020-19 (RezoningCBVenturesLLC)REZONING APPLICATION #02-19 CB VENTURES, LLC. Staff Report for the Board of Supervisors Prepared: August 30, 2019 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director Reviewed Action Planning Commission: 08/07/19 Public Hearing Held; Recommended Approval Board of Supervisors: 09/11/19 Pending PROPOSAL: To rezone 1.04+/- acres from the B2 (General Business) District to the B3 (Industrial Transition) District with proffers. The subject property was rezoned from the B3 District to the B2 District in 2016 with the approval of Rezoning #05-16. LOCATION: The subject property is located at the south side of Martinsburg Pike (Route 11) and the northeast side of Amoco Lane (Route 839) at the southwest quadrant of Interstate 81. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 09/11/19 BOARD OF SUPERVISORS MEETING: This is an application to rezone 1.04+/- acres from the B2 (General Business) District to the B3 (Industrial Transition) District with proffers. The subject property was rezoned from the B3 District to the B2 District in 2016 with the approval of Rezoning #05-16. The site is located within the limits of the Northeast Land Use Plan of the 2035 Comprehensive Plan and depicts the subject property with commercial land use designation. The existing B2 Zoning as well as the requested B3 Zoning are consistent with the . Comprehensive Plan The Planning Commission did not identify any concerns with the request and recommended approval of the application at their August 7, 2019 meeting. The proffers associated with this rezoning request are as follows: Proffer Statement Dated June 25, 2019: A)Land Use Restrictions: - The Applicant has proffered to prohibit the following uses: Truck Stops Drive-in Motion Picture Theaters Golf Driving Ranges and Miniature Golf Course Fire and Rescue Stations Tractor Truck and Tractor Trailer Parking *Staff Note: The Applicant has removed the proffer that prohibited the construction of metal buildings on the site. This proffer still applies to the remainder of the site rezoned with Rezoning #05-16. B)Transportation Enhancements: 1)The Applicant has proffered to design and construct improvements to Amoco Lane within the existing right-of-way to include pavement mill and overlay to the existing centerline from the limits of the pavement mill and overlay improvements performed by Parcel 43-A-48 (Sheetz property); and for the installation of curb and gutter along the frontage of the Property to the limits of the southeastern most Rezoning #02-19 CB VENTURES, LLC. August 30, 2019 Page 2 commercial entrance serving the Property that is developed along Amoco Lane. These improvements will be designed and constructed by the Owner concurrent with the development of the first approved Site Development Plan for the Property and will be completed prior to the issuance of the first Certificate of Occupancy Permit associated with the Property. 2)The Applicant has proffered to provide inter-parcel connection to Parcel 43-A-48E that will continue into the Property from the limits of the inter-parcel connection stub within the 30ingress/egress easement on the adjoining properties. This improvement will be designed and constructed by the Owner concurrent with the development of the Site Development Plan for the Property and will be completed prior to the issuance of the Certificate of Occupancy Permit associated with this Site Development Plan. *Staff Note: The Applicant has removed the proffer pertaining to the construction of a pump station with a SCADA System. This proffer still applies to the remainder of the site rezoned with Rezoning #05-16. C)Off-Site Residential Buffer: The Owner hereby proffers to provide a landscape buffer on the properties fronting along Amoco Lane (Route 839) that are improved as residential land use if desired by the individual off-site owners. The Owner shall provide a letter to each property owner within 30 days of final approval for the first Site Plan proposed for the Property, which advises of the Owners offer to pay the cost for the installation of a single row of evergreen trees that are a minimum of four feet in height and planted on 10- foot centers in a location acceptable to each property owner. The letter will require the off- site property owners to respond in writing within 90 days of receipt of the letter advising the Owner of the desire to have the landscape buffer installed within a landscape easement provided on the off-site property. The Owner shall install the proffered landscape buffer during the next appropriate planting season and shall be responsible for the replacement of any trees that does not survive for a period of one year from the date of installation. D)Monetary Contributions