HomeMy WebLinkAbout033-20 (CUPBartonsvilleEnergyFacility) CONDITIONAL USE PERMIT #05-20 Bartonsville Energy Facility, LLC Staff Report for the Board of Supervisors Prepared: September 11, 2020 Staff Contact: M. Tyler Klein, AICP, Senior Planner This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this request. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 09/02/20 Recommended Approval Board of Supervisors: 09/23/20 Pending EXECUTIVE SUMMARY: This is a request for a Conditional Use Permit (CUP) to enable construction of a 705-acre utility- scale solar power generating facility (disturbed area) located on properties totaling approximately 1,160.5-acres. Should the Board of Supervisors find this use for a utility-scale solar power generating facility to be appropriate, the Planning Commission would suggest the following Conditions of Approval: 1.All review agency comments provided during the review of this application shall be complied with at all times. 2.An engineered site plan, in accordance with the requirements of Article VIII of the Frederick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address additional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. 3.Buffers and screening shall be provided around the perimeter of the project in general conformance with quantity of the proposed plantings depicted on Sheets 3 and 4 of the Concept cape Buffer A, B, C, D, E & F included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. The landscape buffer plantings shall be maintained in good health for the life of the project. 4.Prior to site plan approval, the owner shall enter into a written agreement with Frederick County to decommission solar energy equipment, facilities, or devices pursuant to the terms and conditions of §15.2-2241.2(B) of the Code of Virginia. The written agreement shall be updated every five (5) years and in general conformance with the Exhibit D: Preliminary Decommissioning Plan, included with the CUP application, prepared by Torch Clean Energy, dated May 2020. Page 2 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 5.Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, are prohibited as part of this CUP. 6.This Conditional Use Permit shall not be effective unless and until the vacations of the Springdale Glen and Carrollton Estates Subdivisions are approved and recorded. In addition, the approval and recordation of such vacations shall take place prior to the approval of any site plan for the use authorized by this Conditional Use Permit. 7.Access to the site shall be limited to two (2) entrances from Springdale Road and one (1) entrance from Passage Road, and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. Delivery of solar array panel construction materials will occur at the site access entrance off of Passage Road identified as Deer Lane on Sheet 4 of the Concept Plan. Solar array panel materials delivery laydown area will be limited to Tax Parcel 74-A-44A (Carbaugh Property). 8.Pile-driving of poles for solar arrays during construction shall be limited to 7:00 a.m. 5:00 p.m. Monday through Friday. All other construction activities are permitted 7:00 a.m. to 7:00 p.m. Monday through Friday and 7:00 a.m. to 5:00 p.m. on Saturday. No construction activities are permitted on Sundays. 9.The location of inverters serving the solar project shall be at least 450-feet from all adjacent residences. 10.Subdivision, for residential development, of Tax Parcels 74-A-3, 74-A-4, 74-A-6C, or of the area currently constituting the Springdale Glen and Carrollton Estates subdivisions shall be prohibited during such time as solar power generating equipment is installed on said parcels. 11.Any expansion or modification of this land use will require the approval of a new CUP. Following this public hearing, a decision regarding this Conditional Use Permit application by the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Board of Supervisors. Any recommendation for approval should also include a statement affirming that the proposed solar facility is in substantial accord with the Comprehensive Plan. Page 3 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 LOCATION: The properties are generally located along Passage Road (Route 648), Marlboro Road (Route 631), Springdale Road (Route 649), Middle Road (Route 628), and west of the CSX rail corridor and partially within the Town of Stephens City limits. MAGISTERIAL DISTRICT: Back Creek and Opequon PROPERTY ID NUMBERS : 74-A-3, 74-A-21, 74-A-45, 74-A-44A, 74-A-4, 74-A-6C, 74-A- 44, 74-A-35A, 74-A-20 and all lots 1-12 in the Springdale Glen Subdivision and lots 1-52 in the Carrolton Estates Subdivision. PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas), R1 (Town of Stephens City) Land Use: Agricultural, Forestal, Vacant & Residential (platted only) ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: Agricultural/Residential/Institutional South: RA (Rural Areas) Use: Agricultural/Residential East: RA/Town of Stephens City Use: Agricultural/Residential/Industrial West: RA (Rural Areas) Use: Agricultural/Residential PROPOSED USE: This is a request to enable construction of a 705-acre utility-scale solar power generating facility (disturbed area) located on properties totaling approximately 1,160.5- acres. REVIEW EVALUATIONS: Virginia Department of Transportation: The application for a Conditional Use Permit for these properties appear to have little measurable impact on Route 649 (Springdale Road), Route 648 (Passage Road), the VDOT facilities providing access to the properties. Locations have been identified for a low-volume commercial entrance, on Route 648 and Route 649. The new entrances will need to meet VDOT standards for the proposed use. Should the use ever expand in the future, the entrance will need to be reviewed, to determine if additional improvements may be required. See comment letter dated May 26, 2020. Frederick County Fire Marshal: Plans approved by Fire Marshal, Frederick County. See comment letter dated May 14, 2020. Page 4 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 Frederick County Inspections: Conditional Use Permit for installation of solar arrays shall be designed per the 2015 Virginia Building Code, U-Utility Use Group. Solar panel installation not associated with publicly regulated utilities require permits. Plans submitted for permits may require the design to be sealed by a Registered Design Professional licensed in the State of Virginia. Arrays shall be designed for the applicable loads as required in Chapter 16 VBC. Please note the requirements in Chapter 17 of VBC for special inspection requirements on the type of structure (soil, concrete etc.). See comment letter dated May 14, 2020. Town of Stephens City: The Town has no objection to the CUP Application and will provide comments at the time of site plan submittal. See comment letter dated June 2, 2020. Historic Resources Advisory Board (HRAB): The Frederick County Historic Resources Advisory Board (HRAB) considered the above referenced Conditional Use Permit application during their meeting on June 16, 2020. The HRAB reviewed information from the Virginia Department of Historic Resources (VDHR) and information provided by the Applicant. This application seeks to construct a utility scale solar project located on 68 parcels of land that total 957 acres. The project will consist of rows of ground-mounted photovoltaic modules,commonly known as solar panels. The site is located along Passage Road and Springdale Road, west of the CSX corridor and the Town of Stephens City. Historic Resources Advisory Board Comments: The following historic resources are located on the subject site: #034-1078 Cherry Dale (Mary Stephens House) located on site 74-A-20 Eligible for listing in the National Register of Historic Places (NRHP) Survey Area 2 has a structure (labeled building 1) that is not mapped. Building 1 is located in the southern portion of the APE and consists of a series of o collapsed buildings. Investigators did identify a potential residence, barn, and several collapsed outbuildings. The property is in the relative mapped location of the building attributed to R. R. Turner on the 1885 atlas (see