COUNTY of FREDERICK
Department of Planning and Development
540/665 -5651
FAX: 540/665-6395
TO: Board of Supervisors
FROM: Michael T. Ruddy, AICP
Deputy Director
DATE: January 15, 2013
RE: Public Hearing: 2013 — 2014 Capital Improvements Plan (CIP)
The 2013 -2014 Capital Improvements Plan (CIP) is scheduled for a Board of Supervisors
Public Hearing on January 23, 2013, Staff is seeking endorsement by the Board
following the Public Hearing.
The Planning Commission reviewed the CIF at their meeting on January 2, 2013, held a
public hearing, and affirmed that the 2013 -2014 CIP is in conformance with the 2030
Comprehensive Policy Plan. As part of their deliberations, the Commission recognized
that their review and endorsement was primarily for the facilities and physical
improvements, rather than the estimated values provided for each project. The Planning
Commission recommended approval of the 2013 -2014 Capital Improvement Plan.
Previously, on November 19, 2012, the Comprehensive Plans and Programs Committee
(CPPC) Executive Committee met with County Department and Agency representatives
to discuss their individual capital improvement project requests, including new projects
and modifications to previous requests, associated with the 2013 -2014 Capital
improvements Plan (CIP).
The role of the CPPC in the CIP process was to ensure that the various departmental
project requests are in conformance with the County's Comprehensive Policy Plan.
Following the CPPC discussion, the CPPC endorsed the 2013 -2014 CIP and endorsed its
conformance with the County's Comprehensive Policy Plan. The CPPC forwarded the
CIP to the Planning Commission for discussion.
107 North Kent Street, Suite 202 m Winchester, Virginia 22601 -5000
Board of Supervisors
Public Hearing: 2013 -2014 CIP
January 15, 2013
Page 2
Both the Planning Commission and Board of Supervisors considered the proposed 2013-
2014 Capital Improvements Plan as a discussion item prior to the CIP's advertisement for
public hearing. The discussion of both bodies expressed general support of the 2013-
2014 CIP.
This year's CIP focuses once again on enhancing the connection between. the CIP and
potential proffered contributions made with rezoning projects. The connection between
the CIP and the 2030 Comprehensive Plan, and the Area Plans, is also reinforced. This
effort is highlighted through the effort of the Parks and Recreation Department and their
identification of their comprehensively planned parks, and an advanced project which
promotes the Abrams Creek Greenway Trail. The CIP projects are generally reflective of
the current economic climate and with the life cycle costs of facilities in mind.
Please find attached with this agenda item the Draft 2013 -2014 CIP which includes: a
summary of the proposed 2013 -2014 CIP in table form, and a draft copy of the proposed
2013 -2014 CIP maps illustrating the known locations of the CIP requests. More detailed
information regarding the individual department requests is available digitally and may
be forwarded to you directly if requested.
If adopted, the CIP and included maps will ultimately become a component of the
Comprehensive Policy Plan, which would satisfy the review requirement of Section 15,2-
2232 of the Code of Virginia, which states that no public facility shall be constructed
unless said facility is a "feature shown" within a jurisdiction's comprehensive plan.
Please contact the Planning Department should you have any questions regarding this
information.
Attachments
MTR/bad
FREDERICK COUNTY
VIRGINIA.
IMPROVEMENTS PLAN
D)?AFT
2013 -2014
Fiscal Year
Adopted by the
Frederick County
Board of Supervisors
Month, Day, 2013
Recommended by the
Frederick County
Planning Commission
January 2, 2013
TABLE OF CONTENTS
INTRODUCTION ................................... ............................... . ......... 1
PROJECT RECOMMENDATIONS ................. ............................... . ...... 2
Frederick County Public Schools .................... ...............................
2
Frederick County Parks and Recreation Department ............................3
Handley Regional Library ......................... ...............................
4
Transportation Committee ........................... ...............................
4
Winchester Regional Airport ........................ ...............................
4
County Administration ............................... ...............................
5
Fire& Rescue ........................................... ..............................5
2013 -2014 CAPITAL PROJECTS MAP ................... ............................... 7
2013 -2014 COUNTY PUBLIC SCHOOLS CAPITAL PROJECTS MAP........... 9
2013 -2014 COUNTY PARKS AND REC. CAPITAL PROJECTS MAP............ I 1
2013 -2014 TRANSPORTATION PROJECTS MAP ..... ............................... 13
2013 -2014 CAPITAL IMPROVEMENT PROJECTS TABLE.. . ..................... 15
CIP TABLE EXPLANATIONS ............................... .............................21
PROJECTFUNDING ........................................... .............................21
PROJECT DESCRIPTIONS ................................. ............................... 23
Frederick County Public Schools ............ ............................... ....23
Frederick County Parks and Recreation Department ............................28
Handley Regional Library .............................. .............................35
Transportation Committee .............................. .............................38
Winchester Regional Airport .......................... .............................42
County Administration ............................... ............................... 49
Fire and Rescue ..................... . ..................... .............................51
Individual Fire & Rescue Company Requests. . .......................... 55
CAPITAL IMPROVEMENTS PLAN
FREDERICK COUNTY
2013-2014
MRODi; CTIION
Section 15.2 -2239 of the Code of Virginia assigns the responsibility for preparation of
plans for capital outlays to the local Planning Commissions. The Capital Improvements
Plan (CIP) consists of a schedule for major capital expenditures for the county for the
ensuing five years.
The CIP is updated annually. Projects are removed from the plans as they are completed
or as priorities change. The plan is intended to assist the Board of Supervisors in
preparation of the county budget. In addition to determining priorities for capital
expenditures, the county must also ensure that projects contained within the CIP conform
to the Comprehensive Policy Plan. Specifically, the projects are reviewed with
considerations regarding health, safety, and the general welfare of the public, and the
policies of the Comprehensive Plan. When the CIP is adopted, it becomes a component
of the Comprehensive Plan. Frederick County approved the 2030 Comprehensive Plan on
July 3, 2011.
The CIF is strictly advisory; it is intended for use as a capital facilities planning
document, not for requesting funding allocations. Once adopted, project priorities may
change throughout the year based on changing circumstances, It is also possible that
particular projects may not be funded during the year that is indicated in the CIP. The
status of any project becomes increasingly uncertain the further in the future it is
projected.
Transportation projects are included in the CIP. The inclusion of transportation projects
to the CIP is in no way an indication that Frederick County will be independently
undertaking these projects. Funding projects will continue to come from a combination of
state and federal funds, developer contributions, and revenue sharing.
The 2013 -2014 CIP continues to emphasize the connection between the CIP,
Comprehensive Plan, and potential proffered contributions made with future rezoning
projects. This effort continues to be reinforced through the effort of the Parks and
Recreation Department and their identification of their comprehensively planned parks
including community, neighborhood, and district parks.
Frederick County Public Schools
Frederick County Public Schools continue to commence and complete capital projects
that have been priorities from previous years. The James Wood Middle School parking
lot safety enhancements, a project done in conjunction with the City of Winchester to
address several traffic safety concerns identified in the vicinity of James Wood Middle
School over the years, has recently been completed and has therefore been removed from
this year's CIP. Previously removed, and soon to be opened, is the new transportation
facility located adjacent to Armel Elementary School. The facility will house
administration, driver training areas, driver and staff meeting areas, mechanical service
and repair bays, inspection bay, wash bay, and fueling bays.
The school renovations proposed to prepare school facilities for an all day Kindergarten
program have moved off the CIP as they have been programmed to be funded and
initiated. The CIP has been reflected accordingly. It should be recognized that the all day
kindergarten program had been delayed for several years in light of the recent fiscal
climate so it is very positive to see the all day kindergarten program progress through the
joint efforts of Frederick County Public Schools and the Board of Supervisors.
The Replacement of Frederick County Middle School is the School's top Capital
improvement priority with the construction of the County's fourth High School the
second highest priority. The new high school and both a replacement and new middle
school have been requested in anticipation of the future demand of a growing student
population. Previously, the Sherando High School Parking Lot Improvement project was
combined with softball field improvements at the school.
A new project, an addition and renovations to Indian Hollow Elementary School, is
proposed. Indian Hollow Elementary School opened in 1958 and is the County's smallest
elementary school building with a program capacity of 492 students. Renovations to the
existing portion of the building will address several major issues, including classroom
storage, ADA compliance, energy conservation, security, and upgrades of fire alarm,
electrical, plumbing, and mechanical systems. A building addition will be needed to
maintain program capacity. This year's CIP continues to include a request to renovate
and expand the current administration building on Amherst Street.
In an effort to maintain educational facilities that will handle the growing student
population, the construction of two new elementary schools is recommended within the
UDA (Urban Development Area). However, the timeframe for these facilities has been
extended out several years.
2
Parks & Recreation
Baseball field lighting at both Clearbrook and Sherando Parks is the number one capital
improvement priority for Parks and Recreation.
Last year for the first time, the CIP reflected the desire to provide Fleet Trip vehicles to
further the progr of the Department. The Fleet Vehicles remain a high priority in
order to offer a comprehensive package of trips to the population of Frederick County.
Swimming improvements continue to be a focus for Parks and Recreation. The upgrade
of pool amenities at the swimming pools at both parks will include the addition of water
slides and a spray ground. This project is expected to increase pool attendance by 30
percent while providing recreational opportunities for both the Sherando and Clearbrook
Park service areas. The indoor aquatic facility continues to be proposed as a high priority
of the Parks and Recreation Department, with modifications to the scope of the project
aimed at providing flexibility in its design.
The Parks and Recreation Department has proposed to acquire land in both the eastern
and western portions of the county for the development of future regional park system.
Both land acquisitions call for 150 -200 acres of land to accommodate the recreational
needs of the growing population.
The effort of the Parks and Recreation Department and their identification of their
comprehensively planned parks including community, neighborhood, and district parks,
further emphasizes the connection between the CIP, Comprehensive Plan, and potential
proffered contributions made with rezoning projects.
