Loading...
050-09Action: PLANNING COMMISSION: February 18, 2009 - Recommended Approval BOARD OF SUPERVISORS: February 25, 2009 Z) APPROVED ❑ DENIED RESOLUTION 2009 -2010 CAPITAL IMPROVEMENTS PLAN (CIP) WHEREAS, the Frederick County Planning Commission held a public hearing on the proposed 2009 -2010 Capital Improvements Plan (CIP) for Frederick County on February 18, 2009; and, WHEREAS, the Frederick County Planning Commission recommended approval of this plan at their regular meeting on February 18o the Frderick County Comprehensive Policy Plan; and, the Capital Improvements Plan (CIP) conform and, WHEREAS, the Frederick County Board of Supervisors held a public hearing on this plan during their regular meeting on February 25, 2009; and, WHEREAS, the Frederick County Board of Supervisors supports the priorities for d that the capital expenditures contained in the Capi Ve l ments Plan (C P) conformantohhedFrederick County projects contained in the Capital Impro Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors as follows: The Frederick County Board of Supervisors hereby approves the 2009 -2010 Capital Improvements Plan (CIP) for Frederick County, Virginia as an element of the Comprehensive Policy Plan. PDRes #09 -09 Passed this 25th day of February, 2009 by the following recorded vote: Richard C. Shickle, Chairman Aye Gary A. Lofton Aye Gary W. Dove A y e Bill M. Ewing Aye Gene E. Fisher Aye Charles S. DeHaven, Jr. A y e Philip A. Lemieux Aye A COPY ATTEST John kAley, Jr. < Frederick County Administrator PDRes #09 -09 BOS Res. #050 -09 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 TO: Frederick County Board of Supervisors FROM: Michael T. Ruddy, AICP Deputy Director -- DATE: February 19, 2009 RE: Public Hearing: 2009 -2010 Capital Improvements Plan (CIP) The 2009 -2010 Capital Improvements Plan (CIP) is scheduled for a Board of Supervisors Public Hearing on February 25, 2009. Endorsement of the CIP by the Board would be appropriate at this time. The Planning Commission recommended approval of the 2009 -2010 CIP at their February 18, 2009 meeting. The CIP was previously considered at the following meetings: • Comprehensive Plans and Programs Committee (CPPC) - November 10, 2008 The CPPC agreed that the CIP requests were in conformance with the Comprehensive Policy Plan and forwarded the draft document out of the Executive Committee for Planning Commission discussion. • Planning Commission - December 3, 2008 The Planning Commission considered the CIP as a discussion item and the consensus of the Commission was that the projects proposed within the CIP were in conformance with the Comprehensive Policy Plan. • Board of Supervisors — January 28, 2009 The Board considered the CIP as a discussion item and directed Staff to schedule public hearings for the 2009 -2010 CIP. The discussion was thorough and reflective of the current economic environment. The discussion resulted in the inclusion of an additional project which establishes a capital expenditure fund for 107 North Kent Street, Suite 202 • Winchester, Virginia 22601 -5000 Board of Supervisors Public Hearing: 2009 -2010 CIP February 19, 2009 Page 2 the purpose of addressing general government capital expenditures that may fall below the established $100,000 departmental threshold. This was previously endorsed by the Board through the Finance Committee. In addition, the Board endorsed a significant modification to a project submitted by the Winchester Regional Airport, the Taxiway relocation project, in an effort to advance this project and to take advantage of potential Federal funding. In light of a similar potential opportunity and some discussion during the Board meeting, Staff has included a proposed modification to the Route 37 project within the Transportation Section of the CIP. This Transportation request now includes the Route 37 project in its entirety, engineering through construction, and is consistent with current project description and values being used by VDOT. • Planning Commission Public Hearing — February 18, 2009 There were no public comments. The Planning Commission unanimously recommended approval of the 2009 -2010 CIP, including the above changes, and found it in conformance with the County's Comprehensive Policy Plan. Please find attached with this agenda item: a draft copy of the proposed 2009 -2010 CIP, which includes three maps illustrating the known locations of the CIP requests and a summary of all of the project requests. If adopted, the CIP and included maps will ultimately become a component of the Comprehensive Policy Plan, satisfying the review requirement of Section 15.2 -2232 of the Code of Virginia, which states that no public facility shall be constructed unless said facility is a "feature shown" within a jurisdiction's comprehensive plan. The CIP is presented as a public hearing. Endorsement of the CIP by the Board would be appropriate at this time. Please contact the Planning Department should you have any questions regarding this information. Attachments MTR/bad FREDERICK COUNTY VIRGINIA CAAM IMPROVEMENTS PLAN mom- AR 2009 -2010 Fiscal Year Adopted by the Frederick County Board of Supervisors February xx, 2009 Recommended by the Frederick County Planning Commission February 18, 2009 TABLE OF CONTENTS INTRODUCTION ............................................. ............................... 1 PROJECT RECOMMENDATIONS ......................... ..............................2 Frederick County Public Schools ..................... ..............................2 Frederick County Parks and Recreation Department ............................2 Handley Regional Library ......................... ............................... 3 Transportation Comirittee ........................... ............................... 3 Winchester Regional Airport ........................ ............................... 3 County Administration ................................ ..............................4 2009 -2010 CAPITAL PROJECTS MAP ................... ............................... 5 2009 -2010 COUNTY PUBLIC SCHOOLS CAPITAL PROJECTS MAP........... 7 2009 -2010 TRANSPORTATION PROJECTS MAP ..... ............................... 9 2009 -2010 CAPITAL IMPROVEMENT PROJECTS TABLE ........................ 11 CIP TABLE EXPLANATIONS ............................... .............................17 PROJECT FUNDING ............ ............................... • ... • ........................17 PROJECT DESCRIPTIONS ................................. ............................... 18 Frederick County Public Schools ...................... .............................18 Frederick County Parks and Recreation Department ............................22 Handley Regional Library .............................. .............................27 Transportation Committee .............................. .............................29 Winchester Regional Airport ........................ ............................... 33 County Administration ............................... ............................... 38 Fire and Rescue .................................. .............................39 Individual Fire & Rescue Company Requests ............................42 CAPITAL IMPROVEMENTS PLAN FREDERICK COUNTY 2009 -2010 INTRODUCTION Section 15.2 -2239 of the Code of Virginia assigns the responsibility for preparation of plans for capital outlays to the local Planning Commissions. The Capital Improvements Plan (CIP) consists of a schedule for major capital expenditures for the county for the ensuing five years. The CIP is updated annually. Projects are removed from the plans as they are completed or as priorities change. The plan is intended to assist the Board of Supervisors in preparation of the county budget. In addition to determining priorities for capital expenditures, the county must also ensure that projects contained within the CIP conform to the Comprehensive Policy Plan. Specifically, the projects are reviewed with considerations regarding health, safety, and the general welfare of the public. When the CIP is adopted, it becomes a component of the Comprehensive Policy Plan. The CIP is strictly advisory; it is intended for use as a capital facilities planning - document, not for requesting funding allocations. Once adopted, project priorities may change throughout the year based on changing circumstances. It is also possible that particular projects may not be funded during the year that is indicated in the CIP. The status of any project becomes increasingly uncertain the further in the future it is projected. Transportation projects are included in the CIP for a third year. The 2007 -2008 CIP included transportation projects for the first time. The reason for this change was that state code now allows for transportation projects to appear in the CIP. The addition of transportation projects to the CIP is in no way an indication that Frederick County will be independently undertaking these projects. Funding projects will continue to come from a combination of state and federal funds, developer contributions, and revenue sharing. PROJECT RECONIlVIENDATIONS Frederick County Public Schools The Public Schools top piiority remains a new transportation facility. This project involves the site acquisition, approximately 50 acres, and development of a new transportation facility for the public school system. The site will house administration, driver training areas, driver and staff meeting areas, mechanical service and repair bays, inspection bay, wash bay, and fueling bays. In an effort to maintain educational facilities that will handle