Figure 13). No evidence of the adjacent building depicted on the early twentieth century quadrangles was noted Page 5 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 during the reconnaissance. (Phase 1A survey - see page 22 for text and appendix C for photograph). The following historic resources are located adjacent or within the vicinity of the subject site (buffer y): #034-0071 Rice Robinson House #034-0083 - Carter Hall Eligible for listing in the NRHP Located adjacent to the area of potential affect (APE) #034-1044 Willow Grove Located adjacent to the area of potential affect (APE) #034-0007 Kernstown Battlefield Eligible for listing in the NRHP After reviewing the information provided, the Historic Resources Advisory Board (HRAB) recommended approval of the CUP with the following comments: The buffers around the historic resources should contain a mixture of evergreen plant species to ensure a natural appearing vegetative buffer. An enhanced buffer along Carter Hall should be provided; similar to the buffer surrounding the proposed substation. A Phase 1 Archeological Survey will be completed as part of the permitting of this project. This survey should document the collection of historic structures on and around this development. This survey should determine if the structures onsite (Building 1 and associated o structures within survey area 2) are potentially significant. This survey should determine if this area would qualify as a rural historic district. o See comment letter dated June 18, 2020. Planning and Zoning: Utility-scale solar power generating facilities are a permitted use in the RA (Rural Areas) Zoning District with an approved Conditional Use Permit (CUP). The Board of Supervisors added utility-scale solar power generating facilities to the Zoning Ordinance on January 8, 2020, including additional regulations for specific uses (i.e. a solar ordinance). These additional regulations further specify for utility-scale solar power generating facilities to prepare an engineered site plan and enter into a written agreement with Frederick County for facility decommissioning. As a conditional use permit, the Board may further specify certain conditions to ensure the project does not have a negative impact on neighboring properties and/or the overall character of the community. The application proposes use of approximately 1,160.5-acres of rural area property, primarily Page 6 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 used for agriculture, to generate 80 to 130 megawatts (MWS) or photovoltaic (solar) electricity. Approximately 705-acres of the subject parcels will be utilized (disturbed) for the installation of rows of ground-mounted photovoltaic modules, commonly known as solar panels, other necessary equipment for facility operations, a transmission substation, access paths, fencing and landscaping. The solar panels will be interconnected, and the power generated by each solar panel will be combined, converted, and the voltage increased to allow delivery of the power to the adjacent First Energy 138 kilovolt (KV) transmission line. The proximity of the project to the existing transmission line was a significant factor in the selection of these properties for the development of the facility. A portion of the project (approximately 135.9+/-acres) is within the limits of the Town of Stephens City. These properties are subject to the regulations of the Town, and the project will receive separate approvals for the use of this acreage for the proposed use. Public utilities, including utility-scale solar power generating facilities, are a by-right use under the Town of Stephens City Zoning Ordinance. Frederick County Staff will continue to coordinate with the Town during the site plan review and approval process if this CUP application is approved by the Board. Approximately 361-acres of the project area are currently platted as 64 rural residential subdivision lots (lots 1-12 inclusive, Springdale Glen Subdivision and lots 1-52 inclusive, Carrollton Estates Subdivision including dedicated right-of-way (ROW)). If this project were to be approved, the Applicant would need to vacate (remove) the 64 platted residential lots and ROW prior to site plan approval. The removal of these residential lots may ultimately reduce the future capital impact to County services. Additionally, the project as proposed does not include any batteries for the purposes of mass storage of electricity that will eventually be transferred into the grid. Small batteries will be utilized as backup for solar tracker motors, substation, and associated equipment. The Zoning Ordinance requirempublic u -scale solar power generating facilitie-204.26) specifies the Zoning Administrator has the authority to determine appropriate setbacks for lots. Setbacks for the solar arrays (panels) will conform to the setback requirements contained in the Zoning Ordinance for principle uses in the RA (Rural Areas) Zoning District (§165-401.07): 60-feet (FT) front setbacks from right-of-way streets and roads, and side/rear setbacks of 50-FT from adjoining parcels 6-acres or less, 100-FT from adjoining parcels of more than 6-acres, and 200-FT from Agricultural and Forestal Districts (more than 6-acres) and orchards (regardless of size). After consultation with Staff during the pre-development of the application, the Applicant has proposed setbacks for the solar arrays (panels) for this project will be a minimum of 100-feet (FT) from all external roads and property lines, and 200-FT from Agricultural and Forestal Districts. The Applicant has further committed to locating inverters on the site at least 450-FT from neighboring residences to reduce noise impacts (see condition # 9). Page 7 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 In order to protect the viewshed and mitigate the visual impact to neighboring properties in the vicinity of the property the Applicant has proposed buffering and screening around the perimeter of the property, in addition to maintaining existing mature woodlands (where feasible), to shield view of the facility from adjacent roadways, residences, and other agriculture uses. In addressing viewshed concerns from residential neighbors, the Applicant will also provide an enhanced buffer (shown as Landscape Buffer F, Sheet 4, Concept Plan) that includes a seven (7) foot earthen berm in addition to landscape plantings. Access to the Bartonsville Energy Facility will be limited to two (2) entrances located on Springdale Road (Route 649) and one (1) entrance from Passage Road (Route 648). No access is proposed from Marlboro Road (Route 631) or Middle Road (Route 628). Proposed entrances are ultimately subject to approval by the Virginia Department of Transportation (VDOT) and will be formally reviewed during the site plan review and approval process. The proposed setbacks, buffers/screening and project entrances are clearly depicted on the Concept Plan prepared by Greenway Engineering, dated August 28, 2020, and included with the CUP application. Finally, a draft Preliminary Decommissioning Plan included with the application materials, satisfies requirements contained in §165-204.26 of the Zoning Ordinance, ensuring that in the event the facility is no longer in operation, the land will be returned to the pre-development condition with all solar infrastructure and related facilities removed, ensuring future viability of the land to resume agricultural operations. Further, proposed condition of approval #4 ensures that Frederick County would maintain a bond that is updated every five (5) years keeping it up to date. The 2035 Comprehensive Plan envisions this area of the County to remain primarily rural in nature and for agricultural land to be preserved for future generations. The project is generally compatible with the Comprehensive Plan, with the rural character of the area, and with the adjoining agricultural and residential uses. The preservation of the underlying land maintains the ability for agricultural uses in the future. The proposed use is highly passive with limited noise, odor, glare, lighting, and traffic during operations. In addition to requirements contained in the Zoning Ordinance, the Applicant will pursue a Permit-by-Rule (PBR) application through the Virginia Department of Environmental Quality (DEQ). The PBR is a state-level administrative review and approval process for the siting of solar energy facilities in the Commonwealth, including environmental and cultural review and study. One component of the state required PBR review is local jurisdiction approval of solar project siting; this CUP application, if approved by the Frederick County Board of Supervisors, would satisfy that requirement enabling completion of a PBR process for this project. Page 8 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 STAFF CONCLUSIONS FOR THE 09/02/20 PLANNING COMMISSION MEETING: This is a request for a Conditional Use Permit (CUP) to enable construction of a 705-acre utility- scale solar power generating facility (disturbed area) located on properties totaling approximately 1,160.5-acres. Should the Planning Commission find this use for a utility-scale solar power generating facility to be appropriate, Staff would suggest the following Conditions of Approval: 1.All review agency comments provided during the review of this application shall be complied with at all times. 