025-16 (RezoningWWWLC)REZONING APPLICATION #08-16
WWW, LC
Staff Report for the Board of Supervisors
Prepared: October 3, 2016
Staff Contact: John A. Bishop, AICP Assistant Director-Transportation
ReviewedAction
Planning Commission:
08/17/16 Public Meeting Held: Recommended Approval
Board of Supervisors:
10/12/16 Pending; Public Meeting
PROPOSAL:
To revise proffers associated with Rezoning #03-03. Specifically this action impacts the
implementation of Petticoat Gap Lane and the extension of Retail Boulevard.
LOCATION:
The site is located at the northwest quadrant of Northwestern Pike (US Rt. 50 West) and Retail
Boulevard intersection.
EXECUTIVE SUMMARY & PLANNING COMMISSION RECOMMENDATION FOR THE
10/12/16 BOARD OF SUPERVISORS MEETING:
Rezoning #03-03 rezoned nearly 71 acres to B2 (General Business) along the north side of Route 50 West
and Route 37. This is
are now located. That rezoning encompassed numerous transportation proffers such as improvements to
Route 50 and the interchange of Route 50 and Route 37. In addition, that rezoning called for the
construction of a major collector roadway behind where the Walmart is now located to connect Route 50 and
Botanical Boulevard. This roadway network is depicted in Master Development Plan #07-04 which is also
referenced in the proffers. Through the development process there were alterations to the layout that was
envisioned at that time and the first section of that major collector roadway was constructed as Retail
Boulevard which, along with an additional access point along Route 50, has provided the access to the retail
area that is now anchored by Walmart.
The Applicant is now proposing to modify the proffers related to the implementation of the final portions of
the proffered collector roadway. The request is to delay the design and construction of Petticoat Gap Lane
and the undeveloped portion of Retail Boulevard and to allow up to 50,000 square feet of additional
commercial development on the property before the road construction. As ownership has changed on
significant portions of the original rezoning, the Applicant is seeking the proffer modification on their
remaining 28.17 acres contained in parcel 52-A-B.
Please note that VDOT has provided comments regarding concerns they have. Regarding proffer B2, VDOT
notes that some additional undeveloped parcels from the original rezoning should be included in the square
footage requirement that is being proposed to trigger the roadway. The Applicant has addressed the other
agency or staff outstanding comments and those of the County Attorney in their final October 3, 2016 proffer
statement.
The Planning Commission was supportive of this request for a minor proffer modification to the road
phasing and construction and recommended approval.
Following the public meeting, a decision regarding this rezoning application by the Board of
Supervisors would be appropriate. The Applicant should be prepared to adequately address all
concerns raised by the Board of Supervisors.
Rezoning #08-16 WWW, LC
October 3, 2016
Page 2
This report is prepared by the Frederick County Planning Staff to provide information to the Planning
Commission and the Board of Supervisors to assist them in making a decision on this application. It may
also be useful to others interested in this zoning matter. Unresolved issues concerning this application are
noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission:
08/17/16 Public Meeting Held; Recommended Approval
Board of Supervisors:
10/12/16 Pending; Public Meeting
PROPOSAL:
To revise proffers associated with Rezoning #03-03. Specifically this action impacts the
implementation of Petticoat Gap Lane and the extension of Retail Boulevard.
LOCATION:
The site is located at the northwest quadrant of Northwestern Pike (US Rt. 50 West) and Retail
Boulevard intersection.
MAGISTERIAL DISTRICT:
Gainesboro
PROPERTY ID NUMBERS:
52-A-B
PROPERTY ZONING:
B2 (General Business)
PRESENT USE:
Agricultural
ADJOINING PROPERTY ZONING & PRESENT USE:
North: RA (Rural Areas) Use: Agricultural
South: B2 (General Business) Use: VDOT/Vacant
B3 (Industrial Transition)
East: B2 (General Business) Use: Vacant/Bank
West: B2 (General Business) Use: Vacant
Rezoning #08-16 WWW, LC
October 3, 2016
Page 3
REVIEW EVALUATIONS:
Virginia Dept. of Transportation:
Please see emails dated 4/14/16 and 10/30/15 from Matthew Smith P.E,
Area Land Use Engineer.