the growing student the population, the construction of two new elementary schools UDA (Urban Development Area). A new high school and a new middle school have also been requested in anticipation of the future demand of a growing student population. A number of school renovations and relocations are proposed, several of which are aimed at accommodating an all day Kindergarten program. The Elementary School renovations have been updated to reflect the phased construction of these improvements projects. This year's CIP continues to include a request to renovate and expand the current administration building on Amherst Street. In recognition-of the current construction of the first phase of this expansion, this request has been modified to include the 2nd and 3rd Phases of this project. Parks & Recreation The indoor aquatic facility continues to be proposed as the top priority of the Parks and Recreation Department for the fourth year in a row. Phase II of the Bike Trail project in the Sherando area is included the plan. The Parks and Recreation Department has proposed to acquire land in both the eastern and western portions of the county for the development of future regional park system. Both land acquisitions call for 150 -200 acres of land to accommodate the recreational needs of the growing population. The majority of the recommended projects are planned for the county's two regional parks ( Sherando & Clearbrook). Nine projects are planned for Sherando Park: upgrade of baseball lighting, upgrade pool amenities, a soccer complex, maintenance compound and office, skateboard park, parking and multi- purpose fields with trail development, a softball complex, picnic area with a shelter, and an access road with parking and trails. The soccer complex has increased in priority in recognition of a partnership opportunity with a co- sponsored organization, BRYSA. There are currently five projects planned for the Clearbrook Park which include, upgrade of baseball lighting, upgrading pool. amenities, a new open play area, a tennis/basketball complex, and shelter with an area for stage seating. The upgrade of pool amenities at the swimming pools at both parks will include the addition of water slides and a spray ground. 2 Handley Regional Library The Handley Regional Library continues to recommend four projects, consistent with their 2008 -2009 request. The library's top priority is a parking lot expansion as well as improvements to sidewalk access at the Bowman Library. The parking lot expansion would accommodate 121 more parking than what is currently available. The library wishes to extend the sidewalks to serve residents traveling from the east to Lakeside Drive. The three remaining projects request that funding be provided for new library branches throughout the county which include the areas of Gainesboro, Senseny /Greenwood Road, and Route 522 South, with the latter two being located within the UDA (Urban Development Area). Transportation Committee This is, the third year the Transportation Committee is providing project requests for the CIP. Virginia State Code allows for transportation projects to be included within a locality's CIP. Funding for transportation project requests will likely come from developers and revenue sharing. Implementation of transportation projects does not take away funding for generalized road improvements. The Transportation Committee has requested funding for twelve projects. The twelve requests include projects that entail widening of major roads; key extensions of roads that help provide better networks, bicycle and pedestrian improvements, and the addition of turn lanes at current unsafe intersections. The relocation of the Senseny Road bicycle and pedestrian improvements and the Eastern Road Plan are the only addition to this year's CIP Winchester Regional Airport The Airport component of the CIP has been modified to be more consistent with the capital planning requirements of the Virginia Department of Aviation. While more projects are included in this CIP than in previous years, several requests represent different phases of construction of these capital improvements. Several of the Airport requests were carried forward from previous years including the request to renovate the terminal building, the request to construct a new airfield maintenance building, a request to upgrade the airfield lighting system to enhance safety for aircraft use of the facility, and two additional requests which were new last year which address the rehabilitation of Runway 14/42 and a new north side Taxi way Connector. In addition to the two previous requests to acquire additional parcels along Bufflick Road this year's CIP includes the acquisition of additional parcels along Bufflick Road which are required to meet noise abatement requirements and will facilitate the proposed expansion of the airport facility. 3 Funding for airport projects is derived through a complex formula where the federal and state governments contribute a majority of the funding, with Frederick County and the other jurisdictions providing the remaining funding. County Administration iincluding Fire and Rescue) The structure of the County Administration section of the CIP has been modified to better reflect the enhancements to the Fire and Rescue component of the CIP which were included last year. This year's CIP also reflects the input provided by the County's Volunteer Fire and Rescue Companies. This is in an effort to further establish the connection between the CIP and the acceptance of proffered contributions made to mitigate the impacts of development projects. The capital requests of the individual Fire and Rescue Companies have been added as a component of this year's CIP. Also added to enhance the connection between the CIP and proffered contributions made to mitigate the impacts of development projects is an item that addresses general government capital expenditures that may fall below the established $100,000 departmental threshold. This is similar to the approach previously taken for Fire and Rescue Capital Equipment. Modifications to two of the County's refuse convenience sites continue to be a Public Works priority. The first request is that the current Gainesboro facility be moved. A fenced, accessible two -acre site will be constructed along North Frederick Pike in close proximity to the existing site on Old Gainesboro Road. This project will require several months to complete and include fencing, earthwork; a retaining wall, electric, lighting, paving and landscaping. The other request is for the expansion/relocation of the Gore Refuse Site to allow for a trash compactor, which will reduce operational costs, by compacting trash before it reaches the landfill. resulted in the inclusion of an additional project which establishes a capital expenditure fund for Fire & Rescue has requested the relocation of two current fire stations in order to operate more efficiently. The top project for the County Administration's Fire and Rescue component is the creation of Fire & Rescue Station #22 in the vicinity of Route 277, with the ability to provide an annex facility for other county related offices. The collaboration of this project with other community users and a land use planning effort was a key element of the Route 277 Land Use Plan. Fire and Rescue has added a project which provides for the capital apparatus needs of this facility. Two new projects for Fire and Rescue are the creation of Station #23, a new facility located in the vicinity of Crosspointe and a Fire & Rescue Regional Training Center. Such a Regional Public Safety Training Center potentially consisting of an administrative building, multi -story bum building, multi -story training tower, vehicle driving range, shooting range, and numerous other training props. This project will incorporate emergency medical services, fire, hazardous materials, rescue, law enforcement, industrial, and educational institutions located within the region. 4 2009-2010 Capital Improvements r` Specific or r ' Approximate Locations it - Parks and Recreation I Sherando Park 2 Clearbrook Park 3 Future Western Parkland (� 4 Future Eastern Parkland \ County Administration I Gainesboro Convenience Site Relocation I 2 Gore Convenience Site Expansion F. 3 Annex Facility 7 Fie & Rescue Station 4 Round Hill Fire Station Relocation 5 Clearbrook Fire SAion Relocation 6 Fire 8 Rescue Station 23 ,. 727 Airport Library j t Bowman Library - Parking Lot and Sidewalk Addition 2 Northern Frederick County Library Branch 3 Library Branch - Senseny & Greenwood Cam �. 4 Library Branch - Rt522 South 2009-2010 Frederick County Capital Improvements Plan s � 4 h ti °37 Wit` Nw. Crewed by fredwk* County Depwunerr d PW"ng A DevWopmwr May retxeswas the Capital Improvmwit Requests dtt ad,n" by various courry dspsunwrts. 0 12,500 25,000 50,000 75,000 0 2 4 Feet 8 12 Mlles 2009-2010 New School Locations Capital Improvements Plan Existing Elementary Schools Existing High Schools Existing Middle Schools O Nev School Location Alternatives Urban Development Area SWSA Replacement FC MS �ru,br r u�i,u Elem School Elem School Map Created by Frederick County Dept of Planning & Development 11/06/08 N �� S 0 1 2 4 Miles US Middle School I High School School Locations Are Most Appropriate Within the UDA 7 1, r l f '•S � /� /� .. �� ' O raicmw NI f i ' / r 7 r. -� 3 Winchester ,�`' 2009-2010 a Capital Improvement Plan `• + p a -- /'J Transportation Projects 37 "' Y CONTINUE RT37 PLANNING � "ENGINEERING WORK �0 3 -- . I -81 EXIT � " 307 RELOCATION 50 WARRIOR O +F @ TO NEW EXIT EXT ENSION 307 t CHANNING DR p ~ 10 %0 EXTENSION TO RT50 r.. Q RT11 N OF WINC WIDENING TO WV LINE BRUCETOWN RD /HOPEWELL RD 2 ALIGNMENTAND INTERSECTION "��•— ` bphGit� i1�JPb oq.SENSENY RD WIDENING EAST TEVIS EXTENSION TO RDWAY RUSSELL 150 & 181 h INVERLEE WAY; CONNECTION FROM RT50 TO SENSENY RD 7 o� 06 t. ,,, FOX DR; INSTALL RT tk F— letickC— ty Dept of TURN LANE ONTO RT522 +, Planning & De✓elapment d► 107N Kent St RENAISSANCE DR N COTRED RI 22801 } wvw.CD.FRED 06. V.US N 20 O6. 