HomeMy WebLinkAbout061-21 (2021-2026CapitalImprovementsPlan(CIP)toPublicHearing)COUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
Fax: 540/ 665-6395
MEMORANDUM
TO:
Frederick County Board of Supervisors
FROM:
Candice E.Perkins, AICP, CZA, AssistantDirector
DATE:
January 19, 2021
RE:Discussion: 2021-2026Capital Improvements Plan (CIP)
The Capital Improvements Plan (CIP) is a document that consists of a schedule of major
capital expenditures for the County for the ensuing five-year period, as well asa category
for long term projects (6 + years out). The CIP is intended to assist the Board of
Supervisors in preparation of the County budget.In addition to determining priorities for
capital expenditures, the County must also ensure that projects contained within the CIP
conform to the Comprehensive Plan. Specifically, the projects are reviewed with
considerations regarding health, safety, andthe general welfare of the public, and the
policies of the Comprehensive Plan. When the CIP is adopted, it becomes a component
of the Comprehensive Plan.
The inclusion of projects on the CIP is in no way an indication that Frederick County will
be undertaking these projects. The CIP is strictly advisory; it is intended for use as capital
facilitiesplanning document, not for requesting funding allocations.Once adopted,
project priorities and cost estimates may change throughout the year based on changing
circumstances. It is also possible that projectsmay not be funded during the year
indicated in the CIP. The status of any project becomes increasingly uncertain the further
out the project date is identified. The CIP is also updated annually, and projects are
removed from the plans as they are completed or as priorities change.
CIP Components
The CIP provides project priorities that are submittedbyvarious County Agencies and
tables that outline the projects and cost estimates. Within the tables,columns for each
year show the funding needs that would be requested in the corresponding budget cycle.
In addition, those projects that are long range projects have been placed at the end of the
CIP table, outside of the five-year window. The CIP includes three separate tables; the
first table shows County funded projects and the second and third tables cover
Transportation projects and Airport projects which are primarily funded through other
sources.
107 North Kent Street, Suite 202Winchester, Virginia 22601-5000
2021-2026CIP–Discussion
January 19, 2021
Page 2
The CIP includes a total of 54projectsfrom thefollowing:Schools, Parks and
Recreation, Regional Library, County Administration, Fire and Rescue, Sheriff’sOffice,
Public Safety Communications, Transportation and the Winchester Regional Airport.
Background –Discussions
On January 11, 2021, the Comprehensive Plans and Programs Committee (CPPC)
discussed the 2021-2026CIP capital improvement project requests.The role of the CPPC
in the CIP process was to ensure that the various departmental project requests are in
conformance with the2035 Comprehensive Plan. Following the CPPC discussion, the
CommitteeendorsedtheCIP and its conformance with the Comprehensive Planand
forwarded the CIP to the Planning Commission for discussion.The Planning
Commission discussed the CIP at their meeting on January 20, 2021; the Planning
Commission recommendedapprovalof the 2021-2026CIP and affirmed that the CIP is
in conformance with the 2035 Comprehensive Plan.
Conclusion
The 2021-2026CIPis presented to theBoard of Supervisors for discussion. Staff is
seekingauthorizationfrom theBoard of Supervisors to schedule the CIPfor public
hearing.
If adopted, the CIP will become a component of the Comprehensive Plan, which would
satisfy the review requirement of Section 15.2-2232 of the Code of Virginia,which states
that no public facility shall be constructed unless said facility is a “feature shown” within
a jurisdiction’s comprehensive plan.
Pleasecontact the Planning Department should you have any questions regarding this
information.
CEP/pd
Attachment-Draft 2021-2026CIPwith applicable text, tables,and maps
2
4 47
Administration…………………….……………….………29
………………………….…………….38
15 27
41
40
18
.3
.3
………………………….……..
….……
..
………………………………………
……..
…
.….……
…………………….……
…….
…………………
………….
………………………………
..
d Rescue……………..………………………………
…….………
creation
ic Schools…………
Winchester Regional Airport…………
Fire Company Requests
ty Communications
Frederick County Parks and Re
RIPTIONS
Transportation Committee
..
brary…
…….……
l
Frederick County Pub
Li
PROJECT DESC
al
Office …
Handley Region
Public Safe
Volunteer
s
County
’
Sheriff
Fire an
-
APPENDIX
TABLE OF CONTENTS
LES….10-13
.………………9
ANATIONS………………………….…….………….………9
..………..8
…..………7
ojects………………………………………5
6
……..………..………………….2
………………………………………………………. 3
..………………. 2 3
2
1 2
.………………….………….……….2 Committee……………………………………. 4
…….4
..3
…..
tion .……………………………..…………..
……...
Fire & Rescue………...……………………………….………………
…..
………………………………
….…….
INTRODUCTION……………………………...…………………………….…
…………………….
…..
…………………………
Transportation Projects………………
nty Public Schools
AB
PROJECT FUNDING………………………………………………
Parks and Recreation ……………
T
OVEMENT PROJECTS
ecreation
Schools
ublic Safety Communications
S
Frederick County Parks and R
Winchester Regional Airport
ECOMMENDATIONS………
PROJECTS MAP
Handley Regional Library
Frederick Cou
Frederick County Public
Capital Pr
County Administra
CAPITAL IMPR
Transportation
s Office
ITAL
6 6 6 6
202202202202
CIP TABLE EXPL
CAP
’
Sheriff
21-21-21-21-
6 6
R
PROJECT
20202020
202202
P
21-21-
2020
2239 of the Code of Virginia assigns the responsibility for preparation of plans for capital outlays to the local Planning ounty for the ounty budget. In addition to determining priorities
for capital ounty must also ensure that projects contained within the CIP conform to the Comprehensive Plan. Specifically, ewed with considerations regarding health, safety, and the
general welfare of the public, and the policies of the The CIP is Once that is indicated in the CIP. The status of any project becomes increasingly uncertain the further in
Comprehensive Plan and provides a link projects may
e CIP is updated annually. Projects are removed from the plans as they are completed or as priorities change. The plan is
1
facilities planning document, not for requesting funding allocations.
inclusion of projects to the CIP is in no way an indication that Frederick County will be undertaking these projects.
adopted, project priorities may change throughout the year based on changing circumstances. It is also possible that
C
IP) consists of a schedule for major capital expenditures for the
between the documents and potential proffered contributions made with future rezoning projects.
2035
the CIP is adopted, it becomes a component of the
ENTS PLAN
FREDERICK COUNTY
6
202
CAPITAL IMPROVEM
21-C
of Supervisors in preparation of the
20
FY
capital
Commissions. The Capital Improvements Plan (C
as a
,
strictly advisory; it is intended for use
not be funded during the year
intended to assist the Board
Once
the future it is projected.
.
the projects are revi
Comprehensive Plan
C
ensuing five years.
expenditures, the
INTRODUCTION
-
15.2
§
tion
The
Sec
Th
priorities from previous years.
James Wood High This facility would provide ng with the surrounding communities and was emphasized in the recreation center, Old Charlestown Road Park wood in locations y General Government
d contributions l government capital expenditures that
new library branch in the Gainesboro area.
.
2
joint Count
and expansion
Senseny/Green
Site.
.
he
rick Area Plan
located within the UDA (Urban Development Area)
Convivence
t
offere
,
renovation
County Office Annex (Former Sunnyside Plaza Shopping Center)
The
areas of
CIP and pr
.
.
cial Center
and the Double Toll Gate
Indian Hollow Elementary School Renovation
the Southern Frede
ol
Recreation is the Abrams Creek Greenway Trail.
Elementary Scho
ete capital projects that have been
y which include the
en the
di
t Ju
this item enhances the connection betwe
genera
future replacement of the Join
rary’s top priority is a
he Senseny/Eastern Frederick Area Plan, and
Armel
those
ount
a
PROJECT RECOMMENDATIONS
site expansion
es
owed by the
include
C
the
address
t
Other top priorities
throughou
made to mitigate the impacts of development projects. This item
y, foll
and compl
lib
Convenience
hich are anticipated to bemay fall below the established $100,000 departmental threshold.
cts. The
rridor alo
rit
and the
The top capital improvement priority for the Schools is the
for new library branches
o
est pri
e
je
or Parks and
Frederick County Public Schools continue to commenc
Gore
pro
nistration and School Administration Building
o
he
additions and renovations is the second high
ts of this c
–
.
three
is also included in the CIP
the
County Administration projects continue to be t
n
the Indoor Aquatic Center.
Senseny/Eastern Frederick Urban Areas Pla
–
s
- t
Public Works
The Handley Regional Library recommend
f
approved area plans
recreational opportunities for residen
both of w
The top capital improvement priority
and third priorities are
Frederick County Public Schools
;
from
522 South
Regional Library
s
y Administration
request
Capital Expenditures
the
, and
Parks & Recreation
Route
consistent with
are two
development
second
and
Handley
School
There
Count
Admi
ad
The
Ro
Also identified as priority 1A is the A is s a component of onal and replacement capital equipment fire and rescue vehicles and he inclusion nd the replacement of two and connect to
the
a new facility located in the vicinity of Stephens City Fire building for mobile
oute 277 3
25 (P25) radio
identified in the County’s capital planning a
2
priority
urchase,
,
vehicles
y of R
steel
that t
Also identified as
vicinit
p
replacement law enforcement
Safety Communications Officials (APCO) International Project
the
t was determined
remain
bay
.
build
ompanies.
station
includes
, a new facility located in the
-
ght
first addition and re
of the living quarters and
0 for the benefit of Fire and Rescue Services was establishedei
and build a new
n
project
. The top project is the construction of a
related offices.
scue C
I
priority. This
related offices.
established by the Finance Committee.
marily for the benefit of the individual Volunteer Fire and Re
23,
#and
tructure
Station
expenses are
-
. Other projects include
facility for other County
building
communications
Fire & Rescue Station #22
s.
onstruction of
isting s
r the expansion/upgrade
-
it
facility for other County
medic un
original
ant capital
heir ex
nd the replacement of two
eir
Fire and Rescue Volunteer Company Capital Equipment Requests
–
to demolish t
ludes the c
thtop public safety
purchasing additi
or an annex signific
to demolish
coverage
their CIP
is the construction
.
d be beneficial in ensuring that -
line
Public
ulator
inc
or an annex
s fo
guide
is seeking
vehicles that require
two
s in
y f
seeking
construction, and deployment of Association of
request
volving fund in the amount of $1,000,00
a firearms training sim
is
o provide the abilit
0
project
Project
for
$100,00
t 25 Public Safety Radio Network
is
Station is
Clearbrook Fire Station
cluded
ital expenditure fund
11, a
the apparatus needed for this facility.
y f
five
apparatus needed for this facility.
d Rescue
equipment that may fall below the
ld also provide the abilit
place tower
This project is pri
included
n
d Fire Station has i
Fire
unications
large, specialized
Middletown
ld als
Fire an
as
and
woul
to re
h
that wou
radios,
project for
Office Comm
cap
Station is seeking
a priority
budget process.