County Attorney:
Please see letter dated March 10, 2016 from County Attorney Roderick B. Williams.
Planning & Zoning:
1)Site History
The original Frederick County zoning map (U.S.G.S. Winchester Quadrangle) identifies the subject
parcel as being zoned A-
combined to form the RA (Rural Areas) District upon adoption of an amendment to the Frederick
County Zoning Ordinance on May 10, 1989. The corresponding revision of the zoning map resulted
in the re-mapping of the subject property and all other A-1 and A-2 zoned land to the RA District. In
1995 parcel 52-A-B was subdivided and sold at auction to WWW L.C. In 2003 the property was
rezoned, with proffers, to the B2 Zoning District.
2)Comprehensive Policy Plan
The WWW, LC site is located within the Round Hill Community Land Use Plan. The site is located
wholly within the Sewer and Water Service Area (SWSA). The Round Hill Community Land Use
Plan envisions the development of business/office land uses subject to the availability of central
sewer and water facilities.
The Round Hill Community Plan recognizes two distinct yet connected areas of development. There
is the core rural community center area centered around Round Hill Road and the more commercial
areas located along Route 50. This rezoning is located within the Route 50 Commercial area.
The Round Hill Community Plan recommends the employment of design techniques to ensure the
contextual compatibility of new commercial development in the Round Hill Community. Such
techniques are intended to preclude the visual disruption of the Route 50 corridor while also
promoting development whose configuration and appearance reflects the established character of the
Round Hill Community. It is also noted that strip commercial development is explicitly discouraged
within the Round Hill Community.
3) Proffer Statement
Proffered Street Improvements
The Applicant is proffering the following:
1.Dedicate the right-of-way for the Retail Boulevard extension and Petticoat Gap Lane within 180
days of the Conditional Zoning Amendment approval by the Board of Supervisors.
2.The owner shall limit site development to 50,000 square feet before completion of the construction
or bonding of the Retail Boulevard extension and Petticoat Gap Lane.
3.The owner shall prepare a public improvement plan for the construction of the above mentioned
Rezoning #08-16 WWW, LC.
October 3, 2016
Page 4
roadways concurrent with the first site plan that exceeds 50,000 square feet of structural area.
4.The Applicant must bond the above noted roadways prior to the issuance of the Certificate of
Occupancy Permit for the site plan which exceeds 50,000 square feet.
5.The Applicant is performing VDOT punch list and taking the actions necessary to get the existing
portion of Retail Blvd. adopted into the system.
6.The combined trip generation for the parcels identified in Master Development Plan #07-04 shall not
exceed 15,000 trips per day without further approval from the County. When the total for existing
traffic and the ITE trip generation report projected traffic exceeds 15,000 the Applicant must
perform an updated TIA. Additional site plans will not be approved until the County is satisfied that
adequate and manageable levels of service will exist on state or internal site roadways.
PLANNING COMMISSION SUMMARY AND ACTION FROM THE 08/17/16 MEETING:
Staff reported this rezoning is a minor proffer amendment regarding the phasing; specifically the
transportation improvements and more specifically the extension of Retail Boulevard and the completion of
Petticoat Gap Lane. Staff presented an aerial graphic of the site. Mr. Bishop explained the property is
located on the Northwest quadrant of the intersection of Route 50 and Retail Boulevard. Staff continued by
presenting a brief history of the site. Staff reported the site consists of 28.17 acres. Mr. Bishop continued
this property was originally rezoned in 2003 and was nearly 71 acres along the north side of Route 50 and
west of Route of Clarke County are located.
