Loading...
040-01 BOARD OF SUPERVISORS RAIL PRESERVATION APPLICATION WINCHESTER & WESTERN RAILROAD RESOLUTION WHEREAS, the WINCHESTER & WESTERN RR desires to file an application with the VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION for safety and improvement projects; and WHEREAS, the identified improvement projects are estimated to cost $6,537,808.00; and WHEREAS, the 2001 General Assembly has approved funding for the acquisition, lease or improvement of railways within the Rail Industrial Access Program budget; and WHEREAS, the WINCHESTER & WESTERN RR is an important element of the WINCHESTER/FREDERICK COUNTY transportation system; and WHEREAS, the WINCHESTER & WESTERN RR is instrumental in the economic development of the WINCHESTER/FREDERICK COUNTY area, and provides relief to the highway system by transporting freight, and provides an alternate means of transporting commodities; and WHEREAS, FREDERICK COUNTY supports the project and the retention of rail service; and WHEREAS, the COMMONWEALTH TRANSPORTATION BOARD has established procedures for all allocation and distribution of the funds approved by the 2001 General Assembly. NOW, THEREFORE, BE IT RESOLVED that FREDERICK COUNTY does hereby request the VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION to give priority consideration to the projects proposed by the WINCHESTER & WESTERN RR totaling $6,537,808.00 in FREDERICK COUNTY and THE CITY OF WINCHESTER. At a Regular Meeting of the Board of Supervisors for the County of Frederick, Virginia, held on April 11,2001, upon motion made by Charles W. Orndoff, Sr. and seconded by Sidney A. Reyes, the above resolution was approved by the following recorded vote: - Resolution - Winchester & Western Railroad April 11, 2001 Page 2 Richard C. Shickle Charles W. Orndoff, Sr. W. Harrington Smith, Jr. RESOLUTION NO.: 040-01 C:ITJPlresolutionsIFY2000-2001IRllilroadMtr. wpd Aye Aye Aye Robert M. Sager Margaret B. Douglas Sidney A. Reyes Aye Aye Aye A COPY TESTE: ---- -----~----~-~-~~-~---~----_..._--_._._-_._-- . ... _._--~----------_._-^ ^ . , WINCBES+ER.-&-~RAIl.ROAD-Com~ 2002 VIRGINIA RAIL PRESERV A nON FUNDS PROJECTS BRIDGE-REW Ru.IL\..TION SANDMAN SUBDIVISION Bridge 17 A (Gore Shop) Install steel and headwalls~and raise approaches $ 50,.000 Bridge 14A (Clarks) Repair headwalls and raise approaches $50.000 Bridge 12A (Back Creek) Repair headwal1s. andcais.e. approaches... 15.Q,.000 Bridge 6C (Coonhunters) Install piers~ steel and ties....and raise approaches $100.000 Bridge 6B (Millers) Install piers. steel and ties.. and raise approaches $100.000 Bridge 6A (McFarlands) Install piers. steel and ties~and raise approaches $100,000 WST SUBDIVISION ~}O-7A (Dunca-R~n) Concrete repairs $ 20",000 Bridge 108A (Turkey Run) Concrete & steel repairs $ 20,000 Bridge 109A (Clearbrook Run) Concrete & steel repairs $ 20,.000 Bridge I13A (Redbud Run) Concrete & steel repairs S 20,000 Sub-total- Sandman Sub-Division - WST ~nM,sia4- TOTAL BRIDGE REHAB COSTS: $ 450,000 80.0~0 $530.0 0 lnella -- - -----_._--~--------------_._.- .' ... .,., I WINCHESTER & WESTERN RAILROAD COMPANY 2001 VIRGINIA RAIL PRESERV A nON FUNDS PROJECTS, Cont'd TTF. RF.PJ .AC'F.MF.NT SANDMAN- SffBDIVl-SK{lf: Replace ties from M.P. 0,0 to M. P. 3.2 (CSX-WW Junction to Stuart Perry's Crossin~) Labor & Equipment $ 27,000 Materials. (1,.500 ties) 'n 000.. $. 60..000 Replace ties from M.P. 5.1 to M. P. 18.2 (Layside Drive to M. P. 18.2) Labor & Equipment $. 54,.000 Materials (3,000 ties) 66.000 $ 120,000 wsrSfIRnTVT.WnN Replace ties from M.P. 106.7 toM_P _108.0 (WV Line to VARt.668) Labor & Equipment $ 18,000 Materials (1~OOO ties). n 000 $. 