200E Sense ny Rd Bike & a ' Pedestrian Improvements 9 BRUCETOWN RO l l J t I l 1, r l f '•S � /� /� .. �� ' O raicmw NI f i ' / r 7 r. -� 3 Winchester ,�`' 2009-2010 a Capital Improvement Plan `• + p a -- /'J Transportation Projects 37 "' Y CONTINUE RT37 PLANNING � "ENGINEERING WORK �0 3 -- . I -81 EXIT � " 307 RELOCATION 50 WARRIOR O +F @ TO NEW EXIT EXT ENSION 307 t CHANNING DR p ~ 10 %0 EXTENSION TO RT50 r.. Q RT11 N OF WINC WIDENING TO WV LINE BRUCETOWN RD /HOPEWELL RD 2 ALIGNMENTAND INTERSECTION "��•— ` bphGit� i1�JPb oq.SENSENY RD WIDENING EAST TEVIS EXTENSION TO RDWAY RUSSELL 150 & 181 h INVERLEE WAY; CONNECTION FROM RT50 TO SENSENY RD 7 o� 06 t. ,,, FOX DR; INSTALL RT tk F— letickC— ty Dept of TURN LANE ONTO RT522 +, Planning & De✓elapment d► 107N Kent St RENAISSANCE DR N COTRED RI 22801 } wvw.CD.FRED 06. V.US N 20 O6. 200E Sense ny Rd Bike & a ' Pedestrian Improvements 9 11 13 C-) \ � \ / ! ) / 0 \ ƒ f / ) { t } k G G ± & 15 THE CIP TABLE CONTENT DESCRIPTIONS The Capital Improvements Plan table, on the previous pages, contains a list of the capital improvement projects proposed for the ensuing five years. A description of the information in Iffins table is explained below. Department Priority- The priority rating assigned by each agency or department for their requested projects. Project Description - The name of the capital improvement projects. County Contribution- The estimated dollar value that will be contributed for each project. This value is listed by individual fiscal years and by total contributions over the five -year period. The total contribution column, located to the right of the fiscal year columns, does not include debt service projections. Notes- Indicates the footnotes that apply to additional funding sources for particular proj ects. Total Project Costs- The cost for each project, including county allocations and other funding sources. PROJECT FUNDING The projects included in the 2009 -2010 Capital Improvements Plan have a total project cost to the county of $529,554,293 primarily over the next five years. • School projects are funded through a combination of loans from the Virginia Public School Authority and the Virginia Literary Fund. • Funding for Parks and Recreation Department projects will come from the unreserved fund balance of the County. The Parks and Recreation Commission will actively seek grants and private sources of funding for projects not funded by the county. • Airport projects will be funded by contributions from the federal, state, and local governments. The local portion may include contributions from Frederick, Clarke, Shenandoah, and Warren Counties, and the City of Winchester. • The inclusion of transportation projects to the CIP is in no way an indication that Frederick County will be independently undertaking these projects. Funding projects will continue to come from a combination of state and federal funds, developer contributions, and revenue sharing. 17 Frederic County Public Schools Proj Priori List p-,- iRITY 1 Transportation Facility Description: This project involves the site acquisition, approximately 50 acres, and development of a new transportation facility for the public school system. The site will house administration, driver training areas, driver and staff meeting areas, mechanical service and repair bays, inspection bay, wash bay, and fueling bays. Capital Cost: $18,220,000 Justification: The current transportation site has outgrown the current facilities and there is not sufficient area to expand. The increase in student membership, coupled with stringent laws and regulations that govern the operation and maintenance of school transportation vehicles, requires a much larger and upgraded transportation facility. Construction Schedule: Construction will take 24 months. PRIORITY 2 * Bass Hoover Elementary School Renovations Description: Currently, Bass - Hoover serves grades K -5. The building is in good condition, but several major issues need to be addressed. These items will be addressed in two phases. This project represents the first phase. A building addition will be needed in this phase to address the implementation of a full -day kindergarten program in the fall of 2009. In the second phase, a renovation of the remaining facility will be completed. Several of the major issues to be addressed in this renovation include open classroom space, ADA compliance, energy conservation, security, and upgrades of fire alarm, electrical, plumbing, and mechanical systems. Capital Cost: $1,100,000 Justification: These renovations are needed to a number of areas to insure economic and efficient operation of the schools for years to come and to accommodate a full day kindergarten program. Construction Schedule: Begin Construction FY 09 -10 PRIORITY 3 Replacement of Frederick County Middle School Description: The replacement of Frederick County Middle School will have a program capacity of 850 students and serve grades 6 -8. The project location has been requested in the western portion of Frederick County between Route 50 West and Route 522 North in the area of Hayfield Road. It will contain approximately 166,000 square feet of floor area and be located on approximately 35 acres. Capital Cost: $33,992,000 Justification: With the need for renovations at the current school to major mechanical systems, items dealing with ADA compliance, increasing membership, location of the 18 facility, concern for best building configuration for the delivery of instruction, and the connectivity to other department projects. Construction Schedule: Construction will take 36 months. PRIORITY 4 Robert E. Aylor Middle School Renovation Description: This project involves renovations of the current facility. Major areas to be included in the project are additional classroom space and storage space; a complete replacement of fire alarm and communication systems, plus roof replacement; upgrade of electrical and plumbing; and complete replacement of mechanical systems. Capital Cost: $22,000,000 Justification: Robert E. Aylor Middle School is soon to be 37 years of age and renovations are needed to a number of different areas to ensure economic and efficient operation of the school for years to come. Construction Schedule: 48 Months Fourth High School Description: This project consists of the development of a fourth high school serving grades 1 - 1 -12 with a program capacity of 1,250 students. The project location has yet to be determined, but will have a floor area of approximately 242,000 square feet and is to be located on approximately 80 acres of land. Capital Cost: $55,250,000 Justification: This project will address continued growth in student enrollment in the school division over the next five years. It is anticipated that student enrollment will increase at all levels. Student enrollment in the high schools by the fall of 2012 is projected to be 4,257. Construction Schedule: Construction will take 48 months PRIORITY 6* Apple Pie Ridge Elementary School Renovations Description: Currently, the building serves grades K -5. The building is in good condition; however, several major areas need to be addressed. These items will be addressed in two phases. The first phase, kindergarten renovation, was completed this summer. In the second phase, a renovation of the remaining facility will be completed. Several of the major issues to be addressed in this renovation include open classroom space, ADA compliance, energy conservation, security, and upgrades of fire alarm, electrical, plumbing, and mechanical systems. Capital Cost: $TBD 19 Justification: Apple Pie Ridge Elementary School is over 30 years old and renovation is needed to a number of areas to ensure the economical an d efficient operations of the school for years to come. Construction Schedule: Begin Construction FY 11 -12 PRIORITY 7 Frederick County Administrative Office Expansion Description: The facility contains 20,592 square feet, which does not include the 5,000 square foot Annex that is currently being constructed or the seven modular units that have been added to help address the need for additional space. The expansion will address the need for office and meeting space, will take advantage of advances in technology, and will provide mechanical, plumbing and electrical wiring to code. Capital Cost: $14,510,000 Justification: The administrative offices will serve 110 current staff housed in the present Frederick County Public Schools Administration building. Construction Schedule: 24 Months PRIORITY 8 James Wood High School Renovation Description: This project involves renovations of the existing facility. Major areas to be included in the project include increased electrical service and distribution to support technology; technology cabling, hardware, and its installation; upgrade of plumbing and mechanical systems; and modification of instructional areas to support instructional delivery. Capital Cost: $TBD Justification: Updating the facility will assist the school division in meeting the community needs for the citizens and high school student in the James Wood High School attendance zone. Construction Schedule: July 2012 PRIORITY 9* Bass Hoover Elementary School Renovations Description: Currently, the building serves grades K -5. The building is in good condition; however, several major areas need to be addressed. These items will be addressed in two phases. In this second phase, a renovation of the remaining facility will be completed. Several of the major issues to be addressed in this renovation include open classroom space, ADA compliance, energy conservation, security, and upgrades of fire alarm, electrical, plumbing, and mechanical systems. Capital Cost: $TBD 20 Justification: Bass Hoover Elementary School is over 30 years old and renovation is needed to a number of areas to ensure the economical and efficient operations of the school for years to come. Construction Schedule: Begin Construction FY 11 -12, 36 months PRIORITY 10 Fifth Middle School Description: This project consists of the development of a new middle school serving grades 6 -8 with a capacity of 850 students. The project location has yet to be determined but will have a floor area of approximately 166,000 square feet and will be located on approximately 35 acres of land. Capital Cost: $33,992,000 Justification: This project will address continued growth in student enrollment in the school division over the next seven years. It is anticipated that student enrollment will increase at all levels. A projection using cohort migration shows enrollment in the middle schools by the fall of 2015 to be 3,460. Based on this projection, it will be necessary to construct the fifth middle school in Frederick County to open in that time frame. Construction Schedule: Construction will take 48 months. PRIORITY 11 Elementary School 413 Description: This is a single -story elementary school with a floor area of approximately 100,000 square feet located on 15 acres. The facility will be designed to accommodate a student membership of 750. The outdoor facilities will include three pods of grade -level appropriate playground equipment, one asphalt play area, one softball field, and a physical education field. This facility will meet or exceed all Virginia Department of Education's new construction requirements for K -5 elementary schools. Capital Cost: $23,200,000 Justification: This project will address continued growth in student enrollment in the school division over the next six years. It is anticipated that student enrollment will increase at all levels. A projection using cohort migration shows enrollment in the elementary schools by the fall of 2014 to be 6,627. Based on this projection, implementation of full -day kindergarten, and renovations at Apple Pie Ridge and Bass - Hoover Elementary Schools, it will be necessary to construct the 13"' elementary school in Frederick County to open in that time frame. Construction Schedule: Construction will take 36 months. 21 PRIORITY 12 Elementary School 414 Description: This is a single -story elementary schccl with a floor area of approximately 100,000 square feet located on 15 acres. The facility will be designed to accommodate a student membership of 750. The outdoor one facilities ay area, one e s oft all field, and e a appropriate playground equipment, p p physical education field. This facility will meet or exceed all Virginia Department of Education new construction requirements for K -5 elementary schools. Capital Cost: $23,200,000 Justification: Significant residential growth in Frederick County is expected to resume once the economy recovers, with the result that school enrollment is expected to exceed program capacity in FY 2019 -20. Construction Schedule: Construction will take 36 months. Parks & Recreation Department Projec Priority List PRIORITY 1 Indoor Aquatic Facility Description: This facility would house a leisure an d competitive lap sw immin g pool with an office, storage a nd locker rooms. This facility should be located on property owned or proffered to the County and would utilize approximately 8 -12 acres with parking. Capital Cost: $15,163,000 Justification: There are no indoor public pools in Frederick County. By constructing the indoor pool, it would permit the department to meet citizen p demands, provide an instructional facility, as well as provide the area with a facility that would attract new businesses to the community. This facility would be available to all area residents. The construction of this project will provide a facility to offer year round recreational programming for the residents of Frederick County and provide a facility for competitive scholastic programs. Construction Schedule: Completion in FY 09 -10. PRIORITY 2 Baseball Field Lighting Upgrade Description: This project involves upgrading the lighting at both Clearbrook and Sherando Parks Baseball Facilities. The upgrade would involve the removal of the existing fixtures and wooden poles and their replacement with fixtures that meet Little League International Standards on all little league fields. Capital Cost: $1,252,498 22 Justification: This project will provide recreational opportunities for the Clearbrook Park and Sherando Park service area which includes all county residents. Park visitation at the two district parks exceeds 425,000 annually and is growing. Construction Schedule: Completion in FY 09 -10 PPRUIRTTV I Park sand — Western Frederick County Description: Parkland acquisition in the western portion of the county. Capital Cost: $3,367,728 Justification: A new 150 -200 acre regional park would be utilized by the entire county population. This project would reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for the Frederick County service area, as recommended by the Virginia Outdoors Plan. The location of this project would provide parkland to create more accessible recreational facilities to residents in western Frederick County. Construction Schedule: Completion in FY 09 -10 PRIORITY 4 Park hand - Eastern Frederick County Description: Parkland acquisition in the eastern portion of the county. Capital Cost: $4,490,510 Justification: A new 150 -200 acre regional park would be utilized by the entire county population. The park would be located in the primary growth center of Frederick County. This project would reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minim standard for the Frederick County service area, as recommended by the Virginia Outdoors Plan. Construction Schedule: Completion in FY 10 -11. PRIORITY 5 Bike Trail Phase II - Sherando Park Description: 10' bike /pedestrian trail at Sherando Park, north side of Route 277, and running from the existing trail, parallel to Warrior Drive, and joining with the trail at the Old Dominion Greens Subdivision. The design and engineering has been completed for this project. Capital Cost: $462,600 Justification: This facility would provide recreational opportunities for the Sherando Park service area and the entire Frederick County Community. Construction Schedule: Completion in FY 10 -11. 23 PRIORITY 6 Swimming Pool Improvements — SherandoiClearbrook Description: This ving boards and installing � project consists of removing the di water slides at both Sherando and Clearbrook Park. The upgrade would also include the addition of a spray ground with 10 -12 features at each pool. Capital Cost: $1,251,208 Justification: This project is expected to increase pool attendance by 30 percent while providing recreational opportunities for both the Sherando and Clearbrook Park service areas. Construction Schedule: Completion in FY 10 -11. PRIORITY 7 Soccer Complex- Sherando Park Description: This project includes the development of one soccer field (artificial grass); access paths; restrooms; concession; one picnic shelter; a plaza; landscaping; and lighting (one field). Capital Cost: $1,121,998 Justification: This facility will serve the entire county population and will be utilized by the Frederick County School System. Construction Schedule: Completion in FY 10 -11 PRIORITY 8 Maintenance Compound and Office — Sherando Park Description: This project involves the construction of a 1,200 square -foot office and a 4,000 square -foot storage shed for operation at Sherando Park. Capital Cost: $374,310 Justification: This facility will enable the County to maintain equipment and facilities in a more responsible and effective manner. The additional responsibility to maintain the outdoor facilities at Sherando High School, Robinson Learning Center, Armel Elementary, Orchard View Elementary, Bass Hoover Elementary, Middletown Elementary, R.E. Aylor Middle, Admiral Byrd Middle, and Evendale Elementary, increases the need for more storage, maintenance, and office space. Construction Schedule: Completion in FY 11 -12 PRIORITY 9 Open Play Area — Clearbrook Description: This project includes development of a picnic shelter; six horseshoe pits; a volleyball court; croquet turf, shuffleboard; parking; refurbishing the existing concession 24 stand; landscaping (14 shade trees); peripheral work; and renovations to existing shelters, restrooms, access paths, and parking areas on the south side of the lake. Capital Cost: $478,565 Justification: These facilities will provide recreational opportunities for the Clearbrook Park Service Area vOluch will lessen the disparity between the number of passive recreational areas needed to meet the minim standards for this service area. Clearbrook Park offers the best location for this development. Construction Schedule: Completion in FY I 1 -12. PRIORITY 10 Access Road with Parking and Trails- Sherando Park Description: This project involves the development of an entrance and 1,800 linear feet of access