Staff explained that particular rezoning encompassed numerous transportation proffers such as improvements
to Route 50 and the interchange of Route 50 and Route 37. Staff noted in addition, that rezoning called for
the construction of a major collector roadway behind the Walmart to connect Route 50 and Botanical
Boulevard. Mr. Bishop continued through the development process with alternations to the layout that was
envisioned at that time; the first section of the major collector road was constructed as Retail Boulevard,
which has provided the access to the retail area that surrounds Walmart.
Staff reported the Applicant is now proposing to modify the proffers related to the final portions of the
proffered collector roadway. Staff presented the proposed phasing triggers:
Submit right-of-way dedication plat for the remaining section of Retail Boulevard and Petticoat Gap
Lane within 180 days of conditional zoning amendment approval by the Board of Supervisors.
Prior to exceeding 50,000 square feet of site development the Applicant will design and construct or
bond the remainder of Retail Boulevard and Petticoat Gap Lane.
Construction must occur on or before the completion of the Phase 2 Lutheran Boulevard
Transportation Program.
Mr. Bishop reported some items to note as this application is considered would be that VDOT and the
County Attorney have provided comments regarding concerns they have. Staff explained regarding proffer
B2, VDOT notes that some additional undeveloped parcels from the original rezoning should be included in
the square footage requirement that is being proposed to trigger the roadway and the County Attorney notes
concerns with the fact that the right-of-way is under a different LLC entity and that the contract to construct
in proffer B4 does not represent an actual guarantee to construct the roadway but merely an obligation to a
third party.
Mr. Evan Wyatt representing the Applicant came forward. Mr. Wyatt reported when this property was
originally rezoned the area was not largely commercialized. Mr. Wyatt continued now there are several
Rezoning #08-16 WWW, LC.
October 3, 2016
Page 4
businesses at the location and the road configuration has changed. Mr. Wyatt highlighted the important
question when is the right time to build Petticoat Gap Lane. Mr. Wyatt noted the Applicant has gone through
several scenarios with VDOT and the most comfortable approach for VDOT appears to be to limit the 28
acres to 50,000 square ft.
Mr. Wyatt continued regarding the comment sent forth by the County Attorney, he explained in 2004 this
parcel was deeded by WWW L.C. to Petticoat Gap L.L.C. and the conditions on the dedication were reserved
for public street purposes. He continued the Applicant has 180 days to perform and the Applicant has
proposed to add to proffer B1. It currently states the owner shall prepare and submit a right-of-way
dedication plat for Petticoat Gap Lane and the undeveloped portion of Retail Boulevard to the County within
180 days of conditional zoning amendment approval by the Frederick County Board of Supervisors. Mr.
Wyatt noted the Applicant would like to add the
A Commission Member commented it may have been simpler to add Petticoat Gap L.L.C. as a party to the
proffers if there is a good relationship. Mr. Wyatt this could have been done however he feels with the
addition to B1 it will result in the same.
A motion was made, seconded, and unanimously recommended approval of REZ #08-16 with the
addition of
.
Absent: Thomas
EXECUTIVE SUMMARY & PLANNING COMMISSION RECOMMENDATION FOR THE
10/12/16 BOARD OF SUPERVISORS MEETING:
Rezoning #03-03 rezoned nearly 71 acres to B2 (General Business) along the north side of Route 50 West
and Route 37. This is where busi
are now located. That rezoning encompassed numerous transportation proffers such as improvements to
Route 50 and the interchange of Route 50 and Route 37. In addition, that rezoning called for the
construction of a major collector roadway behind where the Walmart is now located to connect Route 50 and
Botanical Boulevard. This roadway network is depicted in Master Development Plan #07-04 which is also
referenced in the proffers. Through the development process there were alterations to the layout that was
envisioned at that time and the first section of that major collector roadway was constructed as Retail
Boulevard which, along with an additional access point along Route 50, has provided the access to the retail
area that is now anchored by Walmart.
The Applicant is now proposing to modify the proffers related to the implementation of the final portions of
the proffered collector roadway. The request is to delay the design and construction of Petticoat Gap Lane
and the undeveloped portion of Retail Boulevard and to allow up to 50,000 square feet of additional
commercial development on the property before the road construction. As ownership has changed on
significant portions of the original rezoning, the Applicant is seeking the proffer modification on their
remaining 28.17 acres contained in parcel 52-A-B.
