HomeMy WebLinkAbout099-21 (RoadResoConstitutionDrive) COUNTY of FREDERICK
Department of Planning and Development
5401665-5651
Fax: 5401665-6395
Memorandum
To: Frederick County Board of Supervisors
From: Mark R Cheran,Zoning and Subdivision Administrator
Date: May 24,2021
RE: Constitution.Drive
The following additions to the Secondary System of State Highways,
pursuant to the statutory provision or provisions cited, are hereby requested;
the right of way for which, including additional easements for cuts, fills and
drainage, as required,is hereby guaranteed;
Constitution Drive—State Route 1619 0.18 miles
Constitution Drive— State Route 1619 0.10 miles
Staff is available to answer any questions.
MRCIslc
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
Vol
RESOLUTION
BY THE
r' FREDERICK COUNTY BOARD OF
SUPERVISORS
The Board of Supervisors of Frederick County, in regular meeting on the 9th day of June,
adopted the following:
WHEREAS, the streets described on the attached Foran AM-43, fully incorporated
herein by reference, are shown on plats recorded in the Clerk's Office of the Circuit
Court of Frederick County; and
WHEREAS, the Resident Engineer of the Virginia Departinent of Transportation has
advised this Board that the streets meet the requirements established by the Subdivision
Street Requirements of the Virginia Department of Transportation; and
WHEREAS, the County and the Virginia Department of Transportation have entered
into an agreement on June 9, 1993, for comprehensive stormwater detention which
applies to this request for addition; and
NOW, THEREFORE, BE IT RESOLVED, this Board requests the Virginia
Department of Transportation to add the streets described in the attached Form AM-4.3 to
the secondary system of state highways, pursuant to 33.2-705, Code of Virginia, and the
Department's Subdivision Street Requirements; and
BE IT FURTHER RESOLVED, this Board guarantees a clear and unrestricted right-of-
way, as described, and any necessary easements for cuts, fills and drainage; and
BE IT FURTHER RESOLVED that a certified copy of this resolution be forwarded to
the Resident Engineer for the Virginia Department of Transportation.
Charles S. DeHaven, Jr., Chairman Aye Shawn L. Graber Aye
J. Douglas McCarthy Aye Robert W. Wells Aye
Blaine P. Dunn Aye David D. Stegxnaier Aye
Judith McCann-Slaughter Aye
A COPY ATTEST
Kris C. Tierney
Frederick County Administrator
RES # 044-21
In Frederick County 37494315
by Resolution of the governing body adopted June 9,2021
The following VDOT Norm AM-4.3 is hereby attached and incorporated as part of the
governing body's resolution for changes to the secondary sys state highways.
A Copy Testee Signed(County Official):
Report of Changes in the Secondary Syst M of 5 e tghways
Project/Subdivision: Constitution Drive
Addition - New subdivision street §33.2-705
Rte Row
Number No. Recordation Width
Street Name From Termini To Termini Length Lanes Reference
0.10 mile Instrument
Constitution northeast of #200018192
1619 Drive Route 50 East Cul-de-sac 0,18 2 Pg 0613 80'
0.10 mile
northeast Instrument
Constitution Intersection with of Route #200018192
4619 Drive Route 50 East 50 East 0.1 3 Pg 0613 80'
Page: 111