Total Time(min) 75 75 75 75 Time Recorded(min) 60 60 60 60 - #of Intervals 5 5 5 5 #of Recorded Intervals 4 4 4 4 Vehs Entered 678 726 680 716 Vehs Exited 675 733 681 715 Starting Vehs 3 10 5 4 Ending Vehs 6 3 4 4 Travel Distance(mi) 207 223 209 219 Travel Time(hr) 5.6 6.0 5.8 5.9 Total Delay(hr) 0.4 0.5 0.5 0.5 Total Stops 82 78 88 83 Fuel Used(gal) 6.4 7.0 6.7 6.8 Interval #0 Information Seeding Start Time 7:45 End Time 8:00 Total Time(min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. - 2023 Build AM SimTraffic Report MJY Page 1 SimTraffic Simulation Summary 2023 Build AM 04/18/2022 Interval #1 Information 1 Start Time 8:00 End Time 8:15 Total Time(min) 15 _ Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 199 173 174 195 161 149 163 Vehs Exited 199 169 174 194 164 151 163 Starting Vehs 6 4 4 6 7 5 7 Ending Vehs 6 8 4 7 4 3 7 Travel Distance(mi) 61 53 54 60 49 45 50 Travel Time(hr) 1.7 1.5 1.5 1.6 1.3 1.2 1.3 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Total Stops 33 25 19 18 17 13 23 Fuel Used(gal) 2.0 1.6 1.7 1.9 1.5 1.4 1.6 Interval #1 Information 1 Start Time 8:00 End Time 8:15 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 179 173 167 172 Vehs Exited 177 173 169 174 - Starting Vehs 3 10 5 4 Ending Vehs 5 10 3 5 Travel Distance(mi) 54 53 51 53 Travel Time(hr) 1.5 1.4 1.4 1.4 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ■ 24 14 16 20 Fuel Used(gal) 1.7 1.6 1.6 1.7 2023 Build AM SimTraffic Report MJY Page 2 SimTraffic Simulation Summary 2023 Build AM 04/18/2022 Interval #2 Information 2 Start Time 8:15 End Time 8:30 Total Time(min) 15 MqW Volumes adjusted by PHF, Growth Factors. Run Number 1 10 2 3 4 5 Vehs Entered 217 190 214 177 198 222 205 Vehs Exited 214 192 212 176 192 216 205 Starting Vehs 6 8 4 7 4 3 7 Ending Vehs 9 6 6 8 10 9 7 Travel Distance(mi) 65 58 65 54 59 66 63 Travel Time(hr) 1.7 1.5 1.7 1.5 1.6 1.9 1.7 Total Delay(hr) 0.2 0.1 0.1 0.1 0.1 0.2 0.1 Total Stops 16 22 24 34 21 26 25 Fuel Used(gal) 1.9 1.8 2.0 1.7 1.8 2.1 1.9 Interval #2 Information 2 Start Time 8:15 End Time 8:30 Total Time(min) 15 Volumes adjusted by PHF, Growth Factors. Run Number 7 8 9 Avg A Vehs Entered 192 203 191 201 Vehs Exited 191 207 187 200 Starting Vehs 5 10 3 5 Ending Vehs 6 6 7 5 i Travel Distance(mi) 58 62 57 61 Travel Time(hr) 1.6 1.7 1.7 1.7 Total Delay(hr) 0.1 0.2 0.2 0.1 Total Stops ■ 18 29 30 23 Fuel Used(gal) 1.8 2.1 1.9 1.9 2023 Build AM SimTraffic Report MJY Page 3 SimTraffic Simulation Summary 2023 Build AM 04/18/2022 Interval #3 Information 3 Start Time 8:30 End Time 8:45 Total Time(min) 15 _ Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 182 174 176 147 162 167 174 Vehs Exited 186 177 175 148 170 170 175 Starting Vehs 9 6 6 8 10 9 7 Ending Vehs 5 3 7 7 2 6 6 Travel Distance(mi) 56 53 55 46 52 52 53 Travel Time(hr) 1.5 1.4 1.4 1.2 1.4 1.4 1.4 Total Delay(hr) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Total Stops 21 18 15 20 14 21 21 Fuel Used(gal) 1.8 1.6 1.7 1.4 1.6 1.6 1.6 Interval #3 Information 3 Start Time 8:30 End