Fire and Rescue
.
Office
CIP. This
ambulances.
Public Safety
and portable
s
third addition
’
Crosspointe
housing of
The Sheriff
Projec
eenwoo
’s
that wou
p
of such Sheriff
e to
re
The The
the
Gr
Th
and safety iway “A”
State Code allows for transportation and n between the CIP and potential proffered tified in the majority of on of a new general elopment to meet
4
The inclusion
eer fire & rescue
This system will provide radio
from developers
for generalized road improvements.
Tax
a
widening
e FAA and VDA.
continues to be number one in the CIP, followed by the
.
mpacts iden
hrough a complex formula where the federal and state governments contribute
, and Renaissance Drive (Phase 2)
County Sheriff’s Department, Frederick County Fire & Rescue, volunt
rport dev
The constructi
Route 277
me
portation i
co
of ai
CIP. Funding for transportation project requests will likely
from th
t
include
ounty.
suppor
.
comes
funding
aimed at mitigating potential trans
a
C
Virgini
critical public safety communications within the
priorities
acquisition in
s
s providing the remaining
funding
ent
tio
P.
onnec
provements
he vast majority of the funding for these improvem
for the CI
top three
way
and easement
e c
not take a
n emphasizes th
projects. The
ct requests
Capacity Im
nies, and the Department of Public Safety Communications.
ojects does
cus on land
urisdiction
cement and
The Transportation Committee continues to provide proje
gai
airport operations
20 priority
jects which are
nce a
revenue sharing. Implementation of transportation pr
the other j
projects fo
Eastern Road Plan Improvements item o
Exit 313 Bridge Repla
and paging communications for the Frederick
included
-
a locality's
ations system to support mission
ther
funding, with Frederick County and
pro
d t
contributions made with rezoning
ure
s
erive
O
ittee ha
t fut
.
s. T
tion (design/construction)
n
s d
ed withi
t
port projects i
onal Airport
por
ion requiremen
e
,
m
tation Committe
terminal to sup
(Phase 1)
The Transportation Com
e Plan.
d
projects to be inclu
Winchester Regi
air
improvements
Comprehensiv
ral Aviat
for
communic
por
on
Funding
compa
Reloca
of the
viati
ans
Fede
the
Tr
a
or cated to the right of the fiscal year and xt five the Virginia . The the Frederick County will be undertaking loper te, and local governments. The local portion may
al
9
l fisc
ed f
s
by
st
e
the unreserved fund balance of the County
propos
s not funded
ed by individuacome from a combination of state and federal funds, dev
costs have been identified beyond the ne
xcludes Airport reque
their requested projects.
nd
ovement projects
l Authority a
chester.
t
and private sources of funding for projec
ted for each project. This value is list
n
es.
Clarke, Shenandoah, Warren Counties, and the City of Wi
o
e e
nty allocations and other funding sourc
ugh a combination of loans from the Virginia Public Scho
es, contains a list of the capital impr
gur
fi
r
lo
is
department fo
s.
hat
tion column,
th
for particular project
,
t
339,062,907
cation
.
TIONS
below
an indi
om
ect
sta
CONTENT DESCRIP
The priority rating assigned by each agency oru
j
escription of the information in this table is explained
r
year period. The total contrib
the pro
come f
.
ederal,
$
of
her sources
P is in no way
ounty
es
ibumuch of
om the f
cts will
rc
r
be cont
y seeks grants
C
the
ng sou
ag
ot
ou
partment proje
cost to
S -
,
nded through
cts will continue to
p
ntributions fr
s to the CI
C
dditional fundi
t five years
lowing four
will
the
BLE
cluding
lar value that
TA
projected
activel
IP
ns.
tation project
THE C
l
ver the nex
ions from Frederick,
n
unded by co
, on the fo
-jectio
r Parks and Recreation De
The cost for each project, i
u
ions, and revenue sharing.
ibutions over the five
transportation projects as these are primarily f
n Commission
Indicates the footnotes that apply to a
a total
ects are funded thro
bt service pro
timated dol
oje
g pr
s
o
ave
Capital Improvements Plan table
or
used to c
ects will be f
ndin
The inclusion of transp
-
h
tment
able 1
tio
The es
se projects. Fu
include de
crea
ntribut
ily
A d
ojects Ranked by Depar
T
Literary Fund.
ars and by total contr
d in
d Re
primar
years.
oj
roj
-
fo
Airport pr
e co
ibution
-
ut
ojects includeFunding
ol pParks an
ounty.
Total Project Costs
DING
olumns, does not
contrib
five
includ
While the CIP is
Scho
the
County Contr
PROJECT FUN
C
the ensuing
-
The pr
years.
es
The
t
No
Pr
ye
c
14
NS
DESCRIPTIO
ENDIX
PP
PROJECT
A
15
empower FCPS and all
and has served continuously as an elementary school since that This renovation needs to address the exterior wall, windows, & doors, and the HVAC. 12. The lding is in good condition;
however, several major areas need to be addressed in a renovation. Foci of the renovation will cal, electrical, years old. Renovations and additions are needed to a number of areas
to support effective, economical, and efficient operation of the school for years to come. This school will be renovated to be more like the spaces to meet the needs of a
The existing
The school
students.
07
, the school has 6
The school
-
s grades 9
42
5 elementary school since that time.
The school has a program capacity of 4
centered instructional delivery, mechani
date the additional growth at Lake Frederick.
areas to
The building serve
James Wood High School opened in 1980 and has served as a high school since that time.
20
of September 15, 20
these few
.
mplished
Aylor MS replacement, with a variety of learning
years old and renovation is needed to
ls Project Priority List
students.
until a full renovation can be acco
As
83
ecessary in today’s working world.
square feet and has a program capacity of 1,2
-
students.
Armel ES opened in 1991 and has served continuously as a K
.
-
ional areas to support modern, student
square feet
hoo
students. Eight classrooms will be added to Armel ES, to accommo
s
c
80
s and Addition
ublic S
Elementary School Addition and Renovation
ns 70,281 square feet and has a program capacity of 5
88
Elementary School opened in 19
ry School Renovation
ounty P
59,065
ly
and efficient
32
School is
Frederick C
ation
ntain
4th HS, the new Frederick County MS, and the
.
ov
buildings co
essing needvariety of learning styles and to impart skills n
40
Ren
James Wood High School is
5.
Elementary
economically
ing, technology, finishes, and site.
School
-
Currently the building serves grades K
ta
Hollow Elemen
Repairing the exterior walls is a pr
24
25
and auxiliary
include modification of instruct
229,187
d High
--
23
24
Indian Hollow
Indian Hollowbuilding
FY
FY
12,000,000
73,600,000
oo
chedule:
edule:
total
James W
Indian
staff to operate the
l
time. The school
auxiliary buildings
Arme
n Sch
$
$
S
1 – 2 –
:
3 -
:
: :
Cost:
Cost:
uction
:
ustification
fication
Constructio
scriptionscription
ion
PRIORITY PRIORITY PRIORITY
cript
al
Capital
Constr
contai
plumb
it
Justi
Des
bui
Cap
DeDe
J
16
This project will address expected growth in high school student enrollment in the school division over the next
Offices
built facility. It would be a separate building 15,000 square foot building with storage areas, work areas, offices, cubicles, conference rooms, a customer service area, customer parking,
a loading tions that are not purpose built for the administration of the
students
will address anticipated growth in high school student enrollment in the school division. The site is located at the end of designed for collaborative education, similar to Frederick
County MS, learning styles and to impart skills necessary in today’s working
ide the Administrative
0
25
a program capacity of 1,
ted near the Administrative Offices on James Wood Middle School property. The new facility would be a
dated as needed and core areas partially renovated to serve the additional students.
Department is currently located in three areas ins
with
.
inefficiencies
-
12
This project would put the entire department together in one purpose
-
serve students grades 9
7.
consuming
We propose to open the new high school in the fall of 202
loca
with a variety of learning spaces to meet the needs of a variety of
multiple
-
’s technology systems creates significant time
will be
is proposed to
in
situated
his school
ounty Public Schools IT
hool Board Office IT Addition
and four trailers behind the offices. Being
oject
Justes Drive behind Admiral Byrd MS. T
parking for IT work vehicles.
The new high school pr
Beyond 2026
ourth High School
2424
--
FY 23FY 23
$94,000,000
16,10,000$6,400,000Frederick C
Construction Schedule: Construction Schedule:
ction Schedule:
facility will be up
Sc
$
5 – F
several years.
school division
4 –
:
:
Justification:on:
Cost:
al Cost:Capital Cost:
Description:
stification
Description
k, and
PRIORITY PRIORITY
Justificati
Constru
Capital
world.
t
Capi
loca
doc
and
Ju
17
3 t
including reorganization and addition of Other areas to be addressed hool opened in 1974 and has served continuously as an elementary school since that Currently several major areas
need to be addressed, including and years old and renovation is needed to a number of areas to ensure the
enovations are res (similar to maker o
boys’
las
32
spaces). Transportation safety concerns exist on and around the school site at Sherando during arrival and dismissal. Sherand
needed to ensure the economical, efficient, and effective operation of the school for years to come. Modern instruction requi
and has a program capacity of 1,
plumbing,
classroom and storage space to better equip the building to support collaborative education. Because we want the facility to
n site, instead using a softball field in Sherando Park. This represents an equity issue between
students.
alarms, electrical,
renovate it. R
be provided, including collaborative spaces of varying sizes and project labs
509
capacity of
will be refreshed.
start to
open classroom space, ADA compliance, energy conservation, security, and upgrades of fire
Sherando High School opened in 1993. The facility contains 239,517 square feet
has a program
years old by the time we
ation,
sports and is contrary to FCPS’ policy of equity between boys and girls sports.
nishes
12. Several major areas need to be addressed in a renov
. The school
another 30 years, facility infrastructure will be renewed and updated, and fihowever,
entary School Phase 2 Renovation
s to come.
5. The building is in good condition;
65,120 square feet
32
are security, traffic safety, and gender equity in athletic facilities.
and Addition
rs old and will be at least
conomical and efficient operations of the school for year
6
Apple Pie Ridge Elementary School is 4
Renovations
and auxiliary building contain
Apple Pie Ridge Elementary Sc
erando High School
Elem
a
s
ye
that a variety of learning space
e Ridge
7
o
does not have a softball field
-
Sherando is 2
the building serves grades K
TBDTBD
-
udents serving grades 9
ction Schedule: ction Schedule:
Apple Pi
mechanical systems.
