Loading...
May 8 2018 Board_Budget_Work_Session_Agenda_PacketAGENDA FREDERICK COUNTY BOARD OF SUPERVISORS BUDGET WORK SESSION TUESDAY, MAY 8, 2018 4:00 P.M. BOARD ROOM, COUNTY ADMINISTRATION BUILDING 107 NORTH KENT STREET, WINCHESTER, VIRGINIA Call to Order Attachment Discussions: 1. Fire & Rescue Apparatus Inventory----------------------------------------------------------------- A Provided in response to the request of Vice Chairman Lofton 2. Aylor School a. School Board Resolution requesting Replacement of Aylor School -------------- B b. Slide from School Board presentation at Joint Meeting of 1-16-18--------------- C c. Aylor School Replacement- Breakdown of $7.2 million "other costs" ---------- D d. Letter of 4-4-18, from Dr. John Lamanna, School Board Chair to BOS----------- E 3. Debt Ratios a. Summary of Debt Analysis Other Adiourn -- F b. Bar Graph: Debt Service to Government Expenditures ---------------------------- G c. Bar Graph: Tax Supported Debt Service ------------------------------------------------ H d. Bar Graph: Debt to Assessed Value Attachment A Frederick County Volunteer Fire and Rescue Companies Apparatus, updated 1 /26/17: Company 11/Stephens City: 1987/2002 (re -furbished) Pierce 105-foot Platform Tower 1992 Pierce Lance Pumper 2002 Rescue Wagon 2002 Ford Crown Victoria Mobile Unit 2001 Ford E-350 PL Custom (Medic) Still Water Rescue and Recovery Boat X 3 2001 Expedition (Chief) 1996 Yukon (Assistant Chief) 1985 Mercedes Unimog Brush Truck 2006 Freightliner Technical Rescue Support (TRS) 1985 F250 pick-up with plow, Utility11 2002 Ford Medic Unit E-450 2001 Freightliner FL40 Medic Master 2016 Pierce Engine Company 12/Middletown: 2008 Ford Explorer -Chief 1999 Ford Expedition Mobile and Reserve ALS 2003 Pierce Dash 2000 Rescue Engine 2007 Navistar 4300 LP Horton Ambulance 2007 Ford F-550 Pierce Attack Pumper 2010 Ford ALS Chase Unit 2012 Dodge 4500 Horton Ambulance 2013 Pierce Pumper Tanker Company 13/Clear Brook: 1997 Ford Expedition Chief's vehicle (emitter) 2001 Pierce Freightliner Pumper (emitter) 2003 Ford F-350 Brush Truck (emitter) 2004 Pierce Dash Pumper (emitter) 2004 Dodge Intrepid Support Vehicle (Mobile 13) (emitter) 2007 Mack Tank 3500 gallon (emitter) 2008 F-450 Ford Ambulance Type 1 Lifeline (emitter) 2012 Dodge Ram 4500 4X4 Type 1 Marque (emitter) Company 14/Gore: 1976 Ford F-250 4 wheel drive Brush Truck 1990 Ford Pierce 4 wheel drive Attack Truck 1994 Pierce Dash Pumper 2001 Ford F-350 Diesel Ambulance 4X4 2002 Ford F-350 Dual Cab Pick-up 4X4 2006 Ford F-450 Diesel Ambulance 4X4 1997 Freightliner Tanker Company 15/Round Hill: 1992 Suburban (Utility15) 1996 Pierce Arrow Rescue Engine with Air Cascade 2001 Ford Expedition (SERV 15) (emitter) 2003 Ford F-450 Diesel Ambulance 2008 Pierce Dash Pumper (emitter) 2014 International/Road Rescue Ambulance 2014 Chevy Tahoe 2014 Ford F-350 Brush 15 Company 16/Gainesboro: 1969 Jeep Brush Truck 1979 Chevrolet CK-30 4X4 Mini Pumper 1982 75' Tower Ladder 1988 Pierce Lance Engine 1989 Pierce Lance Tanker Engine 1994 F-Liner 3000 gallon tanker 1998 Chevy 3500 4X4 Type 1 Horton Ambulance (16-1) 1999 Chevy CK-2500 4X4 ALS Command Vehicle (Chief-16) 2004 Chevrolet 4X4 Blazer ALS Chase Unit (ALS-16) Boat (county owned) 2006 Chevrolet Suburban 2008 F-450 S/D 4X4 Type I Horton ALS Ambulance Company 17/Star Tannery: 1985 Ford 8000 FMC Tanker 1994 Ford 9000/Marion Pumper 2004 Ford Crown Vic 2002 International 4 Wheel Drive Marion Body Pumper 2006 Ford F-450 AEV Ambulance 2008 F-350 Brush Truck Company 18/Greenwood: 1984 Chevrolet 4 wheel drive Brush Truck 1998 Ford Horton F-350 Ambulance 2016 Smeal Quint, 75 feet 2005 Ford F-150 (Chief 18) 2006 F-350 Lifeline Ambulance 2008 Smeal Pumper 2013 Horton Ambulance Medic Unit (18-3) (emitter) Company 19/North Mountain: 1985 Jeep Scrambler Brush Unit 1986 Ford Pierce Attack Truck Minipumper 1995 Freightliner Pierce Engine Pumper -Tanker 1999 Suburban (Chiefs Vehicle) 2001 Pierce Freightliner Pumper -Tanker 2002 Ford Crown Victoria 2006 Chevrolet 250OHD Duramax Diesel: SERV 19 2009 Ford Horton 4X4 Ambulance 2013 Ford Horton 4X4 Ambulance Company 20/Reynolds Store: 1951 Dodge Brush Jeep 1978 Ford Bronco Brush 20-3 1992 Kaiser Brush Truck, 10 wheel drive 1995 Pierce Quantum Pumper 1998 Crown Victoria SERV Unit 2000 Chevrolet 3500 Diesel Ambulance 2003 Quantum Rescue Engine 