Time 8:45 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 155 167 149 164 Vehs Exited 152 166 150 166 Starting Vehs 6 6 7 5 Ending Vehs 9 7 6 4 Travel Distance(mi) 47 52 47 51 Travel Time(hr) 1.2 1.4 1.2 1.4 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops ■ 16 12 15 16 Fuel Used(gal) 1.4 1.5 1.4 1.6 2023 Build AM SimTraffic Report MJY Page 4 SimTraffic Simulation Summary 2023 Build AM 04/18/2022 Interval #4 Information 4 Start Time 8:45 End Time 9:00 Total Time(min) 15 _ Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 173 188 183 163 194 158 195 Vehs Exited 169 186 183 166 190 159 198 Starting Vehs 5 3 7 7 2 6 6 Ending Vehs 9 5 7 4 6 5 3 Travel Distance(mi) 54 57 55 50 59 48 61 Travel Time(hr) 1.4 1.5 1.5 1.3 1.6 1.3 1.6 Total Delay(hr) 0.1 0.1 0.1 0.1 0.2 0.1 0.1 Total Stops 17 20 29 22 27 19 15 Fuel Used(gal) 1.6 1.8 1.7 1.6 1.9 1.5 1.9 Interval #4 Information 4 Start Time 8:45 End Time 9:00 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 152 183 173 176 Vehs Exited 187 175 177 Starting Vehs 9 7 6 4 Ending Vehs 3 4 4 Travel Distance(mi) 47 56 54 54 Travel Time(hr) 1.6 1.5 1.5 Total Delay(hr) 0.1 0.1 0.1 0.1 Total Stops 23 27 22 Fuel Used(gal) 1.5 1.7 1.8 1.7 2023 Build AM SimTraffic Report MJY Page 5 Queuing and Blocking Report 2023 Build AM 04/18/2022 Intersection: 1: Martinsburg Pike & Yardmaster Ct/Private Dwy Movement EB EB WB NB NB SB Directions Served LT R LTR L TR T Maximum Queue(ft) 69 61 47 66 12 8 Average Queue(ft) 21 18 5 13 0 0 95th Queue(ft) 55 50 27 47 10 5 Link Distance(ft) 455 312 754 844 Upstream Blk Time(%) Queuing Penalty(veh) Storage Bay Dist(ft) 290 90 Storage Blk Time(%) 0 0 Queuing Penalty(veh) 0 0 Intersection: 2: Yardmaster Ct & Site Dwy Movement SB Directions Served LR Maximum Queue(ft) 38 Average Queue(ft) 16 95th Queue(ft) 41 Link Distance(ft) 226 Upstream Blk Time(%) Queuing Penalty(veh) Storage Bay Dist(ft) Storage Blk Time(%) Queuing Penalty(veh) Network Summary Network wide Queuing Penalty:0 _ 2023 Build AM SimTraffic Report MJY Page 6 Lanes, Volumes, Timings 2023 Build PM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 1I04/18/2022 --1. .4--- t i Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +' r 1� Vii + r Traffic Volume(vph) 34 0 62 1 0 0 29 537 0 0 292 20 Future Volume(vph) 34 0 62 1 0 0 29 537 0 0 292 20 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width(ft) 11 11 11 12 12 12 11 11 11 11 11 13 Grade(%) -2% 2% 1% -1% Storage Length (ft) 0 290 0 0 90 0 175 275 Storage Lanes 0 1 0 0 1 0 1 1 Taper Length(ft) 25 25 0 0 Link Speed(mph) 25 25 45 45 Link Distance(ft) 535 347 793 874 Travel Time(s) 14.6 9.5 12.0 13.2 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Heavy Vehicles(%) 2% 0% 5% 0% 0% 0% 18% 3% 0% 0% 2% 20% Shared Lane Traffic(%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 38.3% ICU Level of Service A Analysis Period(min) 15 2023 Build PM Synchro 10 Report MJY Page 1 HCM 6th TWSC 2023 Build PM 1: Martinsburg Pike & Yardmaster Ct/Private Dwy 04/18/2022 Intersection Int Delay,s/veh 