TBDTBD
time. The school
6 – Sh
7 –
: :
: :
Capital Cost:Capital Cost:
stificationication
DescriptionDescription
PRIORITY PRIORITY
girls’
ConstruConstru
stif
and
st
JuJu
e
are
trail roximately 1 mile each. Each phase will have logical beginning and ending points and be usable trail sections in 2 from Woodstock Lane to Woody's Place, and Phase 3 from allocated
for the project in the schedule above. Funds for Phases II and III are not yet secured. Grant funding will be pursued for dents and provide an alternate means of entering and e community
as d include an indoor area large enough to floor sleeves and drop curtains or partitions. This boat shows, thus providing a flexible facility for a multitude of activities to take
place at one time. The facility would also house a
n length. As outlined below, the project is envisioned in quilt, or ificantly on the use of the county public dequately addressed Recreation Center needs for a time, however the
t area would also be designed for utilization by indoor soccer, baseball,
18
nstruction
use trail along Abrams Creek. From Senseny Road to Channing Drive. It is estimated the
VDOT Transportation Alternatives (TA) Highway Safety Improvement Program (HSIP) funds
identified in the 2017 Frederick County Parks and Recreation Community Survey, and the 2012 Virginia Outdoors Plan Survey.
que,
ow VDOT funding. Phase I is funded through VDOT with design scheduled for FY 21, co
and home, outdoor, craft, anti
s of th
This project is intended to meet the need
Priority List
The Recreation Center project would be approximately 44,000 square feet an
d Recreation Department has relied sign
garden,
area could also be used for special events such as dances, proms, music festivals,
-
Parks & Recreation Department Project
and badminton with the installation of in
This facility would provide recreational opportunities for resi
will be approximately 3 miles i
FY 26
rooms, office, storage, and locker rooms.
themselves. Phase 1 from Senseny Road to Woodstock Lane. Phase
Beyond
ster from Eastern Frederick County.
minimum of two basketball courts. This cour
–
schools to house recreation programs. This arrangement a
and III
23, Phase II
Since its inception, the Parks an
crossings and
-
-
FY 22
yond FY 26
t, shared
tennis,
nning Drive.
The construction schedule will foll
–
l
Trai
Phase I Recreation Center
all, wrestling, volleyball,
10' wide, asphal
k
purpose
will have six bridge stream
Be
exiting the City of Winche
ms Cree
3
9,900,000
Construction Schedule:
3,828,900
1-
dy's Place to Cha
Phase
-
fitness center, multi
ree phases of app
Abra
accommodate a
.
$
$
– –
e phases.
tal Cost:
ription:
ustification:
ion:
2, and 23 Capital Cost:
n:
PRIORITY 12
PRIORITY
iptio
icat
cr
if
Capi softb
c
Woo
thes
Just
FY 2
DesDes
th
J
department is limited in its ability to meet dents. A Recreation Center facility will facilitate the department to meet the Snowden Bridge development provides land for the and 2003
ater teaching pool, ove facility would meet the swimming needs of the or public pools in Frederick County. By constructing the indoor pool, it would permit the a nucleus to attract
new businesses to the community. This project is intended to meet the needs of the community as identified in the 2017 Frederick County Parks and he construction of this project will
provide a
usinesses to the community. This facility would de rectangular fields and hard surface courts at this location. There are no
19
restroom,
rezoning proffer of
above park is to include athletic fields suitable for league play. Fields,
competitive pool, 6 lane warm w
The overall park design is informed by the Snowden Bridge (formerly Stephenson Village)
ctional needs, citizen programming provide
currently offers over 250 sections of programs, creating a situation where the
ould be available to all area residents. T
izen programming demands and provide the area with a facility to attract new b
The ab
lane
recreational programming.
-
meeting rooms, shower and changing rooms, and facilities support areas.
Old Charlestown Road Park, situated on land proffered by
10
building will likely house a
public rectangular fields in the north of Frederick County.
pment
the programming and facility needs of the county resi
and public input sessions in 2020. Plans are to provi
Old Charlestown Road Park Develo
round
24
2223
nt to meet competition needs, instru
23-
This facility w
The
--
sf
2122
swim teams.
-
in FY
year
ion in FY
35,000
Completion in FY
There are no public indo
recreation park.
wim and
ility
Completion
parking are part of the park concept.
The approximately
be available to all area residents.
ac
et
n Community Survey.
mpl
community, including HS level
c F
facility to offer competitive s
quati
12,835,000
Co
dule:
3,400,000
chedule:e:
provision of an active
A
l
Indoor
du
heSche
Construction Sc
$
Construction S
$
– –
Description:
ification:Justification:
st:
Capital Cost:
department
onstruction
Description:
34
IORITY
Co
departme
RIORITY
Recreatio
al
t
Capi
Just
cit
PR
P C
for shared school and ze (comparable to Orchard View, Greenwood MIll, The model in place since Orchard View Elementary was built in 2000 added gymnasium and multipurpose space to purpose
space. Adding population continues to the removal of the diving boards and the installation of one 50' water slide and one 75' water slide at each pool. The upgrade would also include
ck County Parks ies are over 20 years old and d decline in recent years and users are requesting different water features. The addition of two water slides and a spray ground to each
pool This project continues the development vision for the NW area of Sherando Park located north of Rt. 277 as shown in Landgrant Lane,
esent. Growth in community
20
chool site.
ed s
cted with two diving boards as the main feature for each pool. Swimming pool attendance has trende
purpose room space to the propos
Frederi
Plan update. Continuing the newly installed Line Drive from Warrior Drive to
r swimming pools at both Clearbrook and Sherando Parks. Upgrade would involve
provide recreational opportunities for the Clearbrook Park and Sherando Park service area.
work
-
for more gymnasium and multi
is that there are no community center spaces in the Stonewall District, while
ect brings the Jordan Springs Elementary School into the Cooperative Use frame
t the regional parks. These facilit
elementary schools, as these schools are located where population growth is pr
appeal to families and increase interest in visiting the outdoor pool facilities.
-
tary School Gyms), and adding community multi
community uses. Expanding the gymnasium from elementary size to full si
and indoor sport leagues continues to create demand
and Recreation Department operates two outdoor swimming pools a
phase.
lementary School
.
12 features at each pool
enovation
ess Phase 2
parking, restroom building, and dog park are elements of this
uilding R
Area 1 Recreation Acc
23
23
Springs E
--
22
22
er Slide / Spray ground / B
Y FY
in F
mpletion in
-
the 2016 North Sherando Park Master
ordan with 10
n
mpletio
utdoo
Evendale, and Gainesboro Elemen
– J
round
ddition
Sherando Park
Upgrade the o
Co
Co
pressure for this location
dule:
1,400,000
the addition of a spray g
Construction Schedule:
This proj
970,000
programming, camps,
Gym A
uction Sche
Wat To
$$
Justification:
ication:
:
– : –
ption:
-
Description:
were constru
Capital Cost:
subsequent
ost
facility will
ion
PRIORITY 567
PRIORITY PRIORITY
increase.
l C
Descript
tr
Descri
Capita
if
ons
Just
C
This project is intended to ea of Clearbrook Park. This vision is consistent with the e amenities ion is are softball fields to complete the complex, a shared use rtunities for the
entire Frederick County area. In addition to its use as a resently, there are ten softball/baseball fields within the as well as youth and adult softball programs. With the increased
usage of these fields, it has become more difficult to facilitate these programs. This
21
ompletes the development vision for the SE area of Sherando Park located north of Rt 277. This vis
ter Plan. Included are basketball, pickleball courts, and an access trail from the existing pool parking lot.
nities for the entire Frederick County area. It would provid
creation Community Survey.
ight of ten existing fields must serve a dual purpose of facilitating youth baseball
complex for county residents.
es for the entire Frederick County area.
et the growing need for diamond field space and tournament opportunities.
needs of the community as identified in the 2017 Frederick County Parks and Re
not readily available in northeastern Frederick County and provide a public pickleball
P
This project implements the development vision for the NE ar
expressed in the 2016 North Sherando Park Master Plan update. Included
creational facility, it will be used by the Frederick County school system.
ld provide recreational opportuniti
ecreation opportu
al oppo
ll Complex
This facility would provide recreation
2323
23
---
222222
Softba
This facility would provide r
n FY n FY n FY
pletion ipletion i
pletion i
-
and parking.
Sherando Park North
county’s regional park system. E
This facility wou
ark
This project c
ComCom
Com
Clearbrook P
000
hedule: hedule:
1,415,000
ay,
dule:
me
1,740,
420,000
Clearbrook Park Mas
roadw
to
uction Sche
project is needed
Construction ScConstruction Sc
$
trail segment,
$$
:
Capital Cost: Capital Cost:
-
–
Description:
ion:ion:
Capital Cost:
Description:
Justification
89
PRIORITY ITY
meet the
JustificatJustificat
r
OR
Const
I
PR
re
red use trail segment,
This project completes the development vision for the SW area of Sherando Park located north of Rt 277. This vision is ortunities for the entire Frederick County area. In addition
to its use as a of N Sherando Softball Complex is direct result, but also aygrounds will need to be replaced to schedule is proposed. Year 1: CB main playground, e FC (footcandle)
level fixtures, lamps and steel at Sherando Park. This standard is required by Little League International on all little league fields. LED light
-
22
FY22
Upgrade the ballfield lighting at Sherando Parks Baseball facilities. The upgrade would involve the removal of th
Year 3: SH 3rd playground. Year 4: SH Main playground.
r Plan update. Included are rectangular play fields, a sha
be displaced. The development of area 3 not only addresses th
With the development
The pl
.
owned parks
50/30
replacement for playgrounds at County Parks.
30/20 FC (footcandle) level fixtures, lamps, and wood poles and replace with
year
recreational facility, it will be used by the Frederick County school system.
-
four
-
ounty
roadway and parking, playground, restroom, and maintenance building.
a
nd.
ongoing;
C
ty park playgrounds are popular amenities at
Frederick Heights. Year 2: CB 2nd playground, SH 2nd playgrou
ce.
This project is anticipated to be
fixtures are specified, as HID fixtures are facing obsolescen
This facility would provide recreational opp
addresses additional identified needs of the community.
lfield Lighting Replacement
Sherando Park Maste
Development
24
-
(CIP item #9) two rectangular play fields will
23
FY
acement
in
3
on
t schedules
Sherando Park Area
)
eti
35 acres
Playground Repl
pl
expressed in the 2016 North
herando Bal
om
C
le:
le:
2,460,0000,000
nd (
meet user expectations.