roadway from Warrior Drive; a 100 space parking area; and 2.8 miles of trails. Capital Cost: $1,540,626 Justification: This facility will provide recreational opportunities for the Sherando Park service area and the entire Frederick County community. The development of this facility will reduce the needs gap between the number of existing passive recreational areas and the number required to meet the minimum standards established for the service area. Construction Schedule: Completion in FY 11 -12. PRIORITY 11 Lake, Parking, and Trail Development with two Multi- purpose Fields Description: This project involves the development of a 12 acre lake; 1.5 mile trail system around the lake; 800 linear feet of access roadway; lighted parking lot with 125 spaces; and development of two irrigated 70x120 yard multi - purpose fields. Capital Cost: $1,360,610 Justification: This facility will provide recreational opportunities for the Sherando Park service area and the entire Frederick County community. The development of this facility will reduce the needs gap between the number of existing passive recreational areas and the number required to meet the minimum standards established for the service area. Construction Schedule: Completion in FY 11 -12. PRIORITY 12 Skateboard Park - Sherando Park Description: This project recommends the development of a skateboard bowl; a half pipe; an open skate area; vehicle parking; an access road; fencing; and landscaping. Capital Cost: $513,089 25 Justification: This facility will enable the County to provide a recreational facility that has been identified in the County Comprehensive Plan for recreational facility development. Construction Schedule: Completion in FY 12 -13. PRIORITY 13 Softball Complex- Sherando Park Description: This project includes two softball fields; an access road; parking spaces; and landscaping. Capital Cost: $671,062 Justification: This facility would provide recreational opportunities for the entire county population, as well as the Frederick County School System. Presently, there are ten softball and baseball fields within the e of facilit facilitating youth baseball, as well as adult existing fields must serve a dual pure softball programs. With the increased usage of these fields, it has become increasingly difficult to facilitate these programs. This project is needed in order for the Parks and Recreation Department to accommodate the existing demand for youth baseball and adult softball programs. Construction Schedule: Completion in FY 12 -13 PRIORITY 14 TertnisBasketball Complex- Clearbrook Park Description: This project includes the development of four tennis courts; two basketball courts; a shelter; access paths; parking; and landscaping. Capital Cost: $526,355 Justification: These facilities will be available to all county residents. Currently, there are no tennis courts or basketball courts in the Clearbrook Park Service Area. Clearbrook Park is utilized by over 180,000 visitors annually; therefore, these facilities are needed. Construction Schedule: Completion in FY 12 -13 PRIORITY 15 Picnic Area- Sherando Park Description: This project includes a restroom/concession area; four picnic shelters; playground area; access paths; parking; and landscaping. Capital Cost: $804,243 Justification: These facilities would be used by the residents of Sherando Park service area. This area of the county is growing and is deficient in passive recreational opportunities. This development is needed to reduce the gap between the number of existing facilities and the minimum standards for the Sherando Park service area and southeastern Frederick County. Construction Schedule: Completion in FY 13 -14 26 PRIORITY 16 Shelter /Stage Seating- Clearbrook Park Description: This project includes the development of a shelter with a performance stage; refurbishing existing restrooms and access paths; and renovations to the lake. Capital Cost: $508,402 Justification: This facility would be used by the entire county population. Presently, there are no facilities to accommodate cultural programs within the county's park system. This project is needed to provide a facility for cultural activities. Construction Schedule: Completion in FY 13 -14 PRIORITY 17 Multi- Generational Community Center Description: The project involves building a 44,000 square foot facility that would contain an indoor track and at least two basketball courts. The court area would be designed to be used by indoor soccer, baseball, softball, wrestling, volleyball, tennis and badminton. The area could also be used for special events. Additionally, the project would house a fitness center, multi - purpose rooms, office, storage, and locker rooms. Capital Cost: $8,802,605 Justification: This facility would give the Parks and Recreation Department the ability to offer year round recreational programming to the residents of Frederick County. The department can no longer meet the programming and facility needs of the County residents. Construction Schedule: FY 13 -14 Handley Regional Library Proiect Priority List PRIORITY 1 Bowman Library Parking Lot and Sidewalk Extension Description: This proposal is to expand the parking lot on the Lakeside Drive side of the library from 101 to 221 parking spaces, and to provide a sidewalk that will extend approximately 400 to 500 feet beyond the sidewalk that now borders the parking lot to connect to the sidewalk on Lakeside Drive. Capital Cost: $258,028 Justification: The parking lot expansion is needed to relieve overcrowding and to accommodate library patrons. The sidewalk is necessary to provide safe access for pedestrians to the library. Planning consideration for alternative modes of transportation such as bicycle connectivity should also be considered. Construction Schedule: Completion in FY 09 -10 27 PRIORITY 2 Northern Frederick County — Gainesboro Library Branch ng Description: Construction of a 7,000 Th e o 0 Socation rwould on Rtt in�the should be for at least 50 vehicles. proposed Gainesboro district, but this could change depending on patterns of library use in the next 3 to 4 years and on whether donated land could be located. The acquisition of the land of 3 to 4 acres would be in fiscal year 2008/2009. There is disc nion to p made re us e of the the old Gainesboro School as a library branch, but this is Board of Supervisors after further study. Capital Cost: $2,191,696 Justification: Now that the Bowman Library is completed, the residents of Gainesboro district comprise the largest population group that is the most distance from a library within the regional system. The Library will provide materials and programming for nal patrons from toddlers to senior citize f r homework k help since it will be open nights materials. It will be a prime source on weekends when s chool and other office applications ations and library for Intern usage. c ompu t er for word processing There will be a meeting room in which area groups can meet. Construction Schedule: Completion in FY 11/12 PRIORITY 3 Frederick County Library Branch — Senseny /Greenwood Description: Construction of a 10,000 sq. ft. branch library with expansion possible to 15,000 square feet. Initial parking should be for up to 100 vehicles. The proposed location is yet to be determined and is depende t 5 to 8 acres velopment. The first step of the project would be the acquisition of the 1 a Capital Cost: N/A Justification: A library in this area would meet the needs of Frederick County citizens by reducing traffic into Winchester. Parents and other library users will use the library more often if they do not have to come downtown to Handley Library. This area also lacks a community center; a library with a meeting room could help fill this need. The Library will provide materials and programming for patrons from toddlers to senior citizens. It will provide recreational and educational materials. It will be a prime source for homework help since it will be open nights and on weekends when school libraries are closed. The library will supply computer access for word processing and other office applications and for Internet usage. There will be a meeting room of 425 square feet in which area groups can meet. Construction Schedule: TBD M? PRIORITY a Frederick County Library Branch- Route 522 South Description: Construction of a 7,000 sq. ft. branch library with expansion possible to 10,000 square feet. Initial parking should be for up to 35 vehicles. The proposed location is yet to be determined and is dependent on future development. The first step of the project would be the acquisition of the land of 3 to 4 acres. Capital Cost: N/A Justification: This population group is not close to a library in the regional system. This area also lacks a community center that a library with meeting room could help fill this need. The Library will provide materials and programming for patrons from toddlers to senior citizens. It will provide recreational and educational materials. It will be a prime source for homework help since it will be open nights and on .weekends when school libraries are closed. The library will supply computer access for word processing and other office applications and for Internet usage. There will be a meeting room of 425 square feet in which area groups can meet. Construction Schedule: TBD Transportation Committee Proiect Priority List PRIORITY 1 Planning, Engineering, Right of Way and Construction Work for Route 37 Description: This project would be to continue work on the Eastern Route 37 extension. More specifically, to update the Environmental Impact Statement to the