018-01
2002-2003 SECONDARY ROAD IMPROVEMENT PLAN
WHEREAS, the Transportation Committee and Frederick County planning staffreviewed
the proposed 2002-2003 Secondary Road Improvement PIan for Frederick County; and,
WHEREAS, the Transportation Committee recommended unanimous approval of this plan
on October 2, 200 1; and,
WHEREAS, the Frederick County Planning Commission held a public hearing and
recommended unanimous approval of this plan at their regular meeting on November 7,2001; and,
WHEREAS, the Frederick County Board of Supervisors had previously agreed to assist
in the preparation of this plan in accordance with the Vuginia Department of Transportation policies
and procedures and participated in a public hearing on the proposed plan, as well as the Construction
Priority List on November 14, 2001, after duly advertised so that all citizens of the County had the
opportunity to participate in said hearing and to make comments and recommendations concerning
the proposed plan and priority list; and,
WHEREAS, Mr. JerryCopp, Residency Engineer, VrrginiaDepartment ofTransportation,
appeared before the Board and recommended approval of the Six- Year Plan for Secondary Roads
(for 2002-2003 through 2007-2008) and the Construction Priority List for 2002-2003 for Frederick
County.
WHEREAS, the Frederick County Board of Supervisors considered and approved this
plan on November 14, 2001; and.
NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of
Supervisors as follows:
The 2002-2003 Secondary Road Improvement Plan appears to be in the best interest of the
Secondary Roads System in Frederick County and of the citizens residing on the Secondary
Roads System; said Six- Year Plan and Construction Priority List are hereby approved as
presented at the public hearing, as amended.
PDRes. #2S-O I
This resolution was approved by the following recorded vote:
Richard C. Shickle, Chairman
~
Sidney A. Reyes
MJL
W. Harrington Smith, Jr.
Aye
Margaret B. Douglas
Aye
Charles W. Orndoff, Sr.
Aye
Robert M. Sager
Aye
A COpy ATIEST
~-
J . Riley, Jr.
Frederick County Administrator
BD. OF SUPERVISORS RESOLUTION NO.: 018-01
A;\S.c111112-2l103....."Il'I
FREDERICK COUNTY
SECONDARY ROAD IMPROVEMENT PLAN
MAJOR PROJECTSI NEW HARD SURFACEI INCIDENTAL CONSTRUCTION
2002 - 2003
Frederick County Transportation Committee
(Recommendation for approval on October 2,2(01)
Frederick County Planning Commi!lJi:ton
(Recommendation for approval on November 7, 2(01)
Adopted on November 14, 200] by the
Frederick County Board of Supervisors
MAJOR ROAD IMPROVEMENT PROJECTS
2002/2003 through 2007/2008
Major road improvement projects command the reconstrnction of hardsurfaced roads to enhance public safety.
[mprovements required for road width, road alignment, road strength, and road gradient are considered major road
improvements projects.
656 Roule 657 Route 659 4237 1.01 miles RB 8.200.000 Under Const.
2) 647 Route 277 Route 642 7241 2.08 miles OP/SH 5.400,000 12/03
3) 719. Roule 277 Route 642 n/a 1.55 miles OP Revenue Sharing 03/02
Warrior Dr. Fund
4) 656' Route 657 Route 655 2,934 1.36 miles SHlRB 7,072,000 UN/SH
5) 655' Route 656 Route 50 4,282 0.78 miles SH 5,056,000 UN/SH
'. * To be constructed as one project
UNSCHEDULED
MAJOR ROAD IMPROVEMENT PROJECTS
2002/2003 through 2007/2008
608 Route 50 West Route 616 1527 2.83 miles BC
659 Route 820 Route 7 401 0.2 mile RB
Towns curb and gutter improvements for the Town of Stephens Clty
Towns curb and gutter improvements for the Town of Middletown
664 Route 761 Route 660 1898 1.1 miles ST
660 Route 664 Route 7 East 1268 2.13 miles ST
622 Winch. City Limits Route 37 9192 1.03 miles SH
600 1.07 Mi. N Rte. 679 Route 684 942 1.93 miles GA
659 Route 656 Route 820 401 1.8 miles RB
657 Winch. City Limits Route 656 9197 1.6 miles SHlRB
739 Route 673 Route 522 North 2763 1.66 miles GAlST
636 Route 277 Route 642 874 1.6 miles OPISH
644 Winch. City Limits Route 522 South 4835 1.36 miles SH
661 Route 11 North Route 660 397 3.24 miles ST
622 Route 629 Route 37 3211 5.86 miles BC
657 Route 656 Clarke Co. Line 4779 2.07 miles RB
641 Route 647 Route 277 2980 0.68 mile OP
761 Route 11 North Route 664 2239 1,13 miles ST
659 Route 7 Route 656 4524 1.09 miles RB
636 Route 277 1.5 Mi. S. Rte. 522 1.5 mUes OP
277
621 Route 1109 Route 628 1080 0.57 mUe BC
600 Route 753 Route 614 2075 1.8 miles BC
642 0.2 Mi. W. Rte1070 Route 1031 8046 0.9 mile SH
661 Route 683 Route 11 North 7729 1.21 miles ST
628 Route 621 Winch. Clty Umits 2722 1.25 miles BClSH
627 Interstate 81 Route 11 South 5187 0.49 mile Be
704 Route 751 Route 683 282 4.11 miles BC
The order of unscheduled major road improvement projects was established based on the year that the specific project
request was received by Frederick County. This order will be maintained until arrobjective rating system is approved by
the Frederick County Board of Supervisors
HARDSURFACE ROAD IMPROVEMENT PROJECTS
2002/2003 through 2007/2008
Hardsurface road improvement projects provide imperoious resurfacing and reconstruction of non-hardsurfaced
secondory roads. Hardsurface improvement projects are prioritized by an objective rating system which
considers average doily traffic volumes; occupied structures; physical road conditions including geometries,
drainage, and accident reports; school bus routing; and the time that project requests have been on the
Secondory Road Improvement Plan.