This projec
945,000
poles on (4) four fields
du
u
Parkla
n Sched
5
Coun
n Sche
1,0
S
–
$$
- 1 - $
cation: isition of
Justification:
Cost:
Capital Cost:
Description:
on:
Capital Cost:
Description:
1012
ConstructioConstructio
PRIORITY 1
Y
PRIORITY
Descripti
PRIORIT
Capital
fi
Justi
Acqu
26
ly
eve the recommended 50/30 footcandle level lighting on the playing surface. This will facilitate the provision of recreational opportunities five years five acres for an additional
park located in eastern Frederick County. Developed amenities will ultimately be determined by ed close to population density, east of Winchester, Redbud / Shawnee ational facilities
and n of six new sites of uent development of these sites. Developed amenities will ultimately be determined by the
23
te
nity Park needs include continued development of existing parks, and the acquisition of approxima
he Parks and Recreation Commission is recommending the ballfield light system be upgraded to achi
-
over twenty
arkland to create more accessible recre
ghborhood project includes the continued development of existing and acquisitio
for the service areas which include all Frederick County residents. The field light fixtures are
f this project would provide developed p
the specific site, however typical development would include:
Potential acreage for parkland would be locat
ical development would include:
opportunities to the residents Frederick County.
25
23
-
-
Acquisition of Parkland, 10 acres per site
24
22
n FY
Y
• Lighted Basketball & Tennis courts
approximately ten acres and the subseq
n F
Acquisition of Parkland; 35 acres
Completion i
i
Neighborhood Parks
ion
s
t
Community Park
mple
district area. The location o
s
old and are affixed to poles.
• Paved & Gravel Path
Co
The Commu
specific site, however typ
2,194,000
dule:
uction Schedule:
The Nei
k uction Sche
Playground
• Playground
ved Path
T
at Sherando Par
3 – 4 –
$
• Shelters Description:
Description:
Justification:
ion:
• Tot lot ost:
ITY 1RITY 1
ustificat
Capital C
• Pa
•
Constr
tr
-
OR
thirty
ons
RIO
PRI
C J P
the amount of parkland needed to meet the to meet the Potential acreage for Rt 277. This vision is
ntified improvements. Included are rectangular play
24
minimum standard for our service area, as recommended by the 2013 Virginia Outdoors Plan. This project is intended
.
rea
rea of Sherando Park located south of
Community Survey.
l opportunities for the entire Frederick County a
County population.
n Development Area or Rural Community Centers.
e community as identified in the 2017 Frederick County Parks and Recreation
To reduce the gap between the amount of existing parkland and
expressed in the 2002 Sherando Park Master Plan update as well as other ide
ick
ion needs of the Freder
mpletes the development vision for the a
fields, skate park, roadway and parking, lake trail, and restroom.
would provide recreationa
meet the recreat
200 acres
26
S. Sherando Park Development
25-
200 acres
FY
200 acres
:
ion in
parkland would be located in the Urba
0-
Acquisition of Parkland
FY26FY26
These improvements
y 15
d
-
t
d d
t woul
-
• Western Frederick County 150
nt
le
ick County 150
Beyon
Beyon
ional Park
Comp
This project co
ou
15,830,000
C
• Hard Surface Courts
2,465,000
This projec
rick
5,024,000
:
: truction Schedule:
n Play Fields
lele
e
Construction ScheduConstruction Schedu
rn Fred
Reg
er
$$
–
n:
$
6 -
Cost:
• Eastern Fred
on:
• Shelter
ustification:
Capital Cost:al Cost:
• Northeaste
scription:
Description:
5
needs of th
IORITY 1PRIORITY 1
stificatio
• Ope
ustificati
apital
it
Cons
Cap
De
PR
Ju
C J J
Frederick County would convert the existing buildings assembly space asium and multipurpose space to elementary schools, as these schools are located where population growth is present.
Growth in community programming, camps, use trail, mountain bike trails, d to
ty could begin to rely on the Parks
letes the development vision for the area of Sherando Park located north of Rt 277 and Wrights Run.
25
This project is intende
y Parks and Recreation Community Survey.
This facility would provide recreational opportunities for the entire Frederick County area.
-
e.
Included are multi
purpose spac
gymn
Coun
The model in place since Orchard View Elementary was built in 2000 addedck
pulation of Frederi
-
and indoor sport leagues continues to create demand for more gymnasium and multi
This vision is expressed in the 2016 North Sherando Park Master Plan update.
meet the needs of the community as identified in the 2017 Frederick Count
po
.
trips where the
to a gymnasium. The project includes flooring and air conditioning
Through an agreement with the National Guard,
N Sherando Park Area 1 & 2 Development
.
m Addition
needs
To offer a comprehensive package of
25
25
-
ir trip
24-
24
and parking.
FY
FY
rmory Gy
ent to meet the
ion in
ion in
Beyond FY 26
p Vehicles
t
t
le
Guard A
le
This project comp
dway,
Comp
Comp
40 Passenger Bus
er Bus
an
:
3,450,000
roa
truction Schedule:
senger V
onstruction Schedule:
Nationali
artm
50 Passeng
0,000
,000
Fleet Tr
Construction Schedule
ooms, pavilions,
n Dep
5
32
$63
s
– 9 –
7 - $$
Justification: Justification:
12 Pa
t:
Capital Cost: :
Description:
Description:
and Recreatio
Description:
on:
--
18
tal Cost
os
4030
Y 1
ORITY 1
PRIORITY
ati
–
–
–
Capital C
PRIORIT
Van #1
s #1
c
us #2
tifi
ons
restr
Capi
RI
s
Bu
Ju
PC B C
y 40,000 square feet and include an indoor area large enough to pproximately ederick County and county residents currently must travel over one hour to needs, provide a nucleus to attract
new businesses to the
The above ice rink may be nty. This project is intended to meet the needs of the community
-
26
year
to offer
facility. By constructing the indoor ice rink, it would permit the department to meet competition
ould be available to all area residents. The construction of this project will provide a facility
accommodate a single 200’ x 85’ ice rink, locker rooms, party/meeting rooms, and concession area and would need a
owned or proffered to the County.
other compatible uses should opportunities arise, reducing the acreage demand.
instructional needs, citizen programming and leisure demands as well as
to construct. This facility should be located on property
f Frederick Cou
The Ice Rink project would be approximatel
There are no public indoor ice rinks in Fr
d in the 2017 FCPRD Community Survey.
recreational programming for the residents o
Beyond FY 26
oor Ice Rink
community. This facility w
le:
930,000
struction Schedu
use an indoor ice
Ind
,
collocated with
$6
–
tification:
Description:
st:
20
as identifie
Capital Co
TY
10 acres
I
PRIOR
round
Con
Jus
other office applications and for Internet usage.
with a planned Frederick tion would be on Rt. 2 in the Gainesboro district, but this could change depending on patterns of library use and on whether donated land could be Frederick
County citizens of all ages checked ed June This t close to a library in the regional system. This new library would serve a sizeable The Library will provide materials and programming
for citizens from source for homework help since ental l ages checked aged
first time
ed branch would fit per
Initial parking should be for a
27
pendent on future development. The first step of
Frederick County residents have library cards and averag
of
557,283 items. 32,570 Frederick County residents have library cards and aver
r
a normal year.)
Fi,
As
registered for library cards for the -
ol libraries are closed. The library will supply computer access via Wi
requirements)
019 Frederick County citizens of al
ago.
Initial parking should be for at least 50 vehicles. The proposed loca
s
he previous FY which is representative of
year
h a Frederick County project already in the early planning stage. This project
located
ere purged 11/18 per state
six
discussions with FCPS on existing property and was outlined in a document prepared by FCPS students
branch library with expansion possible to 15,000 square feet.
ide recreational and educational materials. It will be a prime
-
facility or co
ty List
Frederick County residents, adults, and children
2019
alone
as well as
-2
i
-
or
In 2018In 2018
is de
y Project Pri
-
uare feet in which area groups can meet.
stand
(inactive users w
n is yet to be determined and
sktop/laptop computers for word processing,
This branch would serve citizens living in this growing area:This branch would serve citizens living in this growing area:
branch library, either as a
32,570
above is from t
Senseny/Greenwood
Handley Regional Librar
items.
uld be the acquisition of the land of 5 to 8 acres.
all materials checked out of the regional system.
oro population of Frederick County that is not being served.
(electronic) = 557,283
e data
Gainesb
it will be open nights and on weekends when scho
is no
4-25
-
-
(Note: Due to CV19 shutdown th
(traditional) + 96,928 (electronic) =
sf
ch
erick County Library Branch
minimum of 65 vehicles. The proposed locatio
chool).
e Gainesboro district
5,000
ibrary Bran
Y 2
sf
ered.
F
-
sq
prov
,000
Completion inion of a 10,00
w middle s
180
8
regist
of a 4
ior citizens. It will
There will be a meeting room of
92
nty L
itional) + 96,
new cards were
nstruction
a de
ocated wit
ou
e
1,849,034
the n
Construct
edule:
vi
Frederick C
nd hotspots,
in th
e.g.,
up
TBD
-l
Fred
out 460,355 (trad
Co
ch
County facility (
$
located or if co
s to sen
ion S
o
the project wo
9.
pital Cost:population gr
2 -
-
:Justification:
ital Cost:out 460,355
iption:
Description:
, 2850
on
201
PRIORITY 1
PRIORITY
i
Construct
of
Justificat
a
8-
tablets,
r
%
toddle
in 201
Descr
9
4.7
201 Cap
Ca
52
6
of June al system. The provide materials and programming for citizens from toddlers to senior citizens. It will provide recreational and be a prime source for homework help since
it will be open nights and on weekends when school ots, via desktop/laptop computers for om of 800 square feet in nitial parking should be for a School projected to be built in the
izens of all ages checked d of June d here as This l provide materials and recreational and educational materials. It will be a prime closed. The library will supply
s representative of a normal is yet to be determined and is dependent on future development. The first step of ng, as well as other office
-
28
FY numbers for each year.) Frederick County residents, adults, and children
time in 2018
items. 32,570 Frederick County residents have library cards and average
em.
As
irements) As
district is not close to a library in the regional syst
tilize
r state requirements)
and children, registered for library cards for the first
u
s year data is
h area groups can meet.
As noted above the population group in the Redbud/Shawnee district is not close to a library in the region
requ
The Library wil
2019 Frederick County cit
64.7 % of all materials checked out of the regional system. (inactive users were purged 11/18 per state
p/laptop computers for word processi
s other office applications and for Internet usage. There will be a meeting ro
y with expansion possible to 10,000 square feet. I
ar’s data is being utilized which i
Due to CV19 shutdown, previou
school libraries are
users were purged 11/18 pe
land of 3 to 4 acre or collocated with the new High
hes.
and hotsp
25 square feet in whic
new Library will serve an area of Frederick County largely unserved by our current branc
tablets,
-
In 2018homework help since it will be open nights and on weekends when
Fi, rental
s living in this growing area:
lers to senior citizens. It will provide
Opequon
tions and for Internet usage. There will be a meeting room of 4
Due to CV19 outbreak and shut down the previous ye
Inactive
ote:
66
d FY2beyond FY2
-
and hotspots, via deskto
losed. The library will supply computer access via Wi
adults,
(N
n group in the
(
beyon
ut of the regional system.