to Offset Impact of Development. A monetary contribution of $0.10 per developed building square foot for County Fire and Rescue Services. Following the required public hearing, a decision regarding this rezoning application by the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Board of Supervisors. Rezoning #02-19 CB VENTURES, LLC. August 30, 2019 Page 3 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by Staff where relevant throughout this staff report. Reviewed Action Planning Commission: 08/07/19 Public Hearing Held; Recommend Approval Board of Supervisors: 09/11/19 Pending PROPOSAL: To rezone 1.04+/- acres from the B2 (General Business) District to the B3 (Industrial Transition) District with proffers. The subject property was rezoned from the B3 District to the B2 District in 2016 with the approval of Rezoning #05-16. LOCATION: The subject property is located at the south side of Martinsburg Pike (Route 11) and the northeast side of Amoco Lane (Route 839) at the southwest quadrant of Interstate 81 (Exit 317). MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBER: 43-A-48E PROPERTY ZONING : B2 (General Business) District PRESENT USE: Vacant ADJOINING PROPERTY ZONING & PRESENT USE: North: B2 (General Business) District Use: Commercial South: B2 (General Business) District Use: Commercial & Residential East: M1 (Light Industrial) District Use: Industrial & Interstate 81 West: B2 (General Business) District Use: Commercial Rezoning #02-19 CB VENTURES, LLC. August 30, 2019 Page 4 REVIEW EVALUATIONS: Virginia Dept. of Transportation: A VDOT review has been conducted on the CB Ventures, LLC Commercial Rezoning received May 29, 2019. The rezoning of this 1.04+/- acre parcel from B2, Business General District, with proffers to establish 1.04+/- acre of B3, Industrial Transition District with proffers, has the potential to create less traffic. Also, existing proffers are not changing. Therefore, since there is no negative impact on the current transportation system, VDOT has no objections to this rezoning. Frederick -Winchester Service Authority : FWSA defers comments to Frederick Water. Frederick Water: Please see letter from Eric R. Lawrence, AICP, Executive Director dated June 18, 2019. Frederick County Department of Public Works: We offer no comments at this time. Frederick County Fire Marshall: Plan approved. Frederick County Attorney: ised proffer statement dated June 25, 2019, and it resolves my previous comments. Planning & Zoning: 2)Site History The subject property was rezoned from the B3 District to the B2 District in 2016 with the approval of Rezoning #05-16. 3)Comprehensive Plan The 2035 Comprehensive Plan is the guide for the future growth of Frederick County. The 2035 Comprehensive Plan is an official public document that serves as the Community's guide for making decisions regarding development, preservation, public facilities and other key components of Community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2035 Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning efforts of the County. Land Use The site is located within the limits of the Northeast Land Use Plan of the 2035 Comprehensive Plan and depicts the subject property with commercial land use designation. The existing B2 Zoning as well as the requested B3 Zoning are consistent with the Comprehensive Plan. 3) Proffer Statement Dated June 25, 2019: A)Land Use Restrictions: - The Applicant has proffered to prohibit the following uses: Rezoning #02-19 CB VENTURES, LLC. August 30, 2019 Page 5 Truck Stops Drive-in Motion Picture Theaters Golf Driving Ranges and Miniature Golf Course Fire and Rescue Stations Tractor Truck and Tractor Trailer Parking *Staff Note: The Applicant has removed the proffer that prohibited the construction of metal buildings on the site. This proffer still applies to the remainder of the site rezoned with Rezoning #05-16. B)Transportation Enhancements: 1)The Applicant has proffered to design and construct improvements to Amoco Lane within the existing right-of-way to include pavement mill and overlay to the existing centerline from the limits of the pavement mill and overlay improvements performed by Parcel 43-A-48 (Sheetz Property); and for the installation of curb and gutter along the frontage of the Property to the limits of the southeastern most commercial entrance serving the Property that is developed along Amoco Lane. These improvements will be designed and constructed by the Owner concurrent with the development of the first approved Site Development Plan for the property and will be completed prior to the issuance of the first Certificate of Occupancy Permit associated with the Property. 