1999-2000 SECONDARY ROAD IMPROVEMENT PLAN
WHEREAS, the Transportation Committee and Frederick County planning staff reviewed
the proposed 1999-2000 Secondary Road Improvement Plan for Frederick County: and,
WHEREAS, the Transportation Committee held a public hearing and recommended
unanimous approval of this plan on September 1, 1998; and,
WHEREAS, the Frederick County Planning Commission held a public hearing and
recommended unanimous approval of this plan at their regular meeting on October 7, 1998; and,
WHEREAS, the Frederick County Board of Supervisors had previously agreed to assist
in the preparation of this plan in accordance with the Virginia Department of Transportation policies
and procedures and participated in a public hearing on the proposed plan, as well as the Construction
Priority List on October 26, 1998, after duly advertised so that all citizens of the County had the
opportunity to participate in said hearing and to make comments and recommendations concerning
the proposed plan and priority list; and,
WHEREAS, the Frederick County Board of Supervisors considered this plan with
addendums to the Major Road Improvement Section to include the Jubal Early Drive Extension
Project; and,
WHEREAS, Mr. Jerry Copp, Residency Engineer, Virginia Department ofTransportation,
appeared before the Board and recommended approval of the Six- Year Plan for Secondary Roads
(for 1999-2000 through 2004-2005) and the Construction Priority List for 1999-2000 for Frederick
County.
NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of
Supervisors as follows:
The 1999-2000 Secondary Road Improvement Plan appears to be in the best interest of the
Secondary Roads System in Frederick County and of the citizens residing on the Secondary
System; said Six- Year Plan and Construction Priority List are hereby approved as presented
at the public hearing, as amended.
PDRes. #27-98
This resolution was approved by the following recorded vote:
James L. Longerbeam, Chairman
W. Harrington Smith, Jr.
Charles W. Orndoff, Sr.
A COPY ATTEST
RESOLUTION NO.: 023-98
U:\Carol\Common\SecondaryRoadPlanlm-2000.res
Aye
Aye
Aye
Robert M. Sager
Margaret B. Douglas
Richard C. Shickle
Nay
Aye
Aye
--
FREDERICK COUNIT
SECONDARY ROAD IMPROVEMENT PLAN
MAJOR PROJECTS/ NEW HARD SURFACE/ INCIDENTAL CONSTRUCTION
1999 - 2000
Frederick County Transportation Committee
(Recommendation for approval on September 1, 1998)
Frederick County Planning Commission
(Recommendation for approval on October 7, 1998)
Adopted on . 1998 by the
Frederick County Board of Supervisors
MAJOR ROAD IMPROVEMENT PROJECTS
Major road improvement projects command the reconstruction of hard surfaced roads to enhance
public safety. Improvements required for road width, road alignment, road strength, and road
gradient are considered major road improvement projects.
RANK ROUTE FROM TO ADT DIST MAGIS ADDAT
628 Rt 631 Rt 732 2410 2.41 miles BC Wid. canst.
2 656. Rt. 657 Rt 659 4237 1.01 miles SHlST 10/99
3 Route 37 1.2 miles BC 04/01
4 647 Rt.277 Rt 642 7241 2.08 miles OP 07/03
5 652 Rt 11 Wmchester City 4,571 0.52 miles BC Wid. canst
limits
6 Warrior Rt 277 Rt 642 NA 1.55 miles OP 03/00
Drive. 719
7 608 Rt SOW Rt 616 1527 2.83 miles BC UN/SH
8 659 Rt 820 Rt 7 401 0.2 miles ST UN/SH
9 656 Rt 655 Rt 657 3041 1.39 miles SHlST UN/SH
10 Towns curb and UN/SH
11 Towns curb and UN/SH
12 664 Rt 761 Rt 660 1898 1.1 miles ST UN/SH
13 660 Rt 664 Rt 7E 1268 2.13 miles ST UN/SH
14 622 Ci of Winchester to Rt 37 9192 1.03 miles BC UN/SH
15 600 1.07 miles N Rt 679 to Rt 684 942 1.93 miles GA UN/SH
16 659 Rt 656 Rt 820 401 1.8 miles ST UN/SH
17 657 Ci of Winchester to Rt. 656 9197 1.6 miles SH UN/SH
18 739 Rt.673 Rt522N 2763 1. 66 miles GA UN/SH
19 636 Rt 277 Rt 642 874 1.6 miles OP/SH UN/SH
UN/SH
1999 - 2000 Road Improvement Plan
Page -2-
r
) .