Please note that VDOT has provided comments regarding concerns they have. Regarding proffer B2, VDOT
notes that some additional undeveloped parcels from the original rezoning should be included in the square
footage requirement that is being proposed to trigger the roadway. The Applicant has addressed the other
Rezoning #08-16 WWW, LC.
October 3, 2016
Page 4
agency or staff outstanding comments and those of the County Attorney in their final October 3, 2016 proffer
statement.
The Planning Commission was supportive of this request for a minor proffer modification to the road
phasing and construction and recommended approval.
Following the public meeting, a decision regarding this rezoning application by the Board of
Supervisors would be appropriate. The Applicant should be prepared to adequately address all
concerns raised by the Board of Supervisors.
REZ # 08 - 16
400
CLOCKTOWER
RIDGE
WWW, LC
PIN:
2106
52 - A - B
NORTHWESTERN
PIKE
Modified Proffers
2340
NORTHWESTERN
PIKE
501
WALMART DR
REZ #08-16
501
WALMART DR
52 A B
501
WALMART DR
501
WALMART DR
110
CROCK
WELLS MILL
150
CROCK
180
WELLS MILL
CROCK
WELLS MILL
01
50
ST
803
Applications
2255
Parcels
2161
2275
NORTHWESTERN
NORTHWESTERN
NORTHWESTERN
Sewer and Water Service Area
2275
PIKE
101
PIKE
PIKE
NORTHWESTERN
2153
Building Footprints
STONEWALL DR
PIKE
NORTHWESTERN
Round Hill
B1 (Business, Neighborhood District)
2177
PIKE
NORTHWESTERN
B2 (Business, General Distrist)
PIKE
B3 (Business, Industrial Transition District)
2147
137
NORTHWESTERN
EM (Extractive Manufacturing District)
ROUND
PIKE
HILL RD
HE (Higher Education District)
100
STONEWALL DR
M1 (Industrial, Light District)
Note:
M2 (Industrial, General District)
REZ # 08 - 16
Frederick County Dept of
MH1 (Mobile Home Community District)
WWW, LC
Planning & Development
I
MS (Medical Support District)
107 N Kent St
PIN:
Suite 202
OM (Office - Manufacturing Park)
52 - A - B
Winchester, VA 22601
R4 (Residential Planned Community District)
Modified Proffers
540 - 665 - 5651
R5 (Residential Recreational Community District)
Map Created: July 14, 2016
RA (Rural Area District)
Staff: jbishop
RP (Residential Performance District)
0165330660Feet
REZ # 08 - 16
400
CLOCKTOWER
RIDGE
WWW, LC
PIN:
2106
52 - A - B
NORTHWESTERN
PIKE
Modified Proffers
2340
NORTHWESTERN
PIKE
501
WALMART DR
REZ #08-16
501
WALMART DR
52 A B
501
WALMART DR
501
WALMART DR
110
CROCK
WELLS MILL
150
CROCK
180
WELLS MILL
CROCK
WELLS MILL
01
50
ST
803
2255
2161
2275
NORTHWESTERN
NORTHWESTERN
NORTHWESTERN
2275
PIKE
101
PIKE
PIKE
NORTHWESTERN
2153
STONEWALL DR
PIKE
NORTHWESTERN
Round Hill
2177
PIKE
NORTHWESTERN
PIKE
2147
137
NORTHWESTERN
ROUND
PIKE
HILL RD
100
STONEWALL DR
Note:
REZ # 08 - 16
Frederick County Dept of
WWW, LC
Planning & Development
I
107 N Kent St
PIN:
Suite 202
52 - A - B
Winchester, VA 22601
Applications
Modified Proffers
540 - 665 - 5651
Parcels
Map Created: July 14, 2016
Sewer and Water Service Area
Staff: jbishop
Building Footprints
0165330660Feet
REZ # 08 - 16
400
CLOCKTOWER
WWW, LC
RIDGE
PIN:
52 - A - B
2106
NORTHWESTERN
Modified Proffers