2)The Applicant has proffered to provide inter-parcel connection to Parcel 43-A-48E that will continue into the Property from the limits of the inter-parcel connection stub within the 30ingress/egress easement on the adjoining properties. This improvement will be designed and constructed by the Owner concurrent with the development of the Site Development Plan for the Property and will be completed prior to the issuance of the Certificate of Occupancy Permit associated with this Site Development Plan. *Staff Note: The Applicant has removed the proffer pertaining to the construction of a pump station with a SCADA System. This proffer still applies to the remainder of the site rezoned with Rezoning #05-16. C)Off-Site Residential Buffer: The Owner hereby proffers to provide a landscape buffer on the properties fronting along Amoco Lane (Route 839) that are improved as residential land use if desired by the individual off site owners. The Owner shall provide a letter to each property owner within 30 days of final approval for the first Site Plan proposed for the Property, which advises of the Owners offer to pay the cost for the installation of a single row of evergreen trees that are a minimum of four feet in height and planted on 10- foot centers in a location acceptable to each property owner. The letter will require the off- site property owners to respond in writing within 90 days of receipt of the letter advising the Owner of the desire to have the landscape buffer installed within a landscape easement provided on the off-site property. The Owner shall install the proffered landscape buffer during the next appropriate planting season and shall be responsible for the replacement of any trees that does not survive for a period of one year from the date of installation. D)Monetary Contributions to Offset Impact of Development. A monetary contribution of $0.10 per developed building square foot for County Fire and Rescue Services. Rezoning #02-19 CB VENTURES, LLC. August 30, 2019 Page 6 PLANNING COMMISSION SUMMARY AND ACTION FROM THE 08/07/19 MEETING: Staff reported this application is to rezone 1.04+/- acres from the B2 (General Business) District to the B3 (Industrial Transition) District with proffers. Staff then provided an overview of the proffers offered with the rezoning. Mr. Evan Wyatt of Greenway Engineering representing the Applicant highlighted Rezoning #02-19. Mr. Wyatt noted that construction is underway at the property with an approved site plan. The Applicant is putting in the onsite structures and improvements on Amoco Lane with a gravity sewer lane with approval from Frederick Water. Mr. Wyatt noted, the reason for the rezoning is the Applicant has a potential buyer +/- for 1.04 acres for the use of a tire & battery facility which is not allowable use in B3 District. Mr. Wyatt continued; the Applicant has a carryover proffer request for residents of Amoco Lane to request landscaping on their property; to date three (3) landowners have contacted the Applicant to have the improvements done that will take place in the Fall of 2019. There were no public comments during the public hearing and the Planning Commission recommended approval of the rezoning application. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Board of Supervisors. REZ # 02 - 19: CB Ventures, LLC PIN: 43 - A - 48E 1601 MARTINSBURG Rezoning from B2 to B3 PIKE Zoning Map 1593 MARTINSBURG PIKE § ¨¦ 81 £ ¤ 11 REZ #02-19 43 A 48E 1574 MARTINSBURG PIKE § ¨¦ £ ¤ 81 11 165 AMOCO LN ¬ « 37 § ¨¦ 81 140 ¬ « 37 AMOCO LN µ Application Parcels B2 (General Business District) Frederick County Planning & Development 107 N Kent St Winchester, VA 22601 540 - 665 - 5651 050100200Feet Map Created: July 8, 2019 REZ # 02 - 19: CB Ventures, LLC PIN: 43 - A - 48E 1601 MARTINSBURG Rezoning from B2 to B3 PIKE Location Map 1593 MARTINSBURG PIKE § ¨¦ 81 £ ¤ 11 REZ #02-19 43 A 48E 1574 MARTINSBURG PIKE § ¨¦ £ ¤ 81 11 165 AMOCO LN ¬ « 37 § ¨¦ 81 140 ¬ « 37 AMOCO LN µ Application Parcels Frederick County Planning & Development 107 N Kent St Winchester, VA 22601 540 - 665 - 5651 050100200Feet Map Created: July 8, 2019 REZ # 02 - 19: CB Ventures, LLC PIN: 43 - A - 48E 1601 MARTINSBURG Rezoning from B2 to B3 PIKE Long Range Land Use Map 1593 MARTINSBURG PIKE § ¨¦ 81 £ ¤ 11 REZ #02-19 Application 43 A 48E Parcels Long Range Land Use Residential Neighborhood Village Urban Center Mobile Home Community Business Highway Commercial Mixed-Use 1574 Mixed Use Commercial/Office MARTINSBURG Mixed Use Industrial/Office PIKE Industrial Warehouse Heavy Industrial Extractive Mining Commercial Rec Rural Community Center Fire & Rescue Sensitive Natural Areas Institutional Planned Unit Development Park Recreation School Employment § ¨¦ Airport Support Area £ ¤ 81 11 B2 / B3 165 Residential, 4 u/a AMOCO LN High-Density