RANK ROUTE FROM TO ADT DIST MAGIS AD.DAT
22 622 Rt 629 Rl37 3211 5.86 miles BC UN/SH
23 657 Rt 656 to Clarke County 4779 2.07 miles ST UN/SH
24 641 Rt 647 Rt 277 2980 0.68 miles OP UN/SH
25 761 Rt IlN Rt 664 2239 1.13 miles ST UN/SH
26 659 Rl7 Rt 656 4524 1.09 miles SHlST UN/SH
27 636 Rt 277 to 1.5 miles south 277 522 1.5 miles OP UN/SH
28 600 Rt 753 Rt614 2075 1.8 miles BC UN/SH
29 655 Rt 50E Rl 656 3176 0.79 miles SH UN/SH
30 642 0.2 miles west RtI070 to Rt103 I 8046 0.9 miles OP/SH UN/SH
31 661 Rt 663 Rt I1N 7229 1.21 miles ST/GA UNISH t
32 628 Rl 621 to Ci of Winchester 2722 1.25 miles BC UN/SH
ABBREVIATIONS AND SYlMBOLS'
ADT - Average Daily Secondary Traffic Tabulation Counts. (1995 Tabulations)
DIST - Distance of total improvement length in miles.
MAGIS - Magisterial District in which road improvement will occur.
AD.DAT - Scheduled Advertisement Date for road improvement project to begin.
656* - hnprovements to Route 656 will include the intersection of Route 656 and Route 659, as well
as the "S" curve leg of Route 656.
** Jubal Early Drive Extension is a joint County/City/State funded project.
1999 - 2000 Road Improvement Plan
Page -3-
HARDSURFACE ROAD IMPROVEMENT PROJECTS
Hardsurface road improvement projects provide impervious resurfacing and reconstruction of non-
hardsurfaced secondary roads. Hardsurface improvements are considered by the Road Rating System
adopted by Frederick County on October 7, 1997.
2
3
695
692
625
1.09 to 2.3 miles north Rt 522
Rt 600 to 1.2 mi. NE Rt 600
unci. const.
Rt 624
Rl 635
83
137
150
1.21 miles
1.2 miles
0.5 miles
GA
GA
BC
und. const.
07/99
ABBREVIATIONS:
ADT - Average Daily Traffic Count. (1995 Tabulations)
DIST - Distance of road segment to be improved.
MAGIS - Magisterial District in which incidental construction will occur.
AD.DAT - Scheduled Advertisement Date for road improvement project to begin.
1'''-
1999 - 2000 Road Improvement Plan
Page -4-
RANK ROUTE FROM TO ADT DIST MAGIS RATING
689 N Rt 600 S Rt. 600 63 4.2 miles GA 90
2 704 Rt 683 WV line 174 3.3 miles Be 86
3 618 Rt 622 Rt 608 92 3.3 miles Be 83
4 679 0.3 miles west Rt 608 to 94 2.5 miles GA 79
0.5 miles east Rt 600
5 676 0.83 mile south Rt671 to 168 0.87 miles GA 75
Rt677
6 692 1.2 mi. NE Rt 600 to Rt 137 1.4 miles GA 73
671
7 734 1.27 miles SW Rt522N to 99 1 mile GA 73 {
2.27 miles SW Rt 522N
8 612 Rt 600 Rt 600 92 1.6 miles Be 67
9 629 Rt631 Rt 625 149 1.8 miles Be 64
10 695 2.3 miles north Rt 522 to 83 0.9 miles GA 62
WV
11 733 Rt SOW Rt 707 61 1.3 miles BC 61
12 607 Rt 600 end State 113 0.78 miles Be 60
Mainten.
