Loading...
037-00 BOARD OF SUPERVISORS RAIL PRESERVATION APPLICATION WINCHESTER & WESTERN RAILROAD RESOLUTION WHEREAS, the WINCHESTER & WESTERN RR desires to file an application with the VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION for safety and improvement projects; and WHEREAS, the identified safety projects are estimated to cost $1,650,000 and the improvement projects are estimated to cost $6,229,998.00; and WHEREAS, the 2000 General Assembly has approved funding for the acquisition, lease or improvement of railways within the Rail Industrial Access Program budget; and WHEREAS, the WINCHESTER & WESTERN RR is an important element of the WINCHESTER/FREDERICK COUNTY transportation system; and WHEREAS, the WINCHESTER & WESTERN RR is instrumental in the economic development of the WINCHESTER/FREDERICK COUNTY area, and provides relief to the highway system by transporting freight, and provides an alternate means of transporting commodities; and WHEREAS, FREDERICK COUNTY supports the project and the retention of rail service; and WHEREAS, the COMMONWEALTH TRANSPORTATION BOARD has established procedures for all allocation and distribution of the funds approved by the 2000 General Assembly. NOW, THEREFORE, BE IT RESOLVED that FREDERICK COUNTY does hereby request the VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION to give priority consideration to the projects proposed by the WINCHESTER & WESTERN RR totaling $7,879,998.00 in FREDERICK COUNTY and THE CITY OF WINCHESTER. At a Regular Meeting of the Board of Supervisors for the County of Frederick, Virginia, held on April 12, 2000, upon motion made by Charles W. Orndoff, Sr., seconded by Sidney A. Reyes, the above resolution was approved. The above motion was approved by the following recorded vote: Resolution - \Vinchester & \Vestern Railroad Page 2 Richard C. Shickle Charles W. Orndoff, Sr. W. Harrington Smith, Jr. RESOLUTION NO.: 037-00 Aye Aye Aye Robert M. Sager Aye Aye Aye Margaret B. Douglas Sidney A. Reyes A COPY TESTE: WINCHESTER & WESTERN RAILROAD COMPANY 2001 VIRGINIA RAIL PUSERV ATION FUNDS PROJECTS 'RIDGE REBABILITA nON SAND}MN SUBDIVISION Bridge 17B (C. E.) Install piers, steel, and raise bridge & approaches $275,000 Bridge SA (Hogue Creek) Install piers, steel, and extend length $275,000 Bridge 11 A (Gore Shop) Install piers, steel. cmd raise approaches $ 50,000 Bridge 14A (Clarks) Install piers, steel. and raise approaches $150,000 Bridge 12A (Back Creek) InstQll piers, raise approaches $ 50,000 Bridge 6C (Coonhunters) Install piers, steel, ties, and raise approaches S100,000 Bridge 6B (Millers) Install piers, steel, ties, and raise approaches $100,000 Bridge 6A (McFarlands) Install piers, steel. ties, and raise approaches $100,000 Bridge 5A (Rt 608) Install piers, ties, and raise approaches $ 75,000 WST SUBDIVISION Bridge 107 A (Dunca Run) Concrete $ 10,000 Bridge 108A (Turkey Run) Concrete & steel $ 10,000 Bridge I09A (Clearbrook Run) Concrete & steel $ 10,000 Bridge 113A (Redbud Run) Concrete & steel $ 10,000 Sub-total- S"ndma Sub - WST Sub TOTAL BRIDGE REHAB COSTS: S 1,175,000 40.000 $1,115,000 SANPMAN SUBDIVISION WINCHESTER & WESTERN RAILROAD COMPANY 2001 VIRGINIA RAIL PRESERVATION FUNDS