Residential, 6 u/a ¬ « 37 High-Density Residential, 12-16 u/a § ¨¦ 81 140 Rural Area ¬ « 37 AMOCO LN Interstate Buffer µ Landfill Support Area Natural Resources & Recreation Environmental & Recreational Resources Frederick County Planning & Development 107 N Kent St Winchester, VA 22601 540 - 665 - 5651 050100200Feet Map Created: July 8, 2019 CB VENTURES, LLC COMMERCIAL DEVELOPMENT IMPACT ANALYSIS STATEMENT Tax Parcel 43-A-48E Stonewall Magisterial District Frederick County, Virginia May 10, 2019 Current Owner: CB Ventures, LLC Contact Person: Evan Wyatt, Director of Land Planning Greenway Engineering, Inc. 151 Windy Hill Lane Winchester, VA 22602 540-662-4185 Greenway Engineering May 10, 2019 CB Ventures, LLC Commercial Rezoning CB VENTURES, LLC COMMERCIAL DEVELOPMENT IMPACT ANALYSIS STATEMENT INTRODUCTION This report has been prepared for the purpose of assessing the impact on Fredrick County by the proffered rezoning of a 1.04±-acre subject property owned by CB Ventures LLC and identified as Tax Parcel 43-A-48E. The subject property is located in the southwest quadrant of Interstate 81 Exit 317, on the south side of Martinsburg Pike (U.S. Route 11) and the northwest side of Amoco Lane (Rt. 839). Tax Map Parcel 43-A-48E is currently zoned B-2, Business General District with proffers. The Owner proposes to rezone the 1.04±-acre subject property to B-3, Business Industrial Transition District with proffers to allow for the development of the 1.04±-acre subject as an automotive tire and battery service facility. The County Planning Department identifies this type of facility under SIC Major Group 75 Automotive Repair, Services, and Parking; therefore, the rezoning of the subject property from the B-2, Business General District to the B-3, Business Industrial Transition District is required to allow for this land use on the subject property. Basic information Location: Fronting on the south side of Martinsburg Pike (U.S. Route 11) and the west side of Interstate 81, at the southwest quadrant of Interstate 81 Exit 317. Magisterial District: Stonewall District Property ID Numbers: 43-A-48E Current Zoning: B-2, Business General District with proffers Current Use: Undeveloped Proposed Zoning: B-3, Industrial Transition District with proffers Proposed Use: Automotive Tire and Battery Service Facility Total Rezoning Area: 1.04±-acres with proffers File #2022C Impact Statement/JRM 2 Greenway Engineering May 10, 2019 CB Ventures, LLC Commercial Rezoning COMPREHENSIVE POLICY PLAN Urban Development Area The Urban Development Area (UDA) defines the general area in which residential, commercial, industrial and institutional land use development is encouraged in the County. The 1.04±-acre subject property is currently located within the UDA; therefore, expansion of the UDA boundary to accommodate the proposed development of an automotive tire and battery service facility or other commercial land uses is not required for this rezoning application. Sewer and Water Service Area The Sewer and Water Service Area (SWSA) is generally consistent with the UDA, but also extends outside of the UDA to accommodate areas of the County in which commercial and industrial land use development is only desired. The 1.04±-acre subject property is currently located within the SWSA; therefore, expansion of the SWSA boundary to accommodate the proposed development of an automotive tire and battery service facility or other commercial land uses is not required for this rezoning application. Comprehensive Plan Conformity The 1.04±-acre subject property is located in the UDA and the SWSA and is within the study area boundary of the Northeast Frederick Land Use Plan. The Northeast Frederick Land Use Plan is a large-area plan that identifies land uses, transportation networks, and other matters that are recommended for consideration for future land use and development within this geographic area of the County. The 1.04±-acre subject property is identified for business land use; therefore, the proposed B-3, Business Industrial Transition District rezoning to accommodate the proposed development of an automotive tire and battery service facility or other commercial land uses is in conformance with the Comprehensive Policy Plan. SUITABILITY OF THE SITE Access The 1.04±-acre subject property is located on the south side of Martinsburg Pike (U.S. Route 11), adjacent to the Interstate 81 Exit 317 interchange.Access to the subject property will be provided through internal private service drives through adjoining properties that will allow for traffic to utilize the existing right in/right out commercial entrance along Martinsburg Pike (U.S. Route 11) and the existing full access commercial entrances along Amoco Lane (Route 839) that will