March 28 2018 Joint_Work_Session_With_School_Board_Agenda_PacketAGENDA
FREDERICK COUNTY BOARD OF SUPERVISORS
JOINT WORK SESSION WITH FREDERICK COUNTY PUBLIC SCHOOLS
WEDNESDAY, MARCH 28, 2018
5:30 P.M.
BOARD ROOM, COUNTY ADMINISTRATION BUILDING
107 NORTH KENT STREET, WINCHESTER, VIRGINIA
Call To Order
Discussion - School Board's funding request for the Robert E. Aylor Middle School
replacement project.
(Attachment: School Board's Buildings & Grounds Committee meeting minutes
from September 19, 2017 and May 15, 2017 with highlighted information.)
Adjourn
Frederick County Public Schools
... to ensure all students an excellent education
Superintendent
of Schools
.Memorandum
David T. Sovine, Ed.D.
sovined@fcpsk42.net
TO: Kris Tierney, Interim County Administrator, County of Frederick, VA
Frederick County Board of Superviso s • ,
F
FROM: Dr. David T. Sovine, Superintendent
Frederick County Public Schools
RE: Frederick County School Board
Buildings & Grounds Committee Summit Meeting
DATE: August 31, 2017
On Tuesday, September 19, 2017, at 12:30 p.m., the Buildings & Grounds Committee of the
Frederick County School Board will meet at Sherando High School in the community room. The
purpose of this meeting will be to conduct a summit on growth projections for Frederick County,
VA. Key participants will be Mike Ruddy, Director of Planning and Development, Frederick
County Government; Patrick Barker, Director of Frederick County Economic Development
Authority; Eric Lawrence, Frederick Water; and Frederick .County Public Schools administrative
staff.
You are invited to attend this meeting to hear what the projected growth trends for our
community are expected to be over the next five years and beyond. An agenda is attached for
your reference. A.light lunch will be served for participants and invited guests.
Attachment
540-662-3888 1415 Amherst Street, Post Office Box 3508, Winchester, VA 22604-2546 FAX 540-722-2788
FREDERICK COUNTY SCHOOL BOARD
Buildings and Grounds Committee
Minutes
September 19, 2017
A meeting of the Buildings and Grounds Committee of the Frederick County School Board was
held at Sherando High School on September 19, 2017, with the following persons present:
Mr. Frank E. Wright, School Board; Chairman, Buildings and Grounds Committee
Mr. Michael A. Lake, School Board; Buildings and Grounds Committee
Mr. Seth T. Thatcher, School Board; Buildings and Grounds Committee
Dr. John J. Lamanna, School Board Chairman
Mr. Jay W. Foreman, School Board
Mrs. Peggy Clark, School Board
Dr. David Sovine, Superintendent of Schools
Dr. Al Orndorff, Assistant Superintendent for Administration
Dr. Jim Angelo, Assistant Superintendent for Instruction
Mr. Tim Crisman, Director of Facilities Services
Mr. John Lee, Assistant Director of Facilities Services
Mr. Wayne Lee, Coordinator of Planning and Development
Mr. Kevin Kenney, Clerk of the Works
Mr. Steve Edwards, Coordinator of Policy and Communications
Mr. Wright called the meeting to order at 12:30 p.m.
Motioned by Mr. Thatcher, seconded by Mr. Lake, the agenda was approved.
Heard those in attendance introduce themselves. In addition to Board members and school staff,
Frederick County Director of Planning and Development Mike Ruddy, Frederick County Economic
Development Authority Director Patrick Barker and Frederick Water Director Eric Lawrence were in
attendance.
Heard Dr. Orndorff and Mr. Wayne Lee present information regarding student growth
projections. Dr. Orndorff and Mr. Ruddy reviewed some of the planning documents that are utilized in
the development of enrollment projections including the 2035 Comprehensive Plan, population
projections, the Urban Development Area (UDA) Report and building permits.
Mr. Ruddy presented information from the Weldon Cooper Center for Public Service regarding
Frederick County's projected population growth. The information indicated that Frederick County's
population in 2016 was 83,998 and is expected to growth to 97,192 by 2020, 119,419 by 2030 and
145,938 by 2040.