The majority of the recommended projects are planned for the county's two regional
parks (Sherando & Clearbrook). Projects planned for Sherando Park include: upgrade of
baseball lighting, upgrade pool amenities, a softball complex, a soccer complex,
maintenance compound and office, skateboard park, parking and multi - purpose fields
with trail development, picnic area with a shelter, and an access road with parking and
trails. The projects planned for the Clearbrook Park include, upgrade of baseball lighting,
upgrading pool amenities, a new open play area, a tennis/basketball complex, and shelter
with an area for stage seating.
A project that has moved up in priority for Parks and Recreation is the Abrams Creek
Greenway Trail. This capital project was first recognized in last year's CIP. This facility
would provide recreational opportunities for residents of this corridor along with the
surrounding communities and was emphasized in the Senseny/Eastern Frederick Urban
Areas Plan completed during 2012. This project will provide trails with bicycle, walking
and joggings opportunities, which ranks ##1 in the 2007 Virginia Outdoors Plan survey for
all outdoor recreational activities.
3
Handley Regional Library
The Handley Regional Library continues to recommend four projects, consistent with
their 2011 -2012 requests. The library's top priority is a parking lot sidewalk extension
promoting sidewalk access at the Bowman Library as phase 2 of the parking lot
expansion project. The parking lot expansion component of the project was completed
during 2011. The library wishes to extend the sidewalks to serve residents traveling from
the east to Lakeside Drive.
The three remaining projects request that funding be provided for new library branches
throughout the county which include the areas of Gainesboro, Senseny /Greenwood Road,
and Route 522 South, with the latter two being located within the UDA (Urban
Development Area).
Transportation Committee
The Transportation Committee continues to provide project requests for the CIP.
Virginia State Code allows for transportation projects to be included within a locality's
CIP. Funding for transportation project requests will likely come from developers and
revenue sharing. Implementation of transportation projects does not take away funding
for generalized road improvements.
The Transportation Committee has requested funding for fifteen projects. The fifteen
requests include projects that entail widening of major roads; key extensions of roads that
help provide better networks, bicycle and pedestrian improvements, and the addition of
turn lanes at current unsafe intersections. The relocation of the Senseny Road bicycle
and pedestrian improvements and the Eastern Road Plan are recent additions to the CIP,
added in 2010 -2011. The inclusion of the Eastern Road Plan Improvements item once
again emphasizes the connection between the CIP and potential proffered contributions
made with rezoning projects which are aimed at mitigating potential transportation
impacts identified in the Comprehensive Plan.
The one new transportation project in this year's CIP is the Route 277 Widening and
Safety Improvement project. Ranked number five, the project identifies the construction
of a 4 -lane divided roadway beginning at 1 -81 and continuing to Sherando Park. The
project would include the realignment of Aylor Road to align with Stickley Drive. This is
a regional transportation improvement that will address congestion in the Southern
Frederick area and address development to the surrounding areas.
Winchester Regional Airport
Funding for airport projects is derived through a complex formula where the federal and
state governments contribute a majority of the funding, with Frederick County and the
other jurisdictions providing the remaining funding.
0
The Airport has recently completed a major improvement of their runway. With this
project moving from the CIP, The Airport Authority is now focusing their CIP efforts on
Taxi way improvements and Property acquisition in support of airport development to
meet Federal Aviation requirements for general aviation facilities. The vast majority of
the funding for these improvements came from the FAA and VDA.
The number one priority for the Airport is the construction of a Maintenance Facility.
The construction of a new general aviation terminal to support fixture airport operations
and associated parking improvements is a project that was added to last year's CIP and
remains in this years. A new project for the airport is the Fuel Storage Facility.
The number of projects that are included in this CIP has been consolidated over last year
as the Airport Authority is further aligning the County's CIP with the one provided to the
Virginia Department of Aviation,
County Administration.
With the Gainesboro citizen convenience center project moving forward, the number one
priority is a new facility proposed as a replacement for the Albin Convenience site. The
other request is for the expansion/relocation of the Gore Refuse Site to allow for a trash
compactor, which will reduce operational costs, by compacting trash before it reaches the
landfill.
Previously, an item was added to enhance the connection between, the CIP and proffered
contributions made to mitigate the impacts of development projects is an item that
addresses general government capital expenditures that may fall below the established
$100,000 departmental threshold. This is similar to the approach previously taken for Fire
and Rescue Capital Equipment. The structure of the County Administration section of the
CIP has been modified and no longer includes Fire and Rescue. Fire and Rescue has its
own section which is as follows.
Fire and Rescue
The top project for the Fire and Rescue component remains the creation of Fire & Rescue
Station 422 in the vicinity of Route 277, with the ability to provide an annex facility for
other county related offices. The collaboration of this project with other community
users and a land use planning effort was a key element of the Route 277 Land Use Plan.
Fire and Rescue has also included a project which provides for the capital apparatus
needs of this facility.
Fire & Rescue has once again requested the relocation of two current fire stations in order
to operate more efficiently, Round Hill and Cleaxbrook. Three newer projects for Fire
and Rescue are the creation of Station #23, a new facility located in the vicinity of
Crosspointe, the creation of Station #24 in the vicinity of Cross Junction/Lake Holiday,
and a Fire & Rescue Regional Training Center. Such a Regional Public Safety Training
0
Center potentially consisting of an administrative building, multi -story burn building,
multi -story training tower, vehicle driving range, shooting range, and numerous other
training props. This project will incorporate emergency medical services, fire, hazardous
materials, rescue, law enforcement, industrial, and educational institutions located within
the region.
Fire and Rescue Volunteer Company Capital Equipment Requests
Previously, a project consisting of a revolving fund in the amount of $1,000,000 for the
benefit of Fire and Rescue Services was established. It is the intention of this capital
expenditure fund to be for the purpose of purchasing additional and replacement capital
equipment fire and rescue vehicles and equipment that may fall below the guidelines
established by the Finance Committee. It was determined that the inclusion of such a
project would be beneficial in ensuring that this significant capital expense is identified in
the County's capital planning and budget process. This project is primarily for the
benefit of the individual Volunteer Fire and Rescue Companies.
The individual Fire and Rescue Companies have identified their own Capital Requests
which have been added to the CIP in no particular order. Most of the Capital requests
meet the $100,000 guideline established by the Finance Committee. Those requests that
do not meet this guideline have been noted and therefore relate to the Fire & Rescue
Capital Equipment project category.
C
2013-2014
Capital Improvements
Specific or
Approximate Locations
Cou my Admin istration
1 Atbtn Convenience Site Expansion
2 Gore Convenienca Site Expansion
3 Annex Facility! Fire & Rescue Station
4 Round Hill Fire Station Relocation
5 Clearorook Fire Station Relocation
6 Fire & Rescue Station 23
7 Fire & Rescue Station 24
4W Airport
4W Library
1 Bowman Library - Parking Lot Sidewalk Addition
2 Northern Frederick County Library Branch
3 Library Branch - Senseny & Greenwood
4 Library Branch - Rt 522 South
Iz
2 50
t 0 5,500 11,000 22,000
Feet
Q 1.5 3 6
Y- 4 ®--- -i
Miles
Note:
Created by Fraderiok County pepaRment of
planning & Q— I.pment
Map rep --b. the Ca Pit. 1 improvment Req—ba
subm8ted by -d'- cmunty departments.
14/09/2012
11
11
,, 3
High Schools
+♦ Middle Schools
Elementary Schools
Support Facilities
Potential School Facility Locations
Potential School Locations
Proffered Land
Potential Proffer
Urban Developm ant Area
SWSA
Middle School
�
f
�
< Elementary School
Elementary School r
A,
zss r !� •. "a r
f ! \ ]WHS r 11
I 1 AvRES /
Old Trans pordat FJ rity
f FCM�
_ Admtnistration� MM
` JWMSO Do
well H ward
5� WfnehesEar m -SRI
Vfrginie
Sen en
1 J 1. f Multi - Use Campus �l
f f'" �J.r � •
� West Jubal Eariy
r •
VES
O
_.iII; 't B EES
Villages at Artrip
ES
r` .�� • 1, i ^ice".,*) �,,,, etr 1l' +,�� .£ 1. New Transport'
REAMS v:,
%S` •.v ! r ' "'r te~ sfephans BHES 1
' city SMS
� 3;`. Virginia � - ElementE
r
Elementary School
IVIT
D 1 2 4 Miles
s ; MMril ®town : -•' '.� U� �,,
(Vote:
Created by Frederick County Department of
Planning & Development
Map represents the Capital' Improvment Requests
submitted by Frederick County School Board
11/01/12
9 Buildings & Grounds
rWES �j(
�r Snowden Bridi
li _J
1
r Middle School
)ad
3
• Elementary School
Fourth High School
n Facility
School
School Locations
Are Most
Appropriate
Within the U ®A
9
Existing County Parks
I t District Park
Neighborhood Park
Proposed Parks
District
Q Community
Neighborhood
Linear Park Trail
fi * *UDA
* Please see attached Spreadsheet.
9
I R
Ss
55
Q
a\ 11
irk `�! ��'�� ,,,•
0 1 2 4 Miles .\�� ��� •�
Note:
Cmated by Frederick County Department of
Planning & Development
Map represents the Capital Lmprovment Requests
submittedby The Dept of Paks &Recreation
11/01/2012
I Clearbrook
11
A
is � i• ! � �!�
i J NE '
L..
�+ EAST'
522 t i
} � r
% d• , }
el
'Sherando �/
I
15
SAo- �4 a us
Y
t
J r Fa
N
Ze
Z
eg
>R ,, w ?lsC7 "'gyp;
m
y 'O O 2p O t;C+P N ^ 4t cO m •Y '` o4 N rYi
kc
A
i tII ¢-• N h (C i��'tl�� {*1 o a' o i
�o
cq r
H9 a Vi K3
H7 £.' .p"� Lo i
�
t
.}
(+
Y
Y .
�
Q1
6
Nont
a 44 bl;
4
C O
a
n 1s
N
IP
R
_
lY7 �
Cc3
cc
3
N Q
0
i LO
N
� w
N cV 4
s n r� -, d
V
o o
r,`
IL L
v,o
O
U
`�
�i
"d` CJ QF m 4n
C7
C
e- t7 N
C,
a
'.