allow for protected left-turn movements at the signalized intersection with Martinsburg Pike. Inter-parcel ingress and egress is permitted through easements identified in section(s) 3.3, 3.4, and 3.5(e), and 3.6 of File #2022C Impact Statement/JRM 3 Greenway Engineering May 10, 2019 CB Ventures, LLC Commercial Rezoning Flood Plains The 1.04±-acre subject property does not contain areas of floodplain as demonstrated on FEMA NFIP Map #51069C0209D, Effective Date September 2, 2009. Wetlands The 1.04±-acre subject property does not contain wetland areas as demonstrated on the National Wetlands Inventory (NWI) Map information or from information identified in the Frederick County GIS Database. Soil Types The 1.04±-acre subject property contains one soil type as demonstrated by the Soil Survey of Frederick County, Virginia and the Frederick County GIS Database. The following soil type is present on site: 32B Oaklet Silt Loams 2-7% slope The Oaklet Silt Loam is identified as a prime agricultural soil and has high shrink/swell properties. The subject property has the same soil type as adjoining parcels that are developed or are currently being developed. The site soil type is conducive for commercial development of the subject property. Other Environmental Features The 1.04±-acre subject property does not contain areas of steep slope, lakes or ponds or natural stormwater retention areas as defined by the Frederick County Zoning Ordinance. The subject property is located in the geographic portion of the County that is underlain by karst geology. Frederick County has reviewed and approved SP #07-17 for the entirety of the Owners parcels owned which includes the 1.04±-acre subject property. The Owner has obtained a Land Disturbance Permit from Frederick County and is currently performing major infrastructure improvements. No development issues specific to the karst geology have been encountered during current construction activities. There are no known environmental features present that create development constraints for the proposed commercial development project. SURROUNDING PROPERTIES Adjoining property zoning and present use: North: B-2, Business General District Use: Hotel and Restaurant South: B-2, Business General District Use: Unimproved File #2022C Impact Statement/JRM 4 Greenway Engineering May 10, 2019 CB Ventures, LLC Commercial Rezoning East: M-1, Light Industrial District Use: Unimproved (across Interstate 81) West: B-2, Business General District Use: Convenience Store TRANSPORTATION The 1.04±-acre subject property was a portion of the 4.98± acres owned by CB Ventures, LLC that was rezoned by the Frederick County Board of Supervisors on July 27, 2016 to the B-2, General Business District with proffers (RZ #05-16). Subsequent to this approval, Greenway Engineering processed Site Plan #07-17 for the 4.98± acres owned by CB Ventures, LLC which was approved by the County on June 20, 2017. Construction has commenced for the on-site and off-site improvements identified on the approved site plan. The approved proffer statement specific to RZ #05-16 Applicant provided for two transportation enhancements which included the installation of curb and gutter along the property frontage along Amoco Lane (Route 839); milling and overlay asphalt improvements to the Amoco Lane centerline; and for inter-parcel connections to adjoining properties. Site Plan #07-17 provided for all applicable transportation enhancements identified in the proffer statement specific to RZ #05-16 and the Owner has obtained a Land Disturbance Permit from Frederick County and is currently performing major infrastructure improvements that includes the installation of curb and gutter and milling/overlay work on Amoco Lane. The inter-parcel connection to the adjoining property that will provide access to the 1.04±-acre subject property is intended to be installed during the development of this parcel. Therefore, the proffer statement prepared for the proposed rezoning maintains this proffer from the previous rezoning application and does not include the previous proffer associated with the Amoco Lane improvements as these improvements are currently under construction. The proposed rezoning of the 1.04±-acre subject property to the B-3, Industrial Transition District is to allow for the development of an automotive tire and battery service facility. The Owner is not proffering this as a specific use for the subject property; therefore, Greenway Engineering has analyzed uses permitted in the B-3 District that are not otherwise permitted in the B-2 District to determine what use represents the greatest impact on traffic generation. Of those potential land uses, the Automotive Repair; Services, and P 75), was determined to