point of anew Record of Decision and to update the 1992 design plans to address the current alignment, engineering guidelines, and possible interchange improvements. In addition, this allows for advanced engineering, right of way purchase and construction. Capital Cost: $300,000,000 + Justification: This project moves the County closer to completion of a transportation improvement that would benefit the entire county and surrounding localities. Construction Schedule: TBD PRIORITY 2 Interstate 81, Exit 307 Relocation Description: Construct a relocated Exit 307 interchange. Capital Cost: $60,000,000 Justification: This is a regional transportation improvement that will address congestion in many areas of the County and address coming development to the surrounding areas. Construction Schedule: TBD 29 PRIORITY 3 Warrior Drive Extension Description: Construct a 4 -lane divided roadway beginning at Route 277 where warrior Drive intersects from the north and continuing that roadway south and west to intersect with I -81 at the location of the relocated Exit 307 interchange. Capital Cost: $23,200,000 Justification: This is a regional transportation improvement that will address congestion in the Southern Frederick area and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 4 Channing Drive Extension Description: Construct a 4 -lane divided roadway beginning at Senseny Road where Channing Drive intersects from the north an d continuing that roadway south to intersect with Route 50 East at Independence Drive. Capital Cost: $20,600,000 Justification: This project has been identified in the Eastern Road Plan, and will address congestion in Eastern Frederick County and address development to the surrounding areas. Construction Schedule: TBD PRIORITY 5 Widening of Route 11 North to the West Virginia State Line Description: Improve Route 11 to a divided 4 and 6 -lane facility as detailed in the Eastern Road Plan. Capital Cost: $47,800,000 Justification: This is a regional transportation improvement that will address congestion over a large area of the County and address development to the surrounding area. This project improves the safety for the traveling public by reducing congestion and improving the flow of traffic. Construction Schedule: TBD PRIORITY 6 Brucetown Road/Hopewell Road Alignment and Intersection Improvements Description: Realign Brucetown Road to meet Hopewell Road at Route 11. Improvements to this intersection will address comprehensive planned development's traffic generation in the area. Capital Cost: $3,000,000 30 Justification: This is a transportation improvement that will have significant impact on the Route 11 corridor. The location is identified by joint planning efforts between the county and VDOT. Construction Schedule: TBD PRIORITY 7 Senseny Road Widening Description: Widen Senseny Road to a 4 -lane divided roadway. This project is not dependent upon, but is being coordinated with the implementation of Route 37, Channing Drive, and development in the area. Capital Cost: $22,800,000 Justification: This is a transportation improvement that will have significant impact on Eastern Frederick County. This project is identified in the adopted Eastern Road Plan. Construction Schedule: TBD PRIORITY 8 East Tevis Street Extension Description: Construct a 4 -lane divided roadway beginning at Route 522 and going west approximately 0.2 miles to connect to the road network being constructed by the Russell 150 development. Capital Cost: $2,600,000 Justification: This is a regional transportation improvement that will address congestion in many areas of the County and address development to the surrounding area. The location is as identified by joint planning efforts between the county, VDOT, and the developer. Construction Schedule: TBD PRIORITY 9 Inverlee Way Description: Construct a 4 -lane divided roadway beginning at Senseny Road and going south to Route 50 East. This project is being planned in conjunction with improvements to Senseny Road and surrounding development. Capital Cost: $10,200,000 Justification: This is a regional transportation improvement that will address congestion and provide an additional needed link between Senseny Road and Route 50 East. Construction Schedule: TBD 31 PRIORI IVY 10 Fog Drive Description: Add additional tU -- ning lane(s) to Fox Drive where it intersects with Route 522 North. Capital Cost: $250,000 Justification: This is a transportation improvement that will address congestion at this intersection. Construction Schedule: TBD PRIORITY 11 Renaissance Drive Description: Construct a connector road between Route 11 and Shady Elm Drive. Capital Cost: $2,000,000 Justification: This is a transportation improvement that will address congestion at key points along Route 11 and Apple Valley Dr.. This project is identified in Secondary Road Improvements Plan. Construction Schedule: TBD PRIORITY 12 Revenue Sharing Description: Plan to prepare for future revenue sharing applications. Capital Cost: $3,000,000 Justification: This project is intended to prepare the county for future revenue sharing applications that may or may not include developer contri butions. Construction Schedule: N/A PRIORITY 13 Senseny Road Bicycle and Pedestrian Improvements Description: This project will construct bicycle and pedestrian improvements along Senseny Road from Greenwood Road to the I -81 crossover. Capital Cost: $2,000,000 Justification: This project will improve pedestrian safety along a corridor surrounded by residential development and centered upon the Senseny Road Elementary School. Construction Schedule: N/A 32 PRIORITY 14 Frederick County Eastern Road Plan Description: This project is intended to address all of the planned transportation improvements in the County Comprehensive Plan, Eastern Road Plan that are not noted individually above. Capital Cost: TBD Justification: This project prepares the county for future development by addressing the projects needed to support that development in a manner consistent with the Comprehensive Plan. Construction Schedule: NIA Winchester Regional Airport Project Priority List PRIORITY 1 Rehab R/W 14/32, Upgrade Airfield Lighting Design Description: Design of Runway Rehab and Lighting Upgrade. Capital Cost: $430,000 Local Cost: $8,600 Justification: This design project involves the rehabilitation of runway 14 -32 to renew the life of the existing pavement. Also included is an upgrade to the runway lighting comprised of new high intensity runway lights and the installation of a new four box PAPI, which provides a greater accuracy for pilots on final approach to the runway. Construction Schedule: Completion in FY 09 -10 PRIORITY 2 Land Acquisition — Bufflick Road — Parcel 50 Description: Acquisition of parcel located along Bufflick Road. Property is included in the 20 Year Master Plan. Capital Cost: $325,000 Local Cost: $65,000 Justification: This project is necessary as the identified parcels are located within the Airport's FAR Part 77 primary surface and/or approach surface. In addition, several of the residential parcels are located inside the FAA's projected DNL 65 noise contour. The FAA considers residential use within the noise contour non - compatible with airport operations. Construction Schedule: Completion in FY 09 -10 33 PRIORITY 3 Rehab R/W I4/32, Upgrade Airfield Lighting Construction Description: Construction of Runway Rehab and Lighting Upgrade. Capital Cost: $4,000,000 Local Cost: $80,000 Justification: This construction project involves the rehabilitation of runway 14 -32 to renew the life of the existing pavement. Also included is an upgrade to the runway lighting comprised of new high intensity runway lights and the installation of a new four box PAPI, which provides a greater accuracy for pilots on final approach to the runway. Construction Schedule: Completion in FY 10 -11 PRIORITY 4 North Side Taxiway Connector — Construction Description: A new taxiway connector on the north side of the airport is proposed to increase access to the runway and as part of an overall airport improvement to improve capacity. Capital Cost: $1,250,000 Local Cost: $25,000 Justification: The construction of the north side taxiway will allow for an increase in the number of based aircraft, in business traffic, and additional hanger space for the airport to lease out. Construction Schedule: Completion in FY 10 -11 PRIORITY 5 Taxiway A Relocation — Phase I & H Design and Construction Description: The relocation of Taxiway A is part of the overall Airport upgrade to meet safety design standards for a Group III airport. This relocation will improve the serviceability and safety of the Airport in regards to ground operations for larger aircraft. Due to the complex task of relocating the entire taxiway, the project has been broken down into two phases — Phase I will begin at the 32 approach end and continue to the terminal building midfield. Phase II will continue from the terminal building to the approach end of runway 14. Capital Cost: $24,350,000 Local Cost: $237,000 Justification: The relocation of Taxiway A is necessary to increase the Airport's ability to accommodate larger aircraft. This project also will improve the serviceability of the Airport in regards to ground traffic. Construction Schedule: Completion in FY 10 -11 34 PRIORITY 6 Land Acquisition — Bufflick Road — Parcels 51, & 52 Description: The Winchester Regional Airport Authority proposes to acquire Parcels 51 and 52 on Bufflick Road. These parcels are critical because a portion of each is located within the airport primary surface, and the structures on the property