Heard Mr. Ruddy review information on the number of vacant lots in Frederick County that are
zoned for residential development. In total, there are 16,134 approved, planned or potential residential
lots/units in the county. Through August 2017, there have been 348 building permits issued for
residencies within the county's UDA. Eighty-three percent of all new residences constructed in 2017
were within the UDA.
Mr. Ruddy noted the potential new school locations included in the county's 2035
Comprehensive Plan.
Buildings and Grounds Committee September 19, 2017
Heard Mr. Ruddy review the Building Permit Report. He noted there were 714 residential
building permits issues in 2016. To date, 505 building permits have been issued in 2017 compared to
516 as of the same time in 2016. Most of the permits issued in 2016 were in the Opequon and Stonewall
magisterial districts.
Heard Dr. Orndorff outline the methodology that's employed to develop the school division's
enrollment projection including the data directly used in developing the projection as well as the data
used to verify the projection. He noted that the actual number of students expected to be enrolled on
September 15, 2018, including prekindergarten and preschool students is 13,827. The projection is
13,705 if you do not count prekindergarten and preschool students. This represents 1.94 percent growth,
or 261 more students than were enrolled on September 15, 2017. Dr. Omdorff also compared the FCPS
enrollment projection and the Weldon Cooper Center for Public Service enrollment projection to actual
enrollment since 2000.
Dr. Orndorff reviewed aerial photographs showing the growth that has occurred in particular
subdivisions over the last several years. He also reviewed population density maps of Frederick County.
Heard Dr. Orndorff review local economic news and the anticipated number of new employees
needed to support recent business announcements including those by the Navy Federal Credit Union,
Amazon and the F.B.I. It was noted that a total of 3,752 jobs have been announced locally. Information
regarding the regional and national economic picture was also shared.
Dr. Orndorff added that the county's three high schools already exceed their capacity by 244
students (based on existing program capacities that will be revised). He noted that by the fall of 2020,
which is the earliest an addition at Millbrook High School could be opened, the high schools are
projected to exceed capacity by 452 students. From the cohort -based enrollment projection, middle
schools are expected to exceed capacity in 2019.
Heard Mr. Lawrence reiterate the figures shared by the school division regarding growth are
conservative. He added that over the past 40 years, the county's population has grown at about 2.9
percent each year. Mr. Barker stated economic growth in jurisdictions in the region do impact Frederick
County and its growth.
Heard Mr. Wayne Lee share concerns the Gainesboro Volunteer Fire Department has expressed
regarding plans to construct a road in the future connecting the Gainesboro Elementary School/Frederick
County Middle School campus directly to Gainesboro Road. Mr. Lee and Mr. Lake have met with the
chief of the department along with the fire marshal to discuss the matter. The concern is that buses using
the intersection of Gainesboro Road and Route 522 could hinder emergency response. After a review of
the emergency calls received during school arrival and dismissal times, the concern was deemed to be
relatively minor. Mr. Lee stated a solution to the concern is to reiterate to bus drivers the need to yield to
emergency vehicles.
Heard Dr. Orndorff introduce J.D. Price from OWPR Architects and Engineers. Mr. Price
reviewed the Condition Assessment Report for Robert E. Aylor Middle School. Mr. Price noted the
school totals 111,525 square feet and opened in 1969. He added that 50 percent of site elements, 82
percent of plumbing components, 85 percent of HVAC systems, 52 percent of finishes and 73 percent of
electrical components have reached their average useful life.
Mr. Price reviewed the conceptual plan for an addition/renovation at Aylor. He noted the plan
would increase the size of the school to 139,525 square feet and the program capacity would be 900
students. Construction would be completed in four separate phases over 26 months. The total estimated
project cost is $25,010,000 (2017 dollars). This cost doesn't include renovating the entire building. If
the entire building is renovated, the cost would increase to approximately $30,000,000 (2017 dollars).
Renovating the site would be part of the project under this scenario. The revised site plan would
segregate bus and vehicular traffic. Mr. Price noted that the cost of the project will escalate by an
estimated three percent per year over three years depending upon the design and construction schedule.