40..000 Replace ties from M.P. 108.7 to M. P. 115.3 (MP 108.7 to End of Line) Labor & Equipment $ 72,000 Materials (2,000 ties) 88.000 160.000 TOTAL TIE REPLACEMENT. COSTS: ! 180.000 I RAIL REPLACEMENT Replace curve-worn, bent, and brittle 85 - 100 lb. rail with 115 lb. or larger rail at the. fallowmglocations: SANDMAN SUBDIVISION 1. MP 0.4 to MP 0.75 (0.35 miles) 2-Me 0.9 to MP 6.3 (SA mil9s) 3. MP 6.6 to MP 7.8 (1.2 miles) 4. MP 11.9 to MP 13.2 (1.3 miles) 5. MP 15.9 to MP 16.6 (0.7 miles) 6_Me L7.ltoMP 17.6 (Q5.mil~s) 7. MP 17.8 to MP 18.2 (0.4 miles) Sandman Rail Replacement: 9.85 mi. @ $186,300/mi. = $ 1,835,055 WST SUBDIVISION 1. MP 106.7 to MP 115:31 (8.61 miles) WST Rail Replacement: 8.61 mi. @ $186.300/mi. = $ 1.604.043 I 'FOTAL RAIL REPLACEMENT COSTS: $ 3.439.098 1b ~ ". WINCHESTER & WESTERN RATT.ROAD COMPANY 2001 VIRGINIA RAIL PRESERVATION FUNDS PROJECTS, Cont'd ROAD CROSSING REPAffiS SANDMAN SUBDLVISlqN Rt. 11 Valley Avenue - Winchester * Rt. 50 Hayfield - Frederick County ** Rt. 684 Gainesboro Road (Fire. Hall).. Rt. 50 Gore - Frederick County ** Rt. 853 Sinking Springs Lane (4 tracks) Total crossing repairs - Sandman Sub WSTSUJ1D1Y1SI{)N Rt. 522 Fairmont Avenue. - Winchester Rt. 672 - Clearbrook R1.. U - C1earbrook. Total crossing repairs - WST Sub TOTAL ROAD CROSSING REPAIRS ROADW A Y SURFACE & ALIGNMENT I SANDMAN SUBDIVISION Surface. Ballast ,Alignment $ 15,.6..40 21,200 8r'Z7 5 WST SUBDIVISION SllrfJl~'" Ballast Alignment 1. 25,.&,70 12,480 4,]45 TOTAL SURFACE & ALIGNMENT COSTS * 4 Lane City Street ** 4 Lane.Divide.d..Highway ic $ 200.000 200,000 20,000 200,000 80.000 I $ 700,000 $ 300,000 150,000 200_0pO $ 650,000 $ 65,615 $ 43,095 $ 108.710 $ 1.350.000 I ~ -. '. WINCBES-'t:E-R-&-WES+E-RN-RAll.ROAD-COMPANY 2001 VIRGINIA RAIL PRESERVATION FUNDS PROJECTS, Cont'd SW1.'tCll R.EIIAB SANDMAN SUBDIVISION UPGKA"DE - O'Sullivan (Catendarj REPLACE - O'Sullivan (Plastic) Stuart Perry's Round Hill Gainesboro Top Gainesboro Bottom Gore. Yard (4 switches.).. WST SUBDIVISION UPc;RADE.- Butler W. S. Frey ZIIr.lcerm:m Crown Cives. Steel REPLACE - Clearbrook N. Stephenson. Shockey Yard (6) G.laize. National Fruit (2) ~ $ 5,000 0.5 12... 4.2 11.9 12.5 L7_4 30,000 30>000 30,000 30,000 30,000 t20 >000 L07A 108.7 LlL6- 113.4 LlJ...8... $. 5>000 5,000 5 >000 5,000 5>000 109.1 Ll2-9 114.0 Uti 115.1 30,000 30..000 180,000 30..000 60,000 BUll..D - ,2 new with runaround@ Winchester vic.MP 114 100.000 I TOTAL SWITCH REHAB COSTS BRIDGE-REHAB. TIE REPLACEMENT RAn. REPLACEMENT. ROAD CROSSINGS SURE'ACE& ALIGNMENT SWITCH REHAB TOTAL COSTS lJ $ 730.000 SUMMARY: Oli' COSTS S- 530.000 380,000 3..439,il?8 1,350,000 10~.0 730.000 $ 6.537.808 ----~-------_._--_._--_._._-- .. WINCHESTER & WESTERN RAILROAD COMPANY Virginia Division 126 E. Piccadilly Slreet Win"h...'"r. VA. 2260l 540-662-2600 COCpDEaLe.. QJJia- 258 Elm Street Ncw-r~n~"n cr. 068.40 203-%6-8880 Ne.w Je.cse.)l Division P. O. Box 1024 Rri<lutnn, Nl 08~02 856-451-6400 March.. 2L 20.0 1 Plan for Achievinl!. CJas8-I and Oass n Track Safety Standards Class I Safety Standards will be achieved by July 2001 assuming present funding levels are maintained.. . Class II Safety Standards could be achieved as soon as July 2002 if enough funding is made available to complete all items on this application, although additional funds to put larger rail through road cross~ as they are upgraded,... would..Jla~e..Iater. expend itllr9' . . Please call with any further questions on this matter. l'REl'ARJi/J. a't; Mio;:hael A, Glascofk Roadmaster Virginil1 Division Winchester & Western RR I net 2.