PIKE
2340
NORTHWESTERN
PIKE
REZ #08-16
52 A B
501
WALMART DR
Applications
Parcels
Sewer and Water Service Area
Building Footprints
Long Range Land Use
Residential
110
Neighborhood Village
CROCK
150
WELLS MILL
Urban Center
CROCK
01
WELLS MILL
Mobile Home Community
50
Business
180
Highway Commercial
CROCK
Mixed-Use
WELLS MILL
Mixed Use Commercial/Office
Mixed Use Industrial/Office
2275
2255
NORTHWESTERN
Industrial
2161
NORTHWESTERN
PIKE
NORTHWESTERN
Warehouse
101
PIKE
PIKE
STONEWALL DR
Heavy Industrial
2275
324
2177
Extractive Mining
NORTHWESTERN
ROUND
NORTHWESTERN
PIKE
HILL RD
PIKE
NORTHWESTERN
Commercial Rec
344
STONEWALL
Rural Community Center
ROUND
137
ORCHARD
HILL RD Fire & Rescue
ROUND
Subdivision
HILL RD
Historic
100
107
Institutional
STONEWALL DR
STONEWALL DR
103
Planned Unit Development
STONEWALL DR
435
Round Hill
Park
ST
WOODCHUCK LN
109
183
803
Recreation
104
STONEWALL DR
ROUND
365
STONEWALL DR
School
108
HILL RD
219
ROCK
STONEWALL DR
ROUND
HARBOR DR
Employment 106
HILL RD
STONEWALL DR
Airport Support Area
B2 / B3
Note:
Residential, 4 u/a
REZ # 08 - 16
Frederick County Dept of
High-Density Residential, 6 u/a
WWW, LC
Planning & Development
I
High-Density Residential, 12-16 u/a
107 N Kent St
PIN:
Suite 202
Rural Area
52 - A - B
Winchester, VA 22601
Interstate Buffer
Modified Proffers
540 - 665 - 5651
Landfill Support Area
Map Created: July 14, 2016
Natural Resources & Recreation
Staff: jbishop
Environmental & Recreational Resources
0210420840Feet
Greenway Engineering April 2, 2015 WWW, LC Rezoning
Revised July 20, 2015; Revised February 8, 2016
Revised September 27, 2016 Revised October 3, 2016
WWW, LC - PROFFER STATEMENT
REZONING: RZ# 08-16 Conditional Zoning Amendment
Business General (B2) with Proffers
to Business General (B2) with Revised Proffers
PROPERTY: Tax Parcel 52-A-B; 28.17+/- acres (here-in after the )
RECORD OWNER: Winchester Warehousing, Inc. & Silver Lake, LLC
APPLICANT: Winchester Warehousing, Inc. & Silver Lake, LLC (here-in after
)
PROJECT NAME: WWW, LC
ORIGINAL DATE
OF PROFFERS: April 2, 2015
REVISION DATE: September 27, 2016 October 3, 2016
Preliminary Matters
Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Owner hereby proffers that in the event the Board of Supervisors
of Frederick County, Virginia, shall approve conditional zoning amendments pertaining
to Rezoning Application #08-16 for the 28.17±-acres Propertyfrom the B2, Business
General District with approved proffers to the B2, Business General District with revised
proffers, development of the Property shall be done in conformity with the terms and
conditions set forth herein, except to the extent that such terms and conditions may be
subsequently amended or revised by the Owner and such be approved by the Frederick
County Board of Supervisors in accordance with the said Code and Zoning Ordinance.
In the event that such rezoning is not granted, then these proffers shall be deemed
withdrawn and have no effect whatsoever. These proffers shall be binding upon the
Owner and any legal successors, heirs, or assigns.