2010 Ford F450 4X4 Ambulance 2010 Kenworth 3000 gal tanker Ford Expedition mobile Company 21/Millwood Station: 1998 Spartan Marion Rescue Engine — Reserve 2002 Ford Type 3 Ambulance 2006 Ford Horton Ambulance 2007 Pierce Contender Engine 2010 Ford 250 SERV 1999 Pierce Quantum Rescue Squad Attachment B RESOLUTION (Replacement of Robert E. Aylor Middle School) Of the County School Board of Frederick County, Virginia, declaring its intention to request a supplemental appropriation to the FY2018 School Construction Fund subject to Frederick County Board of Supervisors' approval. WHEREAS, Frederick County Public Schools (the "Division") is a political subdivision organized and existing under the laws of the Commonwealth of Virginia; and WHEREAS, the County School Board of Frederick County, Virginia (the "Board") is charged by law to manage and control the property of the school division and provide for the erecting, furnishing, and equipping of necessary school buildings (§22.1-79); and WHEREAS, the Frederick County Board of Supervisors, Virginia (the Supervisors") approved the Robert E. Aylor Middle School (Aylor School) Addition & Renovation through annual adoptions of the Capital Improvements Plan since 2004; and i WHEREAS, the Board has'conducted extensive condition study and evaluation of major building systems, building finishes, and site amenities in December of 2013, , amended July 2017 in preparation for preliminary design detail; and WHEREAS, the configuration of Aylor School, the extensive use of masonry load bearing walls, low ceiling heights, and undersized classrooms and science laboratoi ies, make renovation and addition to the existing structure difficult and overly expensive; and WHEREAS, Aylor School transitioned from a 1960's era junior high school4acility lacking grade level teaming arrangements, adequate power and technology systems support; and WHEREAS, the cost comparison of like size facilities between replacement exceeds 75% of the cost of a new facility. MnW, THEREFORE, BE IT RESOLVED BY THE BOARD as touows: dition to The Board requests a supplemental appropriation to the FY2018 Construction Fund in the amount of $52,000,000.00 for the acquisition of land and the construction of a new Aylor School; Section I — The Board shall construct the new Aylor School in compliance with the regulations of the Board of Education and the Uniform Statewide Building Code (§22.1-140); Section II - The school design shall be approved in writing by the Division's Superintendent in accordance with State Law (§22.1-140); Section III — The school plans shall be reviewed and approved according to Frederick County Ordinance by the Chief Building Official and appropriate State or Federal Agencies with jurisdiction such as the Virginia Department of Transportation; Section IV — The school shall be sized to accommodate a program capacity of 900 students in accordance to the Virginia Board of Education Regulations and Virginia Department of Education Guidelines for School Facilities. Section V - Should the appropriation be reduced from the amount requested, the school shall be reduced in size and program capacity accordingly without affecting the instructional space/layout and integrity of the school to accommodate current instructional pedagogy and integration of technology. BE IT FURTHER RESOLVED, that this Resolution shall take effect immediately upon its passage. Dr. John J. Lamanna, Chair Clerk, Frederick County School Board Attested To: (Name) Executive Director of Finance and Deputy Clerk (Title) Recorded Vote Moved By: _ Seconded. By: Yeas: Nays: Attachment C Robert E. Aylor Middle School Replacement Preliminary estimate to renovate and add an addition for a total building of 140,000 sq. ft. is $33.0 million Replacement building estimate for new building at 140,000 sq. ft. at $280.00 per sq. ft. _ $39.0 million 160,000 sq. ft. at $280.00 per sq. ft. _ $44.8 million Other costs $7.2 million Estimate to replace Aylor Middle School $52.0 million Attachment D Robert E. Aylor Middle School Replacement Project Scheduled open date: August 2021 This is a working document, FCPS Planning & Development. Project Cost Items February 28, 2018 160,000 square feet School Board Proposal Aylor MS Replacement Project - Initial Budget Land $1,400,000 A & E Fees $2,800,000 Legal (Bond Counsel, etc.) $3,000 