`�•-';:
• N - iFf
1* L]:
r d' ,- P- xi ri
sfi rU N.
Aa
T
s4 -
�
[l
- 6v 7.T ,v rra N
U1. �
_i
.w
U L'7 C p Ll, y C
c - o •t4 _:..
�..�
R a, .c
Dl
L C s L7 11J N E . (p er O S5: d
N t9 Q G m [7 0 C7'.
L1
L
o r � a g ofl W o Y U a.�
a � .
v _ ¢ t 3 .a
�n 5
- e c� cn w
CC
N. .�. �. d.. C r �' N 9 d A.'C[ ' �'
Cl
- v m a m ti to
:. `T j p �. � O m L'LO'.
7/ Y3' O N S9 a"
D
f9 `� N C
C O -�tLl
m yr q u m
":] b F °. 4 f0 ��, N l9 N Zl E.; E
-. N, m ..
fl k o'er E v 91 m k �' °' m.C� E r'n
en +U b' 61 L Y .V v : C N "G
'W
o❑ a c_ a t C3:: r is
rfY z LL on c.
u a Q m m n o Y = - � �. o m
•,d �. a 7 ;': -- O .� rn �'f- a cg� U Z i3"
O
d ,�,,�
pg � '
C
9
r
O D 0 <] o
C
a
}p .,'
p . i G C6 C6 R L�1� 'A t6 t6 r6 'i
15
n+
c an `'.m 4,
Iv
U
h +3i � t
i-
ii
fyi
G O O C � C O C si3z � �b � �
�
, ',� "{� � ? Y9 xCS +G�� {i0 Qd G P C F 3 . `v� C?
➢(�`',.
ti, *'
by N
t?5.
:
� C] R
t+J [ti ffi !H. W f£� H} - - S (✓`R '�li` v
a
- ' ;�.ti "�a� { a
s _
�•
N
L13 Lu LL ..0 LL: ul 141 W 4LU tL Ll. LL UL W
GR : . m � LG :'M m >Q m m m LTl LZ -m ]7 m m M. C
¢ ¢ a < d a ¢ ¢
O
CD
-
, Ln P xr` -c,5' N 51,
k•,x
N Sa15 a hA N f»
"'n 3
$�
' b „ . O [] Clf 3bk fib b
O O - V y$'A` 'ao O
_a
Y]
co
ci
U4 '°
4
q m [O K} t rt'�, N '`I' q N ". fA' �?�.
ea u1 us K uv s k
j -� $
'R p
ARS
��.
�
co
-tom
C
�'� - *;a.,
.b }y,La''S r� Sq A3i' 2 a}g,+
�.4 �'�•_ �# � $,:'
-� Q �'r .•i?d �i !..:5 t}
N ..
�
$fix �,' �*
3:z t �✓ �.,� 1 �: w� �'��
�*.' '�," .....� ' .� �
i- g si r .' � %.'�.
b� 0 R,
C 0 o p
4 L
m n o in
CD
Y
CAE
O'
N
C,.
A.
C
-
dS '� ¢ N� C O Z J W C,i
s^ °�'
4 W
.Q)
m
IL
12:6 m
,J O N
Vf a,,:. C O .,
V J U (�
° ,,
L CI LS1 Ol O Ltl
t N N lV: p C C O C iil . t/A F r
i ., fy
'B > CU, N ;:15 lV i4: t6 ttl l0 r 9�ls N f0+ l0 L9 (B i9 59 - . O
ms m [� Ci a d:; 2 n- a R, a EL" iq
c m
m.. ...
f c a y i❑ t
" 3 'ova
o
fA C9
o m - eo Ed 0 �� � . � � y E �; o m m <:RS
w ,fY., mj U =m, w LL � SL' _ut,
'N: � a- 11 t C9 a ro� c m m
y{'
J «.1 ....J J. J J .' Z .J. J ..J. J ...J'- 1 lL
iL
f, �.
f yg. ,
L t, L fl E d 3 "S
,;�•TaY.
17
d'
CS
xa,
C3,-
H_
F�
r �O�ds
a
3
Ln
d
ri
C
U
r�
s;
.q, M
o -
k;a
O
[7
' 7n
?
f
i0
N
h
N
(D
Fh77
IL
a
SC] otCy -o n a
n.
C
�j c9
M rZm
a
7
N N
w mrtr su ass
cs
7
�
8
C
Ln o .o
CO O ;p
:txs o cs o rn
<C7 4 tom. 6
'.-
O Q
N N
M ZA 0,
[W ;
Sys
U
o v tL
c55
v u
r3
a
n o�
a
u5
=
C
b
a 4
C
N.
f >
L'
O
a Iz
F
CC
! 7 7
..
N '.
.N N M'
R N
�'-
R.
Z3
N
w!
A
s V a :Q:
x7+ U
p
ttl N
s
C
'(D U) 90
y
:
N V
N
a u
Q� d
4
q
.
aj
C
N
F
�,
F
Z3
N q
w E
m �
4 4
`z
Q
o a m
� n
a E o °
2
b
t t!
a rt a ii
a m is o
9
a
0
19
y '
THE CIP TABLE
CONTENT DESCRIPTIONS
The Capital Improvements Plan table, on the previous pages, contains a list of the capital
improvement projects proposed for the ensuing five years. A description of the
information in this table is explained below.
Department Priority- The priority rating assigned by each agency or department for
their requested projects.
Project Description- The name of the capital improvement projects.
County Contribution- The estimated. dollar value that will be contributed for each
project. This value is listed by individual fiscal years and by total contributions over the
five -year period. The total contribution column, located to the right of the fiscal year
columns, does not include debt service projections.
Notes- Indicates the footnotes that apply to additional funding sources for particular
projects.
Total Project Costs- The cost for each project, including county allocations and other
funding sources.
PROJECT FUNDING
The projects included in the 2013 -2014 Capital Improvements Plan have a total project
cost to the county of $923,531,936. While the CIP is primarily used to cover the next five
years, much of the project costs have been identified beyond the next five years.
• School projects are funded through a combination of loans from the
Virginia Public School Authority and the Virginia Literary Fund.
• Funding for Parks and Recreation Department projects will come from the
unreserved fund balance of the County. The Parks and Recreation
Commission will actively seek grants and private sources of funding for
projects not funded by the county.
• Airport projects will be funded by contributions from the federal, state,
and local governments. The local portion may include contributions from
Frederick, Clarke, Shenandoah, and Warren Counties, and the City of
Winchester.
• The inclusion of transportation projects to the CIP is in no way an
indication that Frederick County will be independently undertaking these
projects. Funding projects will continue to come from a combination of
state and federal funds, developer contributions, and revenue sharing.
21
Frederick County Public Schools Project Priority List
PRIORITY ]
Replacement of Frederick County Middle School
Description: Frederick County Middle School opened in 1965. The school contains
96,701 square feet and has a program capacity of 730 students. Currently, the building
serves grades 6 -8. The building is in passable condition; however, there are several
major areas of concern. The replacement Frederick County Middle School (FCMS)
project will have a program capacity of 850 students and will serve grades 6 -8. It will
have a floor area of approximately 166,000 square feet and have land acreage of
approximately 35 acres. This project could be located in the western part of Frederick
County between Route 50 west and Route 522 north or in the eastern part of Frederick
County between Snowden Bridge and Route 50.
Capital Cost: $38,930,000
Justification: The replacement FCMS is listed as a priority project due to the near -term
need to renovate the current FCMS, including major infrastructure and items dealing with
ADA compliance_ Further, replacement is the best option because of concern for the best
building configuration for the delivery of instruction and the location of the facility.
Construction Schedule: Construction will tape 48 months.
Fourth High School
Description: The fourth high school project will have a program capacity of 1,250
students and serve grades 9 -12. The location of this project has been added to the
Comprehensive Plan's Capital Project Map for the east side of Frederick County,
centered on Route 522. The facility will have a floor area of approximately 254,000
square feet and be located on approximately 80 areas of land.
Capital Cost: $64,140,000
Justification.: This project will address expected growth in high school student
enrollment in the school division over the next several years. We project that enrollment
in the high schools by the fall of 2016 will be 4,252. Based on this projection, it is
necessary to construct the fourth high school in Frederick County to open in that time
frame. The location of this project is shown on the Comprehensive Policy Plan's
Potential New School Locations Map.
Construction. Schedule: Construction will take 54 months
23
PRIORITY 3
Robert E. Aylor Middle School Renovation
Description: Robert E. Aylor Middle School opened in 1969 and has served as a middle
school since that time. The school contains 113,643 square feet and has a program
capacity of 850 students. Currently, the building serves grades 6-8. The building is in
good condition; however, several major areas need to be addressed in a renovation.
Major areas of this renovation project include the following: additional classroom and
storage space, complete replacement of fire alarm and communication systems, roof
replacement, upgrade of electrical and plumbing, and complete replacement of
mechanical systems. Other areas to be addressed are security, repaving of asphalted
areas, and the installation of an emergency system.
Capital Cost: $21,992,491
Justification: Robert E. Aylor Middle School is soon to be 37 years of age and
renovations are needed to a number of different areas to ensure economic and efficient
operation of the school for years to come.
Construction Schedule: 48 Months
PRIORITY 4
Jaynes Wood High School Renovation
Description: James Wood High School opened in 1980 and has served as a high school
since that time. The school contains 234,095 square feet and has a program capacity of
1400 students. Currently, the building serves grades 9 -12. The building is in good
condition; however, several major areas need to be addressed in a renovation. Major
areas to be included in this renovation project are increased electrical service and
distribution to support technology, technology cabling, hardware and its installation,
upgrade of plumbing and mechanical systems, and modification of instructional areas to
support instructional delivery.
Capital Cost: $TBD
Justification: Updating the facility will assist the school division in meeting the
community needs for the citizens and high school student in the James Wood High
School attendance zone.