Buildings and Grounds Committee September 19, 2017
He stated the total cost estimate to renovate the entire building and complete the addition would be $32.7
million using a schedule that would have the project completed in July 2021 and taking the escalation of
cost into account. Dr. Orndorff noted an appropriation will need to be made for the Aylor
addition/renovation project to proceed any further as no funds have been appropriated at this time.
Heard Dr. Omdorff update the committee on the preliminary assessment of a possible addition at
Millbrook High School. He noted the initial plan includes adding 17 classrooms, three labs and three
resource rooms. The addition would overlap the math area and block all windows in those classrooms.
It would also result in some parking spaces being lost. Mr. Price stated the concept would increase the
school's program capacity by 347 students. Mr. Price stated the construction cost estimate for the project
as initially conceptualized would be $7,993,007 and would include renovation to include a secure
entrance and renovation of a tech-ed lab. Based upon the $9.2 million the Board of Supervisors has
stated it would be willing to consider for such a project, Mr. Lee noted the construction budget would
have to be approximately $6.9 million. Mr. Lee stated in order to meet a $9.2 million budget the size of
the addition would have to be reduced. In rough and very preliminary terms, Mr. Lee stated that it looks
as though the most capacity that can be gained by building an addition at Millbrook with a $9.2 million
budget would be 245 seats.
Heard Dr. Orndorff provide an update on the 121h elementary school. He reviewed the revised
project budget and schedule. He noted the additional architectural and engineering fees that are
necessary due to the building having to be redesigned based on the Board of Supervisors appropriating
less for the project than was requested by the School Board. The total project budget remains $28.5
million and the project is scheduled to be completed in May 2020 and open to students in the fall of
2020. Dr. Orndorff, Mr. Lee and Mr. Kenney reviewed some of the reductions that have been made to
the design of the school in order to meet the project budget.
Motioned by Mr. Thatcher, seconded by Mr. Lake, the committee recommended the full Board
approve the revised budget and project schedule for the 121h elementary school to be built at Snowden
Bridge.
Motioned by Mr. Lake, seconded by Mr. Thatcher, the meeting adjourned at 2:57 p.m.
ACTION ITEMS:
1. Recommend approval of the revised budget and project schedule for the 12th elementary
school to be built at Snowden Bridge.
2. Recommend approval of the minutes from the Buildings and Grounds Committee meeting
held on September 19, 2017.
FREDERICK COUNTY SCHOOL BOARD
Buildings and Grounds Committee
Minutes
May 15, 2017
A meeting of the Buildings and Grounds Committee of the Frederick County School Board was
held at Robert E. Aylor Middle School on May 15, 2017, with the following persons present:
Mr. Frank E. Wright, School Board; Chairman, Buildings and Grounds Committee
Mr. Michael A. Lake, School Board; Buildings and Grounds Committee
Mr. Seth T. Thatcher, School Board; Buildings and Grounds Committee
Dr. John J. Lamanna, School Board Chairman
Mrs. Peggy Clark, School Board
Mr. Jay W. Foreman, School Board
Dr. David Sovine, Superintendent of Schools
Dr. Al Omdorff, Assistant Superintendent for Administration
Dr. Jim Angelo, Assistant Superintendent for Instruction
Mr. Wayne Lee, Coordinator of Planning and Development
Mr. Tim Crisman, Director of Facilities Services
Mr. John Lee, Assistant Director of Facilities Services
Mr. Kevin Kenney, Clerk of the Works
Mr. David Rudy, Principal, Robert E. Aylor Middle School
Mr. Rob Yost, Director of Technology
Mr. Steve Edwards, Coordinator of Policy and Communications
Mr. Wright called the meeting to order at 4:58 p.m.
Motioned by Mr. Lake, seconded by Mr. Thatcher, the agenda was approved.
Heard Dr. Orndorff review the scope of work and preliminary conceptual design for the Robert E.