Construction $44,800,000 Construction -Related Costs $1,341,793 Site Testing $14,655 Review Fees and Costs $11,120 VSMP Permit $1,649 Surveying and Plats $3,664 Water & Sewer $321,467 Availabilities/Connection Fees Natural Gas Connection TBD Fees/Charges Construction Management $87,435 Third Party Testing $48,268 Contractor Contingency $164,141 Owner Contingency $656,565 Commissioning $32,828 Moving/Move-in TBD Furniture, Fixtures, & Equipment $827,603 Technology $827,603 Total $52,000,000 FCPS Planning Office 4/25/2018 Modifications: February 28, 2018 - Most costs are assumed, based on past projects. Land price set to reflect current market. A&E fees are set at the standard 6.25% of construction. A small amount of legal is present to cover bond counsel. Construction is set assuming 160,000 sf built at $280 per square foot. Site testing is based on site testing costs for the 12th ES. Review Fees and Costs, and VSMP Permit fees are based on fees for Frederick County MS. Surveying is based on surveying at the 12th ES. W&S Connection Fees are based on one 4" connection and one 2" connection with one 8" fire line connection, using rates effective July 2019. These rates may increase since this will be a 2020 or 2021 connection. The number and size of connections is based on connections at Admiral Byrd MS. Construction management is based on FY2018 Clerk of the Works salary scale with 25% payroll costs and 25 months of construction and closeout. Third party testing is based on FCMS, and is adjusted for facility size. Contingencies are based on the industry standards. Commissioning is based on commissioning costs at Frederick County MS. FF&E and IT are based on 12th ES and are adjusted for building size. All construction -related costs, except for Water & Sewer Availabilities, are then adjusted to meet budget. FF&E and IT are also adjusted to meet budget. FCPS Planning Office 4/25/2018 y1�f4Pn[5 An Attachment E School Board C Dr. John J. Lamanna, Chairman c Seth T. Thatcher, Vice Chairman Jay W. Foreman FCPS Kali C. Klubertanz Michael A. Lake Shontya C. Washington Frederick County Public Schools Franklin E. Wright 1415 Amherst Street, P.O. Box 3508, Winchester, VA 22604 Visit us at www. frederick.02.va.us April 4, 2018 Mr. Charles DeHaven, Chairman Members of the Frederick County Board of Supervisors County of Frederick 107 N. Kent Street Winchester, VA 22601 Dear Chairman DeHaven and Members of the Board of Supervisors: On behalf of the School Board, thank you for meeting with us last week to discuss our request for a $52 million appropriation for the replacement Robert E. Aylor Middle School. During our meeting, you had specific questions about the three cost estimates we have shared with you. I would like to take the opportunity to try to clarify any misunderstanding that may exist regarding the estimates and what each includes. The first estimate that was presented at our Buildings and Grounds Committee meeting/Growth Summit in September 2017, and at our joint meeting with you in January 2018, totaled $33 million. This preliminary estimate was based upon a Tier 2 renovation of Aylor, which included an addition that would bring the total square footage of the school to 140,000 square feet. Adding an additional 20,000 square feet to make the size of Aylor comparable to our other middle schools increased this preliminary estimate to $38.6 million. It's important to note that a Tier 2 renovation would not address renovations needed in the student entrance corridor, the gym and locker rooms, or the career and technical education labs and hallway. This option would result in Aylor having a program capacity of 900 students. The $49 million renovation estimate shared with you last week includes a more comprehensive Tier 3 renovation that would include those renovations needed in the student entrance corridor, the gym and locker rooms, as well as the career and technical education labs and hallway. This estimate also includes an addition that would bring the size of the school to 160,000 square feet. This option would also result in Aylor having a program capacity of 900 students. Although a school totaling 140,000 square feet and one totaling 160,000 square feet can both accommodate 900 students, the additional space is needed for larger labs and collaborative learning spaces in the