1.6 Movement EBL EBBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurationsi Traffic Vol,veh/h 34 0 62 1 0 0 29 537 0 0 292 20 _ Future Vol,veh/h 34 0 62 1 0 0 29 537 0 0 292 20 Conflicting Peds,#/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized None None - None - None _ Storage Length 290 90 175 275 Veh in Median Storage,# 0 - 0 - 0 - 0 - _ Grade, % -2 - 2 - 1 - -1 - Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 _ Heavy Vehicles, % 2 0 5 0 0 0 18 3 0 0 2 20 Mvmt Flow 36 0 66 1 0 0 31 571 0 0 311 21 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 944 944 311 988 965 571 332 0 0 571 0 0 Stage 1 311 311 - 633 633 - - - - - - - Stage 2 633 633 - 355 332 - - - Critical Hdwy 6.72 6.1 6.05 7.5 6.9 6.4 4.28 4.1 Critical Hdwy Stg 1 5.72 5.1 - 6.5 5.9 - - - Critical Hdwy Stg 2 5.72 5.1 - 6.5 5.9 - - - Follow-up Hdwy 3.518 4 3.345 3.5 4 3.3 2.362 2.2 Pot Cap-1 Maneuver 269 293 735 204 231 508 1143 1012 Stage 1 724 685 - 439 444 - - - Stage 2 502 511 - 641 625 - - - _ Platoon blocked, % Mov Cap-1 Maneuver 263 285 735 182 225 508 1143 1012 _ Mov Cap-2 Maneuver 263 285 - 182 225 - - - Stage 1 704 685 427 432 _ Stage 2 488 497 583 625 Approach EB WB NB SB _ HCM Control Delay,s 14.1 24.9 0.4 0 _ HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity(veh/h) 1143 263 735 182 1012 - HCM Lane V/C Ratio 0.027 0.138 0.09 0.006 - HCM Control Delay(s) 8.2 20.9 10.4 24.9 0 - HCM Lane LOS A C B C A HCM 95th%tile Q(veh) 0.1 0.5 0.3 0 0 2023 Build PM Synchro 10 Report MJY Page 2 Lanes, Volumes, Timings 2023 Build PM 2: Yardmaster Ct & Site Dwy 04/18/2022 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume(vph) 0 54 16 33 42 0 Future Volume(vph) 0 54 16 33 42 0 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Grade(%) -2% 2% 0% Link Speed(mph) 25 25 25 Link Distance(ft) 451 535 256 Travel Time(s) 12.3 14.6 7.0 Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 Heavy Vehicles(%) 2% 4% 18% 2% 2% 2% Shared Lane Traffic(%) Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 13.3% ICU Level of Service A Analysis Period(min) 15 2023 Build PM Synchro 10 Report MJY Page 3 HCM 6th TWSC 2023 Build PM 2: Yardmaster Ct & Site Dwy 04/18/2022 Intersection Int Delay,s/veh 2.7 Movement EBL EBT WBT WBR SBL SBR Lane Configurations + 1� Traffic Vol,veh/h 0 54 16 33 42 0 Future Vol,veh/h 0 54 16 33 42 0 Conflicting Peds,#/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized None None - None Storage Length - 0 Veh in Median Storage,# 0 0 0 Grade, % -2 2 0 Peak Hour Factor 88 88 88 88 88 88 Heavy Vehicles, % 2 4 18 2 2 2 Mvmt Flow 0 61 18 38 48 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 0 0 98 37 Stage 1 - - 37 - Stage 2 61 - Critical Hdwy 6.42 6.22 Critical Hdwy Stg 1 5.42 - Critical Hdwy Stg 2 5.42 - Follow-up Hdwy 3.518 3.318 Pot Cap-1 Maneuver 0 901 1035 ' Stage 1 0 985 - Stage 2 0 962 - _ Platoon blocked, % Mov Cap-1 Maneuver - 901 1035 _ Mov Cap-2 Maneuver 901 - Stage 1 985 _ Stage 2 962 Approach EB WB SB _ HCM Control Delay,s 0 0 9.2 HCM LOS A Minor Lane/Major