13 638 Rt 625 Rt 759 86 0.8 miles BC 60
14 709 Rt 636 Rt. 735 133 2.7 miles OP 59
]5 636 Rt 640 Rt641 46 1.5 miles OP 59
16 636 Rt 709 Rt 735 147 1.1 miles OP 55
17 644 Rt 50E Clarke Co. 69 0.81 miles SH 54
1999 - 2000 Road Improvement Plan
Page -5-
RANK
ROUTE
FROM
TO
ADT
DIST
MAGIS
RATING
19
20
696
836
Rt 522N
Rt 694
81
75
1.3 miles
GA
ST
52
49
21
634
0.8 miles
180
0.25 miles
OP
47
ABBREVIATIONS:
MAGIS - Magisterial District in which incidental construction will occur.
ADT - Average Daily Traffic Count. (1995 Tabulations)
DIST - Distance of road segment to be improved.
RATING - Point total for road segment based on Road Rating System Policy adopted by the Board
of Supervisors on October 7, 1997.
1999 - 2000 Road Improvement Plan
Page -6-
,-';.
" 1
.
. "
INCIDENTAL CONSTRUCTION
Incidental construction projects are defined as minor construction projects that cost less than
$100,000. Examples involve drainage improvements, site distance improvements, spot widening,
repIacing overflow pipes with box culverts, and the application of cold mix on existing road surfaces.
The Virginia Department of Transportation determines if a proposed projects qualifies for Incidental
Construction based on the overall scope of the improvement.
RANK ROUTE FROM TO DESCRlPTION MAGIS FlY
661 Intersection Rt 661/ F -73 2 New Tum Lane; Widen GNST 99/00
Railroad Crossing; Enhance
Si lion
2 T-II02 Rt II to 0.14 Mi. E. WidenlNew Base & Overl OP 99/00
3 688 at 0.02 Mi. W. Rt 684 GA 99/00
4 704 1.27 M S. Rt 632 to 2.5 MS BC 99/00 t
5 600. COlmty wide improvement Install Guardrail N/A 99/00
6 671 0.08 ME. Rt 742 to 0.07 Improve Alignment ST 99/00
MW. Rt 742
7 656 500' N. Rt 659 to 1500' N Install Guardrail ST 99/00
Rt 659
8 631 0,2 ME. Rt 628 to 0.27 ME. Widen Shoulder BC 99/00
9 689 Rt 600 to 1.93 MS. Spot Widen GA 99/00
10 College Park Subd. Improvements 165 Ibs. Plant Mix SH 99/00
11 Wakeland Manor Subd. Improvements 165 Ibs. Plant Mix SH 99/00
12 621 0.90 Mile South Route 50 Rubberized Crossing & BC 00101
Flashing Lights
13 641 FromRte. 636 to 0.15 Mile Realign Road to South to OP 0010 I
E. Rte. 636 Improve Sight Distance
14 661 From Rte. 671 to 0.10 Mile S. Widen Curve to Improve Sight ST 00101
Rte.671 Distance
1.
I999 - 2000 Road Improvement Plan
Page -7-
RANK ROUTE FROM TO DESCRlPTION MAGIS FlY
15 664 0.10 Mile E.Rte.11 Imp. Drainage; ST 00/01
Remove Box
Culverts; Inst Pipe
16 670 At 0.25 Mile S. Rte. 669 Inst Box Culvert to ST 00101
Improve Drainage
17 836 From Rte. 11 to 0.14 Mi. E. Rte. Spot Widen & ST 00/01
II Improve Drainage
18 1054 Fredericktowne Subdivision 165 1bs. Plant Mix OP 00/01
Im rovements
19 692 From 0.91 Mi. S. Rte. 522 to 1.07 Replace Pipe; Inst GA 00/01
Mi. S. Rte. 522 Box Culvert;
Realign Road &
Intersection.