have the highest potential traffic generation impact. th The ITE Manual of Trip Generation, 9 identifies a Saturday Peak Hour of Generation of 6.61 per 1,000 sq. feet of gross floor area, as the greatest traffic generation factor for this land use. It is anticipated that the proposed automotive tire and battery service facility will be approximately 6,500 square feet, which would yield approximately 43 peak hour trips. This traffic generation would be less than permitted land uses in the B-2 District that the subject parcel is currently zoned; therefore, the proposed rezoning does not create additional traffic impacts than were determined to be mitigated under the previous rezoning application. File #2022C Impact Statement/JRM 5 Greenway Engineering May 10, 2019 CB Ventures, LLC Commercial Rezoning SEWAGE CONVEYANCE AND TREATMENT The 1.04±-acre subject property is located within the Sewer and Water Service Area (SWSA); therefore, the property is entitled to be served by public sewer based on County Policy. Frederick Water (FW) is the provider of public sewer service within this area of the County but does not currently have sewer infrastructure within, or adjacent to the subject property. The subject property was part of RZ #05-16 that was rezoned by the Board of Supervisors on July 27, 2016. FW issued a letter dated March 23, 2016 in conjunction with RZ #05-16 advising that there was adequate capacity at the Opequon Wastewater Treatment Facility to accommodate the 22,000 gpd proposed sanitary flows projected for the buildout of the 4.98±- acre project and the Red Bud Pump Station could accommodate the added flows from this project. However, FW advised that sewer conveyance for the 4.98±- acre project could potentially be challenged due to nearby sewer force main capacities. Greenway Engineering worked with FW to determine the appropriate approach for the development of sewer infrastructure to provide sewer service for the 4.98± acre project and for the properties along Amoco Lane (Route 839). In accordance with the proffer statement approved July 1, 2016 (RZ #05-16), Greenway Engineering submitted a public improvement plan, for a new pump station, with a SCADA system, to be located at the terminus of Amoco Lane that was approved by FW. Through additional coordination with FW, it was determined that a more mutually beneficial plan was available, and that sewer capacity for the overall project could be obtained through gravity sewer line to an existing sewer manhole located near the rail spur serving the Kingspan facility. Greenway Engineering has designed a gravity sewer system that collects effluent from the 4.98± acre project area (which includes the 1.04± acre subject property proposed for rezoning) that has been sized to allow for off-site land uses to connect to this system. The gravity sewer system design includes the sewer collection system within the subject project and along the Amoco Lane frontage to allow for on-site and off-site connections. The gravity sewer system will terminate at the existing sewer manhole located near the rail spur serving the Kingspan facility, which ties into the Red Bud Pump Station to direct effluent to the Opequon Water Treatment Facility. The CB Ventures Gravity Sewer Plan has been designed and submitted for review and approval to FW and the County Public Works Department. Both agencies have approved this design plan and the approved improvements will be installed prior to development of the subject property. FW has determined that this approach is appropriate for addressing sewer impacts associated with the 4.98± acre project; therefore, the sewer requirements associated with proposed rezoning of the 1.04± acre subject property have been adequately addressed. WATER SUPPLY The 1.04±-acre subject property is located within the Sewer and Water Service Area (SWSA); therefore, the property is entitled to be served by public water based on County Policy. Frederick Water (FW) is the provider of public water service within this area of the File #2022C Impact Statement/JRM 6 Greenway Engineering May 10, 2019 CB Ventures, LLC Commercial Rezoning County and has Martinsburg Pike (U.S. Route 11) and Amoco Lane (Route 839) that provides public water to the property. Frederick County approved SP #07-17 for the CB Ventures 4.98± acre project area on July 24, 2017, which includes the 1.04± subject property proposed for rezoning. SP #07-17 was reviewed and approved by FW on April 24, 2017 as part of the site plan approval process and they determined that adequate water pressure and capacities were available for service to this property. Additionally, the water system design for the build-out of commercial land use on the 4.98± acre project included the connection