are located closest to the runway. Capital Cost: $585,000 Local Cost: $117,000 Justification: Parcels 51 and 52 lie within the runway's prirnary surface at the Winchester Regional Airport. Structures on the property are also located closed to the runway. The airport has completed all preliminary efforts (i.e. appraisal, surveys, EDDA, etc.) and has made its initial offer along with negotiations and will act to complete this transaction to ultimately improve safety conditions at the airport. Construction Schedule: Completion in FY 10 -11 PRIORITY 7 Terminal Building Renovation, Design Phase Description: The Winchester Regional Airport proposes a complete renovation of the terminal building. This renovation includes interior work (including floor layout), — exterior work (including new windows and walls), and mechanical and electrical system replacement. Capital Cost: $300,000 Local Cost: $300,000 Justification: There are currently 130 based aircraft at the Winchester Regional Airport. The owners and passengers of these aircraft will use the general aviation terminal building on a regular basis. Construction Schedule: Completion in FY 10 -11 PRIORITY 8 Terminal Building Renovation, Phase I Construction (Exterior) Description: This project proposes complete renovation of the terminal building. Phase I of this renovation involves all exterior work, including new windows and walls, and all other items pertaining to the stability of the building. Capital Cost: $3,000,000 Local Cost: $3,000,000 Justification: There are currently 130 based aircraft at the Winchester Regional Airport. The owners and passengers of these aircraft will use the general aviation terminal building on a regular basis. Construction Schedule: Completion in FY 11 -12 35 PRIORITY 9 Terminal Building Renovation, Phase II Construction (Systems) Description: The Winchester Regional Airport proposes a complete renovation of the terminal building. This portion of the renovation includes the installation of new mechanical and electrical systems along with a new HVAC system. Capital Cost: $330,000 Local Cost: $330,000 Justification: There are currently 130 based aircraft at the Winchester Regional Airport. The owners and passengers of these aircraft will use the general aviation terminal building on a regular basis. Construction Schedule: Completion in FY 12 -13 PRIORITY 10 Terminal Building Renovation, Phase III Construction (Interior) Description: The Winchester Regional Airport proposes a complete renovation of the terminal building. This portion of the renovation includes interior work and furnishings for the new terminal building. Capital Cost: $150,000 Local Cost: $150,000 Justification: There are currently 130 based aircraft at the Winchester Regional Airport. The owners and passengers of these aircraft will use the general aviation terminal building on a regular basis. Construction Schedule: Completion in FY 12 -13 PRIORITY 11 Airfield Maintenance Building Description: The Winchester Regional Airport Authority proposes to design an airfield maintenance equipment storage facility and site. This project includes site grading, all building materials, and connection to all necessary utilities. Capital Cost: $580,000 Local Cost: $234,750 Justification: Airfield maintenance equipment is currently stored in an old barn or outside at several locations around the airport. Having equipment spread out creates manpower challenges, and having equipment stored outside accelerates the aging of the equipment. The consolidation of the airport maintenance equipment under one roof will help to improve maintenance storage conditions. Construction Schedule: Completion in FY 10 -11 36 PRIORITY 12 Land Acquisition — Bufflick Road — Parcels 47, 47A, & 48 Descriptioru: The Winchester Regional Airport Authority proposes to acquire Parcels 47, 47A and 48 on Bufflick Road. These parcels are critical because a portion of each is located within the airport primary surface, and the structures on the property are located closest to the runway. Capital Cost: $770,000 Local Cost: $154,000 Justification: Parcels 47 and 47A lie within the runway's primary surface at the Winchester Regional Airport. Structures on the property are also located closed to the runway. The airport has completed all preliminary efforts (i.e. appraisal, surveys, EDDA, etc.) and has made its initial offer along with negotiations and will act to complete this transaction to ultimately improve safety conditions at the airport. Construction Schedule: Completion in FY 11 -12 PRIORITY 13 Land Acquisition — Bufflick Road — Parcels 54 and 68 Description: The Winchester Regional Airport Authority proposes to acquire two additional parcels on Bufflick Road identified on the Airport property map as Parcels 54 and 68. These parcels are critical because a portion of each is located within the airport primary surface, and the structures on the property are located closest to the runway. Capital Cost: $620,000 Local Cost: $124,000 Justification: The two additional parcels on Bufflick Road lie within the runway's primary surface at the Winchester Regional Airport. Structures on the property are also located closed to the runway. The airport has completed all preliminary efforts (i.e. appraisal, surveys, EDDA, etc.) and has made its initial offer along with negotiations and will act to complete this transaction to ultimately improve safety conditions at the airport. Construction Schedule: Completion in FY 12 -13 PRIORITY 14 Land Acquisition — Bufflick Road — Parcels 64 and 65 Description: The Winchester Regional Airport Authority proposes to acquire two additional parcels on Bufflick Road identified on the Airport property map as Parcels 64 and 65. These parcels are critical because a portion of each is located within the airport primary surface, and the structures on the property are located closest to the runway. Capital Cost: $620,000 Local Cost: $124,000 Justification: The two additional parcels on Bufflick Road lie within the runway's primary surface at the Winchester Regional Airport. Structures on the property are also located closed to the runway. The airport has completed all preliminary efforts (i.e. 37 appraisal, surveys, EDDA, etc.) and has made its initial offer along with negotiations and will act to complete this transaction to ultimately improve safety conditions at the airport. Construction Schedule: Completion in FY 14 -15 PRIORITY 15 Land Acquisition — Bufflick Road — Parcels 66 and 67 Description: The Winchester Regional Airport Authority proposes to acquire two additional parcels on Bufflick Road identified on the Airport property map as Parcels 66 and 67. These parcels are critical because a portion of each is located within the airport primary surface, and the structures on the property are located closest to the runway. Capital Cost: $620,000 Local Cost: $124,000 Justification: The two additional parcels on Bufflick Road lie within the runway's primary surface at the Winchester Regional Airport. Structures on the property are also located closed to the runway. The airport has completed all preliminary efforts (i.e. appraisal, surveys, EDDA, etc.) and has made its initial offer along with negotiations and will act to complete this transaction to ultimately improve safety conditions at the airport. Construction Schedule: Completion in FY 13 -14 Count y Ad ministration Proiect Priority List PRIORITY 1 Gainesboro Convenience Site Relocation Description: The relocation of the Gainesboro citizens' convenience site to property located within the Gainesboro community is planned for the 09/10 fiscal year. Remaining design work will be completed during the current fiscal year. A fenced, accessible two - acre site will be constructed along North Frederick Pike in close proximity to the existing site on Old Gainesboro Road. This project will require several months to complete and include fencing, earthwork, a retaining wall, electric, lighting, paving and landscaping. Capital Cost: $462,500 Justification: Approximately 4,000 residents are served by the Gainesboro facility. The refuse site serves a wide geographic area from Gainesboro westward to the Cross Junction, Whitacre and Reynolds Store communities. Construction Schedule: Start in FY 09 -10 PRIORITY 2 Gore Refuse Site Relocation/Expansion Description: The project will expand refuse collection capacity at Gore by installing a surplus trash compactor. With the relocation of the Gainesboro site and purchase of new equipment, there will be an available compactor. Installation of a compactor at Gore will 38 drive down collection costs at the site where trash is now collected in 10 8 -yard boxes. In order to accomplish this, and account for improved traffic flow and the construction of necessary concrete walls, the site will be expanded onto an adjoining parcel already owned by the county. Capital Cost: $435,500 Justification: This project would also provide much - needed capacity during heavy flow times such as weekends and holidays. All 10 containers now on site fill to capacity during Saturday afternoons and during the Sunday shift when up to 189 vehicles visit the facility. A 40 -yard roll -off is placed at the site during the Christmas holidays to provide for increased trash generation. An upgraded site would meet the future solid waste demands of a growing community. Construction Schedule: Start in FY 10 -11 Countv Administration Continued. Fire & Rescue Project Priority List PRIORITY 1 Fire & Rescue Station 422 / Annex Facilities (Route 277) Description: Construct a two bay Fire and Rescue Station with satellite Sheriff s