academic areas. Students need opportunities to work in teams to analyze and evaluate information and problems; generate and test original ideas and new solutions; collaboratively plan effective communication strategies and use those strategies to clearly articulate their findings; and engage in reflective practice on their learning. Collaborative spaces allow students to engage in these experiences, deepening their understanding of concepts while practicing and honing skills that will enable them to make positive contributions to the local, national, and global community. Mr. Charles Deflaven, Chairman Members of the Frederick County Board of Supervisors Page 2 The option supported by the School Board is to build a replacement Aylor Middle School. A great deal of thought and consideration went into the Board's decision to pursue a replacement, including the cost comparison between a Tier 3 renovation/addition and the many challenges associated with renovating the current school that Mr. Crisman and Mr. Kenney shared with you last week. The total project cost, including land and all other costs, is $52 million in today's construction market. This estimate is based upon a new school that would total approximately 160,000 square feet, meet our needs now and in the future, and have a program capacity of 900 students. The appropriation being sought for a replacement school is reasonable when you consider a total of $28.5 million was appropriated for the 12th elementary school, which will total 82,300 square feet and have a program capacity of about 500 students. As you know, the land for that school was part of a proffer which helped to reduce the total project cost. I, along with my colleagues on the Board, recognize the challenges associated with addressing the many needs of our growing community in a cost-effective and efficient manner. We look forward to working together with you to address the school division's needs so that we can continue to serve our community well. Sincerely, Dr. John J. Lamanna, Chairman Frederick County School Board cc: Members of the Frederick County School Board Dr. David Sovine, Superintendent of Schools Attachment F Debt Ratios Debt Service to Government Expenditures • Updated to include debt service on new elementary school in Snowden Bridge and $39 million borrowing for Aylor replacement. Updated model remains within county adopted policy of 8-12%. Tax Supported Debt Service • Updated to include debt service on new elementary school in Snowden Bridge and $39 million borrowing for Aylor replacement. Updated model remains within county adopted policy of 65% of principal to be retired in next 10 years. Debt to Assessed Value • Updated to include debt service on new elementary school in Snowden Bridge and $39 million borrowing for Aylor replacement. Updated model DOES NOT remain within the county adopted policy of .75% - 1.75%. S&P recognizes a positive adjustment to score for ratio below 3.00%. Key Debt Ratio Debt Service to Expenditures 15.000% 12.000% 9.000% 6.000% 3.000% 0.000% Attachment G Debt Service vs. Govt Exp IMI III!!!!! IIIIIIIIIIIHIH yb y� LO Ly LL L� LD Lh L<o L1 L'b ti0 50 �� . , 3 " 3' 3C �O �� �L ti0 LO y0 y0 ti0 ti0 LO y0 y0 ti0 ti0 ti0 ,LO 10 ti0 ti0 ti0 IP 10 ti0 1ti 1 l ,y0 1 *2018 & beyond (assumes 2% increase) 8% -12% range is the adopted County debt policy guideline 39M Aylor Attachment H Key Debt Ratio Tax Supported Debt Service 10-Year payout 100.0% 90.0% 80.0% - 7 0.0 % - — — — — — — — — — — — — — — — — — — 6 0.0 % - — — — — — — — — — — — — — — — — — — 5 0.0 % - — — — — — — — — — — — — — — — — — — 4 0.0 % -—— — — — — — — — — — — — — — — — - 30.0% 2 0.0 % - — — — — — — — — — — — — — — — — - 10.0%— — — — — — — — — — — — ■ ■ ■ ■ N P 0.0% , P �� �� �� �� �0 �JO iti ti� ti� ti� ti� "P ti� "P ti� -0 ti� -0 '0 -& - -P -P -P -0 -P -0 '0 ti� -P P -P Amount of principal to be retired in the next 10 years. 65% is the County guideline 39M Aylor Key Debt Ratio Debt to Assessed Value 2.500% 2.250% 2.000% 1.750% 1.500% 1.250% 1.000% 0.750% 0.500% 0.250% 0.000% Attachment I Debt to Assessed Value y4� y°' tiO 1y lL L'� lD Lh lLO b L1 LO LO LO LO 10 LO 10 LO LO ,LO 10 l0 LO 10 LO 10 LO LO LO LO LO 10 10 LO 75-1.75 % is County guideline Assessed value from 2017 CAM Table 5 , 2017 value is $11,010,295,149 Growth in assessed value is 2% average 39M Aylor