2.An engineered site plan, in accordance with the requirements of Article VIII of the Frederick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address additional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. 3.Buffers and screening shall be provided around the perimeter of the project in general conformance with quantity of the proposed plantings depicted on Sheets 3 and 4 of the Concept , E & F included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. The landscape buffer plantings shall be maintained in good health for the life of the project. 4.Prior to site plan approval, the owner shall enter into a written agreement with Frederick County to decommission solar energy equipment, facilities, or devices pursuant to the terms and conditions of §15.2-2241.2(B) of the Code of Virginia. The written agreement shall be updated every five (5) years and in general conformance with the Exhibit D: Preliminary Decommissioning Plan, included with the CUP application, prepared by Torch Clean Energy, dated May 2020. 5.Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, are prohibited as part of this CUP. 6.This Conditional Use Permit shall not be effective unless and until the vacations of the Springdale Glen and Carrollton Estates Subdivisions are approved and recorded. In addition, the approval and recordation of such vacations shall take place prior to the approval of any site plan for the use authorized by this Conditional Use Permit. 7.Access to the site shall be limited to two (2) entrances from Springdale Road and Page 9 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 one (1) entrance from Passage Road, and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. Delivery of solar array panel construction materials will occur at the site access entrance off of Passage Road identified as Deer Lane on Sheet 4 of the Concept Plan. Solar array panel materials delivery laydown area will be limited to Tax Parcel 74-A-44A (Carbaugh Property). 8.Pile-driving of poles for solar arrays during construction shall be limited to 7:00a.m. to 5:00 p.m. Monday through Friday. All other construction activities are permitted 7:00 a.m. to 7:00 p.m. Monday through Friday and 7:00 a.m. to 5:00 p.m. on Saturday. No construction activities are permitted on Sundays. 9.The location of inverters serving the solar project shall be at least 450-feet from all adjacent residences. 10.Any expansion or modification of this land use will require the approval of a new CUP. PLANNING COMMISSION SUMMARY AND ACTION FOR THE 09/02/20 MEETING: nd The Planning Commission held a public hearing on the proposed CUP on September 2. Following a Staff presentation, the Applicant made a presentation highlighting Torch Clean Energy (the developer), site development/construction timeline, and outreach efforts to adjoining property owners and the wider community in the vicinity of the project. The Planning Commission asked for clarification regarding interconnection parcels and substation location; the Applicant highlighted those parcels as having only underground utility easements and that there would be no solar panels located on these interconnection parcels. Commissioner Oates asked Staff to confirm that the property within the corporate limits of the Town of Stephens City was subject to the applicable regulations of the Town and not under the jurisdiction of Frederick County; Staff confirmed this was the case but those parcels were included in the overall project information for context only. Eleven (11) members of the public spoke on the proposed project. Citizen comments included request for additional berms and screening, increasing the setbacks from 100-feet (FT), concerns over impacts of the project to quality of life and community character, impact to existing viewshed, loss of agricultural land, construction and inverter noise and glare. Following the public hearing, the Applicant responded to several of the comments noting that several of the speakers are residents of the Town of Stephens City and the portion of the project they were concerned about is within the Towns corporate limits, and not subject to the regulations of Frederick County. The Applicant further stated that in an effort to be a good neighbor they had worked directly with the adjoining property owners and district commissioners to address those concerns through enhanced landscaping and a 7-FT tall earthen berm. The Applicant noted that Page 10 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 all of the proposed landscaping/screening was included on Sheets 3 and 4 of the Concept Plan (revised August 28, 2020) and that the conditions specify conformance with the plan. Commissioner Jewell stated in his remarks that the project would increase tax revenue to the County, would eliminate 64 platted residential lots bringing a net savings to the County on capital costs, would preserve agricultural land for future use, and that the work done by the Applicant to address neighbor concerns would ensure the project was not visible from adjoining roadways and residences. Commissioner Oates proposed an additional condition be added that for the life of the project no new residential lots could be subdivided out while solar facilities were located on the property. The Planning Commission concluded their remarks noting that several of the speakers (Sneddon, Gordon, Heath) were residents of the Town of Stephens City, and their properties adjoin the project area that is within the jurisdiction of the Town and subject to the regulations of the Town, not Frederick County. The Planning Commission voted 10-2-1 (Commissioner Kenney & Triplett No; Commissioner Cline Absent) to forward the application to the Board of Supervisors with a recommendation of approval including the amended condition proposed by Commissioner Oates. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 09/23/20 BOARD OF SUPERVISORS MEETING: This is a request for a Conditional Use Permit (CUP) to enable construction of a 705-acre utility- scale solar power generating facility (disturbed area) located on properties totaling approximately 1,160.5-acres. Should the Board of Supervisors find this use for a utility-scale solar power generating facility to be appropriate, the Planning Commission would suggest the following Conditions of Approval: 1.All review agency comments provided during the review of this application shall be complied with at all times. 2.An engineered site plan, in accordance with the requirements of Article VIII of the Frederick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address additional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. 3.Buffers and screening shall be provided around the perimeter of the project in general conformance with quantity of the proposed plantings depicted on Sheets 3 and 4 of the Concept Plan, scape Buffer A, B, C, D, E & F included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. The landscape Page 11 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 buffer plantings shall be maintained in good health for the life of the project. 