9.
ty residents,
201
,283
– –
-
nning objective nning objective
18
branch librar
ctronic) = 557
e first time in 20
hese are end of
minimum of 35 vehicles. The proposed location
This populatio
This branch would serve citizen
2019, 2850 new registrations Frederick Cound be the acquisition of the
tablets,
sf
g range plapla
e
n of a 7,000
out 460,355 (traditional) + 96,928 (el
zens from todd
nge
, rental
registered for library cards for th
all materials checked o, 2850 new registrations (t
r)
South Library
ng ra
educational materials. It will
f a normal yea
area groups can meet.
n
word processing, as well aFi
Lo
Lo
Constructio
-
:
cess via Wi
dule:
Schedule
citi
522
TBD
programming for
truction Sche
the project woul
representative o
(Note:
3 –
libraries are c
:
al Cost:
Construction
cription:r ac
on
same area.
Library will
source for
PRIORITY
i
% of
Justificat
compute
2019.
applica
year.)
which
it
Cons
9
64.7
es
Cap 201
D
The project will expand refuse capacity and improve efficiency of collection in the Gore community by installing a yard boxes for refuse collection to one that uses a compactor will
drive down collection costs dramatically. In order to accomplish this, and account for improved trash flow and he ease of 7 percent in usage. 2019 . Also, imes such as supports this
project. Basic design The project will expand refuse capacity in the growing Double Toll Gate, Lake Frederick, Stephens City and Armel unty and is ust 2020, an increase of 11 percent
in usage. 2019 lace, capacity and traffic flow would be enhanced and the area well since the late 1970's. A recycling
On a typical Sunday, up to 183 vehicles drop of trash, filling the site's refuse collection cans to ors and blowing litter, all of ion and disposal costs (21 percent) percent over 2018.
An average of 321 vehicle trips are made to the facility each day, making it one of the w necessary in order to meet the growing demands of solid
29
ite will be expanded onto an adjoining parcel already owned by t
n of solid waste prior to transport
ties by adding a second trash compactor and poured concrete wall. The current site is situated in Clarke Co
capacity during heavy trash flow t
months.
lace, refuse will be contained in an enclosed receiver can, reducing odor, vect
This construction will take place over a period of
acility during August 2020, an incr
leased from the state at no cost. The facility also serves Clarke residents. Clarke shares in collect
ty List
The Public Works Committee
nned for FY 21/22.
ct Priori
collection costs through compactio
o close early on holidays and weekends eliminated. This location has served the
need
-
e
Proj
s 10 8
A total of 8,654 vehicle trips were made to the facility during Aug
-
ans. Project will provide much
Works
lize
sites. With a second compactor in p
ction is pla
ore facility from one which uti
in 2009. Additional upgrades are no
Public
Expansion
kends. At times, the site is forced to close early.
county. This construction will take place over a period of months.
he s
A total of 3,785 vehicle trips were made to the f
and
work has already taken place in the current fiscal year. Constru
r and recycling staging area, t
inistration
-
Double Toll Gate Citizens' Convenience Site
capacity. The project will pay for itself in lower refuse
while Frederick maintains the site and provides labor.
21-22
which are challenges of using open collection c
ounty Adm
Citizens Convenience Site
Y
surplus trash compactor. Converting the G
F
Completion in
county's busiest refuse and recycling
pad and new pavement were added
C
owed a growth of 10 percent.
the construction of a compacto
hike of 11
750,000 le:
585,000
with a compactor in p
u
ched
e
holidays and wee
Gor
$
$
onstruction S
also showed a
1 - 2 -
Justification:Justification:
ost:Cost:
n:n:
PRIORITY PRIORITY
Descriptiotio
communi
C
l
l
Descrip
need t
CapitaCapita
trash
sh
C
d take place in FY 22/23. Construction is et This project will accommodate the existing ties and services for and government eral Governmental Capital t is for the benefit of of the
al equipment for an the eficial in ensuring
rnmental
30
000 square fe
ies.
teer Fire and Rescue Companies.
ents
al entit
s may be less th
er to address
of purchasing capital equipment for gove
em
ers accepted on behalf of the government
r
requi
4,
, meeting space,
chasing capit
would be ben
ng shopping center containing approximately 6
his capital facility will allow for improvements to general governmental facili
This projec
eet the
rd
enditure
ounty office annex in o
t of Gen
ies will enable the County to m
und to be for the purpose of pur
ss.
the inclusion of such a project
h exp
ce space
enefi
an Development Area.et proce
al facilities. Suc
ividual Volun
,000,000 for the b
The Public Works Committee supports this project. Design work woul
l meet the increasing need for offi
budg
C
of certain departments (TDB) from the 107 N. Kent Street complex to this
pital planning and
the CIP but does not include ind
for the purpose
l government
enter)
nt of cash proff
amount of $1
the County’s Urb
improvements to general governmental facilit
Annex (Former Sunnyside Plaza Shopping C
at
t was determined th
This project consists of the renovation of an existi
nera
fCounty’s ca
capital expenditure
re fund
sburseme
the
ents to ge
g fund in
522 in
nts of Frederick County and wil
rnment Capital Expenditures
nditu
the
o the collection and di
n
ovem
Intersection of Fox Drive and Route
ntified in
this capital expe
ies participating i
21-22
s.
I
lvin
ld.
ounty department
for impr
f a revo
thresho
this
Y
ide
F
Completion in
Expenditures. It is the intention of
llow
pense is
sts o
established $100,000 departmental
The inclusion of t
services in an accessible location.
si
o a
inclusion of
t
Enti
th regards t
n
and t
ct co
al ex
County Office
TBDN/A
C
nmental
re space needs of
General Gove
00,000
or
it
e
de
le:chedule::
is proj
cies and to allow f
gencies
p
le
the benefit of the resi
planned for FY 23/24.
nt ca
D
management.
uConstruction Schedu
The
ched
a wi
$1,0
TB
the County Gover
Th
a
ignific
governmental a
of Virgini
located at the
onstruction SConstruction S
4 -
3–
Justification:fication:
t:
al Cost:
Description:Description:
s
relocation
IORITY
PRIORITY
al Co
that this s
and futu
waste
ode
Capitt
usti
Capi
n
age
PR
C J C
ounty’s Urban e building shared with the nchester s for the government he court
for the
nd government
31
and services
y of Wi
ith t
rvice
and
and se
ation w
e C
e Cit
space, a
ng space,
nerally in th
general governmental facilities
ities
ed generally in th
munic
ting
l
ci
re foot offic
al faincreasing need for office space, meeti
m
office space, mee
co
cated ge
t
oing
vernmen
g
to be locat
ough on
roject is for a new 150,000 squa
be lo
for improvements to general go
tion Building, to
roject has been established thr
ing need for
lity
,000 square feet.
o
ial Center Faci
for improvements t
d Administra
reas
et the inc
t Judic
would be 50
he
p
nd will meet t
tive Office Complex
Boarw
Join
istration Building
ty will allow
l me
allo
e
ty/School
ur
ed for this p
ity will
and wil
w fut
tion
hools’ por
inclusion of this capital facili
The inclusion of this capital facil
ounty a
e
lity
he County’s Urban Development Area.
of a n
ounty
Coun
Joint Judicial Center New Faci
l Board Admin
n an accessible location. The ne
a
ts of a
istr
This new project consists
ick C
k C
e Sc
int Admin
deric
m and the City of Winchester.
esidents of Freder
rvices in an accessible location.
tion. Th
onsis
e
s of Fr
t c
TBD
TBD
County/Schoo
The Jo
istra
rojec
Schedule:
ule:
benefit of the resident
in
Development Area.
p
TBD
This
m
e
d
TBD
ls Ad
Sche
Th
fit of the r
truction
5 - 6 -
o
Justification:
on:
t:
al Cost:
ruction
:tion:
ty Scho
Description
pital Cos
RIORITY
PRIORITY
ati
i
services
Descrip
Justific
t
Const
Capit
Cons
Counyste
bene
or in
Ca
se
P s
availability for satellite Sheriff’s office and County office space for The station will be located in the area of Fairfax Pike, ,000 sq ft facility to house an engine and Development
near this area will necessitate the development of this station. The Lake Frederick development is age restrictions on 80% of the homes above 55 and the other 20% This fire and rescue
apparatus will be assigned to Fire and Rescue Station 22 located on Fairfax Pike East area of ecessary equipment satellite offices for the Frederick County Sheriff’s Office, square
feet of building area. An approximately ,000 sq ft facility to house an
acre site
all
32
1822E specifications and equipped with
-
Purchase one (1) custom pumper equipped and one (1) custom Type I Advanced Life Support (A.L.S.) capable
White Oak Road and Tasker Road to provide service for the heavy growth area east of Stephens City. An approximate three
above 45. The developer’s master plan will allow for 2130 individual dwelling units using a mix of housing types.
required and n
5
The fire station will be approximately a 1
all
Those who would occupy the facility will determine the size of the satellite offices.
Frederick County. The pumper will be built to N.F.P.A. 1901 specifications and equipped with
5
The fire station will be approximately a 1
-A-
required and necessary equipment to function as an Advanced Life Support ambulance.
.
to function as a Class A Pumper. The ambulance will be built to the Federal KKK
and BOS office with meeting room
Fire & Rescue Project Priority List
evenue, and BOS office with meeting room.
Frederick County Fire and Rescue Station 22 Apparatus
availability for
ambulance equipped to be assigned to Fire and Rescue Station 22.
bay Fire and Rescue Station with
scheduled to be an active adult resort gated community with
.
site will be needed to accommodate the facility
and Rescue Station 23 / Annex Facilities
Frederick County Fire & Rescue Station 22
with
,
bay fire station
Commissioner of Revenue
4-25 24-25
will be needed to accommodate this facility.
Completion in FY 2
Completion in FY
R
ommissioner of the
-
-
hree
three
Construct a t
00,00000,000
Construct
Schedule:ule:
s Office, and
Construction Sched
7,5$1,1
Fire
$
-
Construction
Description:
1 - 2 -
C
Justification:Justification:
Capital Cost:Capital Cost:
reasurer’s,
Description:Description:
1A
ambulance.
’
PRIORITY PRIORITY
acre
Treasurer
PRIORITY
-
three
T
The project is located at As commercial and residential developments continue to expand in this area of Frederick County, and with the This fire and rescue apparatus will be assigned
to Fire and Rescue Station 22 located on Fairfax Pike East area of required and necessary equipment 1822E specifications and equipped with all of the This project consists of a revolving
fund in the amount of $1,000,000 for the benefit of Fire and Rescue Services. It is the purpose of purchasing additional and replacement capital equipment fire t this The inclusion
of this capital expenditure fund for the purpose of purchasing additional and replacement capital will enable the County to meet the requirements of the Code of Virginia
address the needs of the growing
33
.
development
and rescue vehicles and equipment. It was determined that the inclusion of such a project would be beneficial in ensuring tha
Purchase one (1) custom pumper equipped and one (1) custom Type I Advanced Life Support (A.L.S.) capable
with regards to the collection and disbursement of cash proffers accepted on behalf of the fire and rescue companies.
and commercial
community and to maintain efficient response times, the addition of a new fire and rescue station is needed.