Construction Schedule: 36 Months
PRIORITY 5
Sherando High School Parking Lot and Softball Field Improvements
Description: This project is being undertaken to address several traffic safety concerns
identified at Sherando High School over the years and equity issues (there is no softball
field at SHS). Traffic safety concerns have reached a level that we have completed two
studies of the site. Concerns exist for pedestrians, school buses, student drivers, parents,
and staff. Rearrangement of the site and the flow of traffic on the site is necessary to
address these needs.
24
Capital Cost: TBD
Justification: This is a two -part project. For transportation safety, concerns exist on the
school site at Sherando High School during arrival and dismissal. The students, many of
their parents, and the staff necessary to serve them are exposed to these safety concerns
on a daily basis. The flow of traffic at arrival is so slow that at times vehicles back up
past Double Church Road. For the softball field, SHS does not have a softball field
onsite, instead using a softball field in neighboring Sherando Park. This represents an
equity issue between boys and girls sports. FCPS strives to attain equity between boys
and girls sports. Additionally, this is a Title IX issue.
Construction Schedule: 30 Months
PRIORITY 6
Apple Pie Ridge Elementary School Phase 2 Renovations
Description: Currently, the building serves grades K -5. The building is in good
condition; however, several major areas need to be addressed. These items will be
addressed in two phases. The first phase, kindergarten renovation, was completed this
summer. In the second phase, a renovation of the remaining facility will be completed.
Several of the major issues to be addressed in this renovation include open classroom
space, ADA compliance, energy conservation, security, and upgrades of fire alarm,
electrical, plumbing, and mechanical systems.
Capital Cost: $7,002,659
Justification: Apple Pie Ridge Elementary School is over 30 years old and renovation is
needed to a number of areas to ensure the economical and efficient operations of the
school for years to come.
Construction Schedule: 36 Months
PRIORITY 7
Frederick County Administrative Office Expansion and Renovation
Description: The facility contains 20,592 square feet, which does not include the 5,000
square foot Annex that has recently been constructed or the seven modular units that have
been added to help address the need for additional space. The expansion and renovation
will address the need for office and meeting space, will take advantage of advances in
technology, and will provide mechanical, plumbing and electrical wiring to code.
Capital Cost: $TBD
Justification: The expansion will address the need for office & meeting space, will take
advantage of advances in technology, and will update 50 -year -old mechanical, plumbing
and electrical wiring to code. Meeting space is at a premium, as we have only 2 sizeable
meeting spaces. Electrical wiring is a safety issue, as existing circuits and outlets in
overcrowded areas of the building are overloaded. All of these issues will continue to
expand as the district and therefore the staff grows. Other issues to be addressed include
building security, vehicular safety entering and exiting Amherst Street, conflicts between
vehicles and pedestrian traffic in the parking lot, and asbestos.
Construction Schedule: 30 Months
25
PRIORITY 8
Bass Hoover Elementary School Phase 2 Renovations
Description: Currently, Bass- Hoover serves grades K -5. The building is in good
condition, but several major issues need to be addressed. Renovation of the remaining
facility will be completed. Several of the major issues to be addressed in this renovation
include open classroom space, ADA compliance, energy conservation, security, and
upgrades of fire alarm, electrical, plumbing, and mechanical systems. A building addition
will be needed to maintain program capacity.
Capital Cost: $8,322,118
Justification: These renovations are needed to a number of areas to insure economic and
efficient operation of the schools for years to come and to accommodate a full day
kindergarten program.
Construction Schedule: 30 Months
PRIORITY 9
Indian Hollow Elementary School Addition and Renovation
Description: Indian Hollow Elementary School opened in 1988. The school contains
59,065 square feet and has a program capacity of 492 students. Indian Hollow is our
smallest elementary school building. Currently, the building serves grades K -5. The
building is in good condition; however, several major areas need to be addressed.
Renovations to the existing portion of the building will address several major issues,
including classroom storage, ADA compliance, energy conservation, security, and
upgrades of fire alarm, electrical, plumbing, and mechanical systems. A building
addition will be needed to maintain program capacity.
Capital Cost: $TBD
Justification: Indian Hollow Elementary School is 24 years old and nearing design life
of much of the infrastructure. The school was built without classroom storage.
Renovation to a number of areas and an addition are needed to ensure the effective,
economical, and efficient delivery of modern instruction at this school.
Construction Schedule: 30 Months
PRIORITY 10
Elementary School 912
Description: This is a single -story elementary school with a floor area of approximately
100,000 square feet located on 15 acres. The facility will be designed to accommodate a
student membership of 850.
Capital Cost: $23,475,000
Justification: This project will address anticipated growth in student enrollment in the
school division over the next several years. It is anticipated that student enrollment will
increase at all levels. A projection using cohort migration shows enrollment in the
26
elementary schools by the fall of 2020 to be 6,452. Based on this projection,
implementation of full -day kindergarten, and renovations at Apple Pie Ridge and Bass -
Hoover Elementary Schools, it will be necessary to construct the 12 elementary school
in Frederick County to open in that time frame. This school will be located in an area to
relieve overcrowding and to accommodate expected new housing development.
Locations for this project are on the Comprehensive Plan's Potential New School
Locations Map and could be placed on one of the two currently proffered pieces of
property (Villages of Artrip or Snowden Bridge).
Construction Schedule: Construction will take 42 months.
PRIORITY 11
Filth Middle School
Description: The new fifth middle school project will have a program capacity of 850
students and serve grades 6 -8. This project has been located on the Comprehensive
Policy Plan's Potential New School Locations Map. The facility will have a floor area of
approximately 166,000 square feet and be located on approximately 35 acres of land.
Capital Cost: $38,930,000
Justification: This project will address growth in student enrollment in the school
division over the next several years. It is anticipated that student enrollment will increase
at all levels. A projection using cohort migration shows enrollment in the middle schools
by the fall of 2021 to be 3,284. Middle school program capacity is 3,280. The
replacement FCMS will increase capacity by 120. We anticipate that student population
growth will necessitate construction of the fifth middle school in Frederick County by the
fall of 2025. As shown on the Comprehensive Plan's Potential New School Locations
Map, the location of this project previously has been in the eastern part of Frederick
County between Route 7 and Route 50 cast. With reconsideration of the location of the
replacement FCMS, the fifth middle school potentially could be located between Route
522 north and Route 50 west.
Construction Schedule: Construction will take 48 months.
PRIORITY 12
Elementary School #13
Description: This is a single -story elementary school with a floor area of approximately
100,000 square feet located on 15 acres. The facility will be designed to accommodate a
student membership of 750. The outdoor facilities will include three pods of grade -level
appropriate playground equipment, one asphalt play area, one softball field, and a
physical education field. This facility will meet or exceed all Virginia Department of
Education new construction requirements for K-5 elementary schools.
Capital Cost: $23,475,000
Justification: Significant residential growth in Frederick County is expected to resume
once the economy recovers, with the result that school enrollment is expected to exceed
program capacity in FY 2019 -20.
27
Construction Schedule: Construction will take 42 months.
Parks & Recreation Department Project Priority List
PRIORITY 1
Baseball Field Lighting Upgrade
Description: Upgrade the ballfield lighting at both Clearbrook and Sherando Parks
Baseball facilities. The upgrade would involve the removal of the 30120 FC (footeandle)
level fixtures, lamps, and wood poles and replace with 50130 FC (footcandle) level
fixtures, lamps and steel poles on (4) four fields at Clearbrook Park and (4) four fields at
Sherando Park. This upgrade is required by Little League International on all little
league fields.
Capital Cost: $1,300,000
Justification: This project will provide recreational opportunities for the Clearbrook
Park and Sherando Park service area which includes all county residents. Park visitation
at the two district parks exceeds 425,000 annually and is growing. The field lighting
fixtures are over 25 years old and the majority of the poles are over 35 years old. With
the decrease in the quality of lighting with the age of the system, with most of the poles
being warped and decayed and in need of replacement and to achieve the recommended
50130 FC (footcandle) level on the playing surface, the Commission is recommending
these facilities be upgraded.
Construction Schedule: Completion in FY 13 -14
M
PRIORITY 2
Fleet Trip Vehicles
Description: The Parks and Recreation Department needs to upgrade the current vehicle
fleet to offer a comprehensive package of trips for Frederick County citizen's recreation
needs. The addition of the below vehicles would replace the current 1994 bus and 1999
van. These are necessary to adequately offer trip packages and provide reliable
transportation for program participants. Bus ##1 — 40 -50 Passenger Bus, Bus #2 -- 30 -40
Passenger Bus, Van. 91 — 12 Passenger Van
Capital Cost: $290,000
Justification: To offer a comprehensive package of trips where the population of
Frederick County could begin to rely on the Parks and Recreation Department to meet
their trip needs.
Construction Schedule: Completion in FY 13 -14
PRIORITY 3
Swimming Pool Improvements — Sherando /Clearbrook
Description: Upgrade the outdoor swimming pools at both Clearbrook and Sherando
Parks. Upgrade would involve the removal of the diving boards and the installation of
one 50' water slide and one 75' water slide at each pool. The upgrade would also include
the addition of a spray ground with 10 -12 features at each pool.
Capital Cost: $1,251,208
Justification: This project is expected to increase pool attendance by 30 percent while
providing recreational opportunities for both the Sherando and Clearbrook Park service
areas.
Construction Schedule: Completion in FY 13 -14,
PRIORITY 4
Indoor Aquatic Facility — Competitive /Training/Leisure Pool
Description: This facility would house competitive, instructional, and leisure pools with
an office, adequate storage and locker rooms and would need approximately 10 acres to
construct. This facility should be located on property owned or proffered to the County.
The above pools may be constructed in one facility, separated into multiple facilities, or
collocated with other compatible uses should opportunities arise, reducing the acreage
demand.
Capital Cost: $15,163,000
Justification: There are no public indoor public pools in Frederick County. By
constructing the indoor pool, it would permit the department to meet competition needs,
instructional needs, citizen programming and leisure demands as well as provide a
nucleus to attract new businesses to the community. This facility would be available to
all area residents. The construction of this proj ect will provide a facility to offer
29
competitive scholastic programs and year round recreational programming for the
residents of Frederick County, The Indoor Pool facility should be located in an area
convenient to the major transportation corridors of the county. However, as an
alternative, one of the two county regional parks could be used to house the facility, since
these locations are already identified as centers for recreation programs and activities.