Aylor Middle School addition/renovation project. He noted the school is 47-years-old and there have
been no comprehensive renovations at the school since it opened in 1969. Dr. Orndorff stated Aylor is
the only remaining middle school built as a junior high departmentalized concept, and is the smallest
middle school facility with a footprint of 111,601 square feet. Dr. Orndorff added that a comprehensive
rezoning of the middle school attendance zones is overdue and is needed to relieve current overcrowding
at Admiral Richard E. Byrd Middle School and to provide capacity for projected student membership
growth in the southeastern portion of the Urban Development Area (UDA).
Dr. Orndorff noted the Aylor addition/renovation project first appeared on the School Board's
2004-2009 Capital Improvement Plan which was adopted in the fall of 2003. Since FY2011, the
facilities services department has allocated and spent $1,040,037.91 on building maintenance repairs at
Aylor. The work has ranged from painting to equipment replacement. Dr. Orndorff also reviewed the
work orders divisionwide for FY17.
Heard Dr. Orndorff review the scope of the planned addition/renovation project at Aylor Middle
School. He stated the work will include fully abating all asbestos floor tile, further investigating and
remediating areas where the concrete floor has dropped, further investigating areas in the parking lot
where water is pumping through the asphalt, fully replacing the heating and air conditioning system
Buildings and Grounds Committee May 15, 2017
within the building (the new chiller will remain), fully demolishing and replacing all student restrooms,
fully renovating the nutrition services kitchen for efficiency of operation, upgrading and replacing
interior surfaces as needed, maintaining compliance with Americans with Disabilities Act requirements,
replacing exterior door hardware with a secure access system, fully accommodating instructional support
mandates, maintaining compliance with Virginia State Board of Education regulations, adding
classrooms as well as low and high intensity laboratories and small/large group collaboration space, and
enhancing energy monitoring and performance.
Dr. Orndorff reviewed the conceptual plan to increase the school to approximately 139,525
square feet with a targeted student capacity of 900. He noted the construction would last approximately
26 months and be completed in four separate phases. The project also would include changes to the
campus in order to enhance vehicular and pedestrian traffic flow. The estimated total project cost is $25
million. Dr. Orndorff added the estimated budget is built on what staff knows today relative to current
bids received in the last 60 days. He added that estimates of construction inflation by professionals in the
field place the lower rate at 5.5 percent with a high rate of 20 percent for 2017. Dr. Orndorff stressed the
concept presented to the committee is preliminary and noted the final concept will be developed along
with stakeholder groups. He added additional work toward developing a schematic design, design detail,
construction design documents and bid specifications will require project appropriation and public
procurement through the bidding process.
Dr. Orndorff stated the next step in the process is having the School Board take action to seek an
appropriation for the project from the Frederick County Board of Supervisors. He added that any
appropriation less than $25 million will only allow for a renovation of the building, not construction of
an addition.
Heard Dr. Omdorff update the committee on the status of the 12th elementary school project. He
reviewed the information presented at the Buildings and Grounds Committee meeting held on March 21,
2017. During that meeting, the committee reviewed the 50 percent design budget for a planned 600
student school to be built on the 20 acre proffered site at the Snowden Bridge Development as well as
several changes that could be made to reduce the total project cost to $31,485,668. The cost reductions
reviewed included: reducing the size of the gym and removing the bleachers; removing preschool
classrooms; removing the multipurpose room; converting the standing seam roof to ethylene propylene
diene terpolymer (EPDM); converting the ceiling materials to acoustical ceiling tile and grid; selecting a
lower quality light fixture package; removing the payment bond from the construction contract; reducing
the amount of interior and exterior glazing; converting the exterior to brick, where possible; and various
other changes to structure, site and details.
Dr. Orndorff noted the Board of Supervisors approved a motion during its meeting on April 12,
2017, stating its willingness to consider a future appropriation of up to $27 million to construct a 12'h
elementary school at Snowden Bridge provided the school will be a complete facility including all state
standard elementary school programs; there will be no unresolved VDOT comments or issues; the Board
of Supervisors will not be asked to appropriate any additional capital funding for the facility for a
minimum of 15 years; and if the capacity of the school is reduced below 600, all support areas will be
designed and constructed to support the original capacity.