4.Prior to site plan approval, the owner shall enter into a written agreement with Frederick County to decommission solar energy equipment, facilities, or devices pursuant to the terms and conditions of §15.2-2241.2(B) of the Code of Virginia. The written agreement shall be updated every five (5) years and in general conformance with the Exhibit D: Preliminary Decommissioning Plan, included with the CUP application, prepared by Torch Clean Energy, dated May 2020. 5.Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, are prohibited as part of this CUP. 6.This Conditional Use Permit shall not be effective unless and until the vacations of the Springdale Glen and Carrollton Estates Subdivisions are approved and recorded. In addition, the approval and recordation of such vacations shall take place prior to the approval of any site plan for the use authorized by this Conditional Use Permit. 7.Access to the site shall be limited to two (2) entrances from Springdale Road and one (1) entrance from Passage Road, and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. Delivery of solar array panel construction materials will occur at the site access entrance off of Passage Road identified as Deer Lane on Sheet 4 of the Concept Plan. Solar array panel materials delivery laydown area will be limited to Tax Parcel 74-A-44A (Carbaugh Property). 8.Pile-driving of poles for solar arrays during construction shall be limited to 7:00AM to 5:00PM Monday through Friday. All other construction activities are permitted 7:00AM to 7:00PM Monday through Friday and 7:00AM to 5:00PM on Saturday. No construction activities are permitted on Sundays. 9.The location of inverters serving the solar project shall be at least 450-feet from all adjacent residences. 10.Subdivision, for residential development, of Tax Parcels 74-A-3, 74-A-4, 74-A-6C, or of the area currently constituting the Springdale Glen and Carrollton Estates subdivisions shall be prohibited during such time as solar power generating equipment is installed on said parcels. 11.Any expansion or modification of this land use will require the approval of a new CUP. Following this public hearing, a decision regarding this Conditional Use Permit application by the Board of Supervisors would be appropriate. The Applicant should be prepared to Page 12 CUP #05-20 Bartonsville Energy Facility, LLC September 11, 2020 adequately address all concerns raised by the Board of Supervisors. Any recommendation for approval should also include a statement affirming that the proposed solar facility is in substantial accord with the Comprehensive Plan. 7563113782 BROOKNEIL DR 152BROOKNEIL DRMIDDLE RD 3475 CUP # 05 - 20: Bartonsville Energy Facility, LLC 190 NEIL DR 3862 3735 MIDDLE RD 217 242 NEIL DR MIDDLE RD 171MIDDLE RD LOY CIR 395 RUBINETTE WAY PINs: 74 - A - 3, 74 - A - 4, 74 - A - 6C, 74 - A - 20, 74 - A - 21, 74 - A - 35A, 74 - A - 44, 74 - A - 44A, 74 - A - 45, 275 OLD LICKSKILLET LN 278 SOLDIERS MIDDLE RD 4032 74 - 5 - 1 thru 74 - 5 - 52, 74 - 7 - 1 - 1 thru 74 - 7 - 1 - 6, and 74 - 7 - 2 - 7 thru 74 - 7 - 2 - 12 RUBINETTE WAY REST LN 243 MIDDLE RD 480 4338 SOLDIERS Utility Scale Solar Facility SHADY MIDDLE RD REST LN ELM RD 540 344 452 Zoning Map 229 4063 BARLEY LN 140 RUBINETTE BARLEY LN SOLDIERS MIDDLE RD LICKSKILLET LN WAY 510 REST LN 4101 46344536 BARLEY LN 4275 4668 370MIDDLE RD MIDDLE RDMIDDLE RD 779 MIDDLE RD MIDDLE RD561 690 BARLEY LN RLEY LN SHADY ELM SHADY 4750 4253 553 ELM RD 194 MIDDLE RD4701 190 MIDDLE RD SHADY BARLEY LN MIDDLE RD 110 HOCKMAN CT ELM RD 158 BARLEY LN CUP #05-20 CUP #05-20 4661 BARLEY LN 5030 MIDDLE RD 74 A 4 MIDDLE RD 196 74 A 3 831 180 GERMANY RD SHADY SKYJES LN 4555 4929203 ELM RD MIDDLE RD MIDDLE RDGERMANY RD 834 161 5005 4118 1786 SHADY SKYJES LN MIDDLE RD VALLE SPRINGDALE RD ELM RD 1662 PIKE 970 5019 SPRINGDALE RD 983 SHADY MIDDLE RD 224 1043 5236 SHADY 327 ELM RD SPRINGDAL SHADY 950 MIDDLE RD5141 ELM RD GERMANY RD ELM RD CUP #05-20 CARTERS LN MIDDLE RD CUP #05-20 1711 14 74 A 6C 385 5153 SPRINGDALE RD SPRINGD 507 SPRINGDALE RD MIDDLE RD 634 117 SPRINGDALE RD SPRINGDALE RD 484 1056 SPRINGD 171 579 GERMANY RD 341 CARTERS LN LAUREL SPRINGDALE RD 950 UREL 4330 CUP #05-20 GROVE RD 371 CARTERS LN OVE RD VALLEY P 5320SPRINGDALE DR 199 976 839 596 MIDDLE RD561 LAUREL SPRINGDALE RD 1216 SPRINGDALE RD GERMANY RD GERMANY RD GROVE RD 4506 452 SPRINGDALE RD 668 842 VALLEY DLE RD GERMANY RD 452 CARTERS LN PIKE 662 4560 225 5455 600 VAL PASSAGE LN VALLEY4548 701 SERVICEBERRY CT MIDDLE RD DLE RD PIK 5533 CUP #05-20 4656 PIKE VALLEY GERMANY RD 1037 MIDDLE RD4541 766VALLEY PIKE 743 SPRINGDALE RD VALLE 5585 PIKE GERMANY RD 9112 CARTERS LN PIKE MIDDLE RD 784 310 GERMANY RD CARTERS LN 5621 6995100 CUP #05-20 289 MIDDLE RD 860 DLE RDPASSAGE LN 4724 CARTERS LN £ GERMANY RD ¤ 74 A 45 VALLEY 11 4737 1030 74 A 44A 258 229 1682 PIKE VALLEY LIME KILN RD CUP #05-20 CARTERS LN CARTERS LN 231 RLBORO RD 4832 199PIKE 173 OAK HILL DR VALLEY BRACKENFERN LN 62 1156 CUP #05-20 CARTERS LN 173 4975 PIKE 820 AYLO 1009MARLBORO RD 125 OAK HILL DR MAIN ST 74 A 44 5095 MARLBORO RD GERMANY RD CARTERS LN 1086 SQUIRREL LN 700 736 868 GERMANY RD AYLOR 123 ORO RD MARLBORO RD CUP #05-20 1512 § INEZ LN967¨¦ MARLBORO RD 81 24274 A 35A 1677 MARLBORO RD INEZ LN RLBORO RD 1541 641 MARLBORO RD MARLBORO RD 1687 1381 184116 LBORO RD MARLBORO RD HITES RDCORA LN CUP #05-20 969 820 131 74 A 21 120 1215 MARLBORO RD MARLBORO RD POMME POMME MARLBORO RD CIR CIR CUP #05-20 1211 MARLBORO RD 1213 74 A 20 MARLBORO RD 131 CHANTERELLE CT 345 181 ESTEP RD ¬¬ «« CHANTERELLE CT FAIRFAX 37 277 PIKE 560 458 ¬ « 5498 37 HITES RD Stephens City TES RD365 VALLEY CARSON LN 564 PIKE 846 HITES RD197 Application 5698 STRODE CARSON LN VALLEY Sewer and Water Service Area MCLEOD LN 5658 PIKE 685 Parcels VALLEY 700 704 HITES RD PIKE 365¬ « B1 (Neighborhood Business District) § ¨¦ VAUCLUSE RD 277 TES RD FAMILY DR 81¬ « B2 (General Business District) 277 5782 320 EM (Extractive Manufacturing District) 332 VALLEY 29 472 388150 CONESTOGA LN TOWN PIKE LUSERD M1 (Light Industrial District)EWINGSLN µ RP (Residential Performance District) Agricultural & Forestal Districts South Frederick District Frederick County Planning & Development 107 N Kent St Winchester, VA 22601 540 - 665 - 5651 01,5503,1006,200Feet Map Created: June 12, 2020 7563113782 BROOKNEIL DR 152BROOKNEIL DRMIDDLE RD 3475 CUP # 05 - 20: Bartonsville Energy Facility, LLC 190 NEIL DR 3862 3735 MIDDLE RD 217 242 NEIL DR MIDDLE RD 171MIDDLE RD LOY CIR 395 RUBINETTE WAY PINs: 74 - A - 3, 74 - A - 4, 74 - A - 6C, 74 - A - 20, 74 - A - 21, 74 - A - 35A, 74 - A - 44, 74 - A - 44A, 74 - A - 45, 275 OLD LICKSKILLET LN 278 SOLDIERS MIDDLE RD 4032 74 - 5 - 1 thru 74 - 5 - 52, 74 - 7 - 1 - 1 thru 74 - 7 - 1 - 6, and 74 - 7 - 2 - 7 thru 74 - 7 - 2 - 12 RUBINETTE WAY REST LN 243 MIDDLE RD 480 4338 SOLDIERS Utility Scale Solar Facility SHADY MIDDLE RD REST LN ELM RD 540 344 452 Location Map 229 4063 BARLEY LN 140 RUBINETTE BARLEY LN SOLDIERS MIDDLE RD LICKSKILLET LN WAY 510 REST LN 4101 46344536 BARLEY LN 4275 4668 370MIDDLE RD MIDDLE RDMIDDLE RD 779 MIDDLE RD MIDDLE RD561 690 BARLEY LN RLEY LN SHADY ELM SHADY 4750 4253 553 ELM RD 194 MIDDLE RD4701 190 MIDDLE RD SHADY BARLEY LN MIDDLE RD 110 HOCKMAN CT ELM RD 158 BARLEY LN CUP #05-20 CUP #05-20 4661 BARLEY LN 5030 MIDDLE RD 74 A 4 MIDDLE RD 196 74 A 3 831 180 GERMANY RD SHADY SKYJES LN 4555 4929203 ELM RD MIDDLE RD MIDDLE RDGERMANY RD 834 161 5005 4118 1786 SHADY SKYJES LN MIDDLE RD VALLE SPRINGDALE RD ELM RD 1662 PIKE 970 5019 SPRINGDALE RD 983 SHADY MIDDLE RD 224 1043 5236 SHADY 327 ELM RD SPRINGDAL SHADY 950 MIDDLE RD5141 ELM RD GERMANY RD ELM RD CUP #05-20 CARTERS LN MIDDLE RD CUP #05-20 1711 14 74 A 6C 385 5153 SPRINGDALE RD SPRINGD 507 SPRINGDALE RD MIDDLE RD 634 117 SPRINGDALE RD SPRINGDALE RD 484 1056 SPRINGD 171 579 GERMANY RD 341 CARTERS LN LAUREL SPRINGDALE RD 950 UREL 4330 CUP #05-20 GROVE RD 371 CARTERS LN OVE RD VALLEY P 5320SPRINGDALE DR 199 976 839 596 MIDDLE RD561 LAUREL SPRINGDALE RD 1216 SPRINGDALE RD GERMANY RD GERMANY RD GROVE RD 4506 452 SPRINGDALE RD 668 842 VALLEY DLE RD