The Property, identified as WWW, LC is more particularly
Winchester Warehousing, Inc., and Silver Lake, LLC, P/O Tax Map Parcel 52-A-Bon
the Final Subdivision Plat of the Property of Winchester Warehousing, Inc. and Silver
Lake , LLC, June 5, 2004, by Gilbert W. Clifford & Associates, recorded as Instrument
Number 040017251.
File #4928S/EAW
1
Greenway Engineering April 2, 2015 WWW, LC Rezoning
Revised July 20, 2015; Revised February 8, 2016
Revised September 27, 2016 Revised October 3, 2016
WWW, LC - PROFFER STATEMENT
A. Master Development Plan
The development of the Property shall be consistent with Master Development Plan
#07-04 approved by Frederick County on June 30, 2004, except for the narrative
pertaining to Petticoat Gap Phasing. The requirements for Petticoat Gap Lane are
specified within the Street Improvements Section of this Proffer Statement.
B. Street Improvements
The Owner shall design and construct all roads adjoining the subject property
as
provided in these proffers and as illustrated on Master Development Plan #07-04.
1.Petticoat Gap Lane and Retail Boulevard are identified on Master
Development #07--of-ways. The Owner shall prepare and
submit a right-of-way dedication plat for Petticoat Gap Lane and the
undeveloped portion of Retail Boulevard to the County within 180 days of
Conditional Zoning Amendment approval by the Frederick County Board of
Supervisors and prior to any development activity on the Property.
2.The Owner shall limit development on the Property to 50,000 square feet of
structural area before construction of the undeveloped portion of Retail
Boulevard and Petticoat Gap Lane.
3.The Owner shall prepare a Public Improvement Plan for the undeveloped
portion of Retail Boulevard along the eastern boundary of the Property and for
Petticoat Gap Lane throughout the limits of the dedicated right-of-way area
identified in Section B1 of the Proffer Statement. The Public Improvement
Plan shall be prepared and submitted for review by VDOT and the County
concurrent with the first Site Plan which exceeds 50,000 square feet of
structural area on the Property. The undeveloped portion of Retail Boulevard
shall be designed consistent with the constructed section and Petticoat Gap
Lane shall be designed as a two-lane street section with a center left turn lane
sufficient to provide for left turn movements at Retail Boulevard and the
intersection immediately east of Wal-Mart (Tax Map Parcel 52-A-D).
4.The Owner shall have the option of constructing or bonding the undeveloped
portion of Retail Boulevard and Petticoat Gap Lane sections consistent with
the approved Public Improvement Plan. The Owner shall provide the County
with bonding for construction prior to the issuance of a Certificate of
File #4928S/EAW
2
Greenway Engineering April 2, 2015 WWW, LC Rezoning
Revised July 20, 2015; Revised February 8, 2016
Revised September 27, 2016 Revised October 3, 2016
Occupancy Permit for the Site Plan which exceeds 50,000 square feet of
structural area on the Property. If the Owner provides bonding for the
completion of the Retail Boulevard and Petticoat Gap Lane sections consistent
with the approved Public Improvement Plan, construction Construction of
these road improvements the undeveloped portion of Retail Boulevard shall
occur on or before the completion of the Phase 2 Lutheran Boulevard
Transportation Program identified in the approved Proffer Statement for RZ
#01-09.
5.The Owner shall complete improvements to the constructed portion of Retail
Boulevard consistent with the Retail Boulevard Punch List Items identified in
the September 21, 2016 correspondence from the Virginia Department of
Transportation (VDOT). Completion of the Retail Boulevard Punch List
Items shall occur within 180 days of Conditional Zoning Amendment
approval by the Frederick County Board of Supervisors and prior to any
development activity on the Property. Completion of the Retail Boulevard
Punch List Items identified in the September 21, 2016 correspondence from
VDOT
Retail Boulevard.