office and County office space for treasure, commissioner of the revenue, and BOS office with meeting room. The station will be located in the area of Fairfax Pike east of White Oak Road to provide service for the heavy growth area east of Stephens City. An approximate three -acre site will be needed to accommodate this facility. The fire station will be approximately a 10,000 sq ft facility to house an engine and ambulance. This facility is specifically identified in the Route 277 Triangle and Urban Center Land Use Plan approved in 2008. Capital Cost: $3,100,000 Justification: The development of satellite offices along major transportation networks and in areas of dense population will provide ease of access for citizens and will improve services to the county. The County continues to experience .a significant rate of growth; therefore, it is important to provide services within these areas instead of requiring citizens to confront congestion, limited parking, and accessibility in the City of Winchester. This facility would facilitate the implement the Route 277 Triangle and Urban Center Land Use Plan approved in 2008. Construction Schedule: Completion in FY 09 -10 PRIORITY 2 Fire & Rescue Station #22 / Apparatus (Route 277) Description: Purchase one (1) custom pumper equipped and one (1) custom Type I Advanced Life Support (A.L.S.) capable ambulance equipped to be assigned to Fire and Rescue Station 22. Capital Cost: $800,000 39 Justification: This fire and rescue apparatus will be assigned to Fire and Rescue Station 22 located on Fairfax Pike East in the Stephens City area of Frederick County. The pumper will be built to N.F.P.A. 1901 specifications and equipped with all of the required and necessary equipment to function as a Class A Pumper. The ambulance will be built to the Federal KKK- A -1822E specifications and equipped with all of the required and necessary equipment to function as an Advanced Life Support ambulance. This fire and rescue apparatus is needed due to the fact that the Fire and Rescue Department currently owns one (1) pumper and one (1) ladder truck that are twenty (20) plus years of age and already assigned to other functions. The currently owned fire and rescue apparatus would not endure the demands placed on it while being assigned to a high call volume station. Construction Schedule: Completion in FY 09 -10 PRIORITY 3 Round Hill Fire and Rescue Station ( #15) Relocation Description: This project includes the relocation and building of a 22,000 square foot facility to accommodate ten or more pieces of emergency equipment and to house living and sleeping areas for staff. A community center of approximately 10,000 square feet, with a capacity of 400 people, is also planned; it would be used for fandraising events and other activities. The project would need a parcel of three to five acres. Capital Cost: $4,608,160 Justification: The existing facility serving the Round Hill area is 50+ years old and not large enough to accommodate the equipment needed to serve the commercial growth in the Round Hill community. This community includes approximately 9,000 households, two schools, and the Winchester Medical Center. Construction Schedule: To be determined PRIORITY 4 Clearbrook Fire Station ( #13) Relocation Description: At the present time the Clear Brook Vol. Fire & Rescue has outgrown the existing building with the equipment on hand, the call volume, the staffing of 24 hour personnel and the traffic at the existing location. We are proposing a new facility to be located on Rt. 11 either North or South of Brucetown Road. The building is to be six (6) drive through bays, administration, eating and sleeping facilities along with a dining hall. The estimated size of the structure is to be approximately 28,000 square feet. This upgrade of the facility will help to provide the needed space for Fire and EMS services for the community of Clear Brook. Capital Cost: $3,240,000 Justification: This project calls for Fire Station #13 to be relocated to an area that has a much safer exit/entrance way. This project will also accommodate the growth in Northeastern Frederick County. The Rt. 11 site also allows for possible growth, if required. Construction Schedule: To be determined 40 PRIORITY 5 Fire &. Rescue Station #23 / New Facility (Crosspointe) Description: This project consists of a 10,000 square foot fire station to accommodate 4 pieces of emergency equipment, and to house living and sleeping areas for staff. This project could also include satellite offices for the Frederick County Sheriff's Office, Treasurers Office, and Commissioner of Revenue as well as a meeting room for County Supervisor meetings with their constituents with an additional 2000 square feet of building area. A two and 1 /2 acre parcel should be sufficient for building, parking and amenities for approximately 20 to 30 persons. The project is located at Crosspointe Center at the end of current Rt.37 South, an area of proposed nigh density residential development, and commercial development. Capital Cost: $3,000,000 Justification: The proposed location at the South end of Route 37 provides for quick and easy access to Interstate 81 North and South at the 310 Exit. Access and response on Rt. 37 will be greatly enhanced from I81 to Route 50 West in the Northbound Lane. Currently Stephens City and Round Hill Volunteer Fire and Rescue Company's serve the area. This location also provides easy access to Rt.I 1 and the Kemstown area along with access to Middle Road and Subdivisions of Brookneil, Stonebrook, and Jackson Woods. These subdivisions have large single family homes in an area of Frederick County outside of the UDA. Water supplies are scarce in these areas and a rapid response from this proposed facility will likely reduce property damage from fire and response times for Medical Emergencies. Major collector roads such as Tasker Road and Warrior Drive along with the proposed extension of Rt. 37 and new roadways in the development will provide quick access to additional homes and businesses in areas including Front Royal Pike, Papermill Road. These roadway construction efforts will provide for an increased level of quality emergency service to the citizens in this entire area. Construction Schedule: To be determined. PRIORITY 6 Fire & Rescue Regional Training Center Description: Construct a Regional Public Safety Training Center potentially consisting of an administrative building, multi -story burn building, multi -story training tower, vehicle driving range, shooting range, and numerous other training props. This project will incorporate emergency medical services, fire, hazardous materials, rescue, law enforcement, industrial, and educational institutions located in Clarke County, Frederick County, Shenandoah County, Warren County, Winchester City, State Agencies, Federal Agencies, and potentially jurisdiction within the State of West Virginia. Capital Cost: $29,075,000 Justification: This project will serve the rapidly growing Northern Shenandoah Valley. One of the main requirements for this project is the aging facilities currently being utilized by Winchester and Frederick County as well as Shenandoah County and the lack of facilities in the other jurisdictions. The need for modern facilities and props to train 41 emergency responders and industrial personnel for response to incidents is becoming more apparent everyday with the increased diversified population, increased number and type of residential complexes, increased number and type of commercial complexes, increased industrial complexes, increased training requirements of emergency services personnel, and mandated requirements for governments throughout the region. Construction Schedule: Completion in FY 10 -11 PRIORITY 7 Capital Equipment Fire & Rescue — Vehicles & Equipment Description: This new project consists of a revolving fund in the amount of $1,000,000 for the benefit of Fire and Rescue Services. It is the intention of this capital expenditure fund to be for the purpose of purchasing additional and replacement capital equipment fire and rescue vehicles and equipment. It was determined that the inclusion of such a project would be beneficial in ensuring that this significant capital expense is identified in the County's capital planning and budget process. This project is primarily for the benefit of the individual Volunteer Fire and Rescue Companies. Please see below for the individual Fire and Rescue Company Capital Equipment Requests which have been added to the CIP in no particular order. Capital Cost: $1,000,000 Justification: The inclusion of this capital expenditure fund for the purpose of purchasing additional and replacement capital equipment fire and rescue vehicles and equipment will enable the County to meet the requirements of the Code of Virginia with regards to the collection and disbursement of cash proffers accepted on behalf of the fire and rescue companies. Construction Schedule: N/A County Administration Continued. I ndividual Fire & Rescue Company Capital Equipm Requests. Stephens City Vol. Fire & Rescue Company Technical Rescue Equipment Acquisition Project Cost: $105,000 Greenwood Vol. Fire & Rescue Company Groundwater Reduction Project Project Cost: $50,000 Ambulance Replacement Project Project Cost: $150,000 Middletown Vol. Fire & Rescue Company Pumper /Tanker Acquisition Project Cost: $552,000 Ambulance Replacement Project Cost: $200,000 42 North Mountain Vol. Fire & Rescue Company North Mountain Fire & Rescue Station iouif cation Project Cost: $32,000 -- Medic Unit Acquisition Project Cost: $159,000 43