GERMANY RD 452 CARTERS LN PIKE 662 4560 225 5455 600 VAL PASSAGE LN VALLEY4548 701 SERVICEBERRY CT MIDDLE RD DLE RD PIK 5533 CUP #05-20 4656 PIKE VALLEY GERMANY RD 1037 MIDDLE RD4541 766VALLEY PIKE 743 SPRINGDALE RD VALLE 5585 PIKE GERMANY RD 9112 CARTERS LN PIKE MIDDLE RD 784 310 GERMANY RD CARTERS LN 5621 6995100 CUP #05-20 289 MIDDLE RD 860 DLE RDPASSAGE LN 4724 CARTERS LN £ GERMANY RD ¤ 74 A 45 VALLEY 11 4737 1030 74 A 44A 258 229 1682 PIKE VALLEY LIME KILN RD CUP #05-20 CARTERS LN CARTERS LN 231 RLBORO RD 4832 199PIKE 173 OAK HILL DR VALLEY BRACKENFERN LN 62 1156 CUP #05-20 CARTERS LN 173 4975 PIKE 820 AYLO 1009MARLBORO RD 125 OAK HILL DR MAIN ST 74 A 44 5095 MARLBORO RD GERMANY RD CARTERS LN 1086 SQUIRREL LN 700 736 868 GERMANY RD AYLOR 123 ORO RD MARLBORO RD CUP #05-20 1512 § INEZ LN967¨¦ MARLBORO RD 81 24274 A 35A 1677 MARLBORO RD INEZ LN RLBORO RD 1541 641 MARLBORO RD MARLBORO RD 1687 1381 184116 LBORO RD MARLBORO RD HITES RDCORA LN CUP #05-20 969 820 131 74 A 21 120 1215 MARLBORO RD MARLBORO RD POMME POMME MARLBORO RD CIR CIR CUP #05-20 1211 MARLBORO RD 1213 74 A 20 MARLBORO RD 131 CHANTERELLE CT 345 181 ESTEP RD ¬¬ «« CHANTERELLE CT FAIRFAX 37 277 PIKE 560 458 ¬ « 5498 37 HITES RD Stephens City TES RD365 VALLEY CARSON LN 564 PIKE 846 HITES RD197 5698 STRODE CARSON LN VALLEY MCLEOD LN 5658 PIKE 685 VALLEY 700 704 HITES RD PIKE 365¬ « § ¨¦ VAUCLUSE RD 277 TES RD FAMILY DR 81¬ « 277 5782 320 332 VALLEY 29 472 388150 CONESTOGA LN TOWN PIKE LUSERD EWINGSLN µ Application Sewer and Water Service Area Parcels Frederick County Planning & Development 107 N Kent St Winchester, VA 22601 540 - 665 - 5651 01,5503,1006,200Feet Map Created: June 12, 2020 Submittal Deadline P/C Meeting BOS Meeting APPLICATION FOR CONDITIONAL USE PERMIT FREDERICK COUNTY, VIRGINIA 䢿 1. Applicant (check one): Property Owner _ _ Other _ ________ NAME: Bartonsville Energy Facility, LLC Attn:Sam Gulland ADDRESS: 230 Court Square, Suite B102, Charlottesville, VA 22902 TELEPHONE: _ (703) 999 - 4280 2.Please list all owners, occupants, or parties in interest of the property: Louis C. Carbaugh et. als; Joseph Carbaugh; Robert R. Staples; Stephen Dubois Brim, et als; Judith B. Cates, Eleanor K. Brim R&T Packing Corporation, APR Mini Storage LLC, William C. Staples 3.The property is located at: (please give exact directions and include the route number of your road or street) Along Passage Road and Springdale Road, west of CSX rail corridor, in Frederick County and Stephens City. 4.The property has a road frontage offeet and a depth of feet and consists of acres. Refer to Concept Plan for road frontages and property depths. 5.The property is owned by as evidenced by deed from(previous owner) recorded in deed book no. on page , as recorded in the records of the Clerk of the Circuit Court, County of Frederick. See Attachment 1. 6.Property Identification Number (P.I.N.) 74-A-45, 74-A-44A, 74-A-4, 74-A-6C, all lots in Springdale 5 Glen/Carrolton Estates Magisterial District Back Creek and Opequon District Current Zoning RA RA Ref 6 7. Adjoining Property: Refer to Sheet 2 of Concept Plan. 8. The type of use proposed is (consult with the Planning Dept. before completing): Utility-scale solar photovoltaic facility 9. It is proposed that the following buildings will beconstructed: Grounded-mounted PV solar energy generation facilities and interconnection facilities. 10. The following are all of the individuals, firms, or corporations owning property adjacent to both sides and rear and in front of (across street from) the property where the requested use will be conducted. (Continue on back if necessary.) These people will be notified by mail of this application: Refer to Sheet 2 of the Concept Plan. 7 11. Please use this page for your sketch ofthe property. Show proposed and/or existing structures on the property, including measurements to all property lines. Refer to Sheet 3 and Sheet 4 of the Concept Plan. 8 Attachment 1: Property Owners Parcel Owner Record/Instrument # 74-A-45 Robert R. Staples Will Bk/Pg 112 / 111 74-A-44A Louis C. Carbaugh, Et Als 190013725 74-A-4 R&T Packing Corporation Deed Bk/Pg 543 / 543 74-A-6C Eleanor K. Brim 040023461 Lots 1 12, Springdale Glen Stephen D. Brim, Judith B. 100003803 Cates Lots 1 52, Carrollton Estates Stephen D. Brim, Et Als 100012733 74-A-44 Joseph Carbaugh 080003967 74-A-35A APR Mini Storage LLC 050017541 74-A-20 William Staples Deed Bk/Pg 844 / 1067 74-A-3 West Oaks Farm Market 150007227 LLC 74-A-21 Wright Renovations, Inc. 190001950 Bartonsville Energy Facility Application Narrative and Statement of Intent for Conditional Use Permit (CUP) August 7, 2020 230 Court Square Suite B102, Charlottesville, VA 22902 Table of Contents ΐȁ %8%#54)6% 35--!29 Αȁ $%3#2)04)/. /& 02/0%249 Βȁ 02/*%#4 /6%26)%7 FS !#),)49 UMMARY CS /.3425#4)/. CHEDULE CCR /-0,)!.#% 7)4( /5.49 EGULATION CSC //2$).!4)/. 7)4( 4%0(%.3 ITY Γȁ !.!,93)3 /& )-0!#43 V ISUAL ED #/,/')#!, !.$ RAINAGE CR 5,452!, ESOURCES N OISE T RAFFIC L IGHTING O,D,F,V DORS UST UMES IBRATIONS FS/S )2% !&%49 ECURITY CO /--5.)49 UTREACH Δȁ $%#/--)33)/.).' ,)34 /& %8()")43 %8()")4 ! %8%#54)6% 35--!29 3500/24 %8()")43 %8()")4 " #/.#%04 0,!. %8()")4 # #5,452!, 2%3/52#%3 2%0/24 %8()")4 $ 02%,)-).!29 $%#/--)33)/.).' 0,!. 2 1. Executive Summary Bartonsville Conditional C as described in this Application. The Project is proposed on the parcels identified by Frederick County as Tax Map IDs 74-A-45, 74-A-44A, 74-A-3, 74-A-4, 74-A-6C, as well as lots 1 through 12 of the Springdale Glen subdivision and lots 1 through 52 of the Carrollton Estates subdivision. The Project area includes parcels that total 1,160.5 . A maximum of 690 acres will be used for solar modules, and a maximum of 705 acres will be disturbed. The majority of the site is located in the Back Creek Magisterial District in Frederick County and a portion is in the Opequon Magisterial District in Stephens City. The Project has been sited and proposed with the following considerations: The Project location was selected for its proximity to existing transmission facilities and minimal visual impact to existing residential areas. The Project will vacate two large subdivisions on agricultural land. This will maintain the ch rural landscape and settlement pattern. The Project has been planned and designed to avoid impacts to cultural and environmental resources. The Project will provide clean energy that matches the electricity consumption of approximately 15,000 homes in Virginia and will help the Commonwealth meet its goals for the adoption of clean energy. The Project will provide personal property and increased real estate taxes to the County over the course of its life as well as injecting direct economic activity into the County during the construction and operating periods. If approved by the Board of Supervisors, the Project will bring economic benefits to Frederick County with no detrimental effects on the neighboring properties or the County as a whole. Torch Clean Energy Torch Clean Energy is developer and owner of renewable energy generation facilities in the United States with offices in Virginia and Colorado. We have developed solar and wind facilities, including the Red Horse Project, a 101 solar and wind hybrid project. Torch has over 500MW of solar under development in the Commonwealth of Virginia, including the Chester Solar Technology Park in Chesterfield County, which was permitted in September of 2019, and the Jarratt Energy Facility, which was permitted in March of 2020. To date, Torch has developed and financed over $600 million of renewable energy projects through the country. 