PROJECTS, Cont'd TIE ~PLACEMENT Replace ties from M.P. 0.0 to M. P. 3.2 (CSX-WW Junction to Stuart Perry', Crossing) Labor & Equipment $ 27,000 Materials (1,500 ties) 33,000 $ 60,000 Replace ties from M.P. 5.1 to M. P. 18.2 (Layside Drive to M. P. 18.2) Labor & Equipment $ 90,000 Materials (5,000 ties) 110,000 $ 200,000 WST SUBDIVISION Replace ties from M.P. 114:2 to M. P. 115.31 (S. Shockey switch to End of Line) Labor & Equipment $ 9,000 Materials (400 ties) 8,800 $ 20,000 Replace ties from M.P. 108.7 to M. P. 111.6 (MP 108.7 to Rt. 837 Ebert Road) Labor & Equipment $ 36,000 Materials (2,000 ties) 44,000 $ 80,000 TOTAL TIE REPLACEMENT COSTS.. $ 360,000 RAn. REPLACEMENT Replace curve-worn, bent, and brittle 85 - 100 lb. rail with 115 lb. or larger rail at the following locations: SANDMAN SUBDIVISION 1. MP 0.4toMP 0.75 (0.35 miles) 2. MP 0.9 to MP 6.3 (5.4 miles) 3. MP 6.6 to MP 7.8 (1.2 miles) 4. MP 8.2 to MP 9.0 (0.8 miles) 5. MP 11.9 to MP 13.2 (1.3 miles) 6. MP 15.8 to MP 16.6 (O.S miles) 7. MP 16.9 to MP 1S.2 (1.3 miles) Sandman Rail Replacement: IUS mi.@S186,3oo/mi. S 2,077,245 WST SUBDIVISION 1. MP 106.7 to MP 115.31 (8.61 miles) WST Rail Replacement: 8.61 mi. @ S186,300/mi. $1,604,043 TOTAL RAIL REPLACEMENT COSTS: $ 3,681,288 WINCHESTER & WESTERN RAILROAD COMPANY 2001 VIRGINIA RAIL PRESERVATION FUNDS PROJECTS, Cont'd ROAD CROSSING REPAIRS SANDMAN SUBDIVISION Rt. 11 Valley Avenue - Winchester * Rt. 50 Hayfield - Frederick County""" Rt. 684 Gllinesboro Road (Fire Hall) Rt. 50 Gore - Frederick County * * Rt. ? Sinking Springs Lane (4 tracks) Total crossing repairs. Sandman Sub $ 200,000 200,000 20,000 200,000 80,000 $ 700,000 WST SUBDlflSIOlt{ Rt. 522 Fairmont Avenue - Winchester Rt. 672 - Clearbrook Rt. 11 - Clearbrook Rt. 661 WeUtownRoad $ 300,000 150,000 200,000 300.000 Total crossing repairs. WST Sub $ 950,000 TOTAL ROAD CROSSING REPAIRS ROADWAY SURFACE & ALIGNMENT $ 1.650,000 SANDMAN SUBDIVISION Swface Ballast Alignment $ 35,640 21,200 8,775 $ 65,615 WST SUBDIVISIOlj Surface Ballast Alignment $ 25,870 12,480 4,745 S 43,095 TOTAL SURFACE & ALIGNMENT COSTS $ 108.710 '" 4 Lane City Street ... * 4 Lane Divided Highway WINCHESTER & WESTERN RAILROAD COMPANY 2001 VIRGINIA RAIL PRESERV A nON FUNDS PROJECTS, Cont'd SWITCH REHAB SANDMAN SUBDIVISION UPGRADE. O'Sullivan (Calendar) m 0.4 $ 5,000 REPLACE. O'Sullivan (plastic) Stuart Perry's Round Hill Gainesboro Top Gainesboro Bottom Gore Yard (4 switches) CED Minerals 0.5 3.2 4.2 11.9 12.5 17.4 17.8 30,000 30,000 30,000 30,000 30,000 120,000 30,000 BUILD - 2 new with runaround @ Gore~ remove WV main switch & siding 1 00,000 WST SUBDIVISION UPGRADE. Butler W. S. Frey Zuckerman World Color (Century) Crown Cives Steel 107.4 108.7 111.6 113.15 113.4 113.8 $ 5,000 5,000 5,000 5,000 5,000 5,000 30,000 30,000 180,000 30,000 60,000 100,000 REPLACE - Clearbrook N. Stephenson Shockey Yard (6) Glaize National Fruit (2) 109.1 112.9 114.0 114.9 115.1 BUll..D. 2 new with runaround @ Winchester TOTAL SWITCH REHAB COSTS $ 865,000 SUMMARY OF COSTS BRIDGE REHAB TIE REPLACEMENT RAIL REPLACEMENT ROAD CROSSINGS SURFACE &: ALIGNMENT SWITCH REHAB $ 1,215,000.00 360,000.00 3,681,288.00 1,650,000.00 108,710.00 865.000.00 TOTAL COSTS $ 7,879,998.00