Loading...
004-054tiG~ CpG~ C ~.< w ~ RESOLUTION :,;;;~ 2006-2007 SECONDARY ROAD IMPROVEMENT PLAN WHEREAS, the Frederick County Transportation Committee and the Frederick County planning staff reviewed the proposed 2006-2007 Secondary Road Improvement Plan for Frederick County; and, WHEREAS, the Frederick County Transportation Committee recommended approval of this plan on June 7, 2005; and, WHEREAS, the Frederick County Planning Commission held a public hearing and recommended approval of this plan at their meeting on July 6, 2005; and, WHEREAS, the Frederick County Board of Supervisors had previously agreed to assist in the preparation of this plan in accordance with the Virginia Department of Transportation's policies and procedures and. participated in a public hearing on the proposed plan, after being duly advertised so that all citizens of the County had the opportunity to participate in said hearing and to make comments and recommendations concerning the proposed plan and priority list; and, WHEREAS, a representative of the Virginia Department of Transportation appeared before the Board during the public hearing; and, WHEREAS, the Frederick County Board of Supervisors support the priorities of the secondary road improvement projects for programming by the Commonwealth Transportation Board and the Virginia Department of Transportation; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors as follows: The 2006-2007 Secondary Road Improvement Plan appears to be in the best interest of the citizens of Frederick County and the Secondary Road System in Frederick County; and therefore, the Frederick County Board of Supervisors hereby approves the 2006-2007 Secondary Road Improvement Plan for Frederick County, Virginia as presented at the public hearing held on August 10, 2005. This resolution was approved by the following recorded vote: Richard C. Shickle, Chairman Aye Barbara E. Van Osten Aye Gary W. Dove Aye Bill M. Ewing Aye Lynda J. Tyler Aye Gene Fisher Aye Gina A. Forrester Aye A COPY ATTEST John i ey, Jr. Frederick County A inistrator PDR #29-OS Board Resolution No.: 004-05 2006-2007 SECONDARY ROAD IMPROVEMENT PLAN for FREDERICK COUNTY, VIRGINIA DRAFT Frederick County Transportation Committee: Recommended Approval on June 7, 2005 Frederick County Planning Commission: Recommended Approval on July 6, 2005 Frederick County Board of Supervisors: Pending 06/14/05 FREDERICK COUNTY MAJOR ROAD IMPROVEMENT PROJECTS 2006/2007 through 2011/2012 Major road improvement projects command the reconstruction of hardsurfaced roads to enhance public safety. Improvements required for road width, road alignment, road strength, and road gradient are considered major road improvements projects. V J Q ~_ W W Q g ~~ Z Z ~ V p W W W Z ~ Z O ~ t' ~~~ 0 Q F'~ ~ ~ ~Q ~ ~ ~' ~ O ~ W ~,. ~ N y Q ~ a n o ~ ~ ~ ~ ~ o c ~ a W 1) 647 Aylor Road 1.1 mi N of 277 Rt Route 642 7100 1.2 miles OPJSH $3,420,000 01/06 2) 656` Greenwood Road . Route 657 Route 655 4400 1.36 miles SH/RB $4,224,114 UN/SH FePah sieity 3) 655` Sulphur Springs Route 656 Route 50 5100 0.78 miles SH $5,653,395 UN/SH FePats Siety 4) 1520 Road Inverlee Way- 0.45 Mi. N. Route 657 New 0.61 miles SH $1,963,018 UN/SH Feasibility Ph 5) 644 Revenue Sharin Papermill Road Rt. 50 0.60 Mi. W. Route 522 Road 7700 0.60 miles SH $1,000,000 UNlSH ase Feasibility Revenue Sharin Rt. 522 Phase * To be constructed as one project Frederick County Major Road Improvement Projects 2006/2007 thru 2011/2012 3 5 ~/ ---~ ~' ~ ~~~ `,Y ~'~- (~`~ ~_ 1 ~~\ ~~ . ,~~ ~ ~~ N W E S ~i Proposed Major Road Improvement Project ~~~ City /Town Bounday DRAFT 1. Aylor Road -Phase 2 2. Greenwood Road 3. Sulphur Springs Road 4. Inverlee Way (Revenue Sharing) 5. Papermill Rd (Revenue Sharing) 06/14/05 FREDERICK COUNTY HARDSURFACE ROAD IMPROVEMENT PROJECTS 2006/2007 through 2011/2012 Hardsurface road improvement projects provide impervious resurfacing and reconstruction of non-hardsun`aced secondary roads. Hardsurface improvement projects are prioritized by an objective rating system, which considers average daily traffic volumes; occupied structures; physical road conditions including geomefrics, drainage, and accident reports; school bus routing; and the time That project requests have been on the Secondary Road Improvement Plan. U W J ~ Z W F Y W Q Z ~ O ~' N1 'e Z ~ Z ¢ W V ~'~ ~ y~j ~ y tW- Q W ~ Z ~ LL }- t-.~ ~~U y ~N O ~~ H. Wp O Q ~ as o ~a ~ v w Q a 1) 689 Adams Road 2.54 Mi. N. Route 600 110 1.7 miles GA $702,800 10/04 Rural Rustic 600 S Rt N 2) 704 Back Creek Road . . Route 683 . Route 617 160 1.66 miles BC $552,000 03/05 Rural Rustic }) 704 Back Creek Road Route 617 W. VA Line 70 1.68 miles BC $559,000 03/06 Rural Rustic 4) 618 Gough Road Route 622 Route 616 60 1.75 miles BC $581,000 03/07 Pot Ru'stiRural 5) 618 Gough Road Route 616 Route 608 70 1.32 miles BC $445,000 03/08 Pot RulstiRural 6) 705 Ebenezer Church Road 0.25 Mi. E. Route 522 160 4.25 miles GA $1,594,100 UN/SH Potential Rural Rustic Rt. 703 Frederick County Hardsurface Road Improvement Projects Scheduled List 2006/2007 thru 2011/2012 N W E S 1. Adams Road ~Hardsurface Road Improvement Projects (HRI) 2. Back Creek Road -northern portion 3. Back Creek Road -southern portion ~~~ City /Town Bounday DRAFT 4. Gough Road -southern portion 5. Gough Road -northern portion 6. Ebenezer Church Road 06/14/05 FREDERICK COUNTY UNSCHEDULED HARDSURFACE ROAD IMPROVEMENT PR07ECTS RATINGS UPDATED MAY, 2004 (MAY, 2005 -PARTIAL) 2006/2007 threuah 2Ai i /~ni 7 -, - a z w ~ z ~ w~ a~aaZ w Z ~ w~ z ~ ~ ~ ~ O W~O ~ N~ ~ ~ ~ o 1) 709 Ridings Mill Route 636 Route 735 160 2.7 OP 128 Road miles 2) 681 Chestnut Route 805 Route 685 270 1.62 GA 124 Grove Road miles 3) 679 Indian Hollow 0.3 Mi. W. Rt. 0.5 Mi. E. Rt. 600 140 2.5 GA 123 Road 608 miles 4) 629 Laurel Grove Route 622 2.5 Mi. W Rt. 622 180 2.5 BC 113 Road miles 5) 707 Hollow Road W. VA Line Route 610 200 1.6 BC/GA 110 miles 6) 692 Pack Horse 1.2 Mi. NE Rt. Route 671 200 1.4 GA 109 Road 600 miles 7) 629 Carter Lane Route 631 Route 625 290 1.8 BC 106 miles 8) 636 Canterburg Route 640 Route 641 130 1.5 OP 101 Road miles 9) 734 North Sleepy 1.27 Mi. SW 2.27 Mi. SW Rt. 140 1 mile GA 100 Creek Road Rt. 522 N. 522 N. 10) 612 Fishel Road Route 600 Route 600 30 1.6 BC 96 miles 11) 676 Warm 0.83 Mi. N Rt. Route 677 240 0.87 GA 95 S rin s Road 677 mile 12) 733 Fletcher Road Route 50 Route 707 120 1.3 GA 94 West miles 13) 730 Babbs Route 654 Route 677 50 0.9 GA 88 Mountain miles Road 14) 638 Clark Road Route 625 Route 759 70 0.8 BC 88 mile 15) 607 Heishman Route 600 End of State 100 0.78 BC 81 Lane Maintenance mile 16) 695 Middle Fork 2.3 miles W. VA State Line 30 0.9 GA 81 Road north Rt. 522 mile 17) 677 Old Baltimore Route 676 Route 672 200 1.2 GA 80 Road miles 18) 636 Huttle Road Route 709 Route 735 150 1.1 OP 78 miles 19) 644 East Parkins Route 50 East Clarke Co. 260 0.81 SH 75 Mill Road mile 20) 696 South Timber Route 522 Route 694. 