3 2. Description of Property The Project Property is zoned RA (Frederick County) and R1 (Stephens City) and consists of the following parcels: Parcels by Usage and Acreage Parcel Acreage in Acreage in Zoning Use Frederick County Stephens City Used for Solar Generating Equipment 74-A-45 11.00 85.55 R1 Crops 74-A-44A 0.00 40.01 R1 Crops 74-A-3 200.00 0.00 RA Crops/Event Center 74-A-4 265.41 0.00 RA Crops / Forested 74-A-6C 3.80 0.00 RA Crops / Forested Lots 1 12, inclusive, 53.20 0.00 RA Crops / Orchard Springdale Glen Lots 1 52, inclusive, 307.90 0.00 RA Crops / Orchard Carrollton Estates Used for Generation-Tie Line and Interconnection Facilities 74-A-44 2.93 6.88 R1 Residence 74-A-35A 18.00 0.00 RA Crops 74-A-20 162.0 0.00 RA Crops 74-A-21 0 3.52 R1 Vacant The Carrollton Estates subdivision contains 52 parcels and the Springdale Glen subdivision contains 12 parcels. Prior to the approval of the Site Plan, each of these subdivisions will be vacated. As noted and highlighted above, Parcels 74-A-44A, 74-A-44, 74-A-45, and 74-A-21 contain a total of 135.96 acres in Stephens City. These properties are subject to the regulations of the Town, and the Project will receive separate approvals for the use of this land. The entirety of the Project is shown in this application for clarity. The Property is located approximately 1.2 miles west of I-81 and Stephens City, and comprises agricultural fields, orchards, and forest stands. The surrounding properties are primarily rural residences, farmland, and forested areas. An existing FirstEnergy 138 kV transmission line runs less than one mile to the east of the Project site, adjacent to the railroad corridor and industrial district flanking Stephens City. This transmission line runs between the Bartonville and Meadowbrook substations. 4 Article IV of the Frederick County Zoning Ordinance permits utility-scale solar facilities in the RA district with a CUP. The Applicant requests a CUP to allow the construction and operation of the Project on the Property. 3. Project Overview Facility Summary The Bartonsville Energy Facility will produce over 180,000 megawatt-hours of clean energy in its first year of operation, which represents the energy consumption of approximately 15,000 homes. The Project will generate electricity from photovoltaic solar modules that will be attached to a racking supported by driven posts. Single-axis trackers will be used to follow the sun from East to West and increase the efficiency of the Project. A series of central inverters will be used to convert the electricity from direct current to alternating current. The Project will interconnect to a FirstEnergy 138-kilovolt transmission line adjacent to the CSX railroad corridor. The Project substation and switching station will be built on parcels 74-A-20 and 74-A-21, and will be linked to the Project site via a 34.5kV distribution voltage Generation-Tie line that will run along an easement corridor crossing parcels 74- A-20, 74-A-35A, and 74-A-44. This Generation-Tie line will be underground. No new transmission- voltage lines will be built for the Project. The Project will not use grid-scale energy storage. Batteries will not be used, except for small backup batteries for the solar tracker motors, substation, and associated equipment. Exhibit B The Project will be developed generally as depicted on , the Concept Plan, as included with this Application. The Concept Plan provides a map of the solar array area, the proposed point of interconnection with the transmission system, vegetative buffer zones, perimeter fencing, access points, and other features of the Project. As shown on the Concept Plan, three points of access are proposed, two of which will be from Springdale Road (Route 649). An entrance to the northern section of the Project will be located approximately 0.75 miles east of the intersection with Germany Road (Route 625), and an entrance to the southern portion will follow Carrollton Lane. A third, southeastern access will be on Passage Road (Route 648), approximately 0.3 miles from the intersection with Marlboro Road. Construction Schedule The construction of the Project is estimated to take approximately 12 months to achieve substantial completion. The first phase of the Project will be civil works, such as area-specific grading, in order to prepare for the installation of the solar equipment. The second phase will consist of the mechanical and electrical installation of the solar equipment. The final phase is the testing of the facility and the energization. Phase 1 Site Preparation and Civil Work: 3-6 Months Phase 2 - Mechanical and Electrical Installation: 4-6 Months 5 Phase 3 Facility Testing and Energization: 3 Months Overlap between the first two phases is expected, subject to the final construction schedule. Additionally, construction of the interconnection facilities by FirstEnergy will span all three phases of construction. Compliance with County Regulation The Applicant completed a Pre-Application meeting with Frederick County Planning and has gathered and addressed feedback from required County agencies. The Applicant conferred with the County Historic Resources Advisory Board to discuss historical and cultural resources in the County. Additional CUP materials have been compiled according to the County Zoning Ordinance and Planning process guidelines. Coordination with Stephens City The Applicant is working concurrently with Stephens City to permit the portion of the Project that falls within the Town. This Application requests a CUP for the County portion of the Project but shows the entirety of the Project for clarity. 4. Analysis of Impacts Pursuant to Chapter 165, Part 103 of the Zoning Ordinance, a CUP may be granted where the Board of Supervisors finds that (i) the proposed use is in accordance with the policies expressed in the Comprehensive Plan of the County, and (ii) the proposed use is in harmony and shall not adversely affect the use and enjoyment of surrounding properties (§ 165-103.02). The Project is supported by the 2035 Comprehensive goals. In particular, the Plan seeks to cluster residential development in appropriate locations and support the agricultural economy and allow residents to harness new opportunities. The Project will vacate two large subdivisions in the Agricultural district and allow residents to harness a new technology that constitutes a safe, passive, and temporary use of the land. In accordance with the criteria set forth in the Zoning Ordinance for CUP approval, the proposed Project will not adversely affect the health, safety, or welfare of persons residing or working in the neighborhood of the proposed use and will not be detrimental to public welfare or injurious to the Property or improvements in the neighborhood. As a passive use located in a Rural district, the Project will not be detrimental to, or substantively change, the character of the surrounding area. The proposed Project will not cause any increase in demand for County services. It will have minimal impacts on drainage and erosion and will not require the use of local water or sewer utilities. Erosion and sediment controls and permanent stormwater management facilities will be provided as part of the Project to the extent required by applicable laws. The Project will not significantly increase traffic 6 in the area, and no public road improvements will be required for the construction or servicing of the Project. The effects of the Project are evaluated as follows: Visual Along the perimeter of the Property, a setback from the Property line to solar generating equipment shall be used. Within this setback, a buffer consisting of new and/or existing vegetation will be used Exhibit B to screen the Project, as outlined below and shown in . The setback from external roads and property lines will generally be 100 feet, with the fence installed between 75 and 100 feet from the property lines. These setbacks shall not apply to the undergound Generation Tie-Line or the interconnection facilities. The most traveled routes near the Project are Middle Road, to the north, and Marlboro road, to the south. The Project has no frontage on either of these routes, except for the underground distribution voltage Generation-Tie line crossing occurring near the intersection of Marlboro Road and Passage Lane. The Project has approximately 0.25 miles of frontage along Passage Road and 0.85 miles of frontage along Springdale Road. The Landscaping Plan will minimize visual impacts to surrounding properties and rights-of-way by maintaining and enhancing existing tree lines and vegetative buffers, while providing for new plantings in targeted areas. Specifically, the Project will do the following: Maintain existing tree lines along western and southern boundaries of the Carrollton Estates and Springdale Glen property; Use existing topography to ensure that the Project is not visible from Middle Road; Plant new vegetative buffers on the southern side of parcel 74-A-45, along Springdale Road; and along a property line to the north of Springdale Road. Exhibit B This plan is depicted in . Ecological and Drainage Wetlands will be delineated and avoided in the construction of the Project. Additionally, the Project will complete thorough consultation with the Department of Environmental Quality as part of the The Project will submit Erosion and Sediment Control and Stormwater Management plans prior to the issuance of the building permit when the design is nearly complete. Because the racking system uses driven posts for structural support, changes to the impervious surface will be limited to inverter and transformer pads, access roads, and interconnection equipment. These uses constitute a small percentage of the total project area. The Project will be designed to minimize stormwater impacts and accommodate existing topography to the extent possible. 