633 Route 625 Route 11 South 91 1.4 miles BC 726.831 Under
Construction
2)
629 0.27 Mi. E. Rl 622 1.15 Mi. E. Rte. 622 98 1.05 miles BC 724.454 09/01
3A)
689 Route 600 S. 2.30 Mi. N. Rl 600 S. 100 2.3 miles GA 1,662.400 08103
38) 689 2.54 Mi.N. Rl. 660 S. Route 600 N. 100 1.7 miles GA 914,024 07/04
4)
704 Rl.683 W. VAline 174 3.30 miles BC 2,600,000 UN/SH
UNSCHEDULED
HARDSURFACE ROAD IMPROVEMENT PROJECTS
2002/2003 through 2007/2008
".'
>
...~ ?i
~>
I "
,,> . > ... ..... .' ......
1) 618 Route 622 Route 608 90 3.3 miles BC 92
2) 705 0.25 Mi. E. Rl. 703 Rt. 522 120 4.25 miles GA 81
3) 679 0.3 Mi. W. Rt. 608 0.5 Mi. E. Rt. 600 90 2.5 miles GA 79
4) 692 1.2 Mi. N.E. Rte. Rt. 671 230 1.4 miles GA 77
600
5) 734 1.27 Mi. SW Rt. 522 2.27 Mi. SW Rl. 522 N 80 1 mile GA 76
N.
6) 709 Rl.636 Rt. 735 130 2.7 miles OP 75
7) 612 Route 600 Route 600 51 1.6 miles BC 71
8) 676 0.83 Mi. S. Rte. 677 Rt. 677 240 0.87 mile GA 71
9) 629 Rt. 631 Rt.625 150 1.8 miles BC 70
10) 636 Route 640 Route 641 150 1.5 miles OP 70
11 ) 707 W. VA line Rt. 610 90 1.6 miles BC/GA 69
12) 607 Route 600 End of State Maint. 110 0.78 mile BC 69
13) 681 Route 805 Route 685 100 1.62 miles GA 63
14) 695 2.3 miles north Rt. WV State line 83 0.9 miles GA 62
522
15) 644 Rt. 50E Clarke Co. 260 0.81 miles SH 60
16) 733 Rt. 50W Rt. 707 60 1.3 miles GA 59
17) 836 Route 11 North End of State 80 0.8 mile ST 59
Maintenance
18) 638 Route 625 Route 759 70 0.8 mile Be 57
19) 636 Route 709 Route 735 50 1.1 miles OP 57
20) 671 Route 669 WV State line 170 0.3 mile ST 57
21) 696 Route 522 North Route 694 100 1.3 miles GA 55
22) 811 Route 671 to End of State 240 0.25 mile ST 51
Maintenance
23) 634 Route 635 Route 11 South 260 0.25 mile BC 50
INCIDENTAL CONSTRUCTION
2002/2003 through 2007/2008
Incidental construction projects are defined as minor construction projects including drainage
improvements, site distance improvements, spot widening, replacing overflow pipes with box
culverts, and the application of plant mix on existing road surfaces. The Virginia Department of
Transportation determines if a proposed project qualifies for Incidental Construction based on the
overall sco e of the im rovement.