Mvmt EBT WBT WBR SBLn1 Capacity(veh/h) 901 HCM Lane V/C Ratio 0.053 HCM Control Delay(s) 9.2 _ HCM Lane LOS A HCM 95th%tile Q(veh) 0.2 2023 Build PM Synchro 10 Report MJY Page 4 SimTraffic Simulation Summary 2023 Build PM 04/18/2022 Summary of All Intervals Run Number 1 10 2 3 4 5 6 Start Time 4:00 4:00 4:00 4:00 4:00 4:00 4:00 End Time 5:15 5:15 5:15 5:15 5:15 5:15 5:15 Total Time(min) 75 75 75 75 75 75 75 Time Recorded(min) 60 60 60 60 60 60 60 #of Intervals 5 5 5 5 5 5 5 #of Recorded Intervals 4 4 4 4 4 4 4 Vehs Entered 1010 939 1002 1002 953 937 997 Vehs Exited 1012 944 1003 1000 956 938 1004 Starting Vehs 14 9 9 6 12 9 13 Ending Vehs 12 4 8 8 9 8 6 Travel Distance(mi) 317 296 315 314 299 294 315 Travel Time(hr) 8.8 8.2 8.5 8.8 8.0 7.9 8.5 Total Delay(hr) 0.8 0.7 0.7 0.8 0.6 0.6 0.8 Total Stops 171 166 139 161 129 137 141 Fuel Used(gal) 10.0 9.5 9.8 10.0 9.3 9.1 9.9 Summary of All Intervals Run Number 7 8 9 Avg Start Time 4:00 4:00 4:00 4:00 End Time 5:15 5:15 5:15 5:15 _ Total Time(min) 75 75 75 75 Time Recorded(min) 60 60 60 60 - #of Intervals 5 5 5 5 #of Recorded Intervals 4 4 4 4 Vehs Entered 1014 944 988 978 Vehs Exited 1010 944 986 979 Starting Vehs 6 10 7 8 Ending Vehs 10 10 9 8 Travel Distance(mi) 317 295 310 307 Travel Time(hr) 8.6 8.1 8.6 8.4 Total Delay(hr) 0.7 0.7 0.8 0.7 Total Stops 148 136 164 149 Fuel Used(gal) 10.0 9.2 9.9 9.7 Interval #0 Information Seeding Start Time 4:00 - End Time 4:15 Total Time(min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. - 2023 Build PM SimTraffic Report MJY Page 1 SimTraffic Simulation Summary 2023 Build PM 04/18/2022 Interval #1 Information 1 Start Time 4:15 End Time 4:30 Total Time(min) 15 _ Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 245 244 247 247 220 224 228 Vehs Exited 252 246 249 246 222 229 233 Starting Vehs 14 9 9 6 12 9 13 Ending Vehs 7 7 7 7 10 4 8 Travel Distance(mi) 78 77 78 77 69 72 73 Travel Time(hr) 2.1 2.1 2.1 2.1 1.8 1.9 1.9 Total Delay(hr) 0.2 0.2 0.2 0.2 0.1 0.1 0.1 Total Stops 40 36 32 36 29 30 30 Fuel Used(gal) 2.4 2.5 2.4 2.4 2.1 2.2 2.2 Interval #1 Information 1 Start Time 4:15 End Time 4:30 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 269 217 224 236 Vehs Exited 268 ' 219 229 240 - Starting Vehs 6 10 7 8 Ending Vehs 7 8 2 5 Travel Distance(mi) 85 69 72 75 Travel Time(hr) 2.3 1.9 2.0 2.0 Total Delay(hr) 0.2 0.2 0.2 0.2 Total Stops 41 33 40 34 Fuel Used(gal) 2.7 2.2 2.3 2.3 2023 Build PM SimTraffic Report MJY Page 2 SimTraffic Simulation Summary 2023 Build PM 04/18/2022 Interval #2 Information 2 Start Time 4:30 End Time 4:45 Total Time(min) 15 MqW Volumes adjusted by PHF, Growth Factors. Run Number 1 10 2 3 4 5 Vehs Entered 259 210 241 241 235 256 255 Vehs Exited 261 208 240 236 233 251 256 Starting Vehs 7 7 7 7 10 4 8 Ending Vehs 5 9 8 12 12 9 7 Travel Distance(mi) 81 66 76 75 73 78 79 Travel Time(hr) 2.3 1.8 2.0 2.0 2.0 2.1 2.3 Total Delay(hr) 0.2 0.1 0.2 0.2 0.2 0.2 0.2 Total Stops 45 37 31 38 32 40 51 Fuel Used(gal) 2.5 2.1 2.3 2.3 2.3 2.5 2.6 Interval #2 Information 2 Start