6.The combined trip generation (ADT) for the parcels identified in Master
Development Plan #07-04 shall not exceed 15,000 TPD (average weekday
volume) without further approval by the County. The trip generation from the
project may be measured by the Owner from data collected from actual traffic
counts and from ITE generation counts. The combined traffic impact from the
overall site identified in Master Development Plan #07-04 is not to exceed
15,000 TPD (average weekday volume) when actual counts and ITE
generation counts are added for cumulative total. If the total for any site
causes the cumulative total for the overall site identified in Master
Development Plan #07-04 to exceed 15,000 TPD, then it is agreed that the
applicant shall not file additional site plan applications until the County is
satisfied that adequate and manageable levels of service will exist on state or
internal site roadways. The applicant shall perform an updated TIA of the
project intersections on U.S. Route 50 and of the Route 50/Route 37
interchange when traffic generation from the site identified in Master
Development Plan #07-04 reaches 15,000 TPD (average weekday volume).
The County may revise this 15,000 TPD limit upward, without modification
of this proffer agreement, should results of the TIA show that additional
loading is appropriate.
C. Property Design Features
File #4928S/EAW
3
Greenway Engineering April 2, 2015 WWW, LC Rezoning
Revised July 20, 2015; Revised February 8, 2016
Revised September 27, 2016 Revised October 3, 2016
Development of the Property shall include the following landscape design features
identified on Master Development Plan #07-04 approved by Frederick County on
June 30, 2004.
1..S. Route 50 West frontage of
the Property travel ways and
commercial structures shall be setback a minimum of from U.S. Route 50
West. The landscaped green strip and hiker/biker trail shall be developed in
conjunction with approved Site Plans that front along U.S. Route 50 West.
2.Individual sites developed on the Property shall be designed with inter-parcel
connections where practical based on topographic constraints of the Property.
3.Metal exteriors shall be prohibited for all buildings constructed on the Property.
4.The Owner shall establish a Property Owners Association for the Property that
will be governed by a Board of Directors that will be responsible for review of all
plans of development to ensure conformity to all requirements identified in
Master Development Plan #07-04 and all requirements associated with private
deed and covenant restrictions.
OWNER NOTARIZED SIGNATURES ON FOLLOWING PAGES
File #4928S/EAW
4
Greenway Engineering April 2, 2015 WWW, LC Rezoning
Revised July 20, 2015; Revised February 8, 2016
Revised September 27, 2016 Revised October 3, 2016
Owner Signature
The conditions proffered above shall be binding upon the heirs, executors,
administrators, assigns and successors in the interest of the Owner. In the event
the Frederick County Board of Supervisors grants this rezoning and accepts the
conditions, the proffered conditions shall apply to the land rezoned in addition to
other requirements set forth in the Frederick County Code.
Respectfully Submitted:
By:
Winchester Warehousing, Inc. Date
Commonwealth of Virginia,
City/County of To Wit:
The foregoing instrument was acknowledged before me this day of
20 by
Notary Public
My Commission Expires
File #4928S/EAW
5
Greenway Engineering April 2, 2015 WWW, LC Rezoning
Revised July 20, 2015; Revised February 8, 2016
Revised September 27, 2016 Revised October 3, 2016
Owner Signature
The conditions proffered above shall be binding upon the heirs, executors,
administrators, assigns and successors in the interest of the Owner. In the event
the Frederick County Board of Supervisors grants this rezoning and accepts the
conditions, the proffered conditions shall apply to the land rezoned in addition to
other requirements set forth in the Frederick County Code.
Respectfully Submitted:
By:
Silver Lake, LLC Date
Commonwealth of Virginia,
City/County of To Wit:
The foregoing instrument was acknowledged before me this day of
20 by
Notary Public
My Commission Expires
File #4928S/EAW
6
:ELACS
teeF 005 = hcnI 1
60-70-6102 :ETAD
S8294 :DI TCEJORP
EWD :YB DENGISED
TNEMDNEMA
AINIGRIV ,YTNUOC KCIREDERF
REFFORP WWW 6102
TCIRTSID LAIRETSIGAM OROBSENIAG
TIBIHXE NOITACOL DNA GNINOZ
TNEMDNEMA REFFORP WWW 6102
TIBIHXE NOITACOL DNA GNINOZ