Construction Schedule: Completion in FY 13 -14.
PRIORITY 5
Access Road with Parking and Trails- Sherando Park
Description: This project involves the development of an entrance and 1,800 linear feet
of access roadway from Warrior Drive; a 100 space parking area; and 2.8 miles of trails.
Capital Cost: $1,540,626
Justification. This facility will provide recreational opportunities for the Sherando Park
service area and the entire Frederick County community. The development of this
facility will reduce the needs gap between the number of existing passive recreational
areas and the number required to meet the minimum standards established for the service
area.
Construction Schedule: Completion in FY 13 -14.
PRIORITY 6
Abrams Creek Greenway Trail
Description: 10' wide asphalt multi -use bicycle /pedestrian trail along Abrams Creek
from Senseny Road to Channing Drive. It is estimated that the trail will have (3) three
bridges (stream crossings) and will be approximately 2.6 miles in length.
Capital Cost: $1,252,558
Justification: This facility would provide recreational opportunities for residents of this
corridor along with the surrounding communities. This project will provide trails with
bicycle, walking and joggings opportunities, which ranks #1 in the 2007 Virginia
Outdoors Plan survey for all outdoor recreational activities.
Construction Schedule: FY 14 -15.
PRIORITY 7
Park Land - Eastern. Frederick County
Description: Parkland acquisition in the eastern portion of the county.
Capital Cost: $4,490,510
Justification: A new 150 -200 acre regional park would be utilized by the entire county
population. The park would be located in the primary growth center of Frederick County,
within the existing urban development area and the approved Southern Frederick Land
30
Use Plan, which consists of 1,200 acres of new residences. This project would reduce the
gap between the amount of existing parkland and the amount of parkland needed to meet
the minim standard for the Frederick County service area, as recommended by the
Virginia Outdoors Plan.
Construction Schedule: Completion in FY 14 -15.
PRIORITY S
Park Land — Western Frederick County
Description: Parkland acquisition in the western portion of the county.
Capital Cost: $3,367,728
Justification: A new 150 -200 acre regional park would be utilized by the entire county
population. This project would reduce the gap between the amount of existing parkland
and the amount of parkland needed to meet the minimum standard for the Frederick
County service area, as recommended by the Virginia Outdoors Plan. The location of
this project would provide parkland to create more accessible recreational facilities to
residents in western Frederick County.
Construction Schedule: Completion in FY 14 -15
PRIORITY 9
Softball Complex- Sherando Park
Description: Softball fields (2) - 300' radius, fully fenced, backstop, four 50 person
bleachers per field, lighted concrete poles 30120 FC, concrete deck. Access Road - 500
LF. Parking - 153 spaces, asphalt paved with curbed islands and drop off; line. markings
and 6 security lights. Landscaping - 100 shade trees; pine screen. Peripheral Work -
General seeding - 1 acre; miscellaneous signage.
Capital Cost: $671,062
Justification: This facility would provide recreational opportunities for the entire county
population, as well as the Frederick County School System. Presently, there are ten
softball and baseball fields within the county's regional park system. Eight of the
existing fields must serve a dual purpose of facilitating youth baseball, as well as adult
softball programs. With the increased usage of these fields, it has become increasingly
difficult to facilitate these programs. This project is needed in order for the Parks and
Recreation Department to accommodate the existing demand for youth baseball and adult
softball programs.
Construction Schedule: Completion in FY 14 -15.
PRIORITY 10
Soccer Complex- Sherando Park
Description: Soccer field - 210' x 360' artificial grass surface with goals. Access paths -
15 00 LF; 10' wide; asphalt paved. Restroom/concession - 820 SF; masonry with concrete
roof deck; full concession hookup. Plaza - 22,000 SF; 50% paved/50% planted; kiosk.
31
Picnic shelters (1) - 24'x 24': 6 picnic tables each; concrete pad; wood frame structure;
asphalt shingles. 12 sets of bleachers. Landscaping - 90 shade trees. Lighting - 1 field
(210'x 360')
Capital Cost: $1,121,998
Justification- This facility would be used by the entire Frederick County area. In
addition to its use as a recreational facility, the soccer complex will also be used by the
Frederick County school system. To reduce the gap between the number of existing
soccer fields and the number of fields which are needed to meet the minimum standard
for our service area. Sherando Park, currently owned by Frederick County, represents the
very best location for soccer field development. The fact that the county will not have to
acquire property for this facility means that the most costly aspect of this development
has already been completed. Sherando Park also provides a location that is situated in
the fastest growing area of the county and is adjacent to the new county high school.
With joint use of facilities between the park and school system, the construction of
additional soccer fields will benefit both agencies.
Construction Schedule: Completion in FY 15 -16.
PRIORITY 11
Maintenance Compound and Office — Sherando Parr
Description: This project involves the construction of a 1,200 square -foot office and a
3,200 square -foot storage shed for operation at Sherando Park.
Capital Cost: $374,310
Justification: This facility will enable the county to maintain its equipment and facilities
in a more responsible and effective manner. Also, with the additional responsibility of
maintaining all outdoor facilities at Sherando High School, Armel Elementary School,
Orchard View Elementary School, Bass - Hoover Elementary School, Middletown
Elementary School, R. E. Aylor Middle School, Admiral Byrd Middle School, Evendale
Elementary School, and the Public Safety Facility there is a need for more storage,
maintenance and office space. Sherando Park, currently owned by Frederick County,
will provide the best location for the development of this maintenance facility. Since the
maintenance equipment, staff and facility is needed to serve as a maintenance function
for Sherando Park =s grounds and facilities, this project should be located at Sherando
Park.
Construction Schedule: Completion in FY 15 -16,
PRIORITY 12
Open Play Area — Clearbrook
Description: This project includes development of a picnic shelter; six horseshoe pits; a
volleyball court; croquet turf; shuffleboard; parking; refurbishing the existing concession
stand; landscaping (14 shade trees); peripheral work; and renovations to existing shelters,
restrooms, access paths, and parking areas on the south side of the lake.
Capital Cost: $478,565
ea
Justification: These facilities will provide recreational opportunities for the Clearbrook
Park Service Area which will lessen the disparity between the number of passive
recreational areas needed to meet the minimum standards for this service area.
Clearbrook Park offers the best location for this development.
Construction Schedule: Completion in FY 15 -16,
PRIORITY 13
Lake, Parking, and Trail Development with two Multi- purpose Fields
Description: This project involves the development of a 12 acre lake; 1.5 mile trail
system around the lake; 800 linear feet of access roadway; lighted parking lot with 125
spaces; and development of two irrigated 70x120 yard multi - purpose fields.
Capital Cost: $1,360,610
Justification: This facility will provide recreational opportunities for the Sherando Park
service area and the entire Frederick County community. The development of this
facility will reduce the needs gap between the number of existing passive recreational
areas and the number required to meet the minimum standards established for the service
area.
Construction Schedule: Completion in FY 15 -16.
PRIORITY 14
Skateboard Park - Sherando Park
Description: This project recommends the development of a skateboard bowl; a half
pipe; an open skate area; vehicle parking; an access road; fencing; and landscaping.
Capital Cost: $513,089
Justification: This facility will enable the County to provide a recreational facility that
has been identified in the County Comprehensive Plan for recreational facility
development.
Construction Schedule: Completion in FY 15 -16.
PRIORITY 15
Tennis/Basketball Complex- Clearbrook Park
Description: This project includes the development of four tennis courts; two basketball
courts; a shelter; access paths; parking; and landscaping.
Capital Cost: $526,355
Justification: These facilities will be available to all county residents. Currently, there
are no tennis courts or basketball courts in the Clearbrook Park Service Area, Clearbrook
Park is utilized by over 180,000 visitors annually; therefore, these facilities are needed.
Construction Schedule: Completion in FY 16 -17.
PRIORITY 16
33
Picnic Area- Sherando Park
Description: This project includes a restroom/concession area; four picnic shelters;
playground area; access paths; parking; and landscaping.
Capital Cost: $804,243
Justification: These facilities would be used by the residents of Sherando Park service
area. This area of the county is growing and is deficient in passive recreational
opportunities. This development is needed to reduce the gap between the number of
existing facilities and the minimum standards for the Sherando Park service area and
southeastern Frederick County.
Construction Schedule: Completion in FY 16-17.
PRIORITY 17
Shelter /Stage Seating- Ciearbrook Park
Description: This project includes the development of a shelter with a performance
stage; refurbishing existing restrooms and access paths; and renovations to the lake.
Capital Cost: $508,402
Justification: This facility would be used by the entire county population. Presently,
there are no facilities to accommodate cultural programs within the county's park system.
This project is needed to provide a facility for cultural activities.
Construction Schedule: Completion in FY 16 -17.
PRIORITY 18
Multi- Generational Community Center
Description: The project involves building a 44,000 square foot facility that would
contain an indoor track and at least two basketball courts. The court area would be
designed to be used by indoor soccer, baseball, softball, wrestling, volleyball, tennis and
badminton. The area could also be used for special events. Additionally, the project
would house a fitness center, multi- purpose rooms, office, storage, and locker rooms.
Capital Cost: $8,802,605
Justification: This facility would give the Parks and Recreation Department the ability
to offer year round recreational programming to the residents of Frederick County. The
department can no longer meet the programming and facility needs of the County
residents.
Construction Schedule: FY 16 -17,
PRIORITY 19
Community Parks (5)
Description: Acquisition of Parkland; 60 acres
Capital Cost: $2,694,306
34
Justification: To reduce the gap between the amount of existing parkland and the
amount of parkland needed to meet the minimum standard for our service area, as
recommended by the Virginia Outdoors Plan. The project meets policy recommendations
for the development of parks and recreation facilities, insuring that adequate and
appropriate open space and recreational facilities are provided.