Heard Dr. Orndorff state the architect estimates that in today's dollars, the school division should
be able to construct a 70,000 square foot elementary school for $27 million (bids expected in the $280-
$300 per square foot range). Dr. Omdorff shared the current design provided 163 square feet per student
while the proposed reduction in the size of the school will result in providing 140 square feet per student.
In addition, the program capacity of the school would be reduced from 600 to 500 students.
Specific changes to the project include removing four classrooms, reducing the size of K-1
classrooms by 100 to 200 square feet each, reducing collaboration space to 200 square feet per classroom
(originally planned for 200 square feet for K-1, 360 square feet for grades 2-3 and 450 square feet for
Buildings and Grounds Committee May 15, 2017
grades 4-5) with the possibility that collaboration space may not be provided for K-2, possibly removing
one or more special education classrooms, removing the music classroom and either putting music on the
stage or on a cart, removing the media center classroom and possibly reducing the square footage of
areas like hallways. Dr. Omdorff added the budget includes a $500,000 increase in the architectural and
engineering fee, pending negotiation. The increase is the result of having to redesign the building based
on the budget figure provided by the Board of Supervisors. He noted the technology line item is too low
and may need to be increased to $1.2 million. In addition, Dr. Omdorff shared the furniture quantity and
quality are being sacrificed and will have to be supplemented with used or refurbished furniture from the
school division's warehouse inventory.
Dr. Omdorff reminded the committee to expect a minimum of a 5.5 percent escalation in
construction costs this year. He added that a bid delayed a year is expected to increase cost to between
$295 to $315 per square foot, or an increase of roughly $1.5 million.
Heard Dr. Omdorff review a draft resolution seeking a supplemental appropriation of $27 million
to the FY2018 School Construction Fund for construction of the 12th elementary school subject to action
by the Frederick County Board of Supervisors.
The committee discussed some of the proposed cuts, specifically the roof system, the elimination
of the music room, and reducing the overall size and program capacity of the school. Mr. Wright
suggested the proposed project changes be shared with members of the community who will be served by
the 12th elementary school.
Heard Dr. Orndorff state that during its meeting on April 12, the Frederick County Board of
Supervisors shared that it's unwilling to fund the construction of a fourth high school as presented and
requested at this time. However, the Board of Supervisors approved a motion stating its willingness to
consider a future appropriation of up to $9.2 million to create 400 additional, permanent classroom seats
at the high school level. Dr. Omdorff noted that any plans to expand an existing high school would
require amending the Board's Capital Improvement Plan in the fall to include such a project. He added
that a project costing a total of $9.2 million would likely include an estimated $7.2 million construction
contract.
Heard Dr. Omdorff review the Mid -Atlantic Region Construction Alert issued by Downey &
Scott, LLC, on a April 7, 2017. The alert included information about the impact of construction inflation
on the cost of construction projects throughout the Mid -Atlantic Region. In the alert, Downey & Scott
Managing Principal Bill Downey noted a "rapid and significant" increase in project cost, as much as 15
to 20 percent in some instances.
At approximately 6:40 p.m., Mr. Lake moved that the Buildings and Grounds Committee of the
County School Board of Frederick County, Virginia, enter a closed session meeting for the following:
1. To review plans related to school safety and security pursuant to the public safety and security
exemption at VA Code Section 2.2-3711, A.19.
Mr. Thatcher seconded the motion which was approved, on a 3-0 vote.
Motioned by Mr. Lake, seconded by Mr. Thatcher, the meeting reconvened at approximately
6:58 p.m.
Mr. Lake moved to certify that, to the best of each committee member's knowledge, only public
business matters, lawfully exempted from open meeting requirements under the Virginia Freedom of
Information Act, were discussed in the closed session, and only such public business matters, as were
Buildings and Grounds Committee
May 15, 2017
identified in the motion by which the closed session was convened, were heard, discussed, or considered
by the committee. The motion, seconded by Mr. Thatcher, passed on a 3-0 roll call vote.
Motioned by Mr. Lake, seconded by Mr. Thatcher, the meeting adjourned at 7:09 p.m.
ACTION ITEMS:
1. Recommend approval of the minutes from the Buildings and Grounds Committee meeting
held on May 15, 2017.