20 600 From 0,28 Mi. N. Rte, 689 to 0.35 Spot Widen to Imp. GA 00/01
Mi. N. Rte. 689 Si t Distance
21 752 From 0.63 Mi. S. Rte 705 to 0.72 Spot Widen GA 00101
Mi. S. Rte. 705
22 608 From 0.02 Mi. E. Rte 618 to 0.08 Spot Widen to Imp. Be 00/01
Mi. E. Rte. 618 Sight Distance
23 600. Install Guard Rail n/a 00/01
ABBREVIATIONS:
MAGIS - Magisterial District in which incidental construction will occur
FlY - Fiscal Year in which incidental construction will occur.
* The number 600 reflects a VDOT project number and is not intended to depict Rt. 600.
Guardrail installation will be along various secondary roads throughout Frederick County as
determined by VDOT.
1999 - 2000 Road Improvement Plan
Page -8-
(..,
NEW ROAD IMPROVEMENT PROJECTS INCORPORATED INTO
1999 - 2000 SECONDARY ROAD IMPROVEMENT PLAN UPDATE
MAJOR ROAD IMPROVEMENT PROJECTS'
No new projects were requested for the 1999 - 2000 update.
(Both Route 621 projects identified on the 1998 - 1999 plan have been removed).]
Jubal Early Drive Extension (Joint County/City/State Project) has been incorporated into the plan.
HARDSURFACE ROAD IMPROVEMENT PROJECTS'
No new projects qualified for the 1999 - 2000 update.
\
INCIDENTAL CONSTRUCTION'
Project # 12: Merrimans Lane (621) - rubberized railroad crossing & flashing lights.
Project # 13: Double Church Road (641) - improve sight distance.
Project # 14: Welltown Pike (661) - improve sight distance.
Project # 15: Stephenson Road (664) - improve drainage.
Project # 16: Ruebuck Lane (670) - improve drainage.
Project # 17: Walters Mill Lane (836) - spot widen and improve drainage.
Project # 18: Apply plant mix throughout the Fredericktowne subdivision as needed to improve
various roads in which pavement failure is a problem.
Project # 19: Chapel Hill Road (692) - improve drainage and sight distance.
Project # 20: Brush Creek Road (600) - improve sight distance.
l
1999 - 2000 Road Improvement Plan
Page -9-
Project # 21: Knob Road (752) - spot widen.
Project # 22: Wardensville Grade (608) - improve sight distance.
Project # 23: Install guardrail - County wide improvement.
ROAD IMPROVEMENT PROJECTS FUNDED UNDER
1998 - 1999 SECONDARY ROAD CONSTRUCTION BUDGET
MAJOR ROAD IMPROVEMENT PROJECTS'
No major road improvement projects were funded from the 1998 - 1999 Road Improvement Plan.
HARDSURF ACE ROAD IMPROVRMENT PROJECTS'
No hardsurface road improvement projects were funded from the 1998 - 1999 Road Improvement
Plan.
INCIDENTAL CONSTRUCTION'
Intersection of Tasker Road (Route 642) and Aylor Road (Route 647) - install new signalization.
Lakeside Subdivision - apply plant mix throughout the as needed to improve various roads in which
pavement failure is a problem.
Pinetop Road (617) - spot widen
Hollow Road (707) - spot widen
Fishel Road (612) - spot widen
Jordan Springs Road (664) - replace pipe culvert with box culvert
Laurel Grove Road (629) - spot widen
Heishmari Lane (607) - spot widen
Back Creek Road (704) - spot widen