Construction Schedule: FY 17 -18,
PRIORITY 20
Neighborhood Parks (3)
Description: Acquisition of Parkland; 20 acres
Capital Cost: $447,928
Justification: To reduce the gap between the amount of existing parkland and the
amount of parkland needed to meet the minimum standard for our service area, as
recommended by the Virginia Outdoors Plan. The project meets policy recommendations
for the development of parks and recreation facilities, insuring that adequate and
appropriate open space and recreational facilities are provided.
Construction Schedule: FY 17 -18.
PRIORITY 21
District Parks (Northeast and Southwest)
Description: Acquisition of Parkland; 2001 acres
Capital Cost: $7,858,238
Justification: To reduce the gap between the amount of existing parkland and the
amount of parkland needed to meet the minimum standard for our service area, as
recommended by the Virginia Outdoors Plan. The project meets policy recommendations
for the development of parks and recreation facilities, insuring that adequate and
appropriate open space and recreational facilities are provided.
Construction Schedule: FY 17 -18.
Handley Regional Library Project Priority List
PRIORITY 1
Bowman Library Parking Lot and Sidewalk Extension
Description: The parking lot addition is nearly completed. Phase 2, a sidewalk at
Bowman Library, has been revised to reflect Frederick County's emphasis on complete
streets. A 10 -foot -wide, 640 - linear -foot shared use path will provide a safe means for
people to reach Bowman Library by foot or bicycle from Lakeside Drive.
Capital Cast: $42,880
35
Justification: In 2010/2011, 135,532 individuals entered the Bowman Library. The
Library serves all age groups from very young children to senior citizens and provides
recreational and education materials for them. The library is a favorite location for
families to visit together and serves many children and adults when they are working on
school assignments or self- improvement. The library supplies computer access for word
processing and other office applications and for Internet usage. The Bowman Library has
proved very popular with children and families. Children from the Lakeside Drive side
of the Library often bicycle or walk to the library. If they bicycle, they ride on Tasker
Road where the traffic often goes faster than the 45 mph speed limit. If they walk, they
can walk across the field between the library and Lakeside Drive, and many children
jump the drainage ditch, rather than walk to the corner where it is easy to get across.
Mothers, who want to walk, complain they have to walk on Tasker Road, where there is
no sidewalk, when they have children in strollers. There is a bicycle rack near the
entrance to the library.
Construction Schedule: Completion in FY13 -14 (3 -6 Months)
Northern Frederick County -- Gainesboro Library Branch
Description: Construction of a 7,000 to 10,000 sq.ft. branch library. Initial parking
should be for at least 50 vehicles. The proposed location would be on Rt. 522 in the
Gainesboro district, but this could change depending on patterns of library use and on
whether donated land could be located. The acquisition of the land of 3 to 4 acres would
be in fiscal year 2013/2014. There is discussion of a possible reuse of the old Gainesboro
School as a library branch, but this is a decision to be made by the Board of Supervisors
after further study. Handley Regional Library currently has used furniture and shelving
stockpiled at the old school with almost enough capacity (except for books and
equipment) to open and run a library. It would be a mish mash of styles and colors but
would be enough to function. If the Board of Supervisors decides the most cost - effective
choice is to demolish the old school, the land could be a possible site for a new library
building.
Capital Cost: $2,279,575
Justification: This branch would serve citizens living in this growing area. In 2010-
2011 Frederick County citizens of all ages checked out 481,244 items. 38,321 Frederick
County residents have library cards and averaged 63.1 % of all materials checked out of
the regional system. 2,743 Frederick County residents, adults and children, registered for
library cards for the first time in 2000 -2011. Of Frederick County residents over five
years of age (when you can get a library card), approximately 52% of the total have
library cards. This population group is not close to a library in the regional system. The
Library will provide materials and programming for patrons from toddlers to senior
citizens. It will provide recreational and educational materials. It will be a prime source
for homework help since it will be open nights and on weekends when school libraries
are closed. The library will supply computer access for word processing and other office
applications and for Internet usage. There will be a meeting room of 425 square feet in
which area groups can meet.
Construction Schedule: Completion in FY 15 -16
36
PRIORITY 3
Frederick County Library Branch — Senseny /Greenwood
Description: Construction of a 10,000 sq.ft. branch library with expansion possible to
15,000 square feet. Initial parking should be for a minimum of 35 vehicles. The
proposed location is yet to be determined and is dependent on fixture development. The
first step of the project would be the acquisition of the land. of 5 to 8 acres.
Capital Cost: TBD
Justification: This branch would serve citizens living in this growing area. In 2010-
2011 Frederick County citizens of all ages checked out 481,244 items. 38,321 Frederick
County residents have library cards and averaged 63.1 % of all materials checked out of
the regional system. 2,743 Frederick County residents, adults and children, registered for
library cards for the first time in 2000 -2011. Of Frederick County residents over five
years of age (when you can get a library card), approximately 52% of the total have
library cards. This population group is not close to a library in the regional system. This
area also lacks a community center that a library with meeting room could help fill this
need. The Library will provide materials and progr for patrons from toddlers to
senior citizens. It will provide recreational and educational materials. It will be a prime
source for homework help since it will be open nights and on weekends when school
libraries are closed. The library will supply computer access for word processing and
other office applications and for Internet usage. There will be a meeting room of 425
square feet in which area groups can meet.
Construction Schedule: TBD
PRTCIRTTV d
Frederick County Library Branch- Route 522 South
Description: Construction of a 7,000 sq.ft. branch library with expansion possible to
10,000 square feet. Initial parking should be for a minim of 35 vehicles. The
proposed location is yet to be determined and is dependent on future development. The
first step of the project would be the acquisition of the land of 3 to 4 acres.
Capital Cost: TBD
Justification: This population group is not close to a library in the regional system. This
area also lacks a community center that a library with meeting room could help fill this
need. The Library will provide materials and programming for patrons from toddlers to
senior citizens. It will provide recreational and educational materials. It will be a prime
source for homework help since it will be open nights and on weekends when school
libraries are closed. The library will supply computer access for word processing and
other office applications and for Internet usage. There will be a meeting room of 425
square feet in which area groups can meet.
Construction Schedule: TBD
37
Transportation Committee Prgjedfriorfty List
PRIORITY 1
Planning, Engineering, Right of Way and Construction Work for Route 37
Description: This project would be to continue work on the Eastern Route 37 extension.
More specifically, to update the Environmental impact Statement to the point of a new
Record of Decision and to update the 1992 design plans to address the current alignment,
engineering guidelines, and possible interchange improvements. In addition, this allows
for advanced engineering, right of way purchase and construction.
Capital Cost: $300,000,000 +
Justification: This project moves the County closer to completion of a transportation
improvement that would benefit the entire county and surrounding localities.
Construction Schedule: TBD
PRIORITY 2
Interstate 81, Exit 310 Improvements
Description: Construct improvements to Exit 310 interchange.
Capital Cost: $30,000,000
Justification: This is a regional transportation improvement that will address congestion
in many areas of the County and address corning development to the surrounding areas.
Construction Schedule: TBD
PRIORITY 3
Interstate 81, Exit 307 Relocation
Description: Construct a relocated Exit 307 interchange.
Capital Cost: $60,000,000
Justification: This is a regional transportation improvement that will address congestion
in many areas of the County and address coming development to the surrounding areas.
Construction Schedule: TBD
PRIORITY 4
East Tevis Street Extension
Description: Construct a 4 -lane divided roadway beginning at Route 522 and going west
approximately 0.2 miles to connect to the road network being constructed by the Russell
150 development.
Capital Cost: $2,600,000
Justification: This is a regional transportation improvement that will address congestion
in many areas of the County and address development to the surrounding area. The
OR
location is as identified b joint planning efforts between the county, VDOT, and the
developer.
Construction Schedule: TBD
PRIORITY 5
Route 277 Widening and Safety Improvements
Description: Construct a 4 -lane divided roadway beginning at I -81 and continuing to
Sherando Parr. Project would include realignment of Aylor Road to align with Stickley
Drive.
Capital Cost: $40,000,000
Justification: This is a regional transportation improvement that will address congestion
in the Southern Frederick area and address development to the surrounding areas.
Construction Schedule: 2013 -2017
PRIORITY 6
Warrior Drive Extension
Description: Construct a 4 -lane divided roadway beginning at Route 277 where Warrior
Drive intersects from the north and continuing that roadway south and west to intersect
with 1-81 at the location of the relocated Exit 307 interchange.
Capital Cost: $23,200,000
Justification: This is a regional transportation improvement that will address congestion
in the Southern Frederick area and address development to the surrounding areas.
Construction Schedule: TBD
PRIORI'T'Y 7
Channing Drive Extension
Description: Construct a 4 -lane divided roadway beginning at Senseny Road where
Channing Drive intersects from the north and continuing that roadway south to intersect
with Route 50 East at Independence Drive.
Capital Cost: $20,600,000
Justification: This project has been identified in the Eastern Road Plan, and will address
congestion in Eastern Frederick County and address development to the surrounding
areas.
Construction Schedule: TBD
I a 0 [�7:7 f111•E:1
Widening of Route 11 North to the West Virginia State Line
Description: Improve Route 11 to a divided 4 and 6 -lane facility as detailed in the
Eastern Road Plan.
39
Capital Cost: $47,800,000
Justification: This is a regional transportation improvement that will address congestion
over a large area of the County and address development to the surrounding area. This
project improves the safety for the traveling public by reducing congestion and improving
the flow of traffic.
Construction Schedule: TBD
PRIORITY 9
Brucetown. Road/Hopewell Road Alignment and Intersection Improvements
Description.: Realign Brucetown Road to meet Hopewell Road at Route 11.
Improvements to this intersection will address comprehensive planned development's
traffic generation in the area.
Capital Cost: $3,000,000
Justification: This is a transportation improvement that will have significant impact on
the Route 11 corridor. The location is identified by joint planning efforts between the
county and VDOT.
Construction Schedule: TBD
PRIORITY 10
Senseny Road Widening
Description: Widen Senseny Road to a 4 -lane divided roadway. This project is not
dependent upon, but is being coordinated with the implementation of Route 37, Channing
Drive, and development in the area.