7 Cultural Resources The Project has undergone an archeological and architectural study in accordance with County regulations and will not directly impact any identified landmarks. Cultural and historical resources in Exhibit C the vicinity of the Project are described in . Additionally, the Project will require concurrence energy facilities. Noise Once operational, the Project will not be audible to adjacent landowners. Construction activities will generally be limited to daylight hours, with pile driving work scheduled for daylight hours between Monday and Saturday. Traffic General construction traffic will use the Proj construction traffic consists of personal vehicles (e.g. pickup trucks) carrying passengers, tools, and minor equipment to and around the Project site. Due to the proximity of the Project to I-81 and the existing road network, there will be little impact to current traffic. Component deliveries (e.g. solar panels, inverters, concrete trucks, construction equipment, etc.) will primarily access the site from I-81, Marlboro Road, and Passage Road. The laydown area for solar array deliveries will be on Parcel 74-A-44A. A separate laydown area for the Project Interconnection will be on Parcels 74-A-20 and 74-A-21, which will be accessed from Marlboro Road. Operations and Maintenance for the Project will not measurably increase vehicular traffic. Lighting Except for minimal safety and security lighting in a few locations, the Project will not be lit. Any installed lighting will comply with applicable County ordinances. Odors, Dust, Fumes, Vibrations The Project will not generate air emissions. Once operational, no odors, trash, or recycled materials will be produced. No fuel or fuel storage and no outside storage will be needed on the Project after construction is completed. There will be no impact on water or air quality. Fire Safety / Security The Project will not pose increased security or safety risks or fire hazards. Once the Project is constructed, a permanent perimeter/boundary fence will enclose the solar panels. The fence will have aminimum height of six (6) feet. The fence will be posted with security signage along with contact information for a 24-hour manned communication system. The three site entrances and internal road network will provide access to every part of the Project. 8 The Project will be monitored remotely on a 24/7 basis. The Operations Team will have the ability to remotely de-energize the Project if necessary and immediately contact and coordinate with the appropriate local fire and EMS personnel. Training will be provided to local fire and EMS on FirstEnergy emergency procedures and notification in case of emergency. Community Outreach During the last nine months, the Applicant has met with landowners in the vicinity of the Project site, Conceptual Plan, particularly with respect to the buffer planting and use of existing topography to screen the Project from view. 5. Decommissioning The Code of the Commonwealth of Virginia requires the owner, lessee, or developer of a solar project to enter into a written agreement to decommission the project prior to the issuance of a site plan. To Exhibit D, support this application, the Applicant has provided the Preliminary Decommissioning Plan. Prior to the issuance of the Site Plan, a Decommissioning Cost Estimate and means of financial Exhibit D security will be provided in accordance with and Virginia Code. 9 Bartonsville Energy Facility Exhibit D: Preliminary Decommissioning Plan May 2020 \[Type text\] \[Type text\] \[Type text\] 1 Table of Contents ΐȁ ).42/$5#4)/. Αȁ $%#/--)33)/.).' /& 3/,!2 &!#),)49 EDR 15)0-%.4 )3-!.4,).' !.$ EMOVAL SR )4% ESTORATION MEMW !.!').' 8#%33 !4%2)!,3 !.$ ASTE Βȁ 02/6)3)/. /& $%#/--)33)/.).' #/34 %34IMATE Γȁ 02/6)3)/. /& &).!.#)!, 3%#52ITY 2 1. Introduction Article 6 of Chapter 22 of the Code of Virginia (§ 15.2-2241.2) requires that the owner, lessee, or developer of real property for a solar project enter into a written agreement to decommission the project prior to the approval of the Site Plan. Bartonsvil the approval of the Site Plan and shall be binding on each successor and assignee of the Owner. The Project is planned on parcels that total 957 acres, with a maximum of 595 disturbed acres. The majority of the site is located in the Back Creek Magisterial District in Frederick County and a portion is in the Opequon Magisterial District in Stephens City. The Project will interconnect to the FirstEnergy 138kV Bartonsville-Meadowbrook transmission line. The Project is expected to operate for a minimum of 30 years, based on the useful life of the equipment and the warrantees that guarantee that equipment. The Plan describes the approach for removal of the Project and land restoration activities. These measures shall be taken upon the end of the useful life of the Project, or if the Project or any portion thereof ceases to perform its intended function for more than twelve (12) consecutive months. 2. Decommissioning of Solar Facility The Owner shall arrange for and be responsible for the decommissioning of the Project, including the following: Equipment Dismantling and Removal including glass semiconductor material, steel, and wiring. When the projectreaches the end of its operational life, reusable and recyclable parts will bedismantled, removed from the site, and transported to reuse or recyclingfacilities. All waste resulting from the decommissioning of the facility will betransported by a certified and licensed contractor and taken to a landfill facility. Above-ground Structure Decommissioning Solar Panel Arrays and Project Substation: De-energize and disconnect the Project from the utility power grid; Disconnect all above ground wirings, cables, fuses and electrical and protection components and reuse or recycle offsite by an approved facility; Remove concrete foundations of inverter and transformer pads Remove PV modules and metallic structures and ship to reuse or recycling facilities for aftermarket use or recycling and material reuse; 3 Remove all waste; Remove the perimeter fence and recycle offsite by an approved metal recycler. Remove inverters, transformers, meters, fans, lighting fixture and other electrical components and recycle offsite by an approved recycler; Access Roads: Consult with landowner (if applicable) to determine if any access roads should be left in place for their continued use. If access road is deemed unnecessary, remove access road, and restore access road location as practicable to its previous condition with native soils and seeding. Below-ground Structure Decommissioning Disconnect all underground cables and transmission lines and remove and recycle offsite by an approved recycling facility; Remove all PV panel racking below and above ground, including the steel pile foundations This Plan is based on current best industry practices and procedures. These practices may be subject to revision based on the development of new and improved decommissioning practices in the future. Site Restoration The Owner will develop a comprehensive restoration plan designed to restore the site so it can be returned to its previous use. Restoration will include the following: Redistribution of topsoil, if necessary, to provide similar ground cover as was present prior to the site disturbance. De-compacting of access roads and other areas where soils have been compacted. Where Project infrastructure has been removed, disturbed areas will be seeded with a quick growing native species to prevent topsoil erosion. Erosion and control measures will be installed at ditches and will be left in place until ground cover is fully established. Watercourses Within the project location there are no water bodies (i.e., permanent watercourses, intermittent watercourses, seepage areas or lakes). As no water bodies are present and the renewable energy facility does not release emissions which could pollute the air and water bodies, no impact to aquatic environment is expected. As a result, no restoration of water bodies, either during construction or decommissioning is planned. 