1) $10,170-10%
Match
2) 621 Previously Funded R1R Crossing - Install Flashing Lights SH $10,040 - 10% 2000/01
Match
3) 661 0.10 Mi. N. Rt.ll R1R Crossing - Install Flashing Lights ST $12,000 - 10% 1999/00
Match
4) 600 From: 0.98 Mi. N Rte. 685 Widen slope and shoulder to improve GA $35,000 2001/02
To: 1.08 Mi. N. Rte. 685 si ht distance
5) 608 At 0.04 Mi. N. Rte. 616 Replace bridge BC $100,000 2001/02
6) 645 From: 0.78 Mi. E. Rte. 728 Construct bridge and approaches SH $104,500 2001/02
To: 0.85 Mi. E. Rte. 728
7) 660 From: Int. Rte. 661 Widen slope to improve sight distance ST $12,000 2001/02
To: 0.02 Mi. N. Rte. 661
8) 671 From: 1.30 Mi. N. Rte. 690 Widen curve to improve sight distance GA $30,000 2001/02
To: 1.38 Mi. N. Rte. 690
9) 672 From: 0.11 Mi.W.Rte663 Lower vertical curve to improve sight ST $100,000 2001/02
To: 0.19 Mi. W. Rte. 663 distance - .Construction Com lete
10) 752 From: Int. Rte. 705 Widen to improve alignment GA $40,000 2001/02
To: 0.15 Mi. S. Rte. 705
11) 803 At 0.25 Mi. SW Rte. 50 Widen box culvert and shoulders BClGA $20,000 2001/02
12) 1160 Greenbriar Subdivision Plant mix SH $200,000 2001/02
1m rovements
13) 672 0.05 M. W. Rt.11 ST $12,500 2001/02
10% Match
14) 638 0.10 M. W. Rt. 11 Be $8,500- 2002103
10% Match
15) 657 Intersection of n9, 807, & 1201 Widen bridge, construct turn lanes SH/RB $50,000 - 2002/03
10% Match
16) 657 Intersection of 1265 & 1228 Construct turn lanes SH/RB $50,000 - 2002103
10% Match
17) 641 From: 0.02 Mi. N. Rt. 636E Improve drainage & widen shoulder OP $22,000 2002/03
To: Rt. 636W
18) 636 From: 0.53 Mi. W Rt. 641 Widen slope OP $30,000 2002/03
To: 0.60 Mi. W Rt. 641
19) 671 From: 0.49 Mi. E Rt. 739 Widen curve ST $35,000 2002103
To: 0.54 Mi. E Rt. 739
20) 660 From: 1.00 Mi. S Rt. 664 Install guardrail ST $5,000 2002103
To: 1.04 Mi. S. Rt. 664
21) 660 From: 0.66 Mi. S Rt. 664 Install guardrail ST $8,000 2002103
To: 0.70 Mi. S Rt. 664
22) 660 From: 1.07 Mi. S Rt. 664 Install guardrail ST $10.000 2002/03
To: 1.11 Mi.SRt.664
~3) 739 From: 0.38 Mi. S Rt. 672 Install guardrail both sides STlGA $19,000 2002103
To: 0.45 Mi. S Rt. 672
24) 739 From: 0.50 Mi. S Rt. 672 Install guardrail STlGA $13,000 2002/03
To: 0.63 Mi. S Rt. 672
25) 654 From: 0.21 Mi. S Rt. 671 Install guardrail GA $16,000 2002/03
To: 0.24 Mi. S Rt. 671
26) 645 From: 0.05 Mi. W. Rt. 50 Road widening SH $30,000 2002103
To: 0.2 Mi. W. Rt. 50
27) 600 From: 0.05 Mi. SRI. 608S Widen slope to improve sight distance GA $21,700 2002/03
To: 0.05 Mi. N Rt. 608S
28) 600 From: 1.15 Mi. S Rt. 693 Widen slope and shoulder both sides GA $45,000 2002/03
To: 1.42 Mi. S Rt. 693
29) 1049 The Pines Subdivision Plant Mix OP $100.000 2002/03
Improvements
30) 1225 Frederick Heights Subdivision Plant Mix RB $100,000 2002103
Improvements
31) 783 From: 0.15 Mi. S. of City Limits Widen Pavement Industrial Access - ST $70,000 2002/03
To: 1322 Kent Street
32) 600 County-wide Improvement Install guardrail at various locations N/A 40,000 2003/04
33) 684 0.2 E. Rt. 600 R1R erossing - Flashing Lights, & GA $12,500 -10% 2003/04
Surface Match
34) 684 0.5 S. Rt. 522 R1R erossing - Flashing Lights & GA $12,500 -10% 2003/04
Surface Match
35) 672 0.45 E. Rt. 11 R1R Crossing Flashing Lights & Bell ST $8,500 - 10% 2003/04
Match
36) 1200 Int. of Rt. 1322 Traffic Light ST $12.000 -10% 2003/04
Match
37) 764 0.5 W. Rt.11 Replace Pipe w/ Box Culvert ST $75,000 2003/04
38) 627 0.02 M. W.I-81 Turn Lane Into Carolyn Avenue at BC $75,000 2003/04
Middletown
39) 661 Rt. 11 To RR Tracks Turn Lane ST $75,000 2003/04
40) 636 From: 0.5 Mi. N. Rt. 641 Spot Improvements OP $100,000 2003/04
To: 2 Mi. N. Rt. 641 .
41) 831 Burning Knolls Subdivision Plant Mix RB $80,000 2003/04
42) 1251 Brentwood Terrace Plant Mix RB $70,000 2003/04
43) 1201, Fairway Estates Plant Mix SH $50,000 2003/04
44) 618 From: 2.09 Mi. S. Rt. 608 Widen eurve BC $30,000 2003/04
To: 2.12 Mi. S. Rt. 608
45) 654 From: 0.11 Mi. N. Rt. 679 Regrade Slope GA $30,000 2003/04
To: 0.16 MI.N. Rt. 679
46) 647 0.1 Mi. N. of Rt. 277 Curb & Gutter OP $10,000 2003/04
47) 707 From: Rt. 733 Spot Improvements - Two locations BClGA $60,000 2003/04
To: West Viroinia Stale Line
COUNTY of FREDERICK
Department or Planning and Development
5401665.565 I
FAX: 540/665-6395
MEMORANDUM I
TO:
Frederick County Board of Supervisors
FROM:
Evan A. Wyatt, Planning Director ~
2002-2003 Secondary Road Improvement Plan
RE:
^'
DATE:
November 8, 200 1
. .
~~~~,,'?"'- "'-:-: "".. """', ......... v->>....~~> ""'x<<'-"'x........... .,;.. <<"y. ;.; ":-.'" ~~.._~;.;-:>v...'<<<<< :-:-;-:-:'" <<"":<<<<->> x_~ ~ ':-.~""""'N..y 0<< "''''' ""'''.'VN
~, "'" ~."
The Frederick County Secondary Road Improvement Plan is updated annually in the talI through a
public hearing process involving reviews by the Transportation Committee, the Planning Commission
and the Board of Supervisors. The adopted plan is submitted to the Vttginia Department of
Transportation (VDOT) Edinburg Residency who in turn develop cost estimates and advertisement
dates for road improvement projects within the County. Allocations for major road improvement
projects, hard surface improvement projects and incidental construction projects are provided based
on priority.
The Frederick County Transportation Committee considered the draft update during their October
2,2001 meeting. No citizens addressed the committee during this meeting and a recommendation
was forwarded to approve the draft 2002-2003 Secondary Road Improvement Plan as presented by
staff. The Frederick County Planning Commission considered the draft update during their
November 7,2001 meeting. No citizens addressed the commission during this meeting; however,
Commissioner Unger advised staff that a citizen had requested that the segment of Cedar Creek
Grade (Route 622) between Route 37 and Laurel Grove Road (Route 629) be moved up in priority
on the Major Road Improvement section of the plan. The Planning Commission recommended
unanimous approval of the draft 2002-2003 Secondary Road Improvement Plan as presented by staff.
Please find attached a draft update for the 2002-2003 Frederick County Secondary Road
Improvement Plan. A summary of the modifications from the previous Secondary Road Improvement
Plan is also included for infonnation. Staff requests that the Board of Supervisors consider this plan
for final resolution. The approved 2002-2003 Frederick County Secondary Road Improvement Plan
will be fOlwarded to the (VDOT) Edinburg Residency for funding allocations.
AI1G01.1OO__.__--.....
107 North Kent Street. Winchester, Virginia 22601-501Ht
200212003 SECONDARY ROAD PLAN UPDATE SUMMARY
Major Road Imorovement Proiects
. Rt. 669 (Exit 323) bridge Preliminary Engineering - Removed From Plan
Warrior Drive project - Ad Date Revised From 03/0 I to 03/02
. No revisions to the Unscheduled Project section
Hardsunace Road Imorovement Proiects
Klines Mill complete but on plan to allow VDOT to charge to project line
. Adams Road split into two projects to allow southern segment to begin while right-of-way
is accomplished in northern section
. Unscheduled projects were rerated and reprioritized to reflect new project request for the
unpaved segment of Chestnut Grove Road (Ri. 681)
Incidental Construction Proiects
.
Item #32 is a continuation of the program to install guardrail at various locations throughout
the county
.
Projects #33 - #47 are new to the plan
.
Several of these projects involve the overlay of existing subdivision streets with plant mix,
including Burning Knolls, Brentwood Terrace and Fairway Estates
General
. All projects have been reviewed to ensure confonnity with new magisterial diltrict lines
A:UCm..... ..b.7~\. . 1'......