Those who would occupy the facility will determine the size of the satellite offices.
density residential
all
81, the calls for emergency services increases as well. To
Frederick County. The pumper will be built to N.F.P.A. 1901 specifications and equipped with
significant capital expense is identified in the County’s capital planning and budget process.
required and necessary equipment to function as an Advanced Life Support ambulance.
-A-
-
function as a Class A Pumper. The ambulance will be built to the Federal KKK
37 South, an area of proposed high
Vehicles & Equipment
Apparatus
3.
ambulance equipped to be assigned to Fire and Rescue Station 2
3
Frederick County Fire and Rescue Station 2
,
fire and rescue vehicles and equipment
the intention of this capital expenditure fund to be for
–
27.
6-27
Capital Equipment Fire & Rescue
-
.
26
Crosspointe Center at the end of current Rt
Completion in FY 2
Completion in FY
-
increased traffic on Rt. 37 and I
A
N/
00,000$1,100,000$1,000,000
Construction Schedule:Construction Schedule:Construction Schedule:
ulance.
7,5
engine and amb
$
AND
-
Justification:Justification:Justification:
Capital Cost:Capital Cost:3- Capital Cost:
Description:Description:
2A
equipment
PRIORITY PRIORITY
to
ving Quarters Upgrade / Expansion project. This will include remodeling the upstairs (2nd floor) portion of the rooms with the existing kitchen; add bathroom facilities for male and
female, with each containing lockers accommodate the additional Staff and Volunteers that are providing fire and rescue service. The existing space is outdated and will not accommodate
the potential Greenwood is one of the busiest stations in the county responding to approximately 2,600 (estimated) EMS calls per the 3rd addition. It is essential for Middletown Volunteer
Fire and Rescue Company Inc. to maintain our capabilities in emergency response and the facilities to house the apparatus, tools and equipment and provide suitable living quarters for
our system
and office areas for future growth in our system.
de a
34
and shower facilities. The upgrade will add a training room and a fitness area to the 2nd floor. The project will also inclu
nd staff. And taller apparatus bay and entry doors.
building, approximately 4,638 sq. ft. of living space. The project will convert the existing open space to add six (6) bunk
into
ld back in that location tied back
Greenwood will be remodeling the day room, bunk rooms, and work areas to
.
Replacement is needed due to the wear and tear on the existing fleet of ambulances
and Addition
renovation of the 1st floor to add office/meeting space and personnel recovery area.
bathroom,
1st addition to the station. Bui
sts.
Currently we are almost at max capacity in the bunk rooms for volunteers a
tal and Capital Equipment Reque
Renovation
.
25)
This addition would be designed to provide additional sleeping,
(Two Ambulances)
-
23 and FY 24
uilding
Upgrade / Expand Living Quarters
Program
Ambulance Replacement
– B
-
additional staff that will be assigned to our Station.
(FY 22
scue Company
Ambulance Replacement program
22
Demolish original building and
-
jective
21
mpletion in FY
e Company Capi
ob
room; upgrade
Re
year
and
-
Multi
Fire
– –
Co
ation ation
650,000 Construction Schedule:695,000 Schedule:
lunteer
cu
four (4) beads in each
es
Greenwood Fire StGreenwood Fire St
& R
TBD
Li
$
$
Middletown Vo
ption:
Individual Fire
ption:
ption:
tion:tion:Justification:
t:
t:ital Cost:
struction
os
os
C
C
ital ital
icaica
riescri
ri
year.
ifif
c
c
JustJust
eses
n
CapCapp
CoCa
DD D
we are maxed on room for sleeping and office space. Our one apparatus bay area has small doors and short At the present time the Clear Brook Vol. Fire & Rescue has outgrown the existing
building with the equipment on personnel and the traffic at the existing location. We are proposing a new building to the Clear Brooks first due area. The building needs to be approximately
a 100x100 Administration and living with a operations, administration, eating and sleeping facility vide the With the current facility and needed for upgrade in living quarters to accommodate
the overnight personnel 24 hours e equipment that we Replacement of a 1986 custom chassis ladder tower truck with a new year custom chassis ladder tower truck. The A. 1901 specifications
and equipped with the required tools and appliances to meet ISO standards at the time of build. The apparatus will meet NFP A standards and ISO requirements at the time of design. A
steering/ design
-
35
Many of the changes in the new standards deal with safety and cannot be retrofitted to existing fire apparatus.
fund
have to provide the service to our community for the health and property protection and with the current staffing needs and
The estimated size of the structure is to be approximately 16,000 square feet. This upgrade of the facility will help to pro
and volunteers, this is of the utmost priority. At the current time we have outgrown our facility and with th
day
mmittee is currently in place and meeting regarding the design process.
-needed space for Fire and EMS services for the community of Clear Brook.
to
-
operations our current facility is in need of upgrading/updating.
day
Truck Bay all single level. The building will be used for
ent
and future staffing.
m
eplace
ection.
Tower 11 R
ceiling that restricts what can be parked in that s
hour
Station
volunteers,–
-
any
24
hand, the call volume, the staffing of
Rescue Comp
New Fire
P.
24
F.
-
of the current career staffing,
23
N.
TBD
FY
aratus will be built to
–
4,830,00000
on
le:n Schedule:
,0
and
-
Fire Stati 00
Construction Schedu
1. Personnel Safety
members. Currently
$1,3
y Fire
located within
$
Description:
Description:
on:ification:
Cost:
Capital Cost:
-
Stephens Cit
100x60 / 4
tructio
arbrook
tificati
Capital
raising
Cons
t
e
app
Jusus
Cle
co
b J
of the major components of an apparatus has been made including the drive he As apparatus get older, replacement parts may become more difficult to obtain, leading to Replacement of
a commercial chassis medic unit with a new commercial chassis custom Type 1 Medic Unit. The unit d and necessary equipment to 1822E standards and ISO controls needed for Many of the
changes in the new standards deal with safety and cannot be retrofitted to existing EMS f an apparatus has been made including the drive 1822E, NFPA 1500, Standard on unit with a new
commercial chassis custom Type 1 Medic Unit. The unit 1822E or NFPA 1917 specifications and equipped with all of the required and necessary equipment 1822E standards and ISO d for
36
train, transmission, engine, ladder, platform, hydraulic systems, pump, chassis, and body. These components are approaching t
requirements at the time of design, to include the required patient restrain and lift system and environmental controls neede
train, transmission, engine, chassis, and patient compartment. These components are approaching the expected service life.
requirements at the time of design, to include the required patient restrain and lift system and environmental
Fire Service Occupational Safety and Health Program and NFPA 1917, Standard for Automotive Ambulances.
-A-
-A-
-3
The apparatus will meet NFPA 1917/KKK
function as an advanced Life Support transport unit. The apparatus will meet NFPA 1917/KKK
require
-A-
11
) Existing
ral KKK
1822E or NFPA 1917 specifications and equipped with all
Compliance with present Fede
Ambulance/Medic Unit Replacement (Type 1
-2
1) UNIT 11
An examination of the major components o
e
t (typ
dic Unit Replacemen
Replacement of a commercial chassis medic
-
to function as an advanced Life Support transport unit.
3. Changes in National Standards and Federal Mandates
An examination
expected service life or have already been replaced.
Me
y–
–
Company
Rescue Compan
-
-
. Availability of Replacement Parts
-
2. Condition of Major Components
2. Condition of Major Components
-A-
-A-
-22
23
will be built to the Federal KKK
Rescue
longer periods of "down time."
22-
will be built to the Federal KKK
21
medicines required for EMS.medicines required for EMS.
FY FY
Construction Schedule:240,000 tion Schedule:
-
andand
1. Personnel Safety
Stephens City Fire Stephens City Fire
$
Description:
ption:
Justification:
al Cost:
apparatus.
Construc
ri
Capit
Desc
3
e changes in the new standards deal with safety and cannot be retrofitted to existing An examination of the major components of an apparatus has been made including the drive 1822E,
NFPA 1500, Standard on
37
ssis, and patient compartment. These components are approaching the expected service life.
Fire Service Occupational Safety and Health Program and NFPA 1917, Standard for Automotive Ambulances.
-A-
Compliance with present Federal KKK
-
3. Changes in National Standards and Federal Mandates
Many of th
Beyond FY 26
-
-
2. Condition of Major Components
1. Personnel Safety
train, transmission, engine, cha
280,000 Construction Schedule:
EMS apparatus.
$
ification:
ost:
ital C
st
ap
Ju
C
notice.
arge constructed on the f all the l be 4,256 square feet and will hicles t. This equipment allows personnel of each specialty team to ue to the simplicity of the building style and
materials and the readily This project is to indicate projected cost of replacement vehicles to the fleet of the Frederick County Sheriff's Office s cost
o emergencies. Protecting the vehicles will allow the elonging to when responding to calls, not the cost of purchasing 46 vehicles
38
6 front concrete pad.
of the Officers. This will offset the cost of purchasing vehicles that were
vehicles that require coverage due to the l
vehicles that are used for the special purpose teams. These ve
over the next five years. This will ensure the replacement of end of service life vehicles to the Sheriff's Office fleet as well a
ment’s
property of the Frederick County Public Safety Building. The building will allow for the maintenance, storage, security o
ure to fluctuating weather conditions. Due to these vehicles b
mo
unction at a
the purchase of land as it will be
8 bay 4 garage door equipment storage building with a 35x7
to meet the basic requirements for Law Enforcement Officers
f
ions teams. This building size wil
to
temperatures
drop
chedule would
be maintained at certain
riority List
large, specialized
are required to be protected from the weather to ensure quick responses t
s
This
This project does not require
t P
specialty teams, the vehicles house important and expensive equipmen
udget years due to budget restraints.
rojec
.
years’ time
uired for the special operat
P
steel building for housing of
he required housing of
Office
D
ready at all times.
must
g engine wear and expos
can be competed in a
s
otating basis.
f’
Sherif
Law Enforcement Vehicles
patrolling of the county, community safety and safety
d. Much of the equipment
icles
an
-21.
uild. This will be
eh
amount of equipment and specialized tools.
objective
V
per year to approximately 25 per year on a r
20
.