4 Agricultural Lands Once all Project facilities are removed, agricultural and silvicultural lands compacted during project operation (such as access roads) will be de-compacted via tilling, plowing or subsoiling and affected areas will be seeded with native grass species. Similar to the construction phase, soil erosion and sedimentation control measures will be re ! implemented during the decommissioning period and until the site is stabilized in order to mitigate erosion and silt/sediment runoff. Access roads will be left at landowner's requests or graded to restore terrain profiles (to the extent practicable) and vegetated. If removed, filter fabric will be bundled and disposed of in accordance with all applicable regulations. As necessary, these areas will be backfilled and restored to meet existing grade. This material may come from existing longterm berm or stockpile. Managing Excess Materials and Waste During the decommissioning phase, waste materials will be removed in accordance with applicable local regulations. It is the goal of the Owner to reuse and recycle materials to the extent practicable and to work with local subcontractors and waste firms to segregate material to be recycled. As an example, it is anticipated that nearly 100% of the above grade metal is salvageable based on current industry practices and trends. Many components of the Project are reusable or recyclable and have salvage value. The Owner will manage decommissioning to minimize, to the extent practicable, the volume of project components Table 1 and materials discarded as waste. below outlines the anticipated disposition methods of the different project components. Table 1 Anticipated Project Decommissioning Disposition Methods Concrete Foundations Crush and recycle Solar Panels Reuse or recycle Metal racks and mounts Salvage/recycle Steel piles and rack foundations Salvage/recycle Wiring and cabling Recycle/salvage Inverters, transformers, and breakers Salvage/recycle/reuse Granular material Reuse/dispose Fence steel Salvage/recycle Project Substation Controls Dispose/reuse 5 Major pieces of equipment such as transformers and breakers are recyclable and reusable and will have significant market value. The solar panels are expected to retain over 80% of their generation capability after 30 years of operation and the potential for re-use is high. Existing solar panel manufacturers have programs to buy and salvage panels. These programs extract the raw materials in the panels to make new panels at a significant discount from new material costs. Recycled materials include the semiconductor and glass. Other components such as electrical cable have a high salvage-market value due to their copper and aluminum content. The same is true for the steel and aluminum racks and foundations that support the solar panels. 3. Provision of Decommissioning Cost Estimate Prior to site plan approval for installation of the Project, the Owner shall provide a Decommissioning Cost Estimate, as determined by a Virginia Licensed Engineer. The Decommissioning Cost Estimate shall be the gross estimated cost of performing the Decommissioning and associated administrative costs, minus 90% of the estimated resale and salvage value of Project equipment. The Estimate will th be updated every fifth (5) year throughout the life of the project. 4. Provision of Financial Security Pursuant to Article 6 of Chapter 22 of the Code of Virginia and County regulation, the Owner shall -2241.2) for removal of the Facility, amounting to the Decommissioning Cost Estimate as determined. Financial security shall be provided prior to the commencement of Commercial Operations. If the Facility is owned by a public utility company or an independent power security shall be required. 6 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 June 18, 2020 Evan Wyatt Greenway Engineering 151 Windy Hill Ln Winchester, Virginia 22602 RE: Request for Historic Resources Advisory Board (HRAB) Comments Conditional Use Permit the Bartonsville Energy Facility Utility Scale Solar Project Zoning: RA (Rural Areas) District Magisterial District: Back Creek Dear Mr. Wyatt: The Frederick County Historic Resources Advisory Board (HRAB) considered the above referenced Conditional Use Permit application during their meeting on June 16, 2020. The HRAB reviewed information from the Virginia Department of Historic Resources (VDHR) and information provided by the Applicant. This application seeks to construct a utility scale solar project located on 68 The project will consist of rows of ground-mounted parcels of land that total 957 acres. photovoltaic modules, commonly known as solar panels. The site is located along Passage Road and Springdale Road, west of the CSX corridor and the Town of Stephens City. Historic Resources Advisory Board Comments: The following historic resources are located on the subject site: #034-1078 Cherry Dale (Mary Stephens House) located on site 74-A-20 Eligible for listing in the National Register of Historic Places (NRHP) Survey Area 2 has a structure (labeled building 1) that is not mapped. Building 1 is located in the southern portion of the APE and consists of a series of o collapsed buildings. Investigators did identify a potential residence, barn, and several collapsed outbuildings. The property is in the relative mapped location of the building attributed to R. R. Turner on the 1885 atlas (see Figure 13). No evidence of the adjacent building depicted on the early twentieth century quadrangles was noted during the reconnaissance. (Phase 1A survey - see page 22 for text and appendix C for photograph). The following historic resources are located adjacent or within the vicinity of the subject 107 North Kent Street, Suite 202 Winchester, Virginia 22601-5000 Historic Resources Advisory Board CUP Comments Bartonsville Energy Facility June 18, 2020 Page 2 #034-0071 Rice Robinson House #034-0083 - Carter Hall Eligible for listing in the NRHP Located adjacent to the area of potential affect (APE) #034-1044 Willow Grove Located adjacent to the area of potential affect (APE) #034-0007 Kernstown Battlefield Eligible for listing in the NRHP After reviewing the information provided, the Historic Resources Advisory Board (HRAB) recommended approval of the CUP with the following comments: The buffers around the historic resources should contain a mixture of evergreen plant species to ensure a natural appearing vegetative buffer. An enhanced buffer along Carter Hall should be provided; similar to the buffer surrounding the proposed substation. A Phase 1 Archeological Survey will be completed as part of the permitting of this project. This survey should document the collection of historic structures on and around this development. This survey should determine if the structures onsite (Building 1 and o associated structures within survey area 2) are potentially significant. This survey should determine if this area would qualify as a rural historic o district. Thank you for the chance to comment on this application. Please call if you have any questions or concerns. Sincerely, Candice E. Perkins, AICP, CZA, Assistant Director CEP/pd cc: Chris Oldman, HRBA Chairman, Tyler Klein