130 1.3 GA 73 Rid a Road North miles nti i~ n ins •.i -i Z ~ Z g V ~`~Z Z ~v Z Z ~ ~~ ~ 4 ~ ~ ~ ~_ y~ ~ ~ ~ ~Q ~ 'ate ~ D ~ 21) 671 Woodside Route 669 W. VA State Line 220 0.3 ST 68 Road mile 22) 634 Cougill Road Route 635 Route 11 South 290 0.25 BC 56 mile 23) 811 Timberlakes Route 671 End of State 180 0.25 ST 48 Lane Maintenance mile 06/14/05 FREDERICK COUNTY INCIDENTAL CONSTRUCTION 2006/2007 through 2011/2012 Incidental construction projects are defined as minor construction projects. Examples involve drainage improvements, site distance improvements, spot widening, replacing overtlow pipes with box culverts, and the application of plant mix on existing road surfaces. The Virginia Department of Transportation determines if a proposed project qualifies for Incidental _ L___J __ aL~ ..II n ..i i{.e imnrnvemen} I,VI WU LII.UVII V PAGV vu uic vva. , m, svv v .., .. ....... .~.~... _..-. Z J W N Y F C ~ a W~ Q y a~ W ' ~ yN ~v N~ ~ O ~ ~ U p v Qp w a ~ Q: W p ~ 1) 1323 Park Centre at 0.4 miles East of Rt. 11 R/R Crossing- Improve ST $8,000 2003/04 Federal Drive Surface 10% Funds match 2) 661 Redbud Road 0.45 mile east of Rt. 11 R/R Crossing-Install SW $15,000 2005/06 Federal flashing lights & bells 10% Funds match 3) 620 Singhas Road 0.05 mile south of Rt. 803 R/R Crossing-Install BC $17,500 2005/06 Federal flashing lights 8 10% Funds bells/u rade crossin match 4) 684 Gainesboro 234' southeast of Rt. 522 R/R Crossing-Install GA $17,500 2005/06 Federal Road flashing lights & 10% Funds bells/u rade crossin match 5) 684 Gainesboro 0.20 mile east of Rt. 600 R/R Crossing-Install GA $17,500 2005/06 Federal Road flashing lights & 10% Funds bells/u rade crossin match 6) 672 Brucetown 0.45 mile east of Rt. 11 R/R Crossing-Install SW $15,000 2005106 Federal Road flashing lights & bells 10% Funds match 7) 704 Back Creek From: 0.37 mile south of Improve drainage & BC $85,000 2005/06 Road Rt. 683 widen roadway To: 0.80 mile south of Rt. 683 8) 1054 Westmoreland Frederick Towne Estates Plant Mix OP $140,000 2006/07 Drive 9) 1349 Forrest Drive Battleview Subdivision Plant Mix SW $46,000 2006/07 10) 1326 Confederate Third Battle Subdivision Plant Mix SW $40,000 2006/07 Drive 11) 749 Quarry Lane 0.05 mile southwest of Rt. R/R Crossing-Install SW $13,000 2006/07 Requesting g72 flashing lights & bells 10% Federal match Funds 12) 649 Springdale 0.55 mile west of Rt. 11 R/R Crossing-Install BC $13,000 2006/07 Requesting Road flashing lights & bells 10% Federal match Funds 13) 633 Klines Mill 0.13 miles west of Rt. 11 R/R Crossing-Install BC $19,500 2006/07 Requesting Road flashing lights & bells 10% Federal match Funds 06/14/05 z z ~ a r w ~ ~ ~ z ~ Z ~ a ~~ ° va W p D ~ ~ ~~. w, Q ~~ ~ o a a 'c ~ ~. ~ o ~ w o `~ ~` ~ w W 14) 668 Bransone 0.22 miles SE of Rt. 11 R/R Crossing-Install SW $19,500 2006/07 Requesting Spring Road flashing lights & gates 10% Federal match Funds 15) 727 Belle Grove 0.04 miles west Rt. 624 R/R Crossing-Install BC $19,500 2006/07 Requesting Road flashing lights & bells 10% Federal match Funds 16) 853 Sinking Spring 0.06 miles south Rt. 751 R/R Crossing-Install BC $25,000 2006/07 Requesting Lane flashing lights & 10% Federal gates/improve crossing match Funds 17) 809 Mcfarland 0.02 miles south Rt. 817 R/R Crossing-Install BC $19,500 2006/07 Requesting Road flashing lights & gates 10% Federal match Funds 18) 671 Woodside 0.30 miles east Rt. 11 R/R Crossing-Improve SW $5,500 2006/07 Requesting Road crossing 10% Federal match Funds 19) 704 Back Creek 0.05 miles south Rt. 617 Install Box Culvert BC $95,000 2006/07 