Capital Cost: $22,800,000
Justification: This is a transportation improvement that will have significant impact on
Eastern Frederick County. This project is identified in the adopted Eastern Road Plan.
Construction. Schedule: TBD
PRIORITY 11
Inverlee Way
Description: Construct a 4 -lane divided roadway beginning at Senseny Road and going
south to Route 50 East. This project is being planned in conjunction with improvements
to Senseny Road and surrounding development.
Capital Cost: $10,200,000
Justification: This is a regional transportation improvement that will address congestion
and provide an additional needed link between Senseny Road and Route 50 East,
Construction Schedule: TBD
PRIORITY 12
Fox Drive
M#
Description: Add additional turning lane(s) to Fox Drive where it intersects with Route
522 North.
Capital Cost: $250,000
Justification: This is a transportation improvement that will address congestion at this
intersection.
Construction Schedule: TBD
PRIORITY 13
Renaissance Drive
Description: Construct a connector road between Route 11 and Shady Elm Drive.
Capital Cost: $2,000,000
Justification: This is a transportation improvement that will address congestion at key
points along Route 11 and Apple Valley Dr. This project is identified in Secondary Road
Improvements Plan.
Construction Schedule: Phase 1 is under construction.
PRIORITY 14
Senseny Road Bicycle and Pedestrian Improvements
Description: This project will construct bicycle and pedestrian improvements along
Senseny Road from Greenwood Road to the 1 -81 crossover.
Capital Cost: $2,000,000
Justification: This project will improve pedestrian safety along a corridor surrounded by
residential development and centered upon the Senseny Road Elementary School.
Construction Schedule: NIA
PRIORITY 15
Frederick County Eastern Road Plan
Description: This project is intended to address all of the planned transportation
improvements in the County Comprehensive Plan, Eastern Road Plan that are not noted
individually above.
Capital Cost: $2,000,000
Justification: This project prepares the county for future development by addressing the
projects needed to support that development in a manner consistent with the
Comprehensive Plan.
Construction Schedule: NIA
41
Winchester Regional Airport Project Priority List
PRIORITY 1
Maintenance Facility
Description: Construction of a maintenance equipment and storage facility.
Capital Cost: $550,000
Justification: This project is necessary to improve the conditions and the lead time
required to access the equipment in case of an emergency.
Construction Schedule: Completion in FY 13 -14
PRIORITY 2
Taxiway (A) Relocation
Description: The relocation of Taxiway (1) is part of the overall Airport upgrade to
meet safety design standards for a Group III airport. This relocation will improve the
serviceability and safety of the Airport in regards to ground operations for larger aircraft.
Capital Cost: $14,284,210
Justification: The relocation of Taxiway (1) is necessary to increase the Airport's ability
to accommodate larger aircraft. This project also will improve the serviceability of the
Airport in regards to ground traffic.
Construction Schedule: Completion in FY 13 -14
PRIORITY 3
Land Acquisition — Bufflick Road — Parcels 64B -A -51
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 49 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $275,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 17+
PRIORITY 4
Land Acquisition — Bufflick Road — Parcels 6413-A -40
42
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 49 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $175,000
Justification: Under the FAA. part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 17+
PRIORITY 5
Land Acquisition — Bufflick Road — Parcels 64 A 70
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 70 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $225,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 13 -14
PRIORITY 6
Land Acquisition -- Bufflick Road -- Parcels 64 A 71
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 71 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $225,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 13 -14
PRTOPTTV 7
43
Land Acquisition — Bufflick Road -- Parcels 64 A 69
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 69 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $235,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 13 -14
PRIORITY S
Land Acquisition — Bufflick Road — Parcels 64 A 66
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 66 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $268,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 14 -15
PRIORITY 9
Land Acquisition — Bufflick Road — Parcels 64 A 67
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 67 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $268,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 14 -15
44
PRIORITY 10
Land Acquisition — Bufflick Road — Parcels 64 A 64
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 64 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $250,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 15 -16
} : ONM
New General Aviation Terminal Construction
Description: The Winchester Regional Airport proposes to construct a new general
aviation terminal building. The new facility will be constructed in a new location slightly
east of the existing terminal building.
Capital Cost: $2,500,000
Justification: Since its opening in the early 1990s, the general aviation terminal building for
the Winchester Regional Airport has had only limited interior work completed. Interior
repairs are necessary due to extensive usage and some damage from water leaking from the
roof prior to its replacement in the Spring of 2006 by necessity. The heating and cooling
systems are approaching 25 years in age and are nearing the end of their useful life. The
exterior of the terminal building is made from Drivet that has failed in many areas and is
generally in fair to poor condition. In addition, the windows are not energy efficient and
several of the window seals have failed. In 2005, a study was completed to examine needs
and costs to renovate the existing terminal building. After review of the study, the WRAA
determined it would be more economical to build a new energy efficient building slightly east
of the existing terminal. The proposed location of the project will allow enough room to build
out a new transient apron during the taxiway relocation project.
Construction Schedule: Completion in FY 14 -15
i - to is "WO—)
Expand Terminal Parking lot
Description: Expand and rehabilitate the existing auto parking at the tenninal building.
Capital Cost: $650,000
Justification: Portions of the existing parking lot will be removed as part of the
demolishing of the terminal building.
Construction Schedule: Completion in FY 15 -16
M
PRIORITY 13
Land Acquisition -- Bufflick Road — Parcels 64 A 63
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 63 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $250,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 15 -16
PRIORITY 14
Land Acquisition — Bufflick Road — Parcels 64 A 60
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 60 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $300,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 15 -16
PRIORITY 15
Land Acquisition — Bufflick Road — Parcels 64 A 59
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 59 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $300,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
46
Construction Schedule: Completion in FY 16 -17
PRIORITY 16
Land Acquisition — Bufflick Road — Parcels 64 A 52
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 52 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $300,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 16 -17
PRIORITY 17
Land Acquisition — Bufflick Road — Parcels 64 A 50
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 50 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $300,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 17+
Land Acquisition. — Bufflick Road — Parcels 64 A 49
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 49 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $250,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
47
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 17+
PRIORITY 19
Land Acquisition — Bufflick Road — Parcels 64 A 47
Description: The Winchester Regional Airport Authority proposes to acquire parcel 64
A 47 on Bufflick Road. This parcel is critical to airport development because a portion is
located within or near the airport primary surfaces.
Capital Cost: $300,000
Justification: Under the FAA part 77 Surface Requirements and the Code of Virginia
15.2, the airport is required to own fee simple property located within the primary
surfaces. There are currently more than 120 based aircraft at the Winchester Regional
Airport. The owners and passengers of these aircraft will have the benefit of increased
safety on the airport once the parcels are acquired and vertical obstructions are
minimized.
Construction Schedule: Completion in FY 17+
PRIORITY 20
Fuel Storage Facility
Description: Construction of a maintenance equipment and storage facility.
Capital Cost: $1,000,000
Justification: This project is necessary to improve the conditions and the lead time
required to access the equipment in case of an emergency.
Construction Schedule: Completion in FY 13 -14
County Administration Proiect Priority List
Albin Convenience Site Relocation
Description: The relocation of the Albin citizens' convenience site to property located
within the Sunnyside /Albin community is planned for the FY 14/15. Design work will be
completed in FY 13/14. A fenced, two -acre site will be constructed along North
Frederick Pike on county -owned property in close proximity to the existing site located
on Indian Hollow Road, ideally on a portion of the current FCPS bus garage property.
This project will require several months to complete and include fencing, earthwork,
retaining wall, electric, equipment, lighting, paving and landscaping.
Capital Cost: $374,850
Justification: During August of 2011 a total of 13,343 residents visited the Albin
facility, according to a site survey. The refuse site serves a geographic area extending
from Sunnyside and the Cedar Creek Grade westward to Gainesboro. The total number of
vehicles using the site, an average of 513 a day, increased by 11 percent between 2008
and 2010. The latest figure represents another 24 percent increase over the previous year.
Weekends are the busiest at Albin when up to 550 residents use the facility on Saturdays.
As trash disposal and the resulting traffic continue to increase at the facility, the present
infrastructure will be unable to safely handle the burden_ During the holidays, the site
requires two site attendants in order to move traffic as quickly as possible. However, lines
still back out onto Indian Hollow Road, a hazard noted several times by the Sheriff's
Office. For residents living between Cedar Creek Grade and Apple Pie Ridge, curbside
pickup is expensive, prompting heavy utilization of the convenience center which attracts
a mix of users from the suburbs and rural community. It is also becoming obviously that
residents in the Gainesboro area are foregoing that facility in favor of the Albin location.
Transient university students from the townhouse community also utilize the recycling
facilities.
Construction Schedule: Start in FY 14 -15
PRIG ITY 2
Gore Refuse Site Relocation/Expansion
Description: The project will expand refuse collection capacity in the Gore community
by installing a surplus trash compactor. With the relocation of the Gainesboro and Albin
sites and purchase of new equipment, there will be an available compactor. Installation of
a compactor at Gore will drive down collection costs at the site where trash is now
collected in 10 8 -yard boxes. In order to accomplish this, and account for improved
traffic flow and the construction of necessary concrete walls, the site will be expanded
onto an adjoining parcel owned by the county.
Capital Cost: $225,350
Justification: This project would also provide much- needed capacity during heavy flow
times such as weekends and holidays. All 10 containers now on site fill to capacity during
Saturday afternoons and during the Sunday shift when up to 189 vehicles visit the
19,
facility. A 40 -yard roll -off is placed at the site during the Christmas holidays to provide
for increased trash generation. An upgraded site would meet the future solid waste
demands of a growing community.
Construction Schedule: Start in FY 15 -16
PRIORITY 3
General Government Capital Expenditures
Description: This new project consists of a revolving fluid in the amount of $1,000,000
for the benefit of General Governmental Capital Expenditures. It is the intention of this
capital expenditure fund to be for the purpose of purchasing capital equipment for
governmental agencies and to allow for improvements to general governmental facilities.