Time 4:30 End Time 4:45 Total Time(min) 15 Volumes adjusted by PHF, Growth Factors. Run Number 7 8 9 Avg Vehs Entered 277 239 269 248 Vehs Exited 278 235 264 247 Starting Vehs 7 8 2 5 Ending Vehs 6 12 7 7 Travel Distance(mi) 86 72 83 77 Travel Time(hr) 2.4 2.0 2.3 2.1 Total Delay(hr) 0.2 0.2 0.2 0.2 Total Stops ■ 44 24 44 38 Fuel Used(gal) 2.7 2.2 2.6 2.4 2023 Build PM SimTraffic Report MJY Page 3 SimTraffic Simulation Summary 2023 Build PM 04/18/2022 Interval #3 Information 3 Start Time 4:45 End Time 5:00 Total Time(min) 15 _ Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 248 245 241 272 245 228 268 Vehs Exited 244 246 240 276 246 229 266 Starting Vehs 5 9 8 12 12 9 7 Ending Vehs 9 8 9 8 11 8 9 Travel Distance(mi) 77 78 75 87 77 72 84 Travel Time(hr) 2.1 2.2 2.0 2.5 2.1 1.9 2.2 Total Delay(hr) 0.2 0.2 0.2 0.3 0.2 0.1 0.2 Total Stops 40 45 35 47 34 33 26 Fuel Used(gal) 2.5 2.5 2.3 2.9 2.4 2.2 2.6 Interval #3 Information 3 Start Time 4:45 End Time 5:00 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 249 235 248 247 Vehs Exited 246 240 244 247 Starting Vehs 6 12 7 7 Ending Vehs 9 7 11 8 Travel Distance(mi) 77 74 78 78 Travel Time(hr) 2.1 2.1 2.2 2.1 Total Delay(hr) 0.2 0.2 0.2 0.2 Total Stops ■ 29 37 41 36 Fuel Used(gal) 2.4 2.3 2.5 2.5 2023 Build PM SimTraffic Report MJY Page 4 SimTraffic Simulation Summary 2023 Build PM 04/18/2022 Interval #4 Information 4 Start Time 5:00 End Time 5:15 Total Time(min) 15 MqW Volumes adjusted by Growth Factors,Anti PHF. Run Number 1 10 2 3 4 5 Vehs Entered 258 240 273 242 253 229 246 Vehs Exited 255 244 274 242 255 229 249 Starting Vehs 9 8 9 8 11 8 9 Ending Vehs 12 4 8 8 9 8 6 Travel Distance(mi) 80 76 87 76 80 72 79 Travel Time(hr) 2.2 2.1 2.4 2.1 2.1 1.9 2.2 Total Delay(hr) 0.2 0.2 0.2 0.2 0.2 0.1 0.2 Total Stops 46 48 41 40 34 34 34 Fuel Used(gal) 2.6 2.4 2.8 2.4 2.4 2.2 2.5 Interval #4 Information 4 Start Time 5:00 End Time 5:15 Total Time(min) 15 Volumes adjusted by Growth Factors,Anti PHF. Run Number 8 9 Avg Vehs Entered 219 253 247 246 Vehs Exited 218 ' 250 249 246 Starting Vehs 9 7 11 8 Ending Vehs 10 10 9 8 Travel Distance(mi) 69 80 78 78 Travel Time(hr) 1.9 2.2 2.1 2.1 Total Delay(hr) 0.2 0.2 0.2 0.2 Total Stops 34 42 39 39 Fuel Used(gal) 2.2 2.5 2.5 2.5 2023 Build PM SimTraffic Report MJY Page 5 Queuing and Blocking Report 2023 Build PM 04/18/2022 Intersection: 1: Martinsburg Pike & Yardmaster Ct/Private Dwy Movement EB EB WB NB Directions Served LT R LTR L Maximum Queue(ft) 51 61 15 46 Average Queue(ft) 19 23 1 8 95th Queue(ft) 43 47 9 30 Link Distance(ft) 455 312 Upstream Blk Time(%) Queuing Penalty(veh) Storage Bay Dist(ft) 290 90 Storage Blk Time(%) Queuing Penalty(veh) Intersection: 2: Yardmaster Ct & Site Dwy Movement SB Directions Served LR Maximum Queue(ft) 55 Average Queue(ft) 25 95th Queue(ft) 51 Link Distance(ft) 226 Upstream Blk Time(%) Queuing Penalty(veh) Storage Bay Dist(ft) Storage Blk Time(%) Queuing Penalty(veh) Network Summary Network wide Queuing Penalty:0 _ 2023 Build PM SimTraffic Report MJY Page 6