arge
tion in FY
effectiveness for repairs to failing vehicles
facilitate t
This project will ensure the equipment is
L
vehicles that are req
r
ded
ability of the land, this building
l Building fo
year
e by reducinnee
bay
2012 b
omple
This project will
require 13,500 square feet to b
8-
This project is
-
ulti
Replacement
an
0
ion at han
-
Cng the 2010
M
Construct
5,220,00
8 Bay Stee
chedule:Schedule:
20,000
longevity of the vehicl
$3conduct the miss
large, specialized
$
S
1 – 2 – n:
struction
struction
replaced duri
ion:
on:on:
l Cost:
ost:
RIORITY
PRIORITY
iioicati
tificat
l C
ipt
Descript
pitapita
Descr
f
avail
Justi
n
n
Jus
CaCoCaCo
P
the public.
s project will update the
. This project will update the mobile tems from previous vehicles for so operable with any band radio system that the County 25 and narrow band compliant as outlined by so long 25
and narrow band compliant as outlined by ile on call outs and rescue aser training and less lethal training. The trainer is
fe situations so that deputies use the appropriate amount of force, hopefully lowering the Sheriff's Office's o be used to demonstrate the complexity of use of force situations to the
39
toto
dio systems
replaced vehicles with current and up to date radio systems
systems for
use of force training for the entire Sheriff's Office and selected members of
date ra
portable radio system for each replaced vehicle. The Sheriff's Office has been recycling all the old portable radio
replaced portables with current and up to
. Thi
wh
This project is need for all the specialty teams that operate outside of their vehicle
timeline
radio system for each replaced vehicle. The Sheriff's Office has been recycling all the old radio sys
acement timeline
t is in conjunction with the implemented mobile radio replacement
-
-
be Po be P
does firearms training, ASP training, pepper spray training, t
This project will also
This project will als
l
-
This project is in conjunction with the implemented vehicle rep
ll be inter
This equipment wi
ne
timeline
timeli
il liability in use of force situations. The simulator can als
with the Emergency Communication Center.
ncy Communication Center.
is needed for equipping all
is needed for equipping all
Training System
long that the current equipment is obsolete.
jectiveobjective
This project will be used to do
adios
th after the radio study.
that the current equipment is obsolete.
adios
ob
R
yearyear
ortable
rearms Simulated
R
obile
communicate with the Emerge
-
-
Multi
Multi
This project
This project
MP
00,000,125,000
8500 0
This projec
Schedule:Schedule:
used to simulate real li
ex 800
The simulated trainer
2
Apex
1,
$1
FCC regulations.
decides to go wi
FCC regulations.
Ap
Fi
$
communicate
3 – 4 – 5 –
ion: struction
ion:
Justification::
l Cost:l Cost:
struction
ion:
ication
RITY Y Y
s.
Descripttt
IORIT
PRIORIT
.
mission
DescripDescrip
CapitaCapita
public
ustif
O
PRI
Con
n
civ
Co
PR
J
the Sheriff's Office could face in excessive use of Safety Communications Officials (APCO) ety communications within the County Sheriff’s Department, Frederick County International Project
25 (P25) radio
40
y.
ount
ions.
C
ical public safety communications within the
ical public saf
volunteer fire & rescue companies, and the Department of Public Safety Communicat
ety Communications Officials (APCO)
-
Public
crit
ng communications for the Frederick
-
Provide real life training to all deputies and reduce the civil liability
oject 25 (P25) radio communications system to support mission
, and deployment of Association of
crit
-
Project 25 Public Safety Radio Network
support mission
Saf
This system will provide radio and pagi
-
Association of Public
Purchase, construction
needed to
Communications
22
-
FY 21
FY 23
20,981,973
is
100,000 Schedule:
chedule:
communications system
his
Public Safety and
T
International Pr
$ $
Fire & Rescue,
Construction S
1 –
struction
:Justification:
l Cost:
al Cost:
Description:
s.
ication
PRIORITY
force case
county.
Capita
ustif
Capit
Con
J
service
s the y
de
41
ddres
Valle
Project would inclu
vements to
s reaching the end of its
and a
d Apple
l not change with this project.
k area
g Route 11 an
mpro
Frederic
e i
.
odate futur
Double Church Road
n
ts.
er
ve.
s congestion at key points alon
ovemen
outh
313 i
Elm Dri
S
accomm
xit
estion in the
ration wil
capacity impr
E
81 at
ing between Route 11 and Shady
t
rity Lis
The new bridge will feature design elements that will
g to
tate
nfigu
g
ject Prio
tinuin
ss con
over Inters
limited
erchange co
nd con
mprovement that will addre
Transportation Committee Pro
bridge at Exit 313 and add
nts
nts Plan.
e
addres
81 a
Capacity Improveme
Millwood Pike) Bridg
y Improvements (Ph 1)
nt
81. The i
-
at I
tion improvement that will
Improveme
ng
oad Cross
inni
-
ments to I
ive.
eg
ded roadway b
Road
r
Railr
ckley D
Route 17/50/522 (
regional transportation i
nt and
cient
ctor road and
and future improve
in Secondary
ning and Safet
with Sti
efi
se 2
Replaceme
surrounding areas.
Replace the structurally d
i
, Pha
ne div
realignment of Aylor Road to align
sporta
e
.
conne
tified
ce Driv
life and needs to be replaced
e 277 Wide
la
ridge
The bridge on
is a tran
-
TBDTBD
TBD
$37,012,924
35,123,000
Route 17/50/522 corridor
Construct a 4
4,223,000
oject is iden
Construct a
nstruction Schedule:Construction Schedule:
e:
313 B
Renaissan
This is a
Construction Schedul
development to the
This
Exit
Rout
ties
$ $
2 –
ri
This pr
1 - 3 -
ion:Justification:
tification:
ost:
st:l Cost:
cription:cription:
:
o
cription
d Pri
PRIORITY PRIORITY PRIORITY
ital Co
Justificat
ital C
ive.
ita
e
Fund
DesDesDes
Cappp
Jus
Dr
CoCaCa
ewalk for 1992 design plans to address the nced ntire lude ck area and address
y, to update the 42
nc
the e
n, this allows for adva
ould i
of sid
t would benefit
roject w
nstallation
sion. More specificall
ess congestion in the Southern Frederi
o Park. P
277 and Warrior Drive. I
a
mprovement th
In additio
rand
e
d to update th
nd continuing to She
.
the Eastern Route 37 exten
ection.
ation i
improvements
e 37
Way and Construction Work for Rout
grade to this inters
sport
.
of Decision an
rsection of Rt
n
ra
ddr
f a t
81 a
hange
nt that will a
tion o
2)
I-
e
c
lane divided roadway beginning at
inte
possible inter
h
r Driv
Record
a significant safety up
oject moves the County closer to comple
(P
the
k on
ements
at Warrio
nt of a new
veme
77 at
tal.
r
to continue wo
lor Road to align with Stickley Drive.
es
nstruction.
afety Improv
impro
2
tbound
ped
d
nsion
uidelines, an
n of pedestrian
on
-
t to the poi
of
ati
n lane exte
turn lane for eas
t-
co
be
nsport
gh
d
as.
would
Route 277 Widening and S
ngineering, Ri
e
way purchase an
ng are
oject would b
ering g
This is a regional tra
ng localities.
mprovement
ur emen
o
allati
urroundi
Route 277 right t
-
772,500,000
a 4
TBDTBD
BD
ntal Impact Stat
ngine
26,191,407
-
nd inst
ht
T
chedule:
Planning, E
ct
tion Schedule:e:
Extend rig
490,943
ounty and surroundi
ul
e
pr
-
t to the s
This prConstru
of
,
orities
This
is i
ed
nment
safety a
t-
Ay
struction Sch
, righ
Th
$f $
tion S
ication:
$
Cost:
Unfunded Pri
4 - 5 - 6 - realignment o
Description:
ication:Justification:
:Capital Cost:
ion:ption:
Capital Cost
pmen
t alig
an engineering
IORITY nme
PRIORITY
TY
ruc
Construc
tri
t
Capital
PRIORI
ip
scri
develo
curren
pedeso
Const
Descr
ifJustif
Envir
Just
Con
De
PR
C
d Snowden t is that e l address is
43
ion
stion on th
projec
widen
at
ion with VDOT.
loc
ion wil
This
of Route 11 north an
dor. The
project would
ss conge
unty.
ct
se
s to this inter
ri
t impact on Eastern Frederick Co
e
rdinat
o addr
e 11 cor
n Road
is
Th
ongoing study in coo
ade t
roadway.
lestow
e Rout
inity
y upgr
ment
to Old Char
on through development land in the vic
ificant impact on th
e
capacit
ve
Improvements
lan
mpro
-
two
hat will provide a significant
te 11. I
oulevard
a
ough
Greenwood Road
arily
ments
astern Road Plan.
r
e traffic flow and safety.
can
th
tion etermined
prim
l have signifi
nterchange Improve
B
ou
idge
sign
oad at R
.
t and Intersec
rently
generation in the area.
divided roadway with turn lanes where appropriate
Br
sportation improvement that will have
int planning efforts between the County and VDOT.
s from Snowden
is cur 15 to
e d
well R
vement that wil
corridor to b
n the adopted E
oulevard
ts from Exit 3
ati
en
wn Road to meet Hope
t t
I
nge upgrades to improv
Redbud Road Realignment and Exit 317 current loc
lignm
ion improvemen
rth of Snowden Bridge B
Route 11 North Widening to 6 Lane
A
ments throughout the
c
l Road
comprehensive planned development’s traffi
idor Improvemen
is project is identified i
impro
Plan.
ts
om i
opewel
Eastern Road
ansportation
bud Road fr
s a transportat
etown Road/H
rcha
uceto
tran
7 Corr
BDTBDTBD
306
29,196,504
prove
is a tr
8,240,0005,150,000
inte
No
T
ed
Realign Br
gn Red
11,576,Construction Schedule:on Schedule:
edule:
This is a
pt
d
Route
Route 11
. Th
This i
d in the ado
ge Boulevard an
Spot im
This
Reali
r
9 - Bruc
lane
Construction Sch
ute 11 Corrido
$ $
$ $
10 –
jo
6-
8 -
y
n:ion:
tification:
7- Capital Cost:Capital Cost:pital Cost:Capital Cost:
ption:tion:Description:Description:
facility to a
identified b
ti
Justificatio
PRIORITY PRIORITY PRIORITY
atPRIORITY
Construc
entifie
Descrip
tific
Descri
id
JusJus
BrRo Ca
id
ith
h ld lan nd and
ill be used to identify key spot is
44
c
nty. This project
ts wou
Opequon Chur
f the County a
P
w
y reducing congestion
omprehensivecoordinated
ese improvemen
Lane
nd
mits to Opequon Church
ing
a large area o
C
ederick Cou
at Route 11 a
promote the
be
on, but is
th
b
ned that
ic
l
pub
stern Fr
tudy w
n.
r
endent up
Drive
a
ove
d Pl
ng
would
ermi
the traveli
e MPO. This s
ion
oa
ill have significant impact on Ea
Shawnee
nts from Winchester City Li
OT det
e Eastern R
improvementss congest
is not dep
for
with the MPO and VD
ion of
ty
the area.
n th
VDOT through thimprovement that will addre
s the safe
rsectproject
d i
his
e
as detaile
t
inia State Lin
idening and improvements to the inte
addition,
lane divided roadway. This
e 37, Channing Drive, and development in
This project improve
facility
11 S Widening & Intersection Improveme
with In
conjunction
the West Virg that w
.
lane
ety in the area
S study
on improvement
-
and 6
ucted in
ransportation
STARrea.
em.
ed 4
to Eastern Road Plan.
it
rth
ess development to the surrounding a
under this
he County is engaged in a
-
af
d
o a 4
Improve Route 11 to a divid
Transportation study con
and s
No
dening
a transportati
Road t
f Route 11
This is a regional t
side wsignificantly improve congestion
Wi
ents to be addressed
improving the flow of traffic.