of a temporary bypass of line to line water main after it is constructed and fully tested. The that will be located throughout the 4.98± acre project, which will terminate at the 1.04± acre subject property. -16, the maximum anticipated flow for build out of the 4.98± acre area was projected by FW at 50,000 gpd. Greenway Engineering has utilized 2015 FW water meter for these land uses and has applied a 1.5 calculation factor of safety to develop a conservative water demand projection of 22,000 gpd for the buildout of the 4.98± acre project area. The projected water demand of 22,000 gpd falls well below the available water supply identified by FW for this site; therefore, there is adequate supply and pressure that will be available for the buildout of commercial land use for the proposed development project. SITE DRAINAGE The topographic relief on the 1.04±-acre subject property generally follows a north to east pattern, which directs drainage from the subject property towards the rear of the property adjacent to Interstate 81. The applicant has provided stormwater management through a design, which has been approved by Frederick County as part of SP #05-17. This stormwater management includes two detention areas, one of which is in the southeast portion of the subject property. The proposed rezoning of the subject property will not affect the existing, approved stormwater management design of the site. The stormwater quantity and quality measures have been designed in conformance with all applicable state and local regulations; therefore, site drainage and stormwater management impacts to adjoining properties and the community have been mitigated. SOLID WASTE DISPOSAL The impact on solid waste disposal facilities associated with the redevelopment of the 1.04± subject site can be projected from an average annual commercial consumption of 5.4 cubic th yards per 1,000 square feet of structural area (Civil Engineering Reference Manual, 4 edition). It is anticipated that the proposed automotive tire and battery service facility will be approximately 6,500 square feet. Therefore, solid waste disposal impacts are based on the following figures that provide the increase in average annual solid waste volume based on the anticipated 6,500 square feet of commercial land use: File #2022C Impact Statement/JRM 7 Greenway Engineering May 10, 2019 CB Ventures, LLC Commercial Rezoning AAV = 5.4 cu. yd. per 1,000 sq. ft. commercial AAV = 5.4 cu yd. x 6.5 (1,000 sq. ft) AAV = 35.1 cu. yd. at build-out, or 24.57 tons/yr. at build-out The Municipal Solid Waste area of the Regional Landfill has a current remaining capacity of 13,100,000 cubic yards of air space. The projected commercial development will generate approximately 24.57 tons of solid waste annually on average. This represents a 0.017% increase in the annual solid waste received by the Municipal Solid Waste area of the Regional Landfill, which currently averages 200,000 tons per year. Solid waste produced by the commercial development will be disposed at the Regional Landfill by a commercial waste hauler; therefore, the County will receive tipping fees associated with this land use to mitigate this impact. The Regional Landfill has adequate capacity to accommodate the solid waste impacts associated with this proposal. HISTORICAL SITES AND STRUCTURES The Frederick County Rural Landmarks Survey does not identify structures deemed to be historically significant on the 1.04±-acre subject property, nor does the survey identify properties within proximity of this site that are deemed potentially significant. The National Park Service Study of Civil War Sites in the Shenandoah Valley identifies the 1.04±-acre subject property as being located within the Second Winchester Stephensons Depot study area boundary; however, the subject property is located well outside of the defined core battlefield area and is also defined as having lost integrity due to existing development patterns. Therefore, the commercial development plan for the property will not create negative impacts associated with historic resources. OTHER POTENTIAL IMPACTS The commercial development of the 1.04±-acre subject property will provide new economic development opportunities for Frederick County, which has been recognized by the County to be positive in the consideration of fiscal impacts to County Capital Facilities. It is understood that the development of commercial land use has the potential to increase service demands on fire and rescue services; therefore, the Owner a monetary contribution of $0.10 per developed building square foot to the County to provide additional revenues that are specifically directed to County fire and rescue services. File #2022C Impact Statement/JRM 8