Such expenditures may be less than the established $100,000 departmental threshold. It
was determined that the inclusion of such a project would be beneficial in ensuring that
this significant capital expense is identified in the County's capital planning and budget
process. This project is for the benefit of the County Governmental Entities participating
in the CIP but does not include individual Volunteer Fire and Rescue Companies.
Capital Cost: $1,000,000
Justification: The inclusion of this capital expenditure fund for the purpose of
purchasing capital equipment for governmental agencies and to allow for improvements
to general governmental facilities will enable the County to meet the requirements of the
Code of Virginia with regards to the collection and disbursement of cash proffers
accepted on behalf of the governmental entities.
Construction Schedule: N/A
50
Fire & Rescue Project Priori List
Fire & Rescue Station #221 Annex Facilities (Route 277)
Description: Construct a two bay Fire and Rescue Station with satellite Sheriff's office
and County office space for treasure, commissioner of the revenue, and BOS office with
meeting room. The station will be located in the area of Fairfax Pike, White Oak Road,
and Tasker Road to provide service for the heavy growth area east of Stephens City. An
approximate three -acre site will be needed to accommodate this facility. The fire station
will be approximately a 10,000 sq ft facility to house an engine and ambulance. Those
who would occupy the facility will determine the size of the satellite offices. This facility
is specifically identified in the Route 277 Triangle and Urban Center Land Use Plan
approved in 2008.
Capital Cost: $3,400,000
Justification: The development of satellite offices along major transportation, networks
and in areas of dense population will provide ease of access for citizens and will improve
services to the county. This facility would facilitate the implement the Route 277
Triangle and Urban Center Land Use Plan approved in 2008. Nearby development is
scheduled to be an active adult resort gated community with age restrictions on 80% of
the homes above 55 and the other 20% above 45. The developer's master plan will allow
for 2130 individual dwelling units using a mix of housing types.
Construction Schedule: Completion in FY 14 -15
PRIORITY 2
Fire & Rescue Station 922 / Apparatus (Route 277)
Description: Purchase one (1) custom pumper equipped and one (1) custom Type I
Advanced Life Support (A.L.S.) capable ambulance equipped to be assigned to Fire and
Rescue Station 22.
Capital Cost: $905,000
Justification: This fire and rescue apparatus will be assigned to Fire and Rescue Station
22 located on Fairfax Pike East in the Stephens City area of Frederick County. The
pumper will be built to N.F.P.A. 1901 specifications and equipped with all of the required
and necessary equipment to function as a Class A Pumper. The ambulance will be built
to the Federal KKK- A -1822E specifications and equipped with all of the required and
necessary equipment to function as an Advanced Life Support ambulance. This fire and
rescue apparatus is needed due to the fact that the Fire and Rescue Department currently
owns one (1) pumper and one (1) ladder truck that are twenty (20) plus years of age and
already assigned to other functions. The currently owned fire and rescue apparatus
would not endure the demands placed on it while being assigned to a high call volume.
Construction Schedule: Completion in FY 14 -15
51
PRIORITY 3
Fire & Rescue Station #231 New Facility (Crosspointe)
Description: This project consists of a 10,000 square foot fire station to accommodate 4
pieces of emergency equipment, and to house living and sleeping areas for staff. This
project could also include satellite offices for the Frederick County Sheriffs Office,
Treasurers Office, and Commissioner of Revenue as well as a meeting room for County
Supervisor meetings with their constituents with an additional 2000 square feet of
building area. A two and 1 /2 acre parcel should be sufficient for building, parking and
amenities for approximately 20 to 30 persons. The project is located at Crosspointe
Center at the end of current Rt.37 South, an area of proposed high density residential
development, and commercial development.
Capital Cost: $3,700,000
Justification: The proposed location at the South end of Route 37 provides for quick and
easy access to Interstate 81 North and South at the 310 Exit. Access and response on Rt.
37 will be greatly enhanced from 181 to Route 50 West in the Northbound Lane.
Currently Stephens City and Round Hill Volunteer Fire and Rescue Company's serve the
area. This location also provides easy access to Rt. 11 and the Kernstown area along with
access to Middle Road and Subdivisions of Brookneil, Stonebrook, and Jacksons Woods.
These subdivisions have large single family homes in an area of Frederick County
outside of the UDA. Water supplies are scarce in these areas and a rapid response from
this proposed facility will likely reduce property damage from fire and response times for
Medical Emergencies. Major collector roads such as Tasker Road and Warrior Drive
along with the proposed extension of Rt. 37 and new roadways in the development will
provide quick access to additional homes and businesses in areas including Front Royal
Pike, Papermill Road. These roadway construction efforts will provide for an increased
level of quality emergency service to the citizens in this entire area.
Construction Schedule: To be determined.
PRIORITY 4
Fire & Rescue Regional Training Center
Description: Construct a Regional Public Safety Training Center potentially consisting
of an administrative building, multi -story burn building, multi -story training tower,
vehicle driving range, shooting range, and numerous other training props. This project
will incorporate emergency medical services, fire, hazardous materials, rescue, law
enforcement, industrial, and educational institutions located in Clarke County, Frederick
County, Shenandoah County, Warren County, Winchester City, State Agencies, Federal
Agencies, and potentially jurisdictions within the State of West Virginia.
Capital Cost: $31,175,000
Justification: This project will facilitate realistic training in today's modern environment
for emergency services and industrial personnel located throughout the Northern
Shenandoah Valley and expanding into the State of West Virginia. This project will
reinforce existing training programs in those respective agencies and jurisdictions as well
as facilitate training that is currently not available within the Northern Shenandoah
52
Valley which causes students and instructors to travel into the Washington Metropolitan
region. The number of potential personnel being trained at this Training Center is
potentially in the thousands based upon training statistics provided in July 2007 by the
participating agencies.
Construction Schedule: Completion in FY 17 -18
PRIORITY 5
Fire and Rescue Station ( #24) Relocation
Description: Construct a three (3) bay fire and rescue station with satellite County
Offices. This station is intended to be located on or near Redland Road in the area of
Lake Holiday either at a site provided by Lake Holiday or other tract in the vicinity. An
approximate three to four acre site is necessary for a 10,000 square foot facility, to house
a fire engine, and ambulance and rescue boat.
Capital Cost: $3,750,000
Justification: The Lake Holiday Development is scheduled to have a final build -out of
2800 single family homes.
Construction Schedule: To be determined
PRIORITY 6
Round Hill Fire and Rescue Station ( #I5) Relocation
Description: The new station RHCFRC plans to build will be a 17,801 A, fully NFPA-
compliant, single- story, pre - engineered structure with 4 double drive -thru bays and 14'
clearances. The bays will take up 5,340 sf and include a turnout gear alcove for 50
lockers, laundry room, tool shop and store rooms. The bays will be able to accommodate
modern -sized apparatus, including a ladder truck, and will give the company ample room
for future expansion. The drive -thru design will reduce the possibility of backing
accidents, as well as ease the flow of apparatus into and out of the station. The bays will
be equipped with spot drains for each vehicle to minimize slip- and -fall accidents. In
2006, a site inventory by Stewart Cooper Newell Architects identified more than 10
features of RHCFRC's station not in compliance with NFPA standards. Perhaps the most
serious is the lack of proper separation between sleeping and vehicles spaces. The men's
bunkroom door opens directly into the bays. Combined with inadequate hazardous
exhaust controls, this creates serious safety concerns for those sleeping inside. This
facility will also be able to accommodate living and sleeping quarters. A community
center is also planned with this project and will be approximately 10,000 sq. ft.
accommodating 400 persons for holding fundraising events. The entire project will be
relocated to an area of 3 to 5 acres.
Capital Cost: $4,281,696
Justification: The operational section of RHCFRC's present station is a brick - and -block
structure of approximately 2,277 square feet built in 1954. A wing of pre-engineered and
block construction was added in 1981 to increase office and public space. Today, the
station is no longer adequate to house the company's 30 firefighters and 8 vehicles in a
safe and efficient manner. The operating space is unsafe and cramped, and limits the
53
services that can be provided to a growing community. First due population for the 2000
ceases was 8,089. The continued growth in the area has brought additional commercial.
development (Walmart, hotels, and planned development by the hospital, shopping and
restaurants). The area includes a high school and elementary school.
Construction Schedule: To be determined
PRIORITY 7
Clear Brook Fire and Rescue Station ( #13) Relocation
Description: A new facility is proposed to be built on our current property, take down
the current building and extend our parking. The building is to be six (6) drive through
bays, administration, eating and sleeping facilities along with a dining hall. The
estimated size of the structure is to be approximately 28,000 square feet.
Capital Cost: $4,396,000
Justification: At the current time we have outgrown our facility and with the equipment
that we have to provide the service to our community for property and health protection
and with the staffing needs and fund raising operations our current facility is in need of
upgrading /updating.
Construction Schedule: To be determined
Fire & Rescue Company Capital Project Requests
Capital Equipment Fire & Rescue — Vehicles & Equipment
Description: This new project consists of a revolving fund in the amount of $1,000,000
for the benefit of Fire and Rescue Services. It is the intention of this capital expenditure
fund to be for the purpose of purchasing additional and replacement capital equipment
fire and rescue vehicles and equipment. It was determined that the inclusion of such a
project would be beneficial in ensuring that this significant capital expense is identified in
the County's capital planning and budget process. This project is primarily for the
benefit of the individual Volunteer Fire and Rescue Companies.
Capital Cost: $1,000,000
Justification: The inclusion of this capital expenditure fund for the purpose of
purchasing additional and replacement capital equipment fire and rescue vehicles and
equipment will enable the County to meet the requirements of the Code of Virginia with
regards to the collection and disbursement of cash proffers accepted on behalf of the fire
and rescue companies.
Construction Schedule: N/A
54
The following requests have been added to the CIP in no particular order:
Individual Fire & Rescue Company Capital Equipment Requests
Greenwood Vol. Fire & Rescue Company
Ambulance Replacement Project
Project Cost: $150,000
Greenwood Vol. Fire & Rescue Company
Apparatus ventilation system project
Project Cost: $100,000
North Mountain Vol. Dire & Rescue Company
Building Expansion
Project Cost: $314,766
55