Road 20) 704 Back Creek 1.18 miles south Rt. 617 Install Box Culvert BC $80,000 2006/07 Road 21) 1065 Ridgefield Various roads Plant Mix OP $80,000 2007/08 Subdivision 22) 1020 The Meadows Various roads Plant Mix OP $54,000 2007/08 Subdivision COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 FAX: 540/665-6395 MEMORANDUM TO: Frederick County Board of Supervisors FROM: Susan K. Eddy, Senior Plam~er s~ RE: Public Hearing - 2006-2007 Secondary Road Improvement Plan DATE: July 15, 2005 The Frederick County Secondary Road Improvement Plan is a six (6) year transportation plan for all secondary roads in Frederick County. The Secondary Road Plan is divided into the following three categories: Major Road Improvement Projects, Hardsurface Road Improvement Projects, and Incidental Road Improvement Projects. Major road improvement projects include the construction of new roads or the upgrading of existing roads. Hardsurface road improvement projects include the paving of existing Secondary Roads which are unpaved. Incidental road improvements include spot. improvements on existing roads. The process to update the Secondary Road Improvement Plan begins in Frederick County and ends in Richmond. After review by the Frederick County Transportation Committee and Planning Commission, the Board of Supervisors will forward a recommended update to the Virginia Department of Transportation for their consideration. Ultimately, VDOT is responsible for establishing the priority of projects in Frederick County. The Frederick County Transportation Committee reviewed and recommended approval of the attached Draft 2006-2007 Secondary Road Improvement Plan during their meeting held on June 7, 2005. Anew addition this year is the re-routing of Papermill Road, at its southern end, to align with the new Justes Drive. Additions to the list of unscheduled hardsurface road improvement projects include Laurel Grove Road and Babbs Mountain Road. Laurel Grove Road, while not on last year's list, has been on the list in previous years. In addition, the Old Baltimore Road project has been extended to include more of this road. The Planning Commission held a public hearing on the road improvement plans at their meeting of July 6, 2005. There were no citizen comments. Discussion included inquiries about the coordination and working relationship between the MPO (Metropolitan Planning Organization), Frederick County, and VDOT; the availability of funding for projects; and progress towards rail transportation. The Planning Commission unanimously recommended approval of the plan as submitted. (Connnissioners Manuel and Ours were absent from the meeting.) SKE'rsa/attachments 107 North Kent Street, Suite 202 Winchester, Virginia 22601-5000 COUNTY of FREDERICK John R. Riley, Jr. County Administrator 540/665-5666 Fax 540/667-0370 E-mail: jriley @ co.frederick. va.us August 12, 2005 Jerry A. Copp Resident Engineer Virginia Department of Transportation 14031 Old Valley Pike Edinburg, VA 22824 Dear Jerry: The Frederick County Board of Supervisors, meeting in regular session and public hearing held on August 10, 2005, approved the update of the 2006-2007 through 2011- 2012 Frederick County Secondary Road Improvement Plan. Please find enclosed the resolution and the road plan. With kindest regards, I am Sin ely, ;; //f~ ,/John R. Riley, Jr. County Administrator JRR/SKE/bad Enclosure cc: Eric R. Lawrence, Planning and Development Director 107 North Kent Street Winchester, Virginia 22601-5000