NB
Widen Senseny
nseny Road
197,760,000
mplementation of Rout
TBD
TBDBDTBD
69,010,000
d
3,399,000
,
Widening o
T
on Schedule:dule:
edule:onstruction Schedule:
Route 11 S
te
Route s
p
is i
ado
vision for this area.
struction Sche
Th
n Sch
e at Route 11 Se
$
T $ $
he
1 –
3 -
2-
tified in t
:ation:Justification:ification:
:apital Cost:ital Cost:
ription:
Description:Description:
Capital Cost
ation
o
PRIORITY 1PRIORITY 1PRIORITY 1
ConstructiConstructi
rovem
tifictific
i
Desc addr
ust iden
Con
mp
Cap
Lan
JusJus he
i C t JC
lanes and potential ss
north and s h and
ntially a full
45
ern Frederick area and addres
e
dr
d ad
rt
no
ntersects from the
of the County an
he
leigh and pote
t
ive intersects from
erchange.
urn
include t
Crest
7 int
rtation improvement that will address congestion in many areas
i
ive
th
intersection of
30
ou
Dr
e to
ted Exit
h Drive
r
congestion in the S
ad where Channing
or D
v
tleigh Dri
ri
grade to this intersection.
and Crestleig
oute 277 where War
of the reloca
e.
he
pendence Driv
res
o Senseny Road at t
nd C
ress
t the location
y Road
eny Ro
eny Road (657) a
dd
vement that will a
ction of Sensen
t Inde
s
g at R
Sen
be a significant safety up
nning at
0 East a
81 a
t
anes
in
I-
nn
t with
of Sens
left and right turn l
adway begi
307 interchange.
Route 5
begi
e
rs
impro
intersec
n lanes at the inte
y
n
lane divided roadwa
rovements to the intersection
reas. continuing that roadway south to intersect with
ocatio on
transportati
d ro
adway south and west to
ding a
Exit 307 Rel
g Drive Extension
uld
poe
areas.
d Exit
lane divid
on
dd
ns
Warrior Drive Extensi
o the surroun
ovement wo
gional tra
ization. This project would a
relocate
ur
ion of the intersection.
rounding
nal
ad T
4-
241,283,133
1,
o
-
TBDTBD
D
his is a regi
46,350,000
48,410,000
onstruct a 4
TB
Senseny Ro
8
a re
Construct a
Construct a
truction Schedule:
2,625,036
tion Schedule:le:
Interstate
development to the sur
impr
t
annin
nt
This is
ruction Schedu
coming developme
This
continuing that ro
Imp
7 - Ch
$ $
$ T
14 -
ion:
$15- 6-
C
:
iption:
:Justification:
Cost:st:
Capital Cost:
ription:
:ption:
tal Cost
tion
Description
ITY 1ITY 1
PRIORITY ORITY
Capital Co
zat
cat
Construc
Capital
ca
signali
Descri
fifi
signal
IORPRIOR
Const
Descr
ti
onsJusti
Capi
Desc
PRI
Jus
PR
C
t. This project is being eded link inus of Warrior t Plan,
ederick County and
support that
46
a
relief
nts in the County Comprehensive
n
e
estio
l n
additiona
the projects needed to
ng
south to the existing term
e significant co
r
n F
s
an
er
Ea
congestion in East
Route 50
de
on and provi
provid
h to
nus
veme
37 extension and would
ut
ent.
ect prepares the County for future development by addressing
t
ing termi
ill address congesti
Developmen
and going so
dress
ro
nd surrounding developm
mp
ansportation i
d
l a
south to exist
wil
e
ing at Senseny Road
n andoint
sp
Pla
in the Cros
t that w
Route
the planned tr
.
pointe
ad
ive Plan
e Eastern Ro
ny Road a
with a
men
Cross
r consistent with the Comprehens
e Route 37 extension
prove
ve.
y beginn
urrent
ll of
ute 37
o
se
ab
een identified in th
County Eastern Road Plan
im
en
ed to address a
s is a regional transportation ividually
t would be conc
ing areas.
dwa xtension from Ro
h improvements to S
d roa
st.
at Exit 310
ind
oad and Route 50 Ea
d
de
ess development to the surround
from th
lane divi
are not note
d
This project is inten
ct has b
This improvemen
s Tasker Road
Warrior Drive E
D
way
lee Way
TBDTBDN/A
-
28,119,000
t
TB
on wi
onstruct a 4
34,505,000
k
e
uction Schedule:
oj
This proje
road
Schedule::
ule:
mann
stern Road Plan that
Frederic
nstruction Schedule
This pr
lanned in conjuncti
ne
Inver
Construction Sched
R
between Senseny
a
ThiBD
Exit 307 as well a
n
la
$ T
4-
8 - - 0 -
development i
cation:
$
C
pital Cost:
Description:
Justification:ification:
tification:
t:Capital Cost:
Construction
iption:
:
19
Description
Capital Cos
TY 1ORITY 2
TY
PRIORIPRIORI
tr
ustifi
e.
Descr
ns
dr
Just
Driv
I
s
CoCaCo
PR
Ea
ad
Ju
p J
ity to accommodate large business ion (FAA) design standards for the taxiway object free area (TOFA) for Taxiway "A". Services include appraisals, review appraisals, 14 Code of Federal
Regulations Part 77 and perational impacts from obstructions
the overall goal to meet Federal Aviation Administration (FAA) airport standards
47
apron and
w facility will be constructed
t
irport design criteria for Group III aircraft.
The project will construct a new terminal building to accommodate a relocated taxiway and aircraft parking
parcel 64B A 60: Cooper off Bufflick Road to meet Federal Aviation Administra
5,500’ taxiway, the project will be completed in phases.
The ne
and enhances our abil
he airport to ensure there are no o
inal building.
ist
at must be protected in accordance with
L
rity
Airport Project Prio
meet a
of a new term
need of rehabilitation/replacement.
to maintain CAT I Instrument Landing System (ILS) weather minimums and
ect improves the safety of airport operations
ction
al
Region
irport proposes design, bid, and constru
rginia. This property must be controlled by t
aircraft. Due to the complexity of relocating the entire
hester
The relocation of Taxiway A is part ofparcel.
The parcel encompasses areas th
2525
nc
Wi
24--
ons, and fee simple purchase of the
24
Cooper)
The airport seeks to acquire
in FY
in FY
n
or incompatible land use in this area.
ddress numerous building systems in
Beyond FY 26
ion
n
“A” Relocatio
New Airport Terminal
0 (
letio
t
-A-6
omple
.
mp
he existing building
and Parcel 64
17,168,888
Co
6,389,000
C
uction Schedule:
This proj
struction Schedule:chedule:
,000
Taxiway
The A
$200
$
$
the Code of Vi
3 – L
S
2 –
-
ustification:
tification:Justification:
st:
ost:ost:
tion
scription:
tion:ion:
PRIORITY 1
PRIORITY PRIORITY
Capital Co
south of t
negotiati
Construc
Capital CCapital C
pt
Descrip
tr
Descri
Cons
Con
Jus
De
a J
avigation easements identified on the airport property e negative impacts oject; identified as PE2, PE3, m obstructions or Site preparation (e.g., grading, utilities) for future aeronautical
development and commercial entrance onto airport rocess. It is the most is in
at may result from obstructions or uses have the potential to cause negative impacts
48
tment and
inves
Certain land uses have the potential to caus
ation easements protect the airport from consequences that may result fro
will make it more attractive to private
e north side of the airport has been through the NEPA environmental approval p
t seeks to acquire easements scoped for purchase in the "RPZ Land Services" pr
asements will help protect the airport from consequences th
h path to Runway 14. Certain land
nd acquisition of 4
suit facilities. The project
The parcels underlie the approach path to Runway 14.
vices
rport's business and marketing plans.
Surveys, appraisals, review appraisals, a
e (RPZ) Land Ser
The parcels underlie the approac
2625
26
-25--
-
2524
, and PE5 on the airport property map.
to
in FY in FY
in FY
-
f Coverstone Drive extended.
attractive area on the airport for build
incompatible land uses in these areas.
atible land uses in these areas.
Runway Protection Zon
letion Completion
on
tions. Avigation e
Site Prep
leti
Easements
to airport operations. Avig
Comp
Comp
d PE5.
The area on th
The airpor
le: Schedule: Construction Schedule:
Side
150,000100,000
,000
map; PE2, PE3, PE4, an
Acquire
struction Schedu
0
keeping with the ai
North
50
to airport opera
$$$
4 – 5 – 6 –
Construction
Justification:ustification:n:
Capital Cost:Capital Cost:Capital Cost:
ription:
Description:Description:
property of
atio
Y RIORITY
PRIORITY
RIT
incomp
Justific
Desc
IO
on
PE4
PR
C J P
. The road will be an side of the runway. With operations on both , and transportation truction of service roads around aircraft activity areas
installed. This project is to renovate the
49
will require access to both sides for fuel delivery, inspections, maintenance
ents.
service road around the end of Runway 14
and/or EPA requirem
The fuel storage facility has not undergone major maintenance since it was
the north
continue to meet DEQ
appropriate length so that vehicles remain clear of navigation aid critical areas.
s the cons
The approved airport layout plan shows new development on
of personnel. The Federal Aviation Administration (FAA) encourage
requirements.
lane
ty is in need of renovation to
-
two
access to runways and taxiways.
This project proposes to construct a
sure it continues to meet DEQ and EPA
26
-
25
Completion in FY
d
26
ides of the runway, ground vehicles
Roa
Beyond FY
Fuel Storage Facility
current facili
North Side Access
to prevent unauthorized
Construction Schedule:
ction Schedule:
600,000
00,000
The
$7
$
TY 7 –
ustification:on:
Cost:Cost:
8 –
:ption:
facility to en
Description
PRIORITY
ficati
